A06_SITE_PHOTOS_MPLC_WAREHOUSE.pdf
PDF 6 MB Posted
- Attached to
- BLM-CO GAOA UFO MPLC WAREHOUSE IMPROVEMENT
- Solicitation number
- 140L1726R0001
About this file
This file is a supplementary site picture document for the Montrose Public Lands Center Warehouse Improvements project, containing photographs to supplement project drawings and specifications.
The document includes interior and exterior images of an approximately 17-foot-height warehouse facility and associated spaces, documenting existing conditions and proposed improvements. Key areas photographed include: the warehouse main floor with equipment and storage, office spaces, men's and women's bathrooms, and a storage shed with manually operated overhead doors. Specific systems and components requiring replacement or repair are identified: an overhead garage door with deteriorated plywood panels, sprinkler head near the garage door track, rooftop HVAC unit, warehouse door closer, electrical panel with two sub-panels marked "NO PRIMING," and multiple electric receptacles requiring relocation. Interior work includes a proposed utility sink with eye wash station, plumbing valve repair, and Office 3 sink/countertop/shelf demolition. Luminaires in both warehouse and office/bathroom areas are identified for replacement, with approximate installation locations marked. The metal roof shows deterioration including missing and deteriorated rubber boots around penetrations, visible screw holes, and at least one documented roof leak evidenced by wet spots on the warehouse floor. Additional items photographed include a photovoltaic inverter system to be replaced and bathroom doorway modifications requiring wall alteration and fire sprinkler line relocation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Montrose Public Lands Center Warehouse Improvements – Supplementary Site Pictures
Site pictures are provided to supplement the drawings and specifications.
Warehouse Building – Looking North
Inside warehouse looking south
Inside warehouse, looking north
Inside warehouse – looking south.
Warehouse overhead door to be replaced.
Warehouse sprinkler head near garage door track
Warehouse – proposed utility sink, eye wash station, and plumbing repair.
Inside warehouse – looking north
Electrical Panel
Electric outlet to be relocated.
Approximate location of proposed electric receptacles
Existing electric receptacle
Typical warehouse luminaires – to be replaced.
Typical office and bathroom luminaires – to be replaced.
Approximate location of proposed luminaries
Office 3 sink, countertop, and shelf to be demolished.
Men’s bathroom – women’s similar
Women’s bathroom – men’s similar
Proposed bathroom door.
Rooftop HVAC unit – to be replaced.
Warehouse Door Closer – to be replaced
Warehouse Roof
Screw holes in warehouse roof.
Screw holes in warehouse roof.
Roof leak – wet spot of floor is a roof leak.
Approximate location of roof leak
Storage Shed – Manually operated overhead doors
Photovoltaic Inverter – to be replaced.