Virginia Peak
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENTUNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Existing Cabinet VICINITY MAP
Directions to Virginia Peak
From Reno Field Office –1340 Financial Blvd, Reno, NV 89502
1. Head northeast on Financial Blvd toward Wall St 0.3 mi
2. Turn right onto Mill St 0.2 mi
3. Use any lane to turn left onto NV-659/S McCarran Blvd 1.7 mi
4. Turn left onto E Victorian Ave 0.8 mi
5. Turn right onto NV-445 N/Pyramid Way 18.5 mi
6. Turn right onto Iron Wood 4.9 mi
7. Turn right onto Amy Rd 0.4 mi
8. Turn left onto Wilcox Ranch Rd 2.4 mi
9. Turn left onto Quaking Aspen Rd 3.4 mi
10. Slight left onto Microwave Rd 4.6 mi
11. Turn right to stay on Microwave Rd 1.5 mi (existing site on left. New location is up the hill)
Degrees Minutes Seconds Decimal
Latitude: 39° 45' 19.9794" N Latitude: 39.75555 N Longitude: 119° 27' 40.464" W Longitude: 119.46124 W Elevation: 8346 ft. AMSL
Soil Resistivity Testing Layout
External Grounding Layout
Title Sheet
Facility Layout Plan
Soil Resistivity Testing Report
T1
A1
E1
E3
TITLESHEET NO. DWG. NO.
SHEET INDEX
01/28/2021
01/28/2021
01/28/2021
01/28/2021
01/28/2021
Revision Date
AREA REFERENCE MAP
SYMBOL
INTERSTATE HIGHWAY
U.S. HIGHWAY
STATE HIGHWAY
DESCRIPTIONSYMBOL
STATE CAPITOL
FACILITY LOCATION
BLM FIELD OFFICE
DESCRIPTION
Cabinet Layout3 A2 01/28/2021
/2 /2
T1 1 6
D
IS
TR
IC
T
ST
A T
E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
D
IS
TR
IC
T
ST
A T
E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T R o b e rt
G a
N u n
C ar so n
C it y D is tr ic t
N e v ad a
V
IR
G
IN
IA
P
E A
K
/2 /2
T1 1 6
D
IS
TR
IC
T
ST
A T
E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T R o b e rt
G a
N u n
C ar so n
C it y D is tr ic t
N e v ad a
V
IR
G
IN
IA
P
E A
K
Carson City
District Office
/2 /2
A1 2 6
E
D
C
B
A
E
D
C
B
A
654321 654321
E
D
C
B
A
E
D
C
B
A
654321 654321
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
R o b e rt
G a
N u n
C ar so n
C it y D is tr ic t
N ev ad a
V
IR
G
IN
IA
P
E A
K
Facility Layout
Virginia Peak
1" = 80'
0 48 80 1600 48 80 160 N
New Location for
PEPRO Cabinet
39° 45' 19.9794" N 119° 27' 40.464" W
Current
Location
PEPRO
Cabinet
(use existing)
/2 /2
A2 3 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
T e d
S u m n e rs
N ev ad a
V
IR
G
IN
IA
P
E A
K
C ar so n
C it y D is tr ic t
1/2" = 1'
0 0 1 2.7 2 0.5 4 10 0 1 2.7 2 0.5 4 1
N
654321 654321
654321 654321
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
/2 /2
A2 3 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T T e d
S u m n e rs
N ev ad a
V
IR
G
IN
IA
P
E A
K
C ar so n
C it y D is tr ic t
1/2" = 1'
0 0 1 2.7 2 0.5 4 1
N
654321
654321
E
D
C
B
A
E
D
C
B
A
Cabinet Layout
39.0°
= to Lat
To TGBTo TGB
Tower Ground Bus Bar (TGB)
Rack Ground Bus Bar (RGB)
Pass-Through Bus Bar at Electrical Entrance
RF Cable Entrance
20-Foot Articulating Mast
Electrical Entrance Box
Concrete Pedestal with UFER (x4)
E q u ip m e n t E q u ip m e n t
SOLAR PANEL INSTALLATION
SOLAR PANEL GROUNDING
EQUIPMENT GROUNDING (TYPICAL)
Rack Ground Bus Bar (RGB)
#6 AWG, Stranded Green-Jacketed Grounding Conductors Using Single-Hole UL 467 Listed Connectors
Duplexer
18 Repeater
18 Battery Shelf
RGB Grounded to Pass-Through Bar with #2 AWG, Green-Jacketed Grounding Conductor Using Two-Hole UL 467 Listed Connectors
Tower Ground Bus Bar (TGB)
RF Cable Entrance
Exhaust
Air Intake
Ballast Plates
UFER Ground Pads
1- Bay Micro Cabinet
20-Foot Articulating Mast
Exhaust
Air Intake
Electrical Entrance Box
UL 1449 Surge Protection (x2)
100 Amp Filters (x4)
Wiring Entry
Pass-Through Bus Bar
Ground Each Solar Panel and Frame
Soil Resistivity Testing Report
5 10 15 20 Testing Notes
Meter Readings Ω Ω Ω Ω
1 of 2 23 26 N/A 6.7
2 of 2 22 25 N/A 6.4
Soil Resistivity Calculations
5 10 15 20 p = (Ω-cm) p = (Ω-cm) p = (Ω-cm) p = (Ω-cm)
1 of 2 22,023 49,790 N/A 25,661
2 of 2 21,065 47,875 N/A 24,512
Enter Highest Amount (Worst Case) 49,790
Grounding Enhancement Material (GEM) 85%
Calculation with GEM 42,322
Test Completed By
Date
Client/Project
Site Location Name /ID
Ground Resistance Tester
Model:
Serial Number:
Calibration Date:
Soil Description
Ambient Conditions
Top Soil Temperature:
Present Conditions (dry, rain, snow):
Date of last precipitation:
Min Average Max
590 2370 7000
340 4060 16,300
1020 15,800 135,000
59,000 94,000 458,000
NOTES
GEM Can lower the soil resistivity between 15 and
30 % depending on how much is used
TEST DATA
Test Location Spacing (Test Depth) Feet p= 191.5 x A x R p= soil reisistivity in Ω-cm
A = Distance betw een test rods (in feet)
R = Resistance obtained from tester
Test Location
Conversion to (Ω-cm) - AUTO CALCULATION
Same, with varying proportions of sand and gravel
Gravel, sand, stones with little clay or loam
Dry
Two Weeks
Typical Soil Descriptions
Ashes, cinders, brine, waste
Clay, shale, gumbo, loam
GRT300
1989519
Typical Resistivity (approx.), Ω-cm
Testing completed at multiple depths in three separate directions across the existing radio facility. 10-foot Depth shall be used for grounding system design based on 30-inch deep trench with ground rod driven vertically with 6 inches extending above trench bottom.
