Tenabo
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENTUNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
NEW CABINET LOCATION VICINITY MAP
Directions to Tenabo
From Elko Nevada
1. Head west on I-80 go 18.4 mi
2. Take exit 279 for NV-278 toward W Carlin/Eureka go 0.3 mi
3. Turn left onto NV-278 S/Bush St go 48.1 mi
4. Turn right onto J D Ranch Rd go 3.6 mi
5. Continue straight onto Tonkin Road for 0.1 mi
6. Continue straight onto Buckhorn Road for 0.7 mi
7. Continue onto Cortez Beowawe Road for 4.4 mi
8. Turn left to stay on Cortez Beowawe Road for 4.1 mi
From this point the Cortez Gold Mine roads are used to gain access to the site. A BLM escort is required as the mine roads shift.
Latitude: 40° 09'44.36"N
Longitude: 116°34'05.74"W
Elevation: 8,929 ft. AMSL
Soil Resistivity Testing Layout
Electrical One-Line – To Be Developed by Contractor
Title Sheet
Facility Layout Plan
Soil Resistivity Testing Worksheet
T1
A1
E1
E2
TITLESHEET NO. DWG. NO.
SHEET INDEX
01/28/2021
01/28/2021
01/28/2021
01/28/2021
Revision Date
AREA REFERENCE MAP
SYMBOL
INTERSTATE HIGHWAY
U.S. HIGHWAY
STATE HIGHWAY
DESCRIPTIONSYMBOL
STATE CAPITOL
FACILITY LOCATION
BLM FIELD OFFICE
DESCRIPTION
Typical PEPRO 2-Bay Micro Cabinet Layout3 A2 01/28/2021
/2 /2
T1 1 7
D
IS
TR
IC
T
ST
A T
E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
D
IS
TR
IC
T
ST
A T
E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T R o b e rt
G a
N u n
El ko
D is tr ic t N ev ad a
T E
N A
B O
/2 /2
T1 1 7
D
IS
TR
IC
T
ST
A T
E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T R o b e rt
G a
N u n
El ko
D is tr ic t N ev ad a
T E
N A
B O
External Grounding7 E3 01/28/2021
Elko District Office
Facility Layout
3/32” = 1'
0 0 6 0 10 0 20 00 0 6 0 10 0 20 0
A1 2 7
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
O R
G A
N
IZ
A T
IO
N
ST
A
T E
El ko
D is tr ic t N ev ad a
T E
N A
B O
/2 /2
A1 2 7
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T
O R
G A
N
IZ
A T
IO
N
ST
A
T E
El ko
D is tr ic t N ev ad a
T E
N A
B O
/2 /2
E
D
C
B
A
E
D
C
B
A
654321 654321
E
D
C
B
A
E
D
C
B
A
654321 654321
Existing BLM
Shelter and Tower
Proposed New
PEPRO Cabinet
Rock Peak
Swale
(GFM)
21 ft. 5.5 in.
Concrete Pedestal with UFER (x4)
3 2 - BAY MICRO CABINET
11 ft.
8 ft.
