These are construction drawings for the rehabilitation of the Kalaloch Wastewater Lagoons at Olympic National Park. The comprehensive set of 23 technical drawings details a major infrastructure upgrade project involving multiple system components, including:

Key project elements include demolishing existing infrastructure, constructing a new prefabricated pump station, installing floating docks in three lagoon cells, replacing aerators, creating a new spray field, implementing a dechlorination system, and installing new electrical and piping infrastructure. The project will upgrade the wastewater treatment facility's efficiency and environmental performance. The drawings provide intricate technical specifications for each project component, including grading plans, electrical diagrams, piping layouts, structural details, and site preparation guidelines. The project is scheduled for completion by March 18, 2024, and involves careful environmental considerations typical of work in a national park setting.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCALE OF MILES

35 0 35

2,000

SCALE OF FEET

SCALE OF METERS

2,000

50 0 50

0 6,000

100 150

4,000

STATE

NATIONAL PARK SERVICE

DENVER SERVICE CENTER REGION COUNTY

DEPARTMENT OF THE INTERIOR

UNITED STATES LOCATION WITHIN PARK

NAME OF PARK

TITLE OF DRAWING

23JEFFERSON WASHINGTON OF

PKG.

NO. SHEET

DRAWING NO.

OLYMPIC NATIONAL PARK

PACIFIC WEST

WASHINGTON

REHABILITATE KALALOCH WASTEWATER

KALALOCH DEVELOPED AREA

THIS PROJECT

FINAL CONSTRUCTION DRAWINGS

188350

149LAGOONS

03.18.2024

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

9/

/2

:2

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

GENERAL NOTES

AND ABBREVIATIONS

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532G1.1

GENERAL NOTES

1. THE UTILITIES SHOWN IN THESE CONSTRUCTION DRAWINGS ARE INDICATED IN ACCORDANCE WITH AVAILABLE RECORDS. ALL

UTILITIES MAY NOT BE SHOWN AND THOSE WHICH ARE SHOWN MAY NOT BE SHOWN ACCURATELY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LOCATING TO DETERMINE EXACT LOCATIONS, ELEVATIONS AND SIZES OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL NPS AND NON-NPS OWNED UTILITIES. REPAIR OR REPLACE ANY DAMAGED EXISTING UTILITIES, AS SPECIFIED IN SECTION 011100 "SUMMARY OF WORK". CONTRACTOR SHALL MAINTAIN A MINIMUM OF 2 FEET HORIZONTAL AND VERTICAL SEPARATION BETWEEN ALL EXISTING DRY UTILITIES AND NEW WATER AND SEWER INSTALLATIONS, UNLESS OTHERWISE NOTED.

2. EVERY ATTEMPT HAS BEEN MADE TO ENSURE THE ACCURACY OF THE DRAWINGS THROUGH FIELD VERIFICATION AND EXISTING PLAN REVIEW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY EXISTING CONDITIONS, SIZE, QUANTITIES, AND TO COORDINATE ALL ASPECTS OF THE PROJECT BEFORE CONSTRUCTION, ORDERING, AND INSTALLATION ANY COMPONENT. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY FOR WRITTEN CLARIFICATION IF ANY DISCREPANCY EXISTS.

3. THE CONTRACTOR SHALL PROTECT EXISTING INFRASTRUCTURE, TREES, AND LANDSCAPING THAT ARE DESIGNATED TO REMAIN. ANY OF THESE ELEMENTS DAMAGED OR INJURED DURING CONSTRUCTION WILL BE REPLACED IN KIND AT THE CONTRACTOR'S EXPENSE.

4. THE CONTRACTOR IS REQUIRED TO RESET, ADJUST, OR REPLACE ANY UTILITIES THAT ARE IMPACTED BY CONSTRUCTION AND DESIGNATED TO REMAIN. IN THE EVENT THAT THE CONTRACTOR ENCOUNTERS A UTILITY NOT MARKED FOR REVISION BUT WILL BE

IMPACTED BY THE PROJECT, NOTIFY THE CONTRACTING OFFICER (C.O.) IMMEDIATELY.

5. PROVIDE TEMPORARY SUPPORT FOR EXISTING WET (WATER, SANITARY SEWER, ETC.) AND DRY UTILITIES (GAS, POWER, ETC.) THAT

CROSS THE TRENCH UNTIL BACKFILLING OF TRENCH IS COMPLETE.

6. ANY TRENCH TO BE LEFT OPEN OVERNIGHT SHALL BE COVERED, NOT JUST TAPED OFF, WITH PLYWOOD OR STEEL. ANY TRENCH LEFT OPEN OVERNIGHT SHALL INCLUDE COMPACTED EARTHEN RAMPS BE BUILT AT THE ENDS INSIDE THE TRENCHES. NO WILDLIFE

SHALL BE HARMED.

7. NO GROUND DISTURBANCE SHALL OCCUR OUTSIDE THE LIMITS OF THE SEWAGE LAGOON FACILITY EFFLUENT SPRAYFIELD AND

ACCESS ROAD UNLESS APPROVED BY THE CONTRACTING OFFICER.

8. THE CONTRACTOR IS RESPONSIBLE FOR PREPARING AND MAINTAINING AN NPS UNDER-AN-ACRE POLLUTION PREVENTION PLAN (UPPP), AS SPECIFIED IN SECTION 01 57 23 "TEMPORARY STORM WATER POLLUTION PREVENTION." IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN ROADSIDE DITCHES, SWALES AND PREVENT EROSION THROUGHOUT THE PROJECT.

9. THE CONTRACTOR SHALL NOT INTRODUCE OR TRANSPORT EXOTIC AND NON-NATIVE PLANTS INTO THE PARK. ALL EQUIPMENT SHALL BE POWER WASHED AND INSPECTED BY A PARK REPRESENTATIVE PRIOR TO ENTERING THE PARK TO ENSURE IT IS FREE OF NON-NATIVE WEEDS AND/OR SEEDS AS WELL AS OIL LEAKS (CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE INSPECTION AT LEAST 48 HOURS IN ADVANCE). IN ADDITION, SOURCES OF IMPORTED ROCK, SAND, GRAVEL, AND SOIL SHALL BE INSPECTED BY NPS FOR INVASIVE NON-NATIVE PLANTS, WEEDS AND/OR SEEDS (NOTIFY NPS 30 CALENDAR DAYS IN ADVANCE OF IMPORTING MATERIALS, IDENTIFYING THE MATERIALS TO BE IMPORTED AND THE SOURCE OF THOSE MATERIALS SO NPS CAN INSPECT THE QUARRY OR

SOURCE LOCATION).

10. ARCHEOLOGICAL MONITORING MAY BE REQUIRED DURING GROUND DISTURBING ACTIVITIES. THE CONTRACTOR WILL COORDINATE WITH C.O. TWO WEEKS IN ADVANCE OF ALL GROUND DISTURBING ACTIVITIES AND AN NPS-PROVIDED ARCHEOLOGIST MAY BE DESIGNATED BY THE C.O. IF AN INADVERTENT DISCOVERY IS MADE DURING THE PROJECT, WORK IN THE AREA MUST STOP AND THE

ON-SITE ARCHAEOLOGIST MUST NOTIFY THE CONTRACTING OFFICER IMMEDIATELY.

11. STRIP SURFACE MATERIAL AND STOCKPILE FOR REPLACEMENTS SPECIFIED IN ALL AREAS OF EXCAVATION AND DISTURBANCE.

MATERIALS NOT SUITED FOR REUSE WILL BE THE CONTRACTOR'S RESPONSIBILITY FOR DISPOSAL.

12. RESTORE ALL SURFACES DISTURBED AS SPECIFIED AND SHOWN ON THE CONSTRUCTION DRAWINGS.

13. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. THE CONTRACTOR IS EXPECTED TO USE QUALITY, ACCEPTABLE CONSTRUCTION PRACTICES AND TECHNIQUES FOR THE EXTENT AND TYPE OF WORK DESCRIBED HEREIN.

14. DO NOT SCALE DRAWINGS. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE CONTRACTING OFFICER IMMEDIATELY FOR WRITTEN CLARIFICATION.

15. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A CLEAN JOBSITE TO MINIMIZE ENVIRONMENTAL AND VISUAL IMPACTS AND

MAXIMIZE WORK SITE SAFETY. DEBRIS MUST BE DISPOSED OF PROPERLY.

16. THE CONTRACTING OFFICER WILL BE THE FINAL AUTHORITY ON ACCEPTING AND/OR REJECTING WORK INCLUDING, BUT NOT LIMITED TO, UNAUTHORIZED WORK, WORK CONDUCTED PRIOR TO APPROVAL OF SUBMITTALS, APPROVAL OF THE APPEARANCE OF THE

WORK, AND COMPLIANCE WITH ALL OTHER SUBJECTIVE REQUIREMENTS OF THE WORK.

17. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL HISTORIC FEATURES AND IS RESPONSIBLE FOR REPAIRING THE HISTORIC FEATURES IN KIND THAT ARE IMPACTED DURING CONSTRUCTION, PER THE DIVISION 1 SPECIFICATIONS.

