This is a Performance Work Statement for preventative maintenance and repair services of gym equipment at Marine Corps Recruit Depot (MCRD) Walker Hall Sports Medicine Facility in San Diego, California. The facility serves rehabilitation and reconditioning of injured recruits and Marines with various musculoskeletal injuries.
The contractor must provide qualified technicians, labor, supervision, tools, materials, equipment, and transportation to maintain gym equipment in operational condition. Monthly routine preventative maintenance includes general maintenance, lubrication, cleaning, adjustments, inspections, and performance testing of all equipment, covering chains, springs, zirk fittings, weight guides, brush dust cleaning, belt tension adjustment, vacuuming, hardware tightening, treadmill belt tracking, and related tasks. Repairs are performed as needed and coordinated by the Technical Point of Contact (TPOC), addressing non-functioning equipment and damage to internal or external parts including chains, springs, cables, upholstery, bearings, belts, electrical components, and alternators. The contractor excludes repairs for damage due to negligence, abuse, unauthorized modifications, and unauthorized service work, as well as detergent and daily routine maintenance per equipment manuals. On-site service is provided during normal working hours (0700-1530, Monday through Friday), with advance coordination required for evenings, weekends, and holidays. The contractor must respond within 24 business hours to unscheduled repair requests. All work is warranted against defects in workmanship, materials, and parts for one year from final acceptance or until the next service interval, whichever is shorter, excluding damage from misuse, tampering, or fire. Service tickets documenting all work must be completed and signed by the TPOC (Melissa Mahoney) or Fiscal Point of Contact (Taylor Nava). Over-and-above work requires Contracting Officer authorization in advance, with estimates prepared within five calendar days under routine conditions or two hours for emergency work, including detailed material lists, labor hours, and travel time calculations. For materials exceeding $2,500, the contractor must provide quotations from three suppliers, with parts supplied at contractor cost without markup. Work is performed at Walker Hall, building 573, MCRD San Diego, and the contractor is responsible for off-base disposal of operational materials in compliance with federal, state, and local laws.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION: DoD COMMUNITY ONLY
Performance Work Statement
Marine Corps Recruit Depot (MCRD)
Walker Hall Gym Equipment Preventative Maintenance (PM)
1.0 Background
1.1 The Marine Corps Recruit Depot (MCRD), San Diego, CA Walker Hall Sports Medicine Facility is used for rehabilitation and reconditioning of injured recruits and Marines. Walker Hall contains various types of gym equipment that help with prevention, evaluation, treatment and rehabilitation of
Musculoskeletal injury(ies) sustained by recruits, drill instructors and officers within the Recruit Training
Regiment. In order to keep the equipment properly functioning, preventative maintenance and repair are required.
2.0 Scope
2.1 The purpose of this contract is to provide full PM/repair service of the gym equipment in support of Walker
Hall Sports Medicine Facility located aboard Marine Corps Recruit Depot San Diego California . The equipment must be maintained at the proper safety levels required to ensure the equipment is fully functional and operational.
3.0 Requirement/Task
3.1 The contractor must provide qualified technicians, all labor, supervision, tools, materials, extra equipment and transportation necessary to maintain the gym equipment in working condition as follows:
3.2 Maintenance / Repairs Service Coverage:
3.2.1 Maintenance shall be performed on a monthly routine basis to prevent failure or breakdown of equipment (See “Walker Hall Gym Equipment List”). Maintenance includes general maintenance, lubricating, cleaning, adjustments, inspections, and performance testing of all equipment. This includes but is not limited to cleaning of chains and springs, lubrication of chains, springs, zirk fittings, weight guides, cleaning of alternator brush dust, adjustment of belt tension, vacuuming, cleaning, inspecting, testing, tightening of hardware, crank arms, tracking of treadmill belts, wiping the inner shrouds and vacuuming beneath the machines.