The highest soil resistance tested at 10-foot measuring 49,790
(Ω-cm), shall be used as a basis for adding additional ground rods to obtain a 25 Ohm or less final resistance to ground of the grounding system.
Single ground resistance is calculated at 136 Ohms. The use of ten 10-foot long, 3/4-inch diameter ground rods is required to achieve 21.2 Ohms 90 Deg. Fahrenheit
90 Deg. Fahrenheit
Robert GaNun
07/20/20
Bureau of Land ManagementT
Virginia Peak
Gravel, sand, stones with little clay or loam
4/27/2020
Extech
4 6
/2 /2
E1 5 6
654321 654321
E
D
C
B
A
E
D
C
B
A
654321 654321
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
R o b e rt
G a
N u n
C ar so n
C it y D is tr ic t
N ev ad a
V
IR
G
IN
IA
P
E A
K
Soil Resistivity Testing Layout
Virginia Peak
3/16" = 1'
N
New Location for Pepro Cabinet
39° 45' 19.9794" N 119° 27' 40.464" W
Highest Soil Resistivity Measurement: = 49,790 Ω-cm
Calculated Single Ground Rod Resistance: = 160 Ω
Grounding System Maximum Resistance: = 25 Ω
Quantity of Ground Rods Required: = 10 Ea.
Calculated Grounding System Resistance: = 21.2 Ω
With use of Grounding Enhancement Material
10 ft. Long, ¾-in. Diameter, Copper Clad Steel
Ground Rod Spacing: = 10 ft.
0 ft. 3 ft. 5 ft. 10 ft.0 ft. 3 ft. 5 ft. 10 ft.
5 ft.
10 ft.
20 ft
Each Test Line Measured at 5, 10 and 20-foot Depths
E
D
C
B
A
E
D
C
B
A
/2 /2
E3 6 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
R o b e rt
G a
N u n
N ev ad a
V
IR
G
IN
IA
P
E A
K
C ar so n
C it y D is tr ic t
¼” = 1'
0 ft. 3 ft. 5 ft. 10 ft.0 ft. 3 ft. 5 ft. 10 ft.
N
/2 /2
E3 6 6
O R
G U
N
IT
ST
A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T R o b e rt
G a
N u n
N ev ad a
V
IR
G
IN
IA
P
E A
K
C ar so n
C it y D is tr ic t
¼” = 1'
0 ft. 3 ft. 5 ft. 10 ft.
N
654321 654321
654321 654321
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
E
D
C
B
A
1 1
1B1B
Ground Rod - ¾ in. Diameter 10 ft. Long Installed Horizontally Spaced 10 ft. Apart On Center (x10)
5 #2 AWG, Bare, Solid, Tinned Copper Grounding Conductor
Shelter Ground Ring #2 AWG, Bare, Solid, Tinned Copper Grounding Conductor
1B Concrete Encased Electrode Bonded to Ground Ring
20 Ground Solar Panel and Frame to TGB
3 Tower Ground Bus Bar (TGB)
Ground Ring – Ten (10) 10 ft. long x 3/4 in. Diameter Rods = 21.2 Ohms
GROUNDING SYSTEM CALCULATIONS
Soil Resistivity = 42,322 Ω-cm
Backfill with grounding enhancement material (ERICO GEM 25) and low resistance soil. Bags of GEM required to fill 12- inch wide trench 2 inches deep = 43
Rtotal = 21.2 Ω
External Grounding Layout
Virginia Peak
Ground Pass-Thru Bar in Electrical Entrance
Bond Each Pedestal (UFER) to Ground Ring
1B
1B
Ground Shelter Grounding Tab to
Ground Ring
Ground Shelter Grounding Tab to
Ground Ring
Bond Each Pedestal (UFER) to Ground Ring
Bond Each Pedestal (UFER) to Ground Ring
Bond Each Pedestal (UFER) to Ground Ring
Ground Tower Ground Bus Bar to Ground Ring
Ground RF Cable to TGB and Inside to RF Entrance
Ground Solar Panels
10 ft. x ¾- in. Ground Rod
Grade 10 ft. Horizontal Ground Rod Installation
Grounding Enhancement Material 2 in. Deep/12 in. Wide
10 ft. x ¾- in. Ground Rod
Connect Ground Rods with #2 AWG, Bare, Tinned Solid Copper Conductor using Exothermic Welds
GROUNDING SYSTEM COMPONENTS
| Virginia Peak.vsdx |
| Title Page |
| A1 Facility Layout |
| A2 Cabinet Layout |
| Soil Testing Worksheet |
| E1 Soil Resistivity |
| E3 External Grounding |