18. THE PARK WILL RETAIN EXCESS NATIVE MATERIALS GENERATED DURING EXCAVATION.

19. FURNISH ALL NECESSARY EQUIPMENT, MATERIALS, AND LABOR TO EFFECTIVELY MEASURE THE SITE AND COMPLETE THE WORK.

ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS

AWWA AMERICAN WATER WORKS ASSOCIATION

CSBC CRUSHED SURFACING BASE COURSE

CSTC CRUSHED SURFACING TOP COURSE

CIP CAST IRON PIPE

CMP CORRUGATED METAL PIPE

CO SEWER CLEANOUT

CLIN CONTRACT LINE ITEM NUMBER

CSBC CRUSHED SURFACING BASE COURSE

CSTC CRUSHT SURFACING TOP COURSE

CP CONTROL POINT

DIP DUCTILE IRON PIPE

DIA. DIAMETER

E EASTING

EG EXISTING GROUND

ELEV. ELEVATION

ETC ET CETERA

ES EXISTING SANITARY

F.I. FINISH FLOOR ELEVATION

FL FLANGE

FM FORCE MAIN

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GPS GLOBAL POSITIONING SYSTEM

HDPE HIGH DENSITY POLYETHYLENE

HP HORSEPOWER

HQ HEADQUARTERS

I.D. INSIDE DIAMETER/DIMENSION

I.E. INVERT ELEVATION

INV. INVERT

LF LINEAR FEET

MAX. MAXIMUM

MH MANHOLE

MJ MECHANICAL JOINT

MIN. MINIMUM

N NORTHING

NO. NUMBER

NPS NATIONAL PARK SERVICE

NTS NOT TO SCALE

O.D. OUTSIDE DIAMETER

O.S.H.A OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

PKG PACKAGE

PMIS PROJECT MANAGEMENT INFORMATION SYSTEM

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

SCH SCHEDULE

SPEC. SPECIFICATIONS

SRVC. SERVICE

SS STAINLESS STEEL

STA. STATION

UPPP UNDER-AN-ACRE POLLUTION PREVENTION PLAN

UV ULTRAVIOLET

T.O.P. TOP OF PIPE

TYP TYPICAL

W WATTS

ABBREVIATIONSSHEET INDEX

SHEET SUB

SHEET TITLE OF SHEET

1 COVER SHEET

2 G1.1 GENERAL NOTES AND ABBREVIATIONS

3 G1.2 EXISTING CONDITIONS

4 G1.3 DEMOLITION PLAN

5 G1.4 STAGING AREA MAP

6 G1.5 SITE OVERVIEW & SHEET LAYOUT

7 C1.0 ROAD IMPROVEMENTS

8 C1.1 PUMP HOUSE AREA GRAVEL PAD CONSTRUCTION

9 C1.2 LAGOON BRUSH CLEARING, FENCE REPAIR, SPLASH BLOCK, AND SIGNAGE

10 C1.3 SPRAY FIELD BRUSH CLEARING & SIGNAGE

11 C1.4 MANUAL HEADWORKS PLAN AND SECTION

12 C1.5 FLOATING DOCK SYSTEM PLAN AND PROFILE

13 C1.6 LEVEL SENSOR, FLOAT SWITCH, AND POND GAUGE PLAN & PROFILE

14 C1.7 FLOATING DECANTER PLAN AND SECTION

15 C1.8 CONCRETE PREFABRICATED PUMP HOUSE PLAN AND ELEVATIONS

16 C1.9 PUMP HOUSE PIPING

17 C1.10 PUMP HOUSE ELECTRICAL

18 C1.11 EFFLUENT PIPING PLAN

19 C1.12 SPRAY FIELD PLAN

20 C2.0 SPRAY FIELD DETAILS

21 C2.1 MISCELLANEOUS DETAILS

22 C2.2 FLOATING DOCK DETAILS

23 C2.3 FLOATING DOCK ATTACHMENT DETAILS

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

FM

FM

FM

FM

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

ES ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/2

/2

:4

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

EXISTING CONDITIONS 149

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532G1.2

SCALE IN FEET

0 50 100

NOTES:

1. NO TOPOGRAPHIC SURVEY DATA PROVIDED FOR THIS AREA.

2. LOCATION OF UTILITIES ARE APPROXIMATE, CONTRACTOR TO VERIFY. SEE

NOTE 1, SHEET G1.1.

6-

IN

C H

C

IP

(C

LO

SE

D

6-INCH CIP6-INCH PVC FORCE MAIN

DOCK

CONCRETE

SPLITTER BOX

FLOATING

DECANTER

PUMP STATION

AERATORS

LAGOON CELL 1

LAGOON CELL 2

LAGOON CELL 3

FORCE MAIN TO

SPRAY FIELD

ACCESS ROAD

ENTRANCE GATE

SPRAY FIELD

LATERALS

SPRAY FIELD

ENTRANCE TO

WASTEWATER

FACILITY

STEEL WOVEN

WIRE MESH FENCE

LEGEND:

DIRECTION OF WASTEWATER FLOW

DECHLORINATION

TABLET FEEDER

ACCESS ROAD

HIGHWAY 101

FM FROM LIFT

STATION LS-2

ACCESS ROAD

4,300 FEET

WEIR BOX &

OVERFLOW

(CLOSED)

WEIR BOX &

OVERFLOW

(CLOSED)

WEIR BOX &

OVERFLOW

(CLOSED)

LIGHT AND

UTILITY POLE

ES ES EXISTING SEWER PIPE

OVERFLOW

ELECTRIC UTILITY

POLE (LOCATION

APPROXIMATE)

ELECTRIC UTILITY

POLE (LOCATION

APPROXIMATE)

LAGOON AND SPRAYFIELD OVERVIEW

OVERALL LAGOON AREA

NTS

FM EXISTING LIFT STATION FORCE MAIN

LAGOON

OVERFLOW PIPE

LAGOON

OVERFLOW PIPE

AERATOR SAFETY

DISCONNECT SWITCH PANEL

O

IL C

ITY, W

A

13 M

ILES

Q U

EETS, W

A

6 M

ILES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

FM

FM

FM

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

ES ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/2

/2

:4

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

DEMOLITION PLAN 149

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532G1.3

SCALE IN FEET

0 50 100

NOTES:

REMOVE AND DISPOSE OF SPLITTER BOX

REMOVE AND DISPOSE OF BUILDING AND FOUNDATION

REMOVE AND DISPOSE OF SANITARY SEWER PIPE

REMOVE AND DISPOSE OF DOCK AND SUPPORTS

REMOVE AND DISPOSE OF AERATORS AND MOORING MASTS

REMOVE AND DISPOSE OF FLOATING DECANTER

REMOVE AND DISPOSE OF EXISTING AERATOR PANEL AND CONDUIT BUT RETAIN

H-FRAME AND SAFETY DISCONNECT SWITCHES FOR REUSE

1. REMOVALS ARE TO BE COORDINATED WITH THE CONTRACTING OFFICER.

2. ALL REMOVED CONCRETE, WOOD, PIPING AND OTHER MATERIALS ARE TO BE

HAULED OFF-SITE IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL LAWS.

3. ANY DAMAGE TO OTHER EXISTING STRUCTURES OR UTILITIES MUST BE RESTORED

IN-KIND.

4. SPRAY FIELD TO REMAIN IN OPERATION DURING CONSTRUCTION THROUGH A

COMBINATION OF THE EXISTING PUMP STATION AND BYPASS PUMPING. SPRAY

FIELD OPERATIONAL PERIOD IS FROM MID-OCTOBER THROUGH APRIL. LAGOON

CELL #3 WILL NEED TO BE PUMPED DOWN DURING INSTALL OF FLOATING

DECANTER. SEE SHEET C1.6.

5. EXISTING BUILDING DOOR HARDWARE AND LOCK SHALL BE PROTECTED, SALVAGED

AND RETURNED TO OWNER.

DEMOLITION FOOTNOTES:

LEGEND:

REMOVE EXISTING SANITARY SEWER PIPE

ES ES EXISTING SEWER

3 2

REMOVE STRUCTURE OR EQUIPMENT

EXISTING PUMP STATION TO BE REMOVED. ELECTRICAL SERVICE TO

BE RELOCATED TO NEW PUMP STATION.

FM EXISTING FORCE MAIN

LAGOON CELL 1

LAGOON CELL 2

LAGOON CELL 3

LAGOON AND SPRAYFIELD DEMOLITION OVERVIEW

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

FM

FM

FM

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

ES ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/2

/2

:4

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

STAGING AREA MAP 149

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532G1.4

SCALE IN FEET

0 50 100

STAGING AREA

NOTES:

1. CONTRACTOR MUST KEEP ACCESS ROAD TO PUMP HOUSE CLEAR.

2. WORK SHALL NOT IMPEDE PUMP HOUSE OPERATIONS WITHOUT COORDINATION WITH THE

CONTRACTING OFFICER.

3. MATERIALS AND EQUIPMENT CAN BE STORED ON THE DESIGNATED HATCHED AREAS.

4. TEMPORARY POWER SHALL BE COORDINATED WITH GRAYS HARBOR PUB AND AT NO EXPENSE

TO THE NPS.

5. CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN AND HAUL ROUTE PLAN TO THE

CONTRACTING OFFICER PRIOR TO BEGINNING WORK. PLAN SHALL INCLUDE A MAP DEPICTING

THE ANTICIPATED HAUL ROUTES AND COMPLIANCE WITH LEGAL LOAD RESTRICTIONS. SUBMIT

PLAN AT LEAST 15 DAYS PRIOR TO HAULING MATERIALS.

6. STAGING OF MATERIALS AND EQUIPMENT SHALL BE WITHIN THE IDENTIFIED STAGING AREAS.

7. ADDITIONAL AND/OR ALTERNATIVE STAGING AREAS SHALL BE REVIEWED AND APPROVED BY

THE CONTRACTING OFFICER UPON REQUEST.

STAGING AREA.

SEE NOTE 3

STAGING AREA.

SEE NOTE 3

STAGING AREA.

SEE NOTE 3

ADDITIONAL STAGING AREA

NTS

ADDITIONAL STAGING AREA OFF THE

BEND OF THE ROAD. IN FRONT OF

THE DOWNED LOGS AND EARTH

BERM. APPROXIMATELY 30' X 40'

LAGOON AND SPRAYFIELD DEMOLITION OVERVIEW

LEGEND:

AVALIBLE OFF-SITE

STAGING AREA, SEE

NOTES, THIS SHEET

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

S

S

S

S

SS

S

S

S S

ES ES

FM

FM

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/2

/2

:5

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

SITE OVERVIEW

SHEET LAYOUT

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532G1.5

SCALE IN FEET

0 60 120

WORK NOTES:

CONSTRUCT NEW SPRAY FIELD IN LOCATION OF EXISTING SPRAY FIELD INCLUDING ALL

PIPING, RISERS, SPRAY HEADS, AND DECHLORINATION SYSTEM.

