U.S. DEPARTMENT OF THE INTERIOR – BUREAU OF LAND MANAGEMENT
RADIO FACILITY TECHNICAL PACKAGE 1 – NEVADA
Tenabo 01 11 00 - 39 Bid Schedule
10/16/2020
PART 5: TENABO – BID SCHEDULE
BID ITEM SOW REF
Unit of
Measure
UNITS MATERIALS LABOR TOTAL
2.3 RADIO FACILITY DESIGNS
Civil Improvement Plans 2.3 each 1 $ $ $
Site Survey - Topographic 2.3 each 1 $ $ $
Electrical One-Line for Modification to Existing Electrical Service 2.3 each 1 $ $ $
Third Party Inspection Services 3.6 each 1 $ $ $
2.3 - SUBTOTAL $ $ $
2.6.1 ALUMINUM CABINET WITH ARTICULATING MAST SHELTER INSTALLATION
Transport and install New Pepro Cabinet (GFM) with 20-foot articulating mast 2.6.1 each 1 $ $ $
2.6.1 - SUBTOTAL $ $ $
3.5.1 PHOTOVOLTAIC POWER AND BATTERY BACKUP SYSTEM
Install Solar Panels and frame (GFM) 3.5.1 each 2 $ $ $
Procure and Install External Wiring between Solar Panels and Entrance to the Shelter 3.5.1 Lineal Foot 20 $ $ $
Install Photovoltaic Charger/Controller (60 - Ampere) including internal wiring 3.5.1 each 1 $ $ $
Install Batteries GFM 3.5.1 each 4 $ $ $
Procure and Install DC Wiring 3.5.1 each 3 $ $ $
3.5.1 - SUBTOTAL $ $ $
3.11 EXTERNAL RF CABLE & WAVEGUIDE INSTALLATION
RF Cable Routing and Support (Pipe-Masts) 3.11 each 2 $ $ $
RF Cable Entrance Installation and Sealing 3.11 each 2 $ $ $
RF Cable Testing and Report 3.17 each 2 $ $ $
Tenabo 01 11 00 - 40 Bid Schedule
10/16/2020
BID ITEM SOW REF
Unit of
Measure
UNITS MATERIALS LABOR TOTAL
Ground RF Cable to Entry Port using Stainless Steel Strap Provided by Pepro 3.11 each 2 $ $ $
3.11 - SUBTOTAL $ $ $
3.12 ANTENNA SYSTEMS INSTALLATION
Antenna Installation (Secured, Plumb, RF Cable Weather Seal) 3.12 each 2 $ $ $
3.12 - SUBTOTAL $ $ $
3.14 COMMON EXTERNAL GROUNDING SYSTEM
Trenching for Grounding System 3.14 per lineal foot 220 $ $ $
Provide and Install Ground Rods: (3/4" diameter, 10-foot long) Includes Exothermic Connections 3.14 each 9 $ $ $
Provide and Install Electrolytic Ground Rods: (2.12" diameter, 20-foot long) Includes Exothermic Connections
3.14 each 1 $ $ $
Provide and Install External Grounding Conductor: # 2 AWG, bare, solid, tinned, copper for Grounding System
3.14 per lineal foot 300 $ $ $
Backfilling for Grounding System (Includes Grounding Enhancement Material for High Soil Resistivity Sites)
3.14 per lineal foot 220 $ $ $
Bond Existing Tower Ground Bus Bar (TGB) to Ground Ring - Remote Facilities 3.14 each 1 $ $ $
Concrete Encased Electrodes in Shelter Foundations Connected to the Shelter Ground Ring 3.14 each 4 $ $ $
Ground Each Grounding Tab on the Cabinet (x3) to the Grounding System 3.14 each 3 $ $ $
Solar Panel and Framework Grounding 3.14 Lump Sum 1 $ $ $
RF Cables Grounded at Base of Pipe Mast 3.14 each 1 $ $ $
Ground RF Cable to Entry Port using Stainless Steel Strap Provided by Pepro 3.14 each 1 $ $ $
RF Cable Surge Protection 3.14 each 2 $ $ $
3.14 - SUBTOTAL $ $ $
3.16 EQUIPMENT RACKS AND CABINETS
Tenabo 01 11 00 - 41 Bid Schedule
10/16/2020
BID ITEM SOW REF
Unit of
Measure
UNITS MATERIALS LABOR TOTAL
Radio Equipment Installation in Racks and Cabinets 3.16 each 1 $ $ $
Ancillary Equipment Installation in Racks and Cabinets 3.16 each 2 $ $ $
Ground Rack-Mounted Equipment (per device to be grounded) 3.16 each 3 $ $ $
3.16 - SUBTOTAL $ $ $
COST SUMMARY MATERIALS LABOR TOTAL
LABOR AND MATERIALS - SUBTOTAL $ $ $
MATERIAL HANDLING AND DELIVERY $ $ $
MOBILIZATION FEES $ $ $
OTHER DIRECT COSTS $ $ $
BOND $ $ $
PROJECT MANAGEMENT FEES $ $ $
OVERHEAD $ $ $
PROFIT $ $ $
TOTAL ESTIMATED COST $ $ $