3.2.2 Repairs handled as needed and coordinated by Technical Point of Contact (TPOC). Repairs are defined as repairing a piece of equipment that is not functioning properly. This includes repairs done on equipment that has been damaged such as damage to internal or external parts. This would include, however, not limited to broken chains, springs, cables, ripped slipcovers or upholstery, failure of bearings, belts, electrical components, wires, power cords, alternators, bottom brackets, and noisy components.
3.2.3 Maintenance Exclusions: Repair of damaged parts due to negligence and abuse of the equipment.
Also repairs and adjustments to correct unauthorized modifications or unauthorized service work. Does not include detergent and daily routine maintenance as specified in equipment maintenance manual.
4.0 Service Ticket
4.1 All Services performed under this contract shall be accomplished and followed by a service ticket submission which shall contain the following information:
Name of Contractor
Date of Service
Contract Number
Description of service/repair performed model and serial number
Physical Location
Description of recommended repairs
Anticipated end-of-life, if applicable
4.2 The technician will ensure that a service ticket is completed at the end of each visit and signed off by the technical point of contact Melissa Mahoney or the Fiscal point of contact Taylor Nava.
5.0 Unscheduled Maintenance Response Time
5.1 When the TPOC notifies the contractor that repair service is needed, the contractor will contact the TPOC within 24 business hours to schedule a service call for a day/time agreeable to the TPOC and contractor.
6.0 Working Hours for Service
6.1 On-site service/repair will be provided during normal working hours 0700-1530, Monday through Friday.
6.2 Contractor shall coordinate the routine schedule and work that must be done on evenings, weekends, or holidays in advance with the TPOC indicated below in paragraph 12.
6.3 Discontinuance of Service: The Government may discontinue maintenance service, in whole or in part, for any of the listed equipment upon thirty days’ notice to the contractor, if agreed to by the contractor at no additional cost to the Government.
7.0 Federal Holidays
New Year’s Day Martin Luther King Jr Birthday
Presidents Day Memorial Day
Independence Day Labor Day
Columbus Day Veterans Day
Thanksgiving Day Christmas Day
Juneteenth Day
8.0 WARRANTY The Contractor shall perform all service, repair, and calibration work in accordance with manufacturers’ specifications and applicable certification standards including OSHA, NIOSH, MSHA, and
NFPA requirements.
8.1 All work performed under this contract shall be warranted against defects in workmanship, materials, and parts under normal operating conditions for one (1) year from final acceptance by the Technical Point of
Contact (TPOC), or until the next required service interval if shorter. The warranty does not apply to damage resulting from misuse, tampering, fire damage, or normal wear and tear. Determination of warranty exceptions shall be made at the discretion of the Contracting Officer.
8.2 Units requiring calibration shall be marked to indicate evidence of tampering. If recalibration is required during the warranty period and is not the result of a warranty exception, the Contractor shall recalibrate and return the unit to the Government at no cost. Recalibration required due to misuse, tampering, fire damage, or normal wear shall be performed under the applicable Over-and-Above repair CLINs.
8.3 The TPOC shall notify the Contractor and Contracting Officer in writing within ten (10) days of discovering any defect or failure. The Contractor shall correct the defect at no cost to the Government within a reasonable time after notification. If the Contractor fails to do so, the Government reserves the right to repair, replace, or otherwise remedy the defect at the Contractor’s expense.
9.0 Location of Work
9.1 All work shall be performed at the Walker Sports Medicine Facility at Walker Hall, building 573, Marine
Corps Recruit epot, San Diego, CA.
10. OVER AND ABOVE WORK.
10.1 The Contractor shall provide all items necessary such as labor, transportation, equipment, tools, supervision, management, quality control, testing equipment, materials, and parts required to perform over and above work repair, modification or replacement of equipment, parts, etc. in a timely manner. The Contractor shall substantiate the need for over and above work by describing the conditions that warrant the repair and why minor repair measures accomplished as part of regular maintenance will not su ffice. The Contractor shall report the need for over and above work repairs to the COR.