INSTALL FLOATING DECANTER SYSTEM.

INSTALL NEW EFFLUENT PUMP STATION BUILDING, PUMPING EQUIPMENT, PLUMBING

AND CONTROLS.

MOVE ELECTRIC SERVICE FROM EXISTING BUILDING TO NEW EFFLUENT PUMP STATION.

INSTALL EFFLUENT TRANSMISSION PIPE TO NEW SPRAY FIELD.

REPLACE AERATORS WITH NEW AERATORS, WIRING, AND CONDUIT. INSTALL NEW

MOORING MASTS.

INSTALL NO TRESPASSING SIGNS AT SPRAY FIELD AND ON LAGOON FENCING.

TRIM VEGETATION AROUND LAGOON FENCING, LAGOON AREA, AND AT EDGES TO

SPRAY FIELD.

INSTALL FLOATING DOCKS IN ALL THREE LAGOON CELLS.

INSTALL STAFF GAUGE, FLOAT SWITCH ASSEMBLY, AND PRESSURE TRANSDUCER FOR

LEVEL DETECTION AND CONTROL.

INSTALL MANUAL HEADWORKS EQUIPMENT AND TIE INTO EXISTING FORCE MAIN AND

GRAVITY PIPE TO LAGOON CELLS #1 AND #2.

INSTALL INLET SPLASH PADS IN LAGOON CELLS #2 AND #3.

REHABILITATE ACCESS ROAD. SEE SHEET C1.0.

LEGEND:

PROPOSED SEWER LINE

ES ES ES LAGOON INFLUENT LINES

S S

FLOATING DOCK SYSTEM PLAN

AND PROFILE IN EACH LAGOON

SEE SHEET C1.5

EFFLUENT PIPING PLAN

SEE SHEET C1.11

SPRAY FIELD PLAN

SEE SHEET C1.12

PUMP HOUSE

PLAN AND PROFILE

SEE SHEET C1.8

FLOATING DECANTER

PLAN AND PROFILE

SEE SHEET C1.7

PRESSURE TRANSDUCER

PLAN AND PROFILE

SEE SHEET C1.6

MANUAL HEADWORKS

PLAN AND PROFILE

SEE SHEET C1.4

PUMP HOUSE PIPING

SEE SHEET C1.9

LAGOON BRUSH CLEARING, FENCE

REPAIR, SPLASH BLOCK, AND SIGNAGE

SEE SHEET C1.2

SPRAYFIELD

BRUSH CLEARING

SEE SHEET C1.3

AERATOR #1

GATE

LAGOON

CELL 1

LAGOON

CELL 2

LAGOON

CELL 3

MOORING LINE

AND MAST SEE

SHEET C2.1

AERATOR #2

PRESSURE TRANSDUCER

SIGNAL CABLE CONDUIT

EFFLUENT PIPE

FM LIFT STATION FORCE MAIN

PROPOSED SPRINKLER RADIUS

AERATOR SAFETY

DISCONNECT

PANEL

FLOATING DOCK SYSTEM PLAN

AND PROFILE IN EACH LAGOON

SEE SHEET C1.5

POND STAFF GAUGE

SEE SHEET C1.6

AERATOR POWER

CABLE CONDUIT

CONCRETE SPLASH PAD

SHEET C1.2

CONCRETE SPLASH PAD

SHEET C1.2

FLOOR DRAIN PIPE

SEE SHEET C1.9

REHABILITATE ACCESS ROAD

SEE SHEET C1.0

PROPOSED WORK AND SHEET LAYOUT

X

X

X

X

X

X

X

X

X

X

X X

X

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/1

0/

7:

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

ROAD IMPROVEMENTS 149

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.0

CSTC (3/4" MINUS ROCK)

CSBC (1-1/4" MINUS ROCK)

3"2" 2" 4"

EXISTING GRADE

6'6'

TURN-AROUND AND ROAD IMPROVEMENT PLAN

NTS

GENERAL NOTES:

GRAVEL ROAD AND SURFACE BUILD UP

GRAVEL ROAD OVERLAY PROFILE

GRAVEL ROAD GRADING AND SURFACING PROFILE

NTS

A

C1.0

1. IT IS RECOMMENDED THAT THE CONTRACTOR FAMILIARIZE THEMSELVES

WITH EXISTING ROAD CONDITIONS PRIOR TO BIDDING.

2. CSBC MATERIAL IN ACCORDANCE WITH CSBC TABLE.

3. CSTC MATERIAL IN ACCORDANCE WITH CSTC TABLE.

4. PROVIDE SITE CLEARING AS REQUIRED IN ACCORDANCE WITH

SPECIFICATION 31 10 00 - SITE CLEARING.

5. VEHICLE TURNAROUNDS SHALL NOT INTERFERE WITH EFFLUENT

PLUMBING AND SHALL BE FIELD FIT.

6. GRADE ROAD TO RE-ESTABLISH ROAD PROFILE. ADD 2-3" CSTC IN

ACCORDANCE WITH DETAIL B/C1.0.

7. RE-ESTABLISH TURNAROUND AT LAGOON GATE ENTRANCE IN

ACCORDANCE WITH A/C1.0.

8. PROVIDE VEHICLE TURNAROUND NEAR THE PROPOSED PUMP STATION IN

ACCORDANCE WITH B/C1.0.

9. SURFACE AREA OF ROAD IMPROVEMENTS IS APPROXIMATELY 11,600 SF.

LEGEND:

STEEPEN (1:1 MAX) AS

NECESSARY TO AVOID

FILLING EXISTING DITCHES

45'

45'

20' R 25

R 25

45'

45'

CSTC (3/4" MINUS ROCK)

3"2" 2"

EXISTING GRADE

6'6'

GRAVEL ROAD OVERLAY PROFILE DETAIL

NTS

B

C1.0

STEEPEN (1:1 MAX) AS

NECESSARY TO AVOID

FILLING EXISTING DITCHES

EXISTING ROAD

SURFACE

BUILT UP TURN

AROUND SURFACE

EXISTING

ROAD WIDTH

EXISTING

ROAD WIDTH

FOLLOW SURFACE

BUILD UP DETAIL B/C1.0

20'

30'

FOLLOW SURFACE

BUILD UP DETAIL B/C1.0

A

C1.0

B

C1.0

FOLLOW SURFACING DETAIL A/C1.0

EXISTING

ROAD WIDTH

2% 2% 2% 2%

COMPACT CSBC TO MIN. FIELD

DENSITY OF 95% PER AASHTO T99

ASTM C-117/C136 -

AASHTO T-11/T-27

1.25" SIEVE

ANALYSIS

CSBC ROAD

AGGREGATE

SIEVE SIZE

(PERCENT

PASSING BY

WEIGHT)

1 1/4" 99 - 100 1" 80 - 100

3/4" 60 - 80 5/8" 50 - 80

No. 4 25 - 45 No. 40 3 - 18 No. 200 7.5 MAX

ASTM C-117/C136 -

AASHTO T-11/T-27

5-8" SIEVE

ANALYSIS

CSTC ROAD

AGGREGATE

SIEVE SIZE

(PERCENT

PASSING BY

WEIGHT)

1" 100 3/4" 99 - 100 5/8" 80 - 100

No. 4 46 - 66 No. 40 8 - 24 No. 200 10.0 MAX

ROAD ENTRANCE

-4 7.

4%

-62.3%

-54.8% 65

X X X X X X X X X X X

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/1

0/

7:

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

PUMP HOUSE AREA

GRAVEL PAD

CONSTRUCTION

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.1

GENERAL NOTES:

1. IT IS RECOMMENDED THAT THE CONTRACTOR FAMILIARIZE THEMSELVES WITH EXISTING SITE CONDITIONS PRIOR TO BIDDING.

2. FILL AND CSBC MATERIAL PLACEMENT IN ACCORDANCE WITH SPECIFICATION 31 23 00 - EARTHWORK

3. PROVIDE SITE CLEARING AS REQUIRED IN ACCORDANCE WITH SPECIFICATION 31 10 00 - SITE CLEARING

GRAVEL PAD BUILD OUT OVERVIEW

NTS

PROPOSED CONCRETE

ENTRYWAY SLAB

EXISTING SURFACE

NTS

PROPOSED SURFACE

NTS

PROPOSED BUILDING PAD SECTION

NTS

A

C1.1

ELECTRICAL POLE SECTION

NTS

B

C1.1

EXISTING BUILDING PAD SECTION

NTS

C

C1.1

EDGE OF GRAVEL PAD

GRAVEL

FILL

GRAVEL

FILL

GRAVEL

FILL

EXISTING GRADE

FINISH GRADE

EXISTING GRADE

FINISH GRADE

EXISTING GRADE

FINISH GRADE

CONCRETE PAD

APPROX. LOCATION

OF EDGE OF ROAD

APPROX. LOCATION

OF EDGE OF ROAD

ESTIMATED

FENCE LOCATION

APPROX. 14'

APPROX 80'28'

APPROX. 14'

DEMO EXISTING

20'X10' PUMP

STATION

PROPOSED 20'X10.5'

PUMP STATION

PROPOSED CONCRETE

ENTRYWAY SLAB

18" CSBC DEPTH

6" CSBC DEPTH

EXISTING 20'X10'

PUMP STATION

EXISTING

POWER POLE

EXISTING FENCELINE

EXISTING PUMP

STATION LOCATION

PROPOSED PUMP

STATION LOCATION

LAGOON CELL #1

LAGOON CELL #3

PROPOSED LOCATION OF PUMP STATION LOOKING NORTHWEST

GRAVEL PAD

BOUNDARY

ESTIMATED FILL AND GRAVEL QUANTITIES

MATERIAL QTY UNIT

FILL 110 CY

CSBC 40 CY

ESTIMATED

FENCE LOCATION

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/9

/2

:3

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

LAGOON BRUSH CLEARING,

FENCE REPAIR, SPLASH

BLOCK, AND SIGNAGE

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.2

NOTES:

FENCING LOCATION APPROXIMATE. CONTRACTOR TO VERIFY EXACT LOCATION AND LENGTH.