Exhaust
20-Foot Articulating Mast
Electrical Entrance Box
Passive Air Intake
Electrical Entrance Box
UL 1449 Surge Protection (x2)
100 Amp Filters (x4)
DC Wiring Entry
Pass-Through Ground Bus Bar
Pass-Through Ground Bus Bar
Solar Panels
Exhaust
Passive Air Intake
Rack Ground Bus Bar (RGB)
RF Cable Entrance
1/4” = 1'
0 3 5 100 3 5 10
A2 3 7
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
O R
G A
N
IZ
A T
IO
N
ST
A
T E
T Y
P
IC
A L
D R
A W
IN
G
/2 /2
A2 3 7
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T
O R
G A
N
IZ
A T
IO
N
ST
A
T E
T Y
P
IC
A L
D R
A W
IN
G
/2 /2
E
D
C
B
A
E
D
C
B
A
654321 654321
E
D
C
B
A
E
D
C
B
A
654321 654321
Typical Pepro 2-Bay Micro Cabinet Layout
E
D
C
B
A
654321
E
D
C
B
A
654321
Typical Pepro 2-Bay Micro Cabinet Layout
A2 3 7
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T
O R
G A
N
IZ
A T
IO
N
ST
A
T E
T Y
P
IC
A L
D R
A W
IN
G
/2 /2
E
D
C
B
A
654321
E
D
C
B
A
654321
Typical Pepro 2-Bay Micro Cabinet Layout
Repeater
Duplexer
SOLAR PANEL INSTALLATION (TYPICAL)19
Angle = to Latitude
SOLAR PANEL GROUNDING (TYPICAL)20
EQUIPMENT INSTALLATION AND GROUNDING (TYPICAL)
Rack Ground Bus Bar (RGB)17
Ground Equipment To RGB with #6 AWG, Stranded Green-Jacketed Grounding Conductors Using Single-Hole UL 467 Listed Connectors
Ground Duplexer
18 Ground Battery Shelf
RGB Grounded to Pass-Through Bar with #2 AWG, Green-Jacketed Grounding Conductor Using Two-Hole UL 467 Listed Connectors
Batteries
18 Ground Misc. Ancillary Devices
Ground Each Solar Panel to common ground bus conductor
Ground Solar Panels to TGB with common #2 AWG, Bare, Solid, Tinned Copper Ground Bus Conductor Using UL 467 Listed Crimp Connectors
Tower Ground Bus Bar (TGB)
1B
16 Tower Ground Bus Bar
(TGB)
Tower Ground Bus Bar
(TGB)
Soil Resistivity Testing
4 7
5 10 15 20 Testing Notes
Meter Readings Ω Ω Ω Ω
1 of 3 68 58 36 N/A
2 of 3 Fail Fail Fail N/A
3 of 3 90 60 49 N/A
Soil Resistivity Calculations
5 10 15 20 p = (Ω-cm) p = (Ω-cm) p = (Ω-cm) p = (Ω-cm)
1 of 3 65,110 111,070 103,410 N/A
2 of 3 Fail Fail Fail N/A
3 of 3 86,175 114,900 140,753 N/A
Enter Highest Amount (Worst Case) 140,753
Grounding Enhancement Material (GEM) 70%
Calculation with GEM 98,527
Test Completed By
Date
Client/Project
Site Location Name /ID
Ground Resistance Tester
Model:
Serial Number:
Calibration Date:
Soil Description
Ambient Conditions
Present Conditions (dry, rain, snow):
Date of last precipitation:
Min Average Max
590 2370 7000
340 4060 16,300
1020 15,800 135,000
59,000 94,000 458,000
07/21/20
Pepro/BLM
Tenabo
Gravel, sand, stones with little clay or loam
GEM Can lower the soil resistivity between 15 and 30 % depending on how much is used
2/1/2019
TEST DATA
Extech
Test Location Spacing (Test Depth) Feet p= 191.5 x A x R p= soil reisistivity in Ω-cm
A = Distance betw een test rods (in feet)
R = Resistance obtained from tester
Test Location
Conversion to (Ω-cm)
GRT300
1804667
Typical Resistivity (approx.), Ω-cm
Same, with varying proportions of sand and gravel
Gravel, sand, stones with little clay or loam
Dry
Unknown
Typical Soil Descriptions
Ashes, cinders, brine, waste
Clay, shale, gumbo, loam
Soil resistivity testing was completed in three separate lines. Test location1 of 3 was completed near the exisitng tower and shelter. The highest measurment was at 10 feet deep measuring 111,070 Ω-cm.
Two separate tests were performed at the proposed location for the new PEPRO 2-Bay cabinet. Test location 2 of 3 failed with measurments exceeding 2,000 Ohms. Measurments were obtained on test location 3 of 3 for multiple depths from 5 feet to 15 feet. The highest measurment of 140,753 Ω-cm will be used as the basis for the grounding system layout. The use of grounding enhancement material (GEM) in the grounding system trench is calculated to lower the resistivity to 98,527 Ω-cm.