10.2 General Requirements and Procedures for Over and Above work. As described in DFARS Clause
252.217-7028, Over and Above Work authorizes the Contractor to perform repairs on identified equipment that is outside of the standard inspection requirements to ensure equipment is sustained in good working order in accordance with manufacturer’s instructions. Work performed under this requirement will be billed under the
Over and Above Work line item identified for each year’s period of performance.
10.3 Response Time. The Contractor shall notify the COR within one (1) hour for emergency work or by 8:00
A.M. the following workday if other than emergency work and provide a description of the work with an estimate showing labor hours and material/parts. Each estimate shall be prepared by the Contractor and forwarded within five (5) calendar days of receipt of the request under routine conditions, and within two (2) hours under emergency conditions.
10.4 Authority to Performance Over and Above Work. The Contracting Officer is the only person(s) with authority to authorize the Contractor to proceed with the work in accordance with the over and above work portion of the contract and work will be negotia ted and approved in advance for each work request. All work requests will be ordered and approved in writing. The Government may elect not to make repairs but instead replace items. Replacement items may be acquired either from the Contractor or from any other source determined to be advantageous to the Government.
10.5 Estimate, Preparation and Evaluation
a. The preparation of estimates is included in the price of the firm fixed-price portion of the contract.
b. Following equipment inspection, or if requested by the COR, the Contractor shall provide a written work estimate that will include the following minimum information:
(1) Contractor name and address.
(2) Contract number
(3) Date inspection was performed/call placed.
(4) Itemized list of parts required to perform repair, including quantity and price for each item.
(5) Estimated number of labor hours required to complete repairs.
(6) Number of hours charged for travel if the repair is not part of the scheduled maintenance inspection.
c. Materials and Parts.
(1) Material price and parts shall be the lowest price available considering the availability of materials and the time constraints of the job. It shall include any discounts and/or rebates received by the Contractor.
Parts shall be provided to the Government at the Contractor’s cost without mark up.
(2) The Contractor shall provide quotations from three suppliers of the required materials exceeding
$2,500.00 per parts/material.
d. Estimate Evaluation. The Contractor’s estimate will be evaluated to determine if:
(1) The scope has been clearly and accurately identified.
(2) The number of labor hours has been accurately estimated.
(3) The cost of materials and parts is reasonable and properly documented. The material and parts shall include a detailed estimate of materials including such items as the name of the part, manufacturer of the part, the part number, the size, quality, quantity (number of units) and the unit p rices.
(4) The estimated lead-time for the delivery of the part to the Contractor is included.
(5) The Contractor shall state the actual time it will take to perform the work from commencement to completion.
(6) The detailed estimate will be used to negotiate over and above work repairs and award of a firm fixed price modification to the contract. The Contractor shall not assume that a modification will be issued and shall not order materials or proceed with any work until receipt of the modification.
11.0 Technical Point of Contact
11.1 The TPOC will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems within the scope of this Performance Work
Statement. The Technical Representative will provide technical clarification and assistance in support of the contract requirements. The Technical Representative DOES NOT have the authority to make changes and/or give directions under this contract. The only authority under this contract authorized to make changes, give direction, and/or provide monetary adjustments is the Contracting Officer from the Regional Contracting Office
MCI-WEST, Camp Pendleton CA.
A. TPOC Contact information: Information will be provided at time of award
Name:
Title:
Email:
Phone Number:
12.0 Contracting Officer’s Authority
12.1 The Contracting Officer is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely in the Contracting Officer (Reference Block 31 on the SF1449). In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and solely at the risk of the contractor.
13.0 Equipment List
13.1 See attachment titled “Walker Hall Gym Equipment List”
14.0 Disposal
14.1 The Contractor shall provide for off base disposal of materials which result from the Contractor's operations in accordance with Federal, state, and local law and regulation. The Contractor shall not handle or dispose of any hazardous substances or wastes in a manner which would permit their release into the environment. Hazardous waste shall be captured and recycled or disposed of in conformance with all applicable local, state and Federal laws and regulations.
File details come from the government source that posted it. Updated .