BRUSH SHALL BE TRIMMED TO 6" MOWER DECK HEIGHT. ANY BRUSH OVERHANG INTO THE

CLEAR SPACE SHALL BE TRIMMED AND REMOVED. TRIM AREA ON EXTERIOR SIDE OF THE

FENCELINE SHALL BE SIX FEET. TRIM AREA ON INTERIOR OF FENCELINE TO ROAD. TRIM

LAGOON SLOPES FROM WATERLINE TO TOP OF DIKE/ACCESS ROAD.

CONTRACTOR TO DISPOSE OF THE CUTTINGS IN AN ACCEPTABLE MANNER AT THEIR OWN

COST. CHIPPED OR MULCHED VEGETATION CAN BE DISPENCED FOR ONSITE DISPOSAL,

EXTERIOR OF THE FENCELINE. COORDINATE DISPERSION LOCATION AND QUANTITIES WITH

CONTRACTING OFFICER.

PROVIDE SIGNAGE EVERY 500 FEET AROUND THE LAGOON FACILITY FENCELINE AND AT

ENTERANCE GATE IN ACCORDANCE WITH DETAIL F/C2.1. EACH SIGN SHALL BE 10" X 14"

NON-REFLECTIVE ALUMINUM. SIGNS SHALL BE INSTALLED AT A 4 FOOT HEIGHT AND SECURED

WITH SIGN MOUNTING BRACKETS DESIGNED FOR WOVEN WIRE FENCING.

REMOVE AND REPLACE 6" FIXED-KNOT WOVEN WIRE FENCE WITH GRADUATED SPACING AT

LOCATION INDICATED IN-KIND. LINE UP WITH EXISTING FENCING GRID AND SECURE WITH

FENCING STAPLES. CONTRACTOR TO VERIFY AND MATCH EXISTING FENCING MATERIAL.

PROVIDE 36" CONCRETE SPLASH BLOCK AT THE 6-INCH PVC INLET FOR CELL #2 AND INLET FOR

CELL #3. PROVIDE COUPLER AND 6-INCH PVC PIPE EXTENSION TO CLEAR TOP OF SPLASH

BLOCK.

VIEW FACING EAST ACROSS LAGOON CELL NO. 1

KALALOCH LAGOON BRUSH CLEARING

VIEW FACING WEST ACROSS LAGOON CELL NO. 3

CLEAR BRUSH BACK 6'

FROM OUTSIDE AND

INSIDE OF FENCELINE

TRIM BRUSH AROUND LAGOON

PERIMETER FENCE BACK 6' FROM

FENCE ON BOTH SIDES

TRIM BRUSH AROUND LAGOON

PERIMETER FENCE BACK 6' FROM

FENCE ON BOTH SIDES

MOW AND TRIM BRUSH

ALONG THE SLOPES OF

THE LAGOONS

MOW AND TRIM BRUSH ALONG

THE SLOPE OF THE LAGOON

MOW AND TRIM BRUSH ALONG

THE SLOPE OF THE LAGOON

UP TO THE ACCESS ROAD

DAMAGED WIRE

FENCE LOCATION

PROVIDE CONCRETE SPLASH

BLOCK TO PREVENT EROSION

PROVIDE CONCRETE SPLASH

BLOCK TO PREVENT EROSION

6" PVC PIPE

6" PVC PIPE

CLEAR A 6' RADIUS

AROUND THE OVER

FLOW PIPE

EMERGENCY

OVERFLOW PIPE

REMOVE AND REPLACE

DAMAGED WIRE FENCING

SCALE IN FEET

0 40 80

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

X ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/9

/2

:3

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

SPRAY FIELD BRUSH

CLEARING & SIGNAGE

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.3

SCALE IN FEET

0 20 40

SPRAYFEILD BRUSH CLEARING (LOOKING SOUTH)

MOW THE ENTIRE SPRAYFIELD

UP TO THE TREE LINE

SPRAYFIELD BRUSH CLEARING

PRIOR TO CONSTRUCTION

MOW SPRAYFIELD UP TO

THE TREE LINE.

NOTES:

1. BRUSH SHALL BE TRIMMED TO 6" MOWER DECK HEIGHT. ANY BRUSH OVERHANG INTO THE CLEAR

SPACE SHALL BE TRIMMED AND REMOVED. OPERATOR TO TAKE CAUTION OF THE ABOVE GROUND

PIPE AND SPRINKLER HEADS. PIPE DAMAGE RESULTING FROM MOWING OPERATIONS WHILE THE

SPRAY FIELD IN STILL IN OPERATION WILL BE REPAIRED AT THE COST OF THE CONTRACTOR. MOW

REMAINDER OF FIELD ONCE EXISTING LATERALS HAVE BEEN REMOVED.

2. PROVIDE ONE T-POST AND SIGNAGE AT ENTRANCE TO FACILITY AS SHOWN IN THE DRAWING AND IN ACCORDANCE WITH DETAIL C2.1/E. SIGN SHALL BE 18" X 12" NON-REFLECTIVE ALUMINUM. SIGN

SHALL BE INSTALLED AT A 5 FOOT HEIGHT AND SECURED WITH SIGN MOUNTING BRACKETS

DESIGNED FOR T-POSTS.

NO TRESPASSING

SIGN AND T-POST

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/2

/2

:5

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

MANUAL HEADWORKS

PLAN AND SECTION

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.4

MANUAL HEADWORKS SCREEN SIDE SECTION

NTS

MANUAL HEADWORKS SCREEN PLAN

MIN 18"

COVER

NOTES:

1. BED ALL PIPE WITH 6" MIN PIPE BEDDING IN ACCORDANCE

WITH SPECIFICATIONS.

2. HEADWORKS UNIT SHALL BE MANUFACTURED IN

ACCORDANCE WITH DRAWINGS AND SPECIFICATION 46 20 01 -

WASTEWATER HEADWORKS.

3. CUSTOM SCREEN RAKE TO BE SUPPLIED BY HEADWORKS

MANUFACTURER.

4. PVC EXPOSED TO UV SHALL BE PAINTED A LIGHT NEUTRAL

COLOR COMPATIBLE WITH PVC PRODUCTS AND IN

ACCORDANCE WITH SPECIFICATION 40 05 00 - PIPE AND

FITTING.

5. 3/4" CHAMFER VERTICAL AND HORIZONTAL EDGES OF

CONCRETE BASIN.

6. GRATING CHANNEL SHALL BE PROVIDED AROUND INSIDE

PERIMETER. GRATING TO SIT FLUSH WITH TOP OF CONCRETE.

7. CONTRACTOR TO PROVIDE 32 GALLON SHOP TRASH CAN - 27

3/8" X 25 1/2" (H X D) - COLOR GRAY.

8. INSTALL PVC BALL VALVES IN ACCORDANCE WITH

SPECIFICATION SECTION 40 05 51 - VALVES-BASIC

REQUIREMENTS.

9. OUTLET FLANGE POSITIONED VERTICALLY SO OUTER EDGE

DOES NOT SIT BELOW THE BOTTOM FLANGE OF THE TANK.

10. PROVIDE PIPE INSULATION ON ALL PIPE EXPOSED TO

OUTDOOR AMBIENT AIR IN ACCORDANCE WITH 40 05 00 - PIPE

AND PIPE FITTING.

11. CONTRACTOR TO TEMPORARILY PLUG CELL #1 AND #2

OUTLET PIPES OR PUMP DOWN LAGOON CELLS KEEP LAGOON

WATER OUT OF WORK AREA DURING INSTALLATION

6"

6" 10' 3"

9' 3"

2'

2'3'

MIN

MIN. 2% SLOPE

6"

6"

AS

REQUIRED

NTS

6"

30"

30"

3'

MIN.

6-INCH SCH

40 PVC

SLOPE FOR POSITIVE DRAINAGE

TOWARDS DRAIN

INSTALL NEW

4-INCH SCH 80 PVC

SCH 80

6-INCH PVC

6" SS SHIELDED

RUBBER COUPLING

SS SHIELDED RUBBER

COUPLING CIP TO PVC

TO EXISTING LAGOON

CELLS NO. 1 AND NO. 2

6-INCH PVC TRUE

UNION BALL

VALVE S X S

6" CONCRETE

COLLAR

CAST IRON

VALVE BOX

5-1/4" LID "SEWER"

INSTALL

REMOVABLE

GRATING

REMOVE SPLITTER BOX AND

PROTECT CIP DISCHARGE

PIPES FOR CONNECTION

6-INCH CONCRETE

COLLAR

DRAIN CHUTE

1/2" SCREEN

1/2" SCREEN

PERFORATED DECK

DRAIN CHUTE

RAKE

6-INCH TRUE

UNION BALL VALVE

S X S, CENTERED

4" MIN. STUBOUT

CONNECT TO EXISTING

6-INCH PVC FORCE MAIN

SXS 90 ELBOW

SCH 80 PVC

SEE GRATE

DETAIL C2.1/D

32 GALLON

TRASH CAN

4" PIPE

PENETRATION SEAL

SXS 90 ELBOW

SCH 80 PVCSXS 90 ELBOW

SCH 80 PVC

SXS 90 ELBOW

SCH 80 PVC

PVC PAINTED

PIPE

EXISTING SPLITTER

BOX (TO BE REMOVED)

TOP OF WALL

POSITIVE SLOPE

SLOPE FOR POSITIVE

DRAINAGE TOWARDS DRAIN

0.5'

3.0'

6"

1" CHANNEL

FOR GRATING

6 X 4 SCH 80 PVC

REDUCER S X SPVC WATERSTOP

70"

10"

5.75"11.875"

STAINLESS

STEEL PIPE

STRAP

INSTALL 2" PLASTIC DRAIN

WITH 4" STAINLESS STEEL

STRAINER INSTALL 2" PLASTIC DRAIN WITH

4" STAINLESS STEEL STRAINER

CSBC ROAD BASE 6" MIN THICKNESS,

95% COMPACTION

SLOPE TO

DRAIN

SLOPE TO

DRAIN

CUSTOM RAKE EXAMPLE

NTS

0.5'

#4 REBAR AT 12" E.W. TYP.