Single ground rod resistance for a 10-foot long, 3/4-inch diameter copper clad steel ground rod is calculated at 316.72 Ohms using
LORESCO calculator. Singe electrode resistance for a 20-foot long, 2.12-inch diameter electrotytic grounding electrode is 49.33 Ohms.
Three radial grounds are used in the design with three (3) ten-foot long, 3/4-inch diameter ground rods in each radial plus one 20-foot long, 2.12-inch diameter electrolytic grounding electrode for a system resistance of 23.6 Ohms.
91 Deg. Fahrenheit
Ted Sumners
NOTES
Soil Resistivity Testing
Test Line 1Test Line 1
Test Line 2Test Line 2
3/32” = 1'
0 0 6 0 10 0 20 00 0 6 0 10 0 20 0
E1 5 7
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
O R
G A
N
IZ
A T
IO
N
ST
A
T E
El ko
D is tr ic t N ev ad a
T E
N A
B O
/2 /2
E1 5 7
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T
O R
G A
N
IZ
A T
IO
N
ST
A
T E
El ko
D is tr ic t N ev ad a
T E
N A
B O
/2 /2
E
D
C
B
A
E
D
C
B
A
654321 654321
E
D
C
B
A
E
D
C
B
A
654321 654321
Existing BLM Shelter and Tower
Proposed New PEPR
Rock Peak
Swale
Highest Soil Resistivity Measurement: = 140,753 Ω-cm
Calculated Single Ground Rod Resistance: = 316.72 Ω (10ft x 0.75 in. Ground Rod)
Calculated Single Ground Rod Resistance: = 49.33 Ω (20 ft x 2.12 in. Electrolytic Grounding Electrode)
E2 6 7
E
D
C
B
A
E
D
C
B
A
654321 654321
E
D
C
B
A
E
D
C
B
A
654321 654321
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
Electrical One-Line
(To Be Developed By Contractor)
O R
G U
N
IT
ST
A
T E
60 Amp Distribution
Surge Protection
PV Battery Load
Sense(+) (-) (+) (-) (+) (-)
60 Amp PV Charger/Controller
Fuse within 6 inches
Exhaust FanExhaust Fan
Repeater 1Repeater 1
12 AWG
12 AWG
60 AMP
DC Distribution
Rack Ground Bus
TYPICAL NOT FOR CONSTRUCTION
Repeater 2Repeater 212 AWG
Repeater 3Repeater 312 AWG
SpareSpare12 AWG
2 AWG
105 Ah Batteries (x4)
Pass-Through Bus Bar
Grounding System Layout
Typical Ground Rod ¾ in. Diameter 10 ft. Long
5 #2 AWG, Bare, Solid, Tinned Copper Grounding Conductor
Shelter Ground Ring #2 AWG, Bare, Solid, Tinned Copper Grounding Conductor
1B Concrete Encased Electrode Bonded to Ground Ring
Radial with two 10 ft. Long Ground Rods Spaced 20 ft. Apart Encased in 2 inches of GEM
Proposed New 2-Bay PEPRO Cabinet with 20 ft Articulating Mast
Swale Radial with two 10 ft. Long Ground Rods Spaced 20 ft. Apart Encased in 2 inches of GEM
Radial with two 10 ft. Long Ground Rods Spaced 20 ft. Apart Encased in 2 inches of GEM
20 Solar Panel Grounding
3 Tower Ground Bus Bar
Bond Grounding Tabs on Cabinet to Ground Ring
N
3/32” = 1'
0 0 6 0 10 0 20 00 0 6 0 10 0 20 0
E3 7 7
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T U
N
IT
E D
S T
A T
E S
D E
P A
R T
M E
N T
O F
T H
E I
N T
E R
IO
R
B U
R E
A U
O F
L A
N D
M A
N A
G E
M E
N T
O R
G A
N
IZ
A T
IO
N
ST
A
T E
El ko
D is tr ic t N ev ad a
T E
N A
B O
/2 /2
E3 7 7
C H
K 'D
B Y
D E
S
IG
N O
F F
IC
E
D E
S
IG
N E
D B
Y
P R
O J E
C T
N O
D R
A W
N B
Y
A P
P R
O V
E D
B Y
D A
T E
U N
IT
E
D S
T A
T E
S D
E P
A R
T M
E N
T O
F T
H E
I N
T E
R
IO
R B
U R
E A
U O
F L
A N
D M
A N
A G
E M
E N
T
O R
G A
N
IZ
A T
IO
N
ST
A
T E
El ko
D is tr ic t N ev ad a
T E
N A
B O
/2 /2
E
D
C
B
A
E
D
C
B
A
654321 654321
E
D
C
B
A
E
D
C
B
A
654321 654321
GROUNDING SYSTEM COMPONENTS – 94 BAGS OF GEM
Shelter Ground Ring with three 10 ft.
