U.S. DEPARTMENT OF THE INTERIOR – BUREAU OF LAND MANAGEMENT
RADIO FACILITY TECHNICAL PACKAGE 1 – NEVADA
Virginia Peak 01 11 00 - 56 Bid Schedule
10/19/2020
PART 5: VIRGINIA PEAK – BID SCHEDULE
BID ITEM SOW REF
Unit of
Measure
UNITS MATERIALS LABOR TOTAL
2.3 DESIGN DRAWINGS (A&E)
Civil Improvement Plans 2.3 each 1 $ $ $
Third Party Inspection Services 3.6 each 1 $ $ $
2.3 DESIGN SERVICES $ $ $
3.5.1 PHOTOVOLTAIC POWER AND BATTERY BACKUP SYSTEM
Remove and Reinstall Solar Panels 3.5.1 each 2 $ $ $
3.5.1 Photovoltaic and Battery System - SUBTOTAL $ $ $
3.7 COMMUNICATIONS EQUIPMENT SHELTER INSTALLATION
Relocate and Install Existing Pepro Cabinet with 20-foot articulating mast 3.7 Lump Sum 1 $ $ $
3.7 Shelter - SUBTOTAL $ - $ - $ -
3.11 EXTERNAL RF CABLE & WAVEGUIDE INSTALLATION
Remove and Reinstall RF Cable 3.11 each 1 $ $ $
Test RF Cable and Antenna 3.11 each 1 $ $ $
3.11 External Cable Installation - SUBTOTAL $ $ $
3.12 ANTENNA SYSTEMS INSTALLATION
Remove and Reinstall Antenna 3.12 each 1 $ $ $
3.12 Antenna Systems - SUBTOTAL $ $ $
3.14 COMMON EXTERNAL GROUNDING SYSTEM
Trenching for Grounding System 3.14 per lineal foot 130 $ $ $
Virginia Peak 01 11 00 - 57 Bid Schedule
BID ITEM SOW REF
Unit of
Measure
UNITS MATERIALS LABOR TOTAL
Provide and Install Ground Rods: (3/4" diameter, 10-foot long) 3.14 each 10 $ $ $
Provide and Install External Grounding Conductor: # 2 AWG, bare, solid, tinned, copper for Grounding System
3.14 per lineal foot 150 $ $ $
Backfilling for Grounding System (Includes Grounding Enhancement Material for High Soil Resistivity Sites)
3.14 per lineal foot 150 $ $ $
Bond Existing Tower Ground Bus Bar (TGB) to Ground Ring - Remote Facilities 3.14 each 1 $ $ $
Concrete Encased Electrodes in Shelter Foundation Connected to the Shelter Ground Ring 3.14 each 4 $ $ $
Ground Each Grounding Tab on the Cabinet (x3) to the Grounding System 3.14 each 3 $ $ $
Solar Panel and Framework Grounding 3.14 each 2 $ $ $
RF Cables Grounded at Base of Pipe Mast 3.14 each 1 $ $ $
Ground RF Cable to Entry Port using Stainless Steel Strap Provided by Pepro 3.14 each 1 $ $ $
RF Cable Surge Protection 3.14 each 1 $ $ $
3.14 External Grounding - SUBTOTAL $ $ $
3.16 EQUIPMENT RACKS AND CABINETS
Ground Rack-Mounted Equipment (per device to be grounded) 3.16 each 3 $ $ $
3.16 Equipment Racks and Cabinets - SUBTOTAL $ $ $
COST SUMMARY MATERIALS LABOR TOTAL
LABOR AND MATERIALS - SUBTOTAL $ $ $
MATERIAL HANDLING AND DELIVERY $ $ $
MOBILIZATION FEES $ $ $
OTHER DIRECT COSTS $ $ $
BOND $ $ $
Virginia Peak 01 11 00 - 58 Bid Schedule
PROJECT MANAGEMENT FEES $ $ $
OVERHEAD $ $ $
PROFIT $ $ $
TOTAL ESTIMATED COST $ $ $