2-INCH CLEAR COVER SIDE AND TOP

WATERSTOP

6" PIPE

PENETRATION SEAL

6"

#4 REBAR AT 12" E.W. MID-DEPTH TYP.

2-INCH CLEAR COVER TOP

4-INCH FLANGE

INLET

6-INCH FLANGE

OUTLET

2-INCH SS

OVERFLOW PIPE

FINISHED GROUND

6" 6"

6"

6" X 6" CONCRETE

COLLAR

NO GRATING

NO GRATING

GRATING 1" CLEAR

FROM TANK

6-INCH SCH

80 PVC

TRANSITION

FROM SCH 80

TO SCH 40

TANK ISOMETRIC VIEW

NTS

SLOPE FINISH GRADE

AWAY FROM STRUCTURE

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/9

/2

:3

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

FLOATING DOCK SYSTEM

PLAN AND PROFILE

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.5

SCALE IN FEET

0 40 80

NOTES:

1. EACH DOCK SHALL BE A MODULAR DOCK SYSTEM CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH

SPECIFICATION 13 34 60 - PRE-FABRICATED DOCKS AND MANUFACTURER'S INSTRUCTIONS.

2. SEE SHEET C2.2 AND C2.3 FOR FLOATING DOCK AND ANCHORING DETAILS.

3. CONTRACTOR TO VERIFY GANGWAY LENGTHS AND ANCHOR SLAB LOCATIONS WITH THE CONTRACTING

OFFICER.

CELL NO. 2

CELL NO. 3

CELL NO. 1

ANCHOR BLOCK

8'

4'

ANCHOR BLOCK

ANCHOR CHAIN

FLOATS SEE

SHEET C2.2/D

16'

VARIES SEE PLAN

FLOATS SEE

SHEET C2.2/D

FLOATING DOCK SEE

SHEET C2.2/B, C2.2/C

GANGWAY

GANGWAY SEE SHEET C2.2/A,

C2.2/B, C2.2/F

16' FLOATING

DOCK

16' FLOATING

DOCK

16' FLOATING

DOCK

CONCRETE

ANCHORING SLAB SEE

SHEET C2.3/A, C2.3/B,

C2.3/C, C2.3/D, C2.3/E

ANCHOR NEAR TOE

OF LAGOON

FLOATING DOCK SEE

SHEET C2.2/B, C2.2/C

25' GANGWAY

15' GANGWAY

15' GANGWAY

FLOATING DOCK PROFILE VIEW

FLOATING DOCK SECTION VIEW

CONCRETE ANCHOR SLAB

3'

MIN. 12"

DEPTH 5' SLAB

WIDTH

APPROX 3:1 OR 4:1

FIELD FIT CONCRETE

ANCHOR SLABAPPROX. 10'

CSBC ROAD BASE

6" MIN THICKNESS,

90% COMPACTION

#4 REBAR AT 12" E.W. TYP.

2" CLEAR COVER SIDE AND TOP

ENSURE GANGWAY HINGE

BOLTS AVOID REBAR

FIELD FIT CONCRETE

ANCHOR SLAB

FIELD FIT CONCRETE

ANCHOR SLAB

FURTHER DOWN SLOPE

CELL NO. 1

OUTLETCELL NO. 2

OUTLET

4" REBAR AT 12" E.W. TYP.

3" CLEAR COVER BOTTOM

2" CLEAR COVER SIDE

EXISTING

GROUND

EXISTING

GROUND

ANCHOR CHAIN

APPROX. 10' FROM PROPOSED

DECANTER HEAD

FLOATING DOCK SITE PLAN LAYOUT

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/9

/2

:3

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

LEVEL SENSOR, FLOAT

SWITCH, AND POND GAUGE

PLAN AND PROFILE

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.6

LEVEL SENSOR DOCK CONNECTION

LAGOON CELL 3

SIGNAL

CABLE

SECURE PRESSURE

TRANSDUCER TO

CONCRETE BLOCK

POND STAFF

GAUGE

POLYETHYLENE

LIFTING LINE

SECURE TO DOCK

4" SCH 80 PVC PIPE

72"

MAINTAIN MIN. 10' OF

SEPARATION BETWEEN

DOCK AND GAUGE

NYLON UV RATED SPLIT

LOOM ELECTRICAL CONDUIT

SECURED TO DOCK

3"

18" DIA.

1/4" SS EYEBOLT

SECURE FLOAT SWITCH ASSEMBLY AND PRESSURE

TRANSDUCER TO CONCRETE BLOCK

ADJUST ALARM, HIGH AND

LOW LEVEL FLOAT SWITCH

DEPTHS IN THE FIELD

FLOAT SWITCH

ASSEMBLY

PROVIDE 8' OF WIRE SLACK

COILED AND HUNG OFF DOCK

NOTES:

1. POND LEVEL GAUGE SHALL BE 4" WIDE, CONSTRUCTED OF FIBERGLASS, POLE

MOUNTABLE WITH 100THS, FEET UNITS OF MEASUREMENT. GAUGE TO BE ATTACHED TO

PVC PIPE WITH STAINLESS STEEL HARDWARE.

2. FLOAT SWITCH ASSEMBLY AND PRESSURE GAUGE TRANSDUCER IN ACCORDANCE WITH

SPECIFICATION 40 71 00 - INSTRUMENTATION.

3. INSTALL INSTRUMENTATION AND GAUGE IN LAGOON CELL #3.

4. COORDINATE WITH CONTRACTING OFFICER FOR FLOAT HEIGHTS.

LEVEL SENSOR, FLOAT SWITCH AND STAFF GAUGE LOCATIONS

FLOAT SWITCH/PRESSURE

TRANSDUCER ASSEMBLY

POND STAFF

GAUGE

SCALE IN FEET

0 10 20

POND STAFF GAUGE INSTALATION

JUNCTION BOX

CONDUIT TO

PUMP STATION

SECURE PIPE TO 24" X 24" X 3"

CONCRETE BLOCK

PLACE STAFF GAUGE

AS VERTICALLY AS

POSSIBLE

SECURE FLOAT STEM

TO CONCRETE BLOCK

PVC

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/9

/2

:3

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

FLOATING DECANTER

PLAN AND SECTION

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.7

NOTES:

1. LAGOON CELL NO. 3 MUST BE PUMPED TO APPROX. 2-3 FOOT WATER LEVEL PRIOR TO PLACING CONCRETE.

CONTRACTOR TO COORDINATE WITH CONTRACTING OFFICER FOR LAGOON DEWATERING AND PLACEMENT.

2. DECANTER MANUFACTURER TO PROVIDE DECANTER UNIT IN ACCORDANCE WITH SPECIFICATION 46 20 00.

3. MANUFACTURER TO PROVIDE ALL DECANTER COMPONENTS.

4. PROVIDE 3/4" CHAMFER ON ALL CONCRETE EDGES.

5. ALL DISTURBANCE TO LAGOON LINER SHALL BE REPLACED WITH BETONITE HOLE PLUG. THICKNESS SHALL

MATCH EXISTING CLAY LINER THICKNESS WITH A 1-FOOT MINIMUM THICKNESS.

6. FLANGE ADAPTOR SHALL BE IN ACCORDANCE WITH SPECIFICATION 33 31 23 - EFFLUENT SEWER PIPELINE

AND APPURTENANCES.

7. DECANTER ORIFICES TO BE LOCATED 12-18" BELOW WATER SURFACE.

2'

VA

R

IE

S

HIGH WATER

LEVEL

LOW WATER

LEVEL

CONCRETE PIPE

ANCHOR BLOCK

FLOATING

DECANTER

FLOATING

DECANTER

TOP OF DIKE

CONCRETE

PIPE ANCHOR

TOP OF DIKE

3' MIN.

COVER

6-INCH SCH 10 TYPE 304

STAINLESS STEEL PIPE 6-INCH SWIVEL

JOINT

FLOATING DECANTER SECTION VIEW

FLOATING DECANTER PLAN VIEW

5'

TOE OF

LAGOON

6-INCH SCH 80

PVC

CONNECT TO

PUMP STATION

6-INCH SCH 10 TYPE 304

STAINLESS STEEL PIPE

20'

MANUFACTURER TO

PROVIDE DIMENSIONS

AND DETAILS OF

DECANTER SYSTEM

INTAKE

MANIFOLD

24"

CONTRACTOR TO

FIELD FIT PIPING TO

PUMP STATION

DEPTH

VARIES

CONTRACTOR TO

FIELD FIT PIPE TO

PUMP STATION

SCH 10 TYPE 304 STAINLESS

STEEL PIPE SPOOL. FLANGES

SHALL BE WELDED ON AND

AND TAPPED FOR SS STUDS.

FLANGE ADAPTER TO

6-INCH SCH 80 PVC. CAST

IRON. WRAP IN PLASTIC.

BASE ROCK 6" MIN THICKNESS,

90% COMPACTION

#4 REBAR AT 12" E.W. TYP.