Long Ground Rods Spaced 20 ft. Apart
Encased in 2 inches of GEM
Complex Grounding Electrode System Resistance
Soil Resistivity = 140,153 Ω-cm (1407.53 Ω-m) QTY R (Ω) 1/R 1/R1+R2+
R3+R4 Rtotal (Ω)
BAGS
of GEM
Ground Ring: Four 10 ft. Long, 3/4 in. Diameter Ground Rods Installed Horizontal, Spaced 14 ft. Apart On Center in 30 in. Deep Trench Interconnected with #2 AWG
Embedded in 2 inches of GEM in 80 linear ft. / 20 ft Diameter Trench (R1)
1 60.68 0.0165 67
Ground Radial: Two 10 ft. Long, 3/4 in. Diameter Ground Rods with 20 ft. # 2 AWG, Bare, Tinned Solid Embedded in 2" Deep GEM in 12" wide, 20 linear ft. Trench (R2) 1 101.84 0.0098 9
Ground Radial: Two 10 ft. Long, 3/4 in. Diameter Ground Rods with 20 ft. # 2 AWG, Bare, Tinned Solid Embedded in 2" Deep GEM in 12" wide, 20 linear ft. Trench (R3) 1 101.84 0.0098 9
Ground Radial: Two 10 ft. Long, 3/4 in. Diameter Ground Rods with 20 ft. # 2 AWG, Bare, Tinned Solid Embedded in 2" Deep GEM in 12" wide, 20 linear ft. Trench (R4) 1 101.84 0.0098 9
TOTAL 94
GROUND RING WITH THREE 20-FOOT RADIALS
CALCULATIONS
0.05 21.77
GROUNDING SYSTEM CALCULATIONS
Ground each concrete encased electrode, grounding tab and pass-through bar
#2 AWG Embedded in GEM 2
in. Deep /12 in. Wide Trench
Vert ical Ground Rods
Interconnected with #2 AWG
#2 AWG Embedded in GEM 2
in. Deep /12 in. Wide Trench
Vert ical Ground Rods
Interconnected with #2 AWG
10 ft
VERTICAL GROUND ROD INSTALLATION
Grade
Trench
30 in. Deep/12 in. Wide
Grounding Enhancement Material
2 in. Deep/12 in. Wide Entire Length of Trench
10 ft
VERTICAL GROUND ROD INSTALLATION
Grade
Trench
30 in. Deep/12 in. Wide
Grounding Enhancement Material
2 in. Deep/12 in. Wide Entire Length of Trench
#2 AWG Embedded in GEM 2
in. Deep /12 in. Wide Trench
Vert ical Ground Rods
Interconnected with #2 AWG
10 ft
VERTICAL GROUND ROD INSTALLATION
Grade
Trench
30 in. Deep/12 in. Wide
Grounding Enhancement Material
2 in. Deep/12 in. Wide Entire Length of Trench
Ground RF Cables to TGB with Ground Kit and to Internal Entry Panel Using PEPRO Grounding Strap
Install Surge Protection Device on RF Cable within 24 inches of Entry into Cabinet
| Tenabo.vsdx |
| T1 |
| A1 Facility Layout |
| A2 Typical 2-Bay |
| Soil Testing Report |
| E1 - Resistivity Testing |
| E2 |
| E3 External Grounding |