2" CLEAR COVER SIDE

3" CLEAR COVER BOTTOM

SWIVEL SUPPORT

STAND

FLOATING DECANTER FRONT VIEW

NTS

A

C1.7

APPROX. 80"

DECANTER FLOAT

BARREL

DECANTER HEAD

DECANTER HEAD ORIFICES SIZE, LOCATION, AND

SPACING TO BE DETERMINED BY MANUFACTURER

AND COORDINATED BY THE CONTRACTOR

BRACKETS CONNECTING

DECANTER FLOAT BARREL

TO DECANTER HEAD

FLOATING DECANTER SIDE VIEW

NTS

B

C1.7

DECANTER FLOATING BARREL

(18-INCH DIAMETER)

DECANTER HEAD

(8-INCH DIAMETER)

6-INCH SCH 10

TYPE 304

STAINLESS STEEL

PIPE

BRACKETS CONNECTING DECANTER

FLOAT BARREL TO DECANTER HEAD

6" SCH 80 PVC

#4 REBAR AT 12" E.W. TYP. 2"

CLEAR COVER TOP AND SIDE

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/3

0/

6:

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

CONCRETE PREFABRICATED

PUMP HOUSE

PLAN AND ELEVATIONS

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.8

NOTES:

ALL DESIGN CRITERIA BELOW TO BE CONFIRMED OR

ADJUSTED BY THE PRECAST MANUFACTURER AND BY A

LICENSED ENGINEER IN THE STATE OF WASHINGTON.

ALL MATERIAL SUPPLIED NEEDS TO BE PART OF THE

CORROSIVE ENVIRONMENTAL PACKAGE.

SUGGESTED DESIGN CRITERIA:

GENERAL NOTES APPLY TO ALL PANELS UNLESS

SPECIFICALLY NOTED OTHERWISE

2021 INTERNATIONAL BUILDING CODE

LOADS:

WIND: 120 MPH EXP D

SEISMIC: ZONE 4

SNOW: 250 PSF ROOF LOAD

FLOOR LIVE LOAD: 400 PSF

MATERIALS:

CONCRETE: F'ci = 2500 PSI

F'C = 5000 PSI

STEEL:

REBAR=ASTM A615 GRADE 60

WELDING NOT ALLOWED

MIN LAP SPLICE IS 40 DIAMETERS

ALL MESH IS 4X4XW8XW8

MIN. MESH LAP IS TWO SQUARES

MESH IS TO BE CENTERED IN PANEL

PLATES & BARS=ASTM A36 FY=36 KSI

PANEL THICKNESS:

FLOOR = 5"

WALLS = 4"

ROOF = 4 1/2"

COLOR: SEE ARCHITECTURAL NOTE

TEXTURE: WALLS - BARNWOOD

ROOF - CEDAR SHAKE

CASTING TOLERANCE:

OVERALL LENGHT OR WIDTH:

10 FT OR UNDER = +/-1/8"

10 TO 20 FT = +1/8", -3/16"

20 TO 40 FT = +/-1/4"

TOTAL THICKNESS = -1/8, +1/4

VARIATION FROM SQUARE = +/-1/8 PER 6 FT OF

DIAGONAL

LOCAL SMOOTHNESS = 1/4" IN 10 FT

SWEEP = +/-1/4"

POSITION OF TENDONS = +/-1/4"

POSITION OF BLOCKOUTS = +/-1/4"

SIZE OF BLOCKOUTS = +/-1/4"

POSITION OF EMBEDS = +/-1/4"

TIPPING AND FLUSHNESS OF PLATES = +0, -1/4

BOWING = LENGTH/360

END SQUARENESS = +/-1/8"

SUB-BASE PREPARATION:

PRIOR TO PLACEMENT OF BUILDING, LEVEL THE

EXISTING GROUND, A PROPERLY PREPARED SUB-BASE

SHALL BE PROVIDED. SUB-BASE SHALL BE A MINIMUM

OF 18" THICK AND CONSIST OF CSBC ROAD BASE

MATERIAL COMPACTED TO 95% OF OPTIMUM DENSITY

IN ACCORDANCE WITH ASTM D1557. FINISHED

SURFACE OF SUB-BASE SHALL BE FLAT AND LEVEL,

WITH MAXIMUM DEVIATION OF -1/2", +0" FROM TRUE

HORIZONTAL PLANE. REFER TO MANUFACTURER'S

BUILDING HANDLING SHEET FOR SUB-BASE

REQUIREMENTS DURING BUILDING PLACEMENTS.

REFER TO SPECIFICATION 13 34 21 - PRE-FABRICATED

BUILDING FOR CSBC MATERIAL AND COMPACTION

DETAILS.

SIDE ELEVATION

C1.8 NTS

FRONT ELEVATION

C1.8 NTS

FLOOR PLAN

C1.8 NTS

ROOF PLAN

C1.8 NTS

'-6

20'

4" TYP

21'

'-1

1"

R

SL

O

PE

R

SL

O

PE

21' 20' 6"

6' -6

INTAKE LOUVER

INTAKE LOUVER

5" K STYLE ALUMINUM

GUTTER WITH LEAF GUARD

FOR RAINWATER COLLECTION

GUTTER FOR

RAINWATER

COLLECTION

ARCHITECTURAL:

EXTERIOR COLOR: MALIBU TAUPE

EXTERIOR WALL TEXTURE: BARNWOOD

ROOF COLOR: CHARCOAL GRAY

ROOF TEXTURE: CEDAR SHAKE

EXTERIOR DOOR COLOR: JAVA BROWN

INTERIOR COLOR: WHITE

GUTTER COLOR: MALIBU TAUPE

ROUGH IN

12-1/2"

ROUGH IN

12-1/2"

EXHAUST FAN

(BACK SIDE OF

BUILDING)

18" ROUGH IN

16-1/2"

ROUGH IN

16-1/2"

16"

MALIBU TAUPE CEDAR SHAKE BARNWOOD

2' MIN.

CLEAR

2' MIN.

CLEAR

JAVA BROWNCHARCOAL GRAY

6"

6"

12"

RED LED WARNING

LIGHT AND

PENETRATION

DARK SKY COMPLIANT LED

STANDARD WALL PACK WITH

PHOTOCELL AND PENETRATION

24"48"

60"

DOWNSPOUT

HINGE

3" X 4" DOWNSPOUT

TO RAIN BARREL

GABLE VENT (EACH SIDE) TO BE

SIZED AND LOCATED BY BUILDING

MANUFACTURER

5-INCH THICKNESS #4 REBAR

AT 18" E.W. TYP. MID-DEPTH

2" CLEAR COVER

FORM SAVER TO RECEIVE

THREADED #4 BARS TO MATCH

SPACING IN SLAB. 18" DEPTH

INTO SLAB. MID DEPTH OF SLAB

CONCRETE

ENTRYWAY

SLAB

CSBC ROAD BASE

6" MIN THICKNESS,

95% COMPACTION

3'

OUTDOOR

FAUCET

FINISHED SURFACE

SLOPE AWAY FROM

STRUCTURE

POSITIVE

SLOPE MAX. 2%

LEFT HAND

OUT-SWING

5"

2'

11'-11" 10'-6"2'-0"

SUB BASE THICKNESS

VARIES, 18" MINIMUM

EXTEND TO FROST

DEPTH

72" X 80" FIBERGLASS

DOUBLE DOORS

CSBC ROAD BASE

6" MIN THICKNESS,

95% COMPACTION

RAIN BARREL

SYSTEM

NATIVE SUBGRADE

SECURE GUTTER WITH INDUSTRY

STANDARD MOUNTING BRACKETS

AND CONCRETE ANCHORS

EXHAUST FAN

FURR INTERIOR WALLS W/2X4 STUDS, AND THE CEILING

W/2X6 STUDS. THERMAX RIGID FOAM INSULATION AND

3/4" ACX FIRE RETARDANT PLYWOOD. (MINIMUM WALL

SYSTEM INSULATION RATING OF R-21) PAINT WITH 2

COATS WHITE FIRE-RETARDANT ENAMEL. PROVIDE

BLOCKOUTS IN FURRING AT ALL OPENINGS. CAULK ALL

INTERIOR SEAMS AND SCREW HEADS TWICE.

NOTE:

CONTRACTING OFFICER TO PROVIDE APPROVAL OF

COLORS PRIOR TO CONSTRUCTION OF PREFAB

BUILDING.

8' -5

5"

FILL SO THAT FINISH GRADE

HEIGHT ( PERIMETER SIDEWALK

OR EARTH) IS EQUAL TO FLOOR

SLAB HEIGHT

PROVIDE 4" FLEXIBLE

DOWNSPOUT EXTENSION

TO FENCELINE

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/3

0/

6:

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

PUMP HOUSE PIPING 149

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.9

SIDE SECTION

C1.9 NTS

FLOOR PLAN

C1.9 NTS

2" AIR RELEASE VALVE

1" BALL VALVE

STATIC MIXER WITH

INJECTION PORT

FLOW METER

PRESSURE GAUGE

WITH OUTPUT SIGNAL

SMOOTH NOSE

SAMPLING TAP

DECHLORINATION

TANK

CHLORINE TANK

1" GRAY PVC CONDUIT FOR

DECHLORINATION PE TUBING

(BEHIND 4-INCH PIPE)

4" SCH 80 PVC

2" X 4" REDUCER

PRESSURE GAUGE

WITH OUTPUT SIGNAL

6" X 3" ECCENTRIC

REDUCER

6" SCH 80 PVC

ELECTRICAL PANELS

METER

PUMP

MOTOR

PIPE BRACKET

PIPE BRACKET

2" AIR RELEASE VALVE

STATIC MIXER WITH

INJECTION PORT

PRESSURE GAUGE

SAMPLING TAP

DECHLORINATION

TANK

CHLORINE TANK

1 1/4" GRAY PVC

CONDUIT

4" PVC SCH 80

4" PVC PIPE

PRESSURE GAUGE

6" X 3" ECCENTRIC

REDUCER

6" PVC SCH 80

METER

MOTOR

SS PIPE BRACKET

SS PIPE BRACKET

PUMP

CONCRETE

PEDESTAL

FLOW METER

4" SCH 80 PVC

SS PIPE BRACKET

5-TIER HEAVY DUTY

PLASTIC STORAGE SHELF

71"H X 36"W X 18"D

60" X 30" LAB

WORKBENCH

UTILITY SINK

EYE WASH

STATION

4" SS FLOOR

DRAIN

72" X 80" COMMERCIAL

DOUBLE DOOR (TYP.)

2'

2'2'

4" UNION

CONNECT EYE WASH DRAIN LINE TO

THE UTILITY SINK DRAIN LINE

2% MIN SLOPE AND

DAYLIGHT TO

LAGOON CELL NO. 3

RAIN WATER COLLECTION

TANK WITH PUMP

6" X 2" TEE

3/4" SCH 80 STUB OUTS

FOR RAIN BARREL

CONNECTION

MINIMUM LENGTH 3X PIPE DIAMETER OR

PER MANUFACTURERS RECOMMENDATION

PRESSURE

TANK

ASSEMBLY

GENERAL NOTES:

1. ALL WORK SHALL BE IN ACCORDANCE WITH THE UNIFORM PLUMBING CODE.

2. PROVIDE X1 SCH 80 3-INCH AND X1 SCH 80 2-INCH BLIND FLANGE. PROVIDE X1 3-INCH AND X1

2-INCH EPDM GASKET. THIS WILL ALLOW A PUMP TO BE ISOLATED IF THE OTHER PUMP IS

REMOVED FOR SERVICE.

3. PROVIDE AND INSTALL FLOW METER AND SUCTION/DISCHARGE PRESSURE GAUGES IN

ACCORDANCE WITH SPECIFICATION 40 71 00 - INSTRUMENTATION.

4. PROVIDE AND INSTALL A 7.5" PLASTIC NON-POTABLE WATER SIGN ABOVE SINK IN ACCORDANCE

WITH DETAIL C2.0/E.

5. PRESSURE TANK ASSEMBLY TO INCLUDE PRESSURE GAUGE, RELIEF VALVE, CHECK VALVE DRAIN, AND CUTOFF PRESSURE SWITCH. IN ACCORDANCE WITH SPECIFICATION 22 42 00 - PLUMBING

FIXTURES.

6. PROVIDE 60" X 30" LAB WORKBENCH, PHENOLIC TOP, HEAVY GAUGE STEEL FRAME WITH 1000 LB

CAPACITY, ADJUSTABLE HEIGHT 29" - 39".

7. PROVIDE AND INSTALL HEAVY DUTY STAINLESS STEEL HOSE HANGER NEAR HYDRANT ON

EXTERIOR OF BUILDING.

8. PROVIDE AND INSTALL CHEMICAL TANK ASSEMBLIES IN ACCORDANCE WITH 22 42 00 - PLUMBING

FIXTURES.

9. 3/4" CHAMFER ON CONCRETE PEDESTAL. CONCRETE PEDESTAL TO MATCH SIZE OF PUMP SKID

BASE.

10. PROVIDE 2" VINYL PIPE LABEL DIRECTIONAL FLOW ARROWS, GRAY BACKGROUND AND WHITE

ARROW.

11. PROVIDE AND INSTALL PUMPS AND PUMP MOTORS IN ACCORDANCE WITH SPECIFICATION

SECTION 46 20 03 - WASTEWATER EFFLUENT PUMPS.

12. CHEMICAL METERING PUMPS SHALL BE CONNECTED TO THEIR RESPECTIVE STATIX MIXER PORTS WITH 3/8" PE POLYETHYLENE TUBING 3/8" OD AT 300 PSI. SPLICING OF TUBING IS NOT ALLOWED.

13. CHEMICAL TANKS, METERING PUMPS AND SPILL PROTECTION PLATFORM SHALL BE IN

ACCORDANCE WITH 46 20 40 - MISCELLANEOUS WATER APPURTENANCES.

14. AIR VALVE IN ACCORDANCE WITH SPECIFICATION 46 20 04 - MISCELLANEOUS APPURTENANCES.

15. ALL WASTEWATER EFFLUENT PIPE AND FITTINGS SHALL BE SCH 80 PVC.

16. PROVIDE PIPE INSULATION ON ALL PIPE EXPOSED TO OUTDOOR AMBIENT AIR IN ACCORDANCE

WITH 40 05 00 - PIPE AND PIPE FITTINGS.

17. BUILDING DESIGN SHALL INCLUDE PIPE AND CONDUIT PENETRATIONS. ALL PENETRATIONS SHALL

BE GROUTED.

18. OPERATOR EQUIPMENT - PROVIDE 1-1/4" NASCO SLUDGE JUDGE II 15-FT SAMPLER.

19. OPERATOR EQUIPMENT - PROVIDE 12-FT NASCO SWING SAMPLER.

20. OPERATIONAL SUPPLY - PROVIDE CAPTOR 30% CALCIUM THIOSULFATE DECHLORINATION LIQUID

15 GALLON DRUM.

CONTRACTOR TO FIELD

FIT PLUMBING FROM

PUMP3/4" FROST FREE ANTI-SIPHON

OUTDOOR FAUCET

HEAVY DUTY

HOSE HANGER

SLOPE TO DRAIN

2" SCH 40 PVC

SCH 80 PVC LONG

RADIUS BEND

6"

8"

18" MIN.

8"

SOCKET FLANGE AND FULL

FACED EPDM GASKET (TYP.)

4" TEE AND 3/4"

THREADED HOSE BIB

#4 EMBEDED 4". DRILL & EPOXY.

24" OC ALONG PERIMETER. 6"

EDGE DISTANCE.

2' MIN.

3/4" SCH 80 STUB

OUTS FOR RAIN

BARREL CONNECTION

2' MIN.

4" CLEAR PVC TRUE UNION

SWING CHECK VALVE

PUMP SKID

23"

3-SHELF POWDER COATED

STEEL ADJUSTABLE WALL

STORAGE RACK 40"W X 24"D

2X PIPE DIAMETER MIN.

CONCRETE

PEDESTAL

DRAIN BACK

TO LAGOON

CELL NO. 3

TO EFFLUENT SPRAY FIELDFROM DECANTER

FROM DECANTER TO EFFLUENT SPRAY FIELD

RUN DECHLORINATION TUBING

THROUGH CONDUIT TO STATIC MIXER

CONNECT CHLORINATION TANK

THROUGH INJECTION PORT

SPILL PROTECTION PLATFORM

LOCATE GRAYS HARBOR PUD FEED THROUGH METER AND 240V 3PH 225A MAIN

SERVICE DISCONNECT ON EXTERIOR BUILDING.

MANUAL TRANSFER SWITCH ON EXTERIOR OF BUILDING.

3 PH SAFETY DISCONNECT SWITCHES FOR PUMPS

3 PH SAFETY DISCONNECT SWITCHES FOR AERATORS (EXISTING, SALVAGE AND

REUSE H-FRAME, REPLACE NEMA 4X PANEL IN-KIND, REUSE SAFETY SWITCHES)

PANEL 225 A, 3 PH, 240/120 OPEN DELTA WITH SURGE PROTECTION DEVICE

PANEL PLC & PUMP CONTROL

PANEL AERATOR #1 3 POLE MOTOR STARTER (EXISTING, SALVAGE AND REUSE)

PANEL AERATOR #2 3 POLE MOTOR STARTER (EXISTING, SALVAGE AND REUSE)

PANEL AERATOR #1 TIMER (EXISTING, REUSE)

PANEL AERATOR #2 TIMER (EXISTING, REUSE)

PUMP STATION ELECTRICAL PLAN

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/3

0/

6:

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

PUMP HOUSE ELECTRICAL 149

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.10

GENERAL NOTES:

1. ALL EQUIPMENT SHOWN IS SCHEMATIC AND IS SHOWN FOR REFERENCE ONLY.

TREATMENT BUILDING EQUIPMENT, POWER AND LIGHTING ELECTRICAL DESIGN

AND LAYOUT SHALL BE DEVELOPED BY THE BUILDING MANUFACTURER OR

CONTRACTOR.

2. BUILDING DESIGN SHALL INCLUDE ELECTRICAL PENETRATIONS. ALL

PENETRATIONS SHALL BE GROUTED.

3. BUILDING MANUFACTURER OR CONTRACTOR TO PROVIDE ELECTRICAL PLANS

BASED ON THESE DRAWINGS IN ACCORDANCE WITH SPECIFICATION 13 34 21 -

PRE-ENGINEERED BUILDINGS.

4. PLC, VFD AND HMI INSTALLATION AND PROGRAMMING IN ACCORDANCE WITH

SPECIFICATIONS 40 63 43 - PROGRAMABLE LOGIC CONTROLLERS, 40 63 44 - HMI

PROGRAM AND TOUCHSCREEN, 40 67 63 - UNINTERUPTABLE POWER SUPPLY, AND

26 29 23 - VARIABLE FREQUENCY DRIVES.

5. SEE SPECIFICATION 23 81 00 FOR EXHAUST FAN AND LOUVER CONFIGURATION.

6. SEE SPECIFICATION 23 82 00 FOR WALL MOUNTED HEATER CONFIGURATION.

DETAIL NOTES:

EF

L

AER-1

GFI GFI

GFI

GFI

L1-1

MECHANICAL EQUIPMENT SCHEDULE

KEY DISCRIPTION VOLTS PH LOAD

CMP-1 CHEMICAL METERING PUMP #1 120 1 1/6 HP

CMP-2 CHEMICAL METERING PUMP #2 120 1 1/6 HP

L LOUVER 120 1 20 W

EF EXHAUST FAN 120 1 1/3 HP

EUH ELECTRIC UNIT HEATER 240 1 3000 W

PMP-1 EFFLUENT PUMP #1 240 3 15 HP

PMP-2 EFFLUENT PUMP #2 240 3 15 HP

AER-1 AERATOR #1 240 3 1 1/2 HP

AER-2 AERATOR #2 240 3 1 1/2 HP

RWP RAIN WATER PUMP 120 1 1 HP

CONDUIT FOR FLOAT SWITCH

CABLES AND PRESSURE

TRANSDUCER SIGNAL CABLE

GFI RWP

RED LED WARNING

LIGHT

DARK SKY COMPLIENT LED

STANDARD WALL PACK

WITH PHOTOCELL

LIGHTING FIXTURE SCHEDULE:

L1: LED VAPOR TIGHT FIXTURE STRIPS 88 WATTS ADJUSTABLE 7,700 -

8,900 - 10,500 LUMENS 3000K - 4000K - 5000K 120-277V 8 FT

L2: EXTERIOR DARK SKY COMPLIANT LED STANDARD WALL MOUNTED

CLEAR PRISMATIC LENSES WITH PHOTOELECTRIC CONTROL

L3: STEADY-ON RED EXTERIOR LED WARNING LIGHT, 120V

POLYCARBONATE LENS, NEMA 4X, WALL MOUNTED.

NTS

SS

STUBOUT FOR PUMP

CIRCUITS FROM

CONTROL PANEL

L2

L3

JUNCTION BOX FOR FLOAT

SWITCHES AND PRESSURE

TRANSDUCER SIGNAL CABLE

CONDUIT FOR

AERATORS

STUBOUT FOR PRESSURE

TRANSDUCER SIGNAL AND

FLOAT SWITCH CABLE

PUMP CONTROL PANEL SCHEDULE:

1. PROGRAMMABLE LOGIC CONTROLLER

2. TOUCH SCREEN PANEL

3. UNINTERRUPTIBLE POWER SUPPLY

4. EFFLUENT PUMP #1 VARIABLE FREQUENCY DRIVE

5. EFFLUENT PUMP #2 VARIABLE FREQUENCY DRIVE

PLC INPUT/OUTPUT:

1. INPUTS

A. PRESSURE TRANSDUCER 4-20 mA

B. ALARM LEVEL FLOAT SWITCH DISCRETE

C. HIGH LEVEL FLOAT SWITCH DISCRETE

D. LOW LEVEL FLOAT SWITCH DISCRETE

E. SUCTION LINE PRESSURE GAUGE 4-20 mA F. DISCHARGE LINE PRESSURE GAUGE 4-20 mA G. FLOW METER 4-20 mA

2. OUTPUTS

A. EFFLUENT PUMP #1 CONTROL, VFD, 2-WIRE START

B. EFFLUENT PUMP #2 CONTROL, VFD, 2-WIRE START

C. CHLORINE METERING PUMP CONTROL, 2-WIRE START

D. DECHLORINATION METERING PUMP CONTROL, 2-WIRE START

E. ALARM LIGHT CONTROL, 2-WIRE START

RWP JUNCTION BOX

NEW GRAYS HARBOR PUD UTILITY 240V 3 PH

FEED-THRU METER. POWER FROM 3 PH EXISTING

OVERHEAD UTILITY LINE POLE.

EUH

STUBOUT FOR

AERATOR POWER

RWP MANUAL RUN SWITCH

S

EXHAUST FAN MANUAL

RUN SWITCH

CMP-1 CMP-2

L1-2

PMP-2

PMP-1

OVERHEAD LIGHT

SWITCH FOR L1-1 & L1-2

AER-2

X X

X X

X X X X X X X X X X X X X X X X X X

X

X

X

S S S S S S S

S S

S

S

S

S

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/2

/2

:5

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

EFFLUENT PIPING PLAN 149

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.11

SCALE IN FEET

0 20 40

EFFLUENT PUMP STATION

SEE SHEETS 14, 15 &16

FLOATING

DECANTER

SEE SHEET 13

ENTRANCE GATE

8" PVC SCH 40

EFFLUENT PIPE

3/8" DECHLORINATION

LINE WITHIN 1" GRAY

PVC CONDUIT

APPROX 450 FEET

8" X 4"

CLEANOUT

SCH 40 PVC 4" X 8"

ECCENTRIC

REDUCER S X S

8" x 4" CLEANOUT

WITH IRRIGATION BOX

C C2.0

M

AT

C H

LI

N

E

- S

EE

S

H

EE

T C

1.

REUSE H-FRAME, REPLACE

AERATOR PANEL IN KIND, REUSE

DISCONNECT SWITCHES

ELECTRICAL CONDUIT FOR

PRESSURE TRANSDUCER SIGNAL

CABLE AND FLOAT SWITCHES

POWER POLE

DEMO EXISTING

PUMP STATION

JUNCTION BOXPOND STAFF

GAUGE

LEVEL SENSOR

SEE SHEET 12

2" SCH 40 PVC

DRAIN LINE

ELECTRICAL CONDUIT

FOR AERATOR POWER

TRANSITION FROM

SCH 80 TO SCH 40 AT

ECCENTRIC REDUCER

GENERAL NOTES:

1. ALL 8" LATERAL PIPE SHALL HAVE A MINIMUM OF 24"

OF COVER AND INSTALLED IN ACCORDANCE WITH THE

SPECIFICATIONS.

2. CONTRACTOR TO PROVIDE FITTING AS REQUIRED.

PROVIDE SS MESH

SCREEN AT OUTLET

C C2.0

X

X

X

X

X

X X

S

S

S

S

S S S S S SSSSSS

S S S S SSSSSS

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

/2

/2

:5

N

AT

H

AN

IA

L.

D

O D

D R

C

:\U

SE

R S\

AA

R

O N

\D J&

A, P

C \D

J& A

C

AD

U

SE

R G

R O

U P

- G

EN

ER

AL

\IN

TI

AT

IV

E# 6_

O

TH

ER

AG

EN

C

IE

S_

M

ER

G E_

W

IT

H _D

JA

_S

TA

N

D

AR

D S\

1.

1_

O

TH

ER

AG

EN

C

IE

S_

IN

IT

AT

IV

E_

TO

-D O

_I

TE

M S\

N

PS

_M

AJ

O R

_C

AD

_U

PD

AT

ES

_2

3_

AA

R O

N \1

_N

PS

_T

EM

PL

AT

ES

-M

ER

G

ER

\2

_D

JA

_N

PS

_C

TB

_A

LL

_2

8_

TO

_P U

LL

SPRAY FIELD PLAN 149

188350

ND/CW

ND

MF

03/18/2024

OLYMPIC NATIONAL PARK

REHABILITATE KALALOCH WASTEWATER LAGOONS

215532C1.12

SCALE IN FEET

0 20 40

71.4' CENTER TO

CENTER (TYP.)

300' 2"

DISTRIBUTION PIPE

(TYP.)

GENERAL NOTES:

1. ALL 4" AND 8"PIPE SHALL HAVE A MINIMUM OF 24" OF COVER AND INSTALLED IN

ACCORDANCE WITH THE SPECIFICATIONS.

2. ALL 2" LATERAL PIPE SHALL HAVE A MINIMUM OF 18" OF COVER AND INSTALLED

IN ACCORDANCE WITH THE SPECIFICATIONS.

3. ALL VALVES AND FITTINGS WILL BE SOCKET PVC.

4. FOR DEEPER VALVES AND DEVICES, USE VALVE BOX EXTENSION MODELS AND

BOTTOM-TO-BOTTOM STACKING.

5. DO NO INSTALL PIPE IN ACCESS ROAD UNTIL AFTER THE BUILDING HAS BEEN

PLACED TO AVOID DAMAGING THE PIPE.

6. REFER TO SPECIFICATION 32 91 13 - TOPSOILING AND FINISHED GRADING.

COORDINATE WITH THE CONTRACTING OFFICER FOR REVEGETATION.

8" x 4" CLEANOUT

WITH IRRIGATION BOX

SAMPLING

STATION

4" BALL VALVE AND

IRRIGATION BOX

SERPENTINE

BEND (TYP.)

8" x 4" CLEANOUT

8" x 4" CLEANOUT

2" BALL VALVE AND

IRRIGATION BOX (TYP.)

8" BASKET STRAINER

4" DRAIN CAP

70' SPRINKLER

SPACING (TYP.)

YARD HYDRANT AND

SPRINKLER (TYP.)

PO

SI

TI

VE

S

LO

PE

(T

YP

A C2.0

C C2.0

E C2.0

C C2.0

D C2.0

C C2.0

3/8" DECHLORINATION LINE

WITHIN 1-1/4" GRAY PVC

CONDUIT 9" SEPARATION

FROM PIPE WALL

F C2.0

POSITIVE SLOPE

MATCHLINE - S

EE SHEET C1.11

54' SPRINKLER

RADIUS (TYP.)

2" LATERAL CLEANOUT

WITH IRRIGATION BOX

(TYP.)

G C2.0

H C2.0

8" X 4" ECCENTRIC REDUCER

8" STATIC MIXER AND

INJECTION PORT

ESTIMATED PIPE MATERIAL QUANTITIES

FROM PUMP STATION TO SPRAY FIELD

MATERIAL QTY UNIT

SCH 40 2-INCH PVC 1260 FT

SCH 40 4-INCH PVC 230 FT

SCH 40 8-INCH PVC 1100 FT

CONDUIT / DECHLOR PE TUBING 450 FT

4-INCH BALL VALVE 1 EA

2-INCH BALL VALVE 4 EA

HYDRANT SPRINKLERS 20 EA

4" CLEANOUT 3 EA

2" CLEANOUT 4 EA

1-INCH BALL VALVE 2 EA

PIPE LINE TO

STOP AT CIRCLE

WARNING

SIGN

E C2.1

4-INCH SCH 40 PVC HEADER

DECHLORINATION

STATIC MIXER

MATCH

FLANGE TYPE

B C2.0

1" PVC

CONDUIT

8" SCH 40 PVC PIPE

SADDLE TAP

SAMPLING

STATION

1" SCH

40 PVC

DRAIN

2" BALL VALVE

H C2.0

2" SCH 40 PVC

LATERAL

4" SCH 40…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .