A06_NIFC_300_JWH_Standby_-_Drawings.pdf
PDF 4 MB Posted
- Attached to
- NIFC 300 JWH STANDBY AND EMERGENCY POWER
- Solicitation number
- 140L3725R0002
About this file
This is a set of construction drawings for the NIFC 300-JWH Standby and Emergency Power project at the National Interagency Fire Center in Boise, Idaho. The drawings detail electrical and architectural modifications to install new standby and emergency power systems in Building 300-JWH, located at 3833 Development Ave, Boise, ID 83705.
The drawings include a cover sheet, basement demolition plan, basement floor plan with door schedules, electrical legends, basement and first floor power plans, and one-line diagrams showing both demolition and new work. Key components include installation of new automatic transfer switches, distribution boards, and associated electrical equipment in the basement electrical room. The scope involves modifying existing electrical systems while maintaining building operations, with work restrictions requiring service interruptions to occur outside regular office hours and be limited to 8 hours or less. Technical specifications require programming of Schneider Electric PME power metering devices and inclusion of a one-year service contract for the power metering system upon project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STOPSTOP
BOLLARD
MCP
MCP
V ehicle Mail
1 2 3 4 5
D
C
B
A
S h e e t T it le
D e s ig n e d b y
D ra w n b y
C h e c k e d b y
A p p ro v e d b y
R e v is io n s
U n it e d S ta te s D e p a rt m e n t o f th e
I n te ri o r
B u re a u o f L a n d M a n a g e m e n t
BLM Project #
Project #
Date:
ALWAYS THINK SAFETY Sheet of
DESIGNERS
REFERENCE MAP VICINITY MAP
UNITED STATES DEPARTMENT OF INTERIOR
BUREAU OF LAND MANAGEMENT
NATIONAL INTERAGENCY FIRE CENTER
BOISE, IDAHO
NATIONAL INTERAGENCY FIRE CENTER
3833 DEVELOPEMENT AVE, BOISE, ID 83705
PROJECT LOCATION
LATITUDE: 43.567010°
LONGITUDE: -116.209169°
NN
/1
/2
:3 :0
P
M C
U s e rs
\a lf o n s o ra m ir e z \D o c u m e n ts
R e v it L o c a lT e m p \L
B Y
D B
L M
T O a rc h a lf o n s o ra m ir e z .r v t
C O
V E
R S
H E
E T
A
R A
M
IR
E Z
A
R A
M
IR
E Z
S
R O
B E
R T
S
S
R O
B E
R T
S
N
IF
C
-J W
H S
T A
N D
B Y
A N
D E
M E
R G
E N
C Y
P O
W E
R
N
IF
C C
A M
P U
S
S
D E
V E
L O
P M
E N
T A
V E
B O
IS
E
ID
140L0619D0008
LBYDBLM24_TO21
11.15.2024
GI001
1 9
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
NIFC 300-JWH STANDBY AND
EMERGENCY POWER
PROJECT SITE
ARCHITECTURAL
AD101 BASEMENT DEMOLITION PLAN
AE101 BASEMENT FLOOR PLAN AND DOOR SCHEDULE
DRAW ING INDEX
ELECTRICAL
E-001 ELECTRICAL LEGENDS
E-100 BASEMENT POWER PLAN
E-101 FIRST FLOOR POWER PLAN
E-600 DEMOLITION ONE-LINE DIAGRAM
E-601 NEW WORK ONE-LINE DIAGRAM
E-602 PANEL SCHEDULES
GENERAL
GI001 COVER SHEET
D es cr ip tio n D at e
LOCATION PLAN
AREA OF WORK
N
1 2 2A 3 4 5
H
I
J
K
MECHANICAL
STAIR
#2
STORAGE
UPS
ELECTRICAL
JAN.
MECH
W ELL
MECH
W ELL
A. THESE DRAWINGS ARE BASED UPON EXISTING DRAWINGS
AND SITE OBSERVATIONS. THE CONTRACTOR IS
RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO COMMENCING WORK.
B. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING
CONTINUOUS ACCESS TO ENTRIES ADN LIFE-SAFETY EXITS
FOR THE OCCUPANTS AT ALL TIMES.
C. PROTECT ALL EXISTING ITEMS TO REMAIN FROM DAMAGE.
PATCH AND REPAIR ALL ITEMS DAMAGED DURING
CONSTRUCTION, MATCH ADJACENT EXISTING
CONSTRUCTION.
D. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
E. VERIFY ALL ROUGH OPENING DIMENSIONS PRIOR TO
FABRICATION AND INSTALLATION.
GENERAL NOTES
1 2 3 4 5
D
C
B
A
S h e e t T it le
D e s ig n e d b y
D ra w n b y
C h e c k e d b y
A p p ro v e d b y
R e v is io n s
U n it e d S ta te s D e p a rt m e n t o f th e
I n te ri o r
B u re a u o f L a n d M a n a g e m e n t
BLM Project #
Project #
Date:
ALWAYS THINK SAFETY Sheet of
/1
/2
:3 :0
P
M C
U s e rs
\a lf o n s o ra m ir e z \D o c u m e n ts
R e v it L o c a lT e m p \L
B Y
D B
L M
T O a rc h a lf o n s o ra m ir e z .r v t
B A
S E
M E
N T
D E
M O
L
IT
IO
N
P L
A N
A
R A
M
IR
E Z
A
R A
M
IR
E Z
S
R O
B E
R T
S
S
R O
B E
R T
S
N
IF
C
-J W
H S
T A
N D
B Y
A N
D E
M E
R G
E N
C Y
P O
W E
R
N
IF
C C
A M
P U
S
S
D E
V E
L O
P M
E N
T A
V E
B O
IS
E
ID
140L0619D0008
LBYDBLM24_TO21
11.15.2024
AD101
2 9
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
0 4' 8' 16'
N
A1
BASEMENT DEMOLITION PLAN
# KEYNOTES
1 REMOVE EXISTING 6'-0" WIDE X 7'-0" HIGH METAL DOOR, DOOR
FRAME AND ASSOCIATED HARDWARE.
2 SEE ELECTRICAL DRAWINGS FOR FURTHER WORK TO OCCUR
WITHIN ROOM NOTED.
3 EXISTING ROOM TO REMAIN, PROTECT DURING
CONSTRUCTION.
D es cr ip tio n D
LOCATION PLAN
AREA OF WORK
N
1 2 2A 3 4 5
H
I
J
K
.1
4 4
MECHANICAL
STORAGE
JAN.
UPS
ELECTRICAL
STAIR
#2
MECH
W ELL
MECH
W ELL
HOLLOW METAL DOOR
S E
E S
C H
E D
SCHED
SEE
F
HOLLOW METAL FRAME
S E
E S
C H
E D
0' - 2"
SCHED
SEE
0' - 2"
REMOVABLE
MULLION
DOOR SCHEDULE NOTES
1. PAINT METAL DOOR AND FRAME PT1 PER
SPECIFICATION SECTION 9.
2. DOOR AND FRAME TO BE RATED FOR 45 MIN,
SEE SPECIFICATION 081113.
DOOR HARDW ARE
GROUP 1
-LOCKSET (STORAGE) PER SPECIFICATIONS.
-HINGES PER SPECIFICATIONS.
-TW O RIM EXIT DEVICES PER SPECIFICATIONS.
-REMOVABLE CENTER MULLION PER SPECIFICATIONS.
-SURFACE CLOSER PER SPECIFICATIONS.
-SMOKE SEAL/GASKETING PER SPECIFICATIONS.
-DOOR SWEEP PER SPECIFICATIONS.
A. THESE DRAWINGS ARE BASED UPON EXISTING DRAWINGS
AND SITE OBSERVATIONS. THE CONTRACTOR IS
RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO COMMENCING WORK.
B. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING
CONTINUOUS ACCESS TO ENTRIES ADN LIFE-SAFETY EXITS
FOR THE OCCUPANTS AT ALL TIMES.
C. PROTECT ALL EXISTING ITEMS TO REMAIN FROM DAMAGE.
PATCH AND REPAIR ALL ITEMS DAMAGED DURING
CONSTRUCTION, MATCH ADJACENT EXISTING
CONSTRUCTION.
D. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
REQUIREMENTS.
E. VERIFY ALL ROUGH OPENING DIMENSIONS PRIOR TO
FABRICATION AND INSTALLATION.
GENERAL NOTES
1 2 3 4 5
D
C
B
A
S h e e t T it le
D e s ig n e d b y
D ra w n b y
C h e c k e d b y
A p p ro v e d b y
R e v is io n s
U n it e d S ta te s D e p a rt m e n t o f th e
I n te ri o r
B u re a u o f L a n d M a n a g e m e n t
BLM Project #
Project #
Date:
ALWAYS THINK SAFETY Sheet of
/1
/2
:3 :0
P
M C
U s e rs
\a lf o n s o ra m ir e z \D o c u m e n ts
R e v it L o c a lT e m p \L
B Y
D B
L M
T O a rc h a lf o n s o ra m ir e z .r v t
B A
S E
M E
N T
F L
O O
R P
L A
N A
N D
D O
O R
S C
H E
D U
L E
A
R A
M
IR
E Z
A
R A
M
IR
E Z
S
R O
B E
R T
S
S
R O
B E
R T
S
N
IF
C
-J W
H S
T A
N D
B Y
A N
D E
M E
R G
E N
C Y
P O
W E
R
N
IF
C C
A M
P U
S
S
D E
V E
L O
P M
E N
T A
V E
B O
IS
E
ID
140L0619D0008
LBYDBLM24_TO21
11.15.2024
AE101
3 9
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
A1
BASEMENT PLAN
0 4' 8' 16'
N
# KEYNOTES
1 NEW RATED DOOR AND FRAME, SEE DOOR SCHEDULE.
2 ELECTRICAL EQUIPMENT, SEE ELECTRICAL DRAWINGS FOR
FURTHER REQUIREMENTS.
3 SEE ELECTRICAL DRAWINGS FOR FURTHER WORK TO OCCUR
WITHIN ROOM NOTED.
4 EXISTING ROOM TO REMAIN, PROTECT DURING
CONSTRUCTION.
DOOR SCHEDULE
DOOR
NUMBER
ROOM
NUMBER
ROOM NAME
DOOR FRAME
FIRE
RATING
HARDWARE
NOTES
SIZE
MTL TYPE GLAZE MTL TYPE GROUP
W H T
22.1 022 ELECTRICAL 6' - 0" 7' - 0" 0' - 1 3/4" HM F - HM 1 45 MIN 1 1,2
D es cr ip tio n D
ABOVE COUNTER, 4" BACK SPLASHAC
AUTOMATIC TRANSFER SWITCHATS
ABOVE FINISHED GRADEAFG
ABOVE FINISHED FLOORAFF
BELOW GRADEBLG
BOTTOM OF DEVICEBOD
CONDUITC
CARD ACCESS SYSTEMCAS
CLOSED CIRCUIT TVCCTV
CEILINGCLG
CENTER OF DEVICECOD
COPPERCU
DIGITAL VIDEO RECORDERDVR
EXISTING(E)
ELECTRICAL CONTRACTOREC
EXHAUST FANEF
GENERAL CONTRACTORGC
GROUNDGND
FIELD ADJUSTABLE LONG TIME,
SHORT TIME AND INSTANTANEOUS
LSI
FIELD ADJUSTABLE LONG TIME, SHORT TIME,
INSTANTANEOUS AND GROUND FAULT
LSIG
MECHANICAL CONTRACTORMC
NEW(N)
NIGHT LIGHTNL
PAN-TILT-ZOOMPTZ
QUANTITYQTY
RELOCATED(R)
SURFACESF
TELECOMMUNICATIONS MAIN GROUNDING
BUS BAR
TMGB
TELECOMMUNICATIONS BONDING BACKBONETBB
TEMPERATURE CONTROL CONTRACTORTC
TELEPHONE TERMINAL BOARDTTB
TYPICALTYP
UNDERGROUNDUG
UNLESS OTHERWISE NOTEDUON
W ITHW/
W IRE MOLDWM
W EATHER PROOF (WHILE IN USE)WP
TRANSFORMERXFMR
SW ITCH DESIGNATIONa,b,c etc
CIRCUIT DESIGNATION, PANEL BN1L, CIRCUITS
2,4,6
BN1L-2,4,6
INDICATES DETAIL 1 ON SHEET E5011/E501
SHEET W ORK NOTE
HOME RUN TO PANEL
CONDUIT CONCEALED IN CEILING OR WALL
CONDUIT CONCEALED UNDER FLOOR
LOW VOLTAGE CIRCUIT
FIBER OPTIC CABLE
CABLE TRAY
CIRCUIT, PROVIDE 2#12 CU, 1#12 CU GND IN
3/4" CONDUIT FOR EACH CIRCUIT, UNLESS
OTHERW ISE NOTED.
LV
# SHEET DEMO W ORK NOTE
SW ITCH - SPST
2 SINGLE POLE, DOUBLE THROW
3 THREEWAY
4 FOURW AY
K KEY OPERATED
P PILOT LIGHT
W P W EATHERPROOF
OS OCCUPANCY SENSOR
D DIMMER
LV LOW VOLTAGE
T TIMER SW ITCH
RECEPTACLE - DUPLEX
USB DEVICE RECEPTACLE W/ USB & USB-C PORTS
DC DROP CORD
W P WEATHERPROOF COVER & W EATHER
RESISTANT RECEPTACLE
TR TAMPER RESISTANT
S SURGE PROTECTED
IG ISOLATED GROUND
RECEPTACLE - DOUBLE DUPLEX
GFI RECEPTACLE - DOUBLE DUPLEX
- SAME INDICATORS AS SHOW N FOR DUPLEX
RECEPTACLE
RECEPTACLE - 208V
R RANGE - NEMA 14-50R
D DRYER - NEMA 14-30R
W W ELDER - NEMA 14-50R
* NEMA CONFIGURATION AS NOTED
DUPLEX RECEPTACLE/GFI IN RECESSED FLOORBOX
- SAME INDICATORS AS SHOWN FOR DUPLEX
RECEPTACLE
DOUBLE DUPLEX RECEPTACLE/GFI IN RECESSED
FLOORBOX
- SAME INDICATORS AS SHOW N FOR DUPLEX
RECEPTACLE
J-BOX - BOX INDICATES FLOOR MOUNTING -4"X4"X2-1/8"
DEEP UNLESS OTHERWISE NOTED
SPECIAL PURPOSE CONNECTION - BOX INDICATES
FLOOR MOUNTING - WORK AS NOTED
RECEPTACLE - DUPLEX, MOUNTING IN CEILING
MANUAL MOTOR DISCONNECT/STARTER SWITCH
COMBINATION STARTER/DISCONNECT SWITCH
DISCONNECT SWITCH
CONTACTOR
ELECTRIC MOTOR CONNECTION
EMERGENCY PUSHBUTTON
EXISTING PANELBOARD, SURFACE MOUNTED
EXISTING PANELBOARD, FLUSH MOUNTED
M ELECTRIC METER
TRANSFORMER, INTERIOR
or
VARIABLE FREQUENCY DRIVE
J JJ
CLG
THERMOSTAT/TEMPERATURE SENSOR BY MC OR TC,
J-BOX AND CONDUIT TO CEILING BY EC
PP POW ER POLE
CIRCUIT BREAKER
CONTROL PANEL
LCP LIGHTING CONTROL PANEL
GAP GENERATOR ANNUNCIATOR PANEL
PANELBOARD, SURFACE MOUNTED
PANELBOARD, FLUSH MOUNTED
TRANSFORMER, EXTERIOR
CLG GFI RECEPTACLE - DUPLEX, MOUNTING IN CEILING
M
T
VFD
ELECTRICAL LEGEND
SYMBOL DESCRIPTION
ABBREVIATIONS AND MISCELLANEOUS
SYMBOL DESCRIPTION
DEVICES AND POWER
SYMBOLS APPLY ONLY W HEN USED ON DRAW INGS
GFI RECEPTACLE - DUPLEX (GROUND FAULT
INTERRUPT)
- SAME INDICATORS AS SHOW N FOR DUPLEX
RECEPTACLE
FINISHED CEILING
FINISHED FLOOR
BOD
BOD
BOD
COD
COD
AC = ABOVE COUNTER, MINIMUM 4"
ABOVE BACKSPLASH TO BOTTOM
OF DEVICE.
48" TOD IS ACCEPTABLE FOR CMU
BLOCK CONSTRUCTION.
M
IN
IM
U M
T O
B O
T T
O M
O F
D E
V
IC
E
M O
U N
T
A
B O
V E
D O
O R
F R
A M
E
T
O T
O P
O F
T R
IM
M
IN
IN
H A
Z A
R D
O U
S L
O C
A T
IO
N
S -T
O B
O T
T O
M O
F C
A N 8
A F
F T
O B
O T
T O
M O
F D
E V
IC
E
O R
B E
L O
W C
E
IL
IN
G
T O
T O
P O
F D
E V
IC
E
W H
IC
H
E V
E R
I S
L O
W E
R
FIRE
FIRE
C S F F F
FIRE
F KPS
D
PANEL
BOARD
W
T CO₂
INTERIOR BOX MOUNTING HEIGHTS
1 2 3 4 5
D
C
B
A
S h e e t T it le
D e s ig n e d b y
D ra w n b y
C h e c k e d b y
A p p ro v e d b y
R e v is io n s
U n it e d S ta te s D e p a rt m e n t o f th e
I n te ri o r
B u re a u o f L a n d M a n a g e m e n t
BLM Project #
Project #
Date:
ALW AYS THINK SAFETY Sheet of
/1
/2
:1 :2
P
M C
U s e rs
\a lf o n s o ra m ir e z \D o c u m e n ts
R e v it L o c a lT e m p \L
B Y
D B
L M
T
O e le c a lf o n s o ra m ir e z .r v t
E L
E C
T R
IC
A
L L
E G
E N
D S
V
IC
T O
R
IN
O
H E
S T
A N
D
V
IC
T O
R
IN
O
H E
S T
A N
D
N
IF
C
-J W
H S
T A
N D
B Y
A N
D E
M E
R G
E N
C Y
P O
W E
R
N
IF
C C
A M
P U
S
S
D E
V E
L O
P M
E N
T A
V E
B O
IS
E
ID
140L0619D0008
LBYDBLM24_TO21
11.15.2024
E-001
4 9
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
D es cr ip tio n D at e
22284
LICE
NSED
P RRO
FE
SSIO
NAL ENGINEE
S OT AT E OF IDA
HTYLE W HEST
AR
ND
11.15.2024
1 2 3 4 5
H
I
J
K
2A
HA
LA-1
LA-2 TA
HE
TE
LE
FACP
T
XFMR
MSB
UPS DSB
EDSB
BYPASS
UPS-1
UPS-2
SDB
MCC
ATS2
METER
CABINET
ELECTRICAL
MECHANICAL
STORAGE
UPS
ATS
1. MODIFY ROUTING OF EXISTING CONDUIT AND RELOCATE
EXISTING NETW ORK CABLING AND W ALL MOUNTED PHONE
AS REQUIRED FOR INSTALLATION OF AUTOMATIC TRANSFER
SW ITCH. VERIFY W ORKING CLEARANCE DOES NOT
CONFLICT W ITH NEW DISTRIBUTION BOARD 'SDB', AS
SHOWN ON THE DRAW INGS.
2. COORDINATE EXACT INSTALLED LOCATION OF FLOOR
MOUNTED DISTRIBUTION BOARD W ITH W ORKING
CLEARANCE OF EXISTING AUTOMATIC TRANSFER SW ITCH
AND W ITH ALL OTHER EXISTING CONDITIONS. PROVIDE 8'
W ORKING CLEARANCE AT FRONT SIDE OF PANEL.
# KEYNOTES
GENERAL NOTES
A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE
CODES/STANDARDS.
B. SHARED NEUTRALS ARE NOT ALLOW ED FOR SINGLE PHASE
BRANCH CIRCUITS.
C. FIRE CAULK ALL NEW PENETRATIONS MADE TO FIRE RATED
W ALLS TO MAINTAIN FIRE RATING.
D. SERVICE INTERRUPTIONS OF BUILDING ELECTRICAL
SYSTEMS SHALL ONLY OCCUR OUTSIDE OF REGULAR OFFICE
HOURS AND BE LIMITED TO 8 HOURS OUR LESS. ELECTRICAL
SERVICE SHUTDOW N SCHEDULE SHALL BE APPROVED BY
THE GOVERNMENT.
E. ELECTRICAL CONTRACTOR SHALL ADJUST PROGRAMMING
OF SCHNEIDER ELECTRIC PME POWER METERING DEVICES
AND SOFTW ARE FOR ALL CHANGES TO THE POWER
METERING, USING MANUFACTURER AUTHORIZED SUPPORT,
AND PROVIDE A ONE YEAR SCHNEIDER ELECTRIC PME
POW ER METERING SERVICE CONTRACT FOR THE LOCAL
CAMPUS SERVER HOSTED PLATFORM UPON COMPLETION OF
THE PROJECT.
LOCATION PLAN
AREA OF WORK
N
1 2 3 4 5
D
C
B
A
S h e e t T it le
D e s ig n e d b y
D ra w n b y
C h e c k e d b y
A p p ro v e d b y
R e v is io n s
U n it e d S ta te s D e p a rt m e n t o f th e
I n te ri o r
B u re a u o f L a n d M a n a g e m e n t
BLM Project #
Project #
Date:
ALW AYS THINK SAFETY Sheet of
/1
/2
:1 :2
P
M C
U s e rs
\a lf o n s o ra m ir e z \D o c u m e n ts
R e v it L o c a lT e m p \L
B Y
D B
L M
T
O e le c a lf o n s o ra m ir e z .r v t
B A
S E
M E
N T
P O
W E
R P
L A
N
V
IC
T O
R
IN
O
H E
S T
A N
D
V
IC
T O
R
IN
O
H E
S T
A N
D
N
IF
C
-J W
H S
T A
N D
B Y
A N
D E
M E
R G
E N
C Y
P O
W E
R
N
IF
C C
A M
P U
S
S
D E
V E
L O
P M
E N
T A
V E
B O
IS
E
ID
140L0619D0008
LBYDBLM24_TO21
11.15.2024
E-100
5 9
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
A1
BASEMENT POW ER PLAN
N
0 4' 8' 16'
D es cr ip tio n D at e
22284
LICE
NSED
P RRO
FE
SSIO
NAL ENGINEE
S OT AT E OF IDA
HTYLE W HEST
AR
1 2 3 4 5 6 7 8 9 10 11 1312
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
2A
GDBMTS
1. EXISTING 600 KW GENERATOR, FIELD COORDINATE
PATHW AYS FOR NEW CONNECTIONS AS SHOWN ON THE
ONE-LINE DIAGRAM.
2. PROPOSED LOCATION OF MTS AND GDB, COORDINATE
LOCATION WITH EXISTING CONDITIONS PRIOR TO ROUGH-IN.
3. APPROXIMATE ROUTE FROM OUTDOOR GEAR TO AUTOMATIC
TRANSFER SWITCHES LOCATED IN BASEMENT ELECTRICAL
ROOM. REFER TO SHEET E-601 FOR CONDUIT AND
CONDUCTOR SIZING. FIELD COORDINATE UNDERGROUND
ROUTING AS W ELL AS PATHW AY ALONG W ALLS OF EXISTING
EXTERIOR GENERATOR/EQUIPMENT ENCLOSURE.
COORDINATE W ITH OTHER TRADES AS REQUIRED FOR
TRENCHING AND BACKFILL.
4. FIELD COORDINATE PENETRATION LOCATION OF BASEMENT
EXTERIOR WALL FOR ACCESS TO BASEMENT ELECTRICAL
ROOM. COORDINATE WITH OTHER TRADES AS REQUIRED
FOR PATCH AND REPAIR.
# KEYNOTES
GENERAL NOTES
A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE
CODES/STANDARDS.
B. SHARED NEUTRALS ARE NOT ALLOW ED FOR SINGLE PHASE
BRANCH CIRCUITS.
C. FIRE CAULK ALL NEW PENETRATIONS MADE TO FIRE RATED
W ALLS TO MAINTAIN FIRE RATING.
D. SERVICE INTERRUPTIONS OF BUILDING ELECTRICAL
SYSTEMS SHALL ONLY OCCUR OUTSIDE OF REGULAR OFFICE
HOURS AND BE LIMITED TO 8 HOURS OUR LESS. ELECTRICAL
SERVICE SHUTDOW N SCHEDULE SHALL BE APPROVED BY
THE GOVERNMENT.
E. ELECTRICAL CONTRACTOR SHALL ADJUST PROGRAMMING
OF SCHNEIDER ELECTRIC PME POWER METERING DEVICES
AND SOFTW ARE FOR ALL CHANGES TO THE POWER
METERING, USING MANUFACTURER AUTHORIZED SUPPORT,
AND PROVIDE A ONE YEAR SCHNEIDER ELECTRIC PME
POW ER METERING SERVICE CONTRACT FOR THE LOCAL
CAMPUS SERVER HOSTED PLATFORM UPON COMPLETION OF
THE PROJECT.
1 2 3 4 5
D
C
B
A
S h e e t T it le
D e s ig n e d b y
D ra w n b y
C h e c k e d b y
A p p ro v e d b y
R e v is io n s
U n it e d S ta te s D e p a rt m e n t o f th e
I n te ri o r
B u re a u o f L a n d M a n a g e m e n t
BLM Project #
Project #
Date:
ALW AYS THINK SAFETY Sheet of
/1
/2
:1 :2
P
M C
U s e rs
\a lf o n s o ra m ir e z \D o c u m e n ts
R e v it L o c a lT e m p \L
B Y
D B
L M
T
O e le c a lf o n s o ra m ir e z .r v t
F
IR
S T
F L
O O
R P
O W
E R
P L
A N
V
IC
T O
R
IN
O
H E
S T
A N
D
V
IC
T O
R
IN
O
H E
S T
A N
D
N
IF
C
-J W
H S
T A
N D
B Y
A N
D E
M E
R G
E N
C Y
P O
W E
R
N
IF
C C
A M
P U
S
S
D E
V E
L O
P M
E N
T A
V E
B O
IS
E
ID
140L0619D0008
LBYDBLM24_TO21
11.15.2024
E-101
6 9
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
A1
FIRST FLOOR POW ER PLAN
N
0 8' 16' 32'
D es cr ip tio n D at e
22284
LICE
NSED
P RRO
FE
SSIO
NAL ENGINEE
S OT AT E OF IDA
HTYLE W HEST
AR
M
PANEL
HE
PANEL
LE
PANEL
LF
(2 SECT.)
PANEL
LC
(2 SECT.)
PANEL
LD
(2 SECT.)
PANEL
LB
PANEL
LA-2
PANEL
LA-3
PANEL
LA-1
PANEL
HC
PANEL
HB
PANEL
HD
PANEL
HF
PANEL
HA
M
G
SPD
MOTOR
CONTROL
CENTER
"MCC"
ELEVATOR
CNTRLR
M M
IB1
(N.C.)
IB2
(N.C.)
UPS 1
BATTERY UPS 1
UPS 2
BATTERY UPS 2
M
PANEL
LED
PANEL
LEC
PDU
1A
PDU
PDU
3A
PDU
PDU
PDU
200A
LPS-RK
200/3
200A
LPS-RK
200/3
150A
LPS-RK
200/3
250A
FRS-R
400/3
250A
FRS-R
400/3
150A
LPS-RK
200/3
200A
LPS-RK
200/3 200/3
100A
LPS-RK
100/3
750A
KRP-C
800/3
45/3
30KVA
480/3 TO
208Y/120
400/3 400/3
AHU-1
480/3
AHU-2
480/3
60/3
45KVA
480/3 TO
208Y/120
60/3
45KVA
480/3 TO
208Y/120
60/3
45KVA
480/3 TO
208Y/120
60/3
45KVA
480/3 TO
208Y/120
75KVA
480/3 TO
208Y/120
600KW/750KVA;
480Y/277 3ϕ, 4W
STANDBY
GENERATOR
(E) 800A 4P
ATS
100/3
150/3
LA-42
HA-10
HA-9,11,13,
15,17,19
EXT. LGT.
BLDG. SEC.
LGT.
20A 2P LTG
CONTACTOR
20A 2P LTG
CONTACTOR
20A 4P LTG
CONTACTOR
(6)4" C'S. EACH W/
4-500MCM (CU)
2000/3
SOLID STATE
W/ADJUST. TRIP
& GRND. FAULT
4 #3/0(CU)
& 1 #6(G)-2"
4 #1/0(CU)
& 1 #6(G)-2"
3 #250MCM
(CU) & 1
#4(G)-2"
4 #1/0(CU)
& 1 #6(G)-2"
4 #3/0(CU)
& 1 #6(G)-2"
3 #250MCM
(CU) & 1
#4(G)-2"
3 #3 & 1 #8(G)-1"
3 #1/0(CU); 1
#3/0(CU)(N) &
1 #6(G)-2"
3 #2/0, #4/0 & 1 #6(G)-2"
3 #2/0, #4/0 & 1 #6(G)-2"
(6) #12-3/4"C
(4) 600MCM(CU)
+(1) 3/0 GND
4-3(CU) &
1-8(G)-1 1/4"
3-8 & 1-10-3/4"
4-3(CU) &
1-8(G)-1 1/4"
3 #6 & 1 #10(G)-3/4"
3 #1/0(CU);
1 #1/0(CU)(N)
& 1 #6(G)-2"
4 #3/0(CU)
& 1 #6(G)-2"
3 1/2"C'S.
4-500MCM(CU)
& 1-1/0(G)
(2)3 1/2"C'S.
4-500MCM(CU)
& 1-1/0(G)
NEUTRAL
1#3/0(CU)-3/4"
WATER
SERVICE
20' of 3/0 B.C.
IN BOTTOM OF
FOOTING
SS
SS
A
V
300-JWH
ENERGY CONSUMPTION
METER 7350
150/3
G N
CB-1
150/3
150/3
150/3
TO E.F.'S 1,2,3,4
ON ROOF
20A 4P
CONTACTOR
T C
'3R' '3R'
150/3 150/3
100/3
SPARE
1 1111 11
MSB: 480Y/277V, 3ϕ, 4W.
2000A, 75,000 AIC
TO IDAHO POWER
UTILITY TRANSFORMER
300-JWH
EMERGENCY
DIST PANEL
METER PMD-850
100A100A
100/3
60A60A60A60A100A100A60A60A100A100A400A450A
100/3100/3100/3100/3100/3100/3100/3100/3100/3100/3100/3600/3600/3
1000/4
DRY COOLERS 480/3 EACH
30/3
20A.FRS
'3R'
PUMP-3
480/3
PUMP-4
480/3
300KVA
480/3 TO
208Y/120
UPSDSB
EMERGENCY
DISTRIBUTION
SWITCHBOARD
100/3100/3
100 A 100 A
S S S S
EMERG.
OFF
EMERG.
SHUT
OFF
60/3
CAC-3
EMERG.
SHUT
OFF
100/3
VAV BOX
EMERG.
SHUT
OFF
60/3
CAC-2
EMERG.
SHUT
OFF
60/3
CAC-1
EMERG.
SHUT
OFF
60/3
CAC-5
3-4 & 1-8(G)-1"
3-4 & 1-8(G)-1"
3-8 & 1-10(G)-3/4"
3-8 & 1-10(G)-1"
SIZE '2'
W/HOA
3-6(CU) &
1-8(G)-1"
3-3(CU) &
1-8(G)-1 1/4"
3-12 & 1-12(G)-3/4"
3"C'S EA. W /
4-400MCM(CU) & 1-3/0(G)
3-2(CU); 1-1/0(CU)
(N) & 1-6(G)-1 1/2"
4-3/0(CU); &
1-6(G)-2"
EMERG.
OFF
EMERG.
OFF
EMERG.
OFF
3-4 & 1-8(G)-1"
3-4 & 1-8(G)-1"
PUE METER
DISCONNECT
3-4 & 1-8(G)-1"
600A800/3
W.P.
ELEVATOR
30HP; 480/3
150/3
SHUNT
TRIP IN
NEMA1
TO F.A.
SYSTEM
HEAT
DETECTORS
S
FA
300-JWH
MCC ENERGY
CONSUMPTION
METER PMD-5110
300-JWH
ELEVATOR ENERGY
CONSUMPTION
METER PMD-5110
(2)2"C'S EA. W/ 3-4/0(CU)
& 1-2(G)
(2)2"C'S EA. W/ 3-3/0(CU)
& 1-3(G)
225A 225A
4-3/0(CU) & 1-3(G) 4-3/0(CU) & 1-3(G)
MB1
(N.C.)
200A
MB2
(N.C.)
200A
MBP
(N.O.)
400A
MIS
(N.C.)
400A
3-3/0(CU) & 1-6(G)
2" C.
3-4/0(CU) & 1-4(G), 2" C.
SHIELDED CABLE
(2) 2" C. EACH WITH
3-3/0(CU) & 1-3(G)
300-JWH
IT EQUIP ENERGY
METER PMD-5560
100 A 100 A
1. MAINTAIN CONDUIT AND CONDUCTORS TO THE
DOWNSTREAM EQUIPMENT TO THE FURTHEST EXTEND
POSSIBLE FOR RECONNECTION TO NEW CONDUCTORS,
REFER TO NEW WORK ONE-LINE DIAGRAM. FIELD
COORDINATE SPLICE LOCATION OF CONDUCTORS.
2. REMOVE FUSE W ITHIN SWITCHBOARD, DOWNSTREAM
CONDUIT CONDUCTORS TO REMAIN, REFER TO SHEET E-601
FOR NEW FUSE RATING.
# KEYNOTES
GENERAL NOTES
A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE
CODES/STANDARDS.
B. SHARED NEUTRALS ARE NOT ALLOW ED FOR SINGLE PHASE
BRANCH CIRCUITS.
C. FIRE CAULK ALL NEW PENETRATIONS MADE TO FIRE RATED
W ALLS TO MAINTAIN FIRE RATING.
D. SERVICE INTERRUPTIONS OF BUILDING ELECTRICAL
SYSTEMS SHALL ONLY OCCUR OUTSIDE OF REGULAR OFFICE
HOURS AND BE LIMITED TO 8 HOURS OUR LESS. ELECTRICAL
SERVICE SHUTDOW N SCHEDULE SHALL BE APPROVED BY
THE GOVERNMENT.
E. ELECTRICAL CONTRACTOR SHALL ADJUST PROGRAMMING
OF SCHNEIDER ELECTRIC PME POWER METERING DEVICES
AND SOFTW ARE FOR ALL CHANGES TO THE POWER
METERING, USING MANUFACTURER AUTHORIZED SUPPORT,
AND PROVIDE A ONE YEAR SCHNEIDER ELECTRIC PME
POW ER METERING SERVICE CONTRACT FOR THE LOCAL
CAMPUS SERVER HOSTED PLATFORM UPON COMPLETION OF
THE PROJECT.
LINE TYPE LEGEND
EXISTING
NEW
DEMO
1 2 3 4 5
D
C
B
A
S h e e t T it le
D e s ig n e d b y
D ra w n b y
C h e c k e d b y
A p p ro v e d b y
R e v is io n s
U n it e d S ta te s D e p a rt m e n t o f th e
I n te ri o r
B u re a u o f L a n d M a n a g e m e n t
BLM Project #
Project #
Date:
ALW AYS THINK SAFETY Sheet of
/1
/2
:1 :2
P
M C
U s e rs
\a lf o n s o ra m ir e z \D o c u m e n ts
R e v it L o c a lT e m p \L
B Y
D B
L M
T
O e le c a lf o n s o ra m ir e z .r v t
D E
M O
L
IT
IO
N
O N
E -L
IN
E
D
IA
G R
A M
V
IC
T O
R
IN
O
H E
S T
A N
D
V
IC
T O
R
IN
O
H E
S T
A N
D
N
IF
C
-J W
H S
T A
N D
B Y
A N
D E
M E
R G
E N
C Y
P O
W E
R
N
IF
C C
A M
P U
S
S
D E
V E
L O
P M
E N
T A
V E
B O
IS
E
ID
140L0619D0008
LBYDBLM24_TO21
11.15.2024
E-600
7 9
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
A1
DEMOLITION ONE-LINE DIAGRAM
D es cr ip tio n D at e
22284
LICE
NSED
P RRO
FE
SSIO
NAL ENGINEE
S OT AT E OF IDA
HTYLE W HEST
AR
M
MOTOR
CONTROL
CENTER
"MCC"
ELEVATOR
CNTRLR
PANEL
HE
PANEL
LE
PANEL
LF
(2 SECT.)
PANEL
LC
(2 SECT.)
PANEL
LD
(2 SECT.)
PANEL
LB
PANEL
LA-2
PANEL
LA-3
PANEL
LA-1
M M
M
PANEL
HC
PANEL
HB
PANEL
HD
PANEL
HF
PANEL
HA
M
G
SPD
SPD
600A 3P
200A 3P
150A 3P
250A 3P
250A 3P
150A 3P
200A 3P
200A 3P
200A 3P
SPARE
200A 3P
SPARE
J J J J JJ J
J
J
IB1
(N.C.)
IB2
(N.C.)
UPS 1
BATTERY UPS 1
UPS 2
BATTERY UPS 2
PANEL
LED
PANEL
LEC
PDU
1A
PDU
PDU
3A
PDU
PDU
PDU
100A100A
100/3
60A60A60A60A100A100A60A60A100A100A400A450A
100/3100/3100/3100/3100/3100/3100/3100/3100/3100/3100/3600/3600/3
DRY COOLERS 480/3 EACH
30/3
20A.FRS
'3R'
PUMP-3
480/3
PUMP-4
480/3
45/3
30KVA
480/3 TO
208Y/120
400/3 400/3
AHU-2
480/3
AHU-1
480/3
60/3
45KVA
480/3 TO
208Y/120
60/3
45KVA
480/3 TO
208Y/120
60/3
45KVA
480/3 TO
208Y/120
60/3
45KVA
480/3 TO
208Y/120
75KVA
480/3 TO
208Y/120
EMERGENCY
DISTRIBUTION
SWITCHBOARD
MSB: 480Y/277V, 3ϕ, 4W.
2000A, 75,000 AIC
600KW , 750KVA;
480Y/277 3ϕ, 4W
STANDBY
GENERATOR
(E) 800A 4P
ATS
100/3
150/3
EMERG.
SHUT
OFF
60/3
CAC-3
EMERG.
SHUT
OFF
100/3
VAV BOX
EMERG.
SHUT
OFF
60/3
CAC-2
EMERG.
SHUT
OFF
60/3
CAC-1
EMERG.
SHUT
OFF
60/3
CAC-5
LA-42
HA-10
HA-9,11,13,
15,17,19
EXT. LGT.
BLDG. SEC.
LGT.
20A 2P LTG
CONTACTOR
20A 2P LTG
CONTACTOR
20A 4P LTG
CONTACTOR
(6)4" C'S. EACH W/
4-500MCM (CU)
2000/3
SOLID STATE
W/ADJUST. TRIP
& GRND. FAULT
4#3/0, 1#6
GND IN 2" C.
4#1/0, 1#6
GND IN 2" C.
3#250, 1#4
GND IN 2" C.
4#1/0, 1#6
GND IN 2" C.
4#3/0, 1#6
GND IN 2" C.
3#250, 1#4
GND IN 2" C.
3 #3 & 1 #8(G)-1"
3 #1/0(CU); 1
#3/0(CU)(N) &
1 #6(G)-2"
3 #2/0, #4/0 & 1 #6(G)-2"
3 #2/0, #4/0 & 1 #6(G)-2"
(6) #12-3/4"C
CONTROL CONDUCTORS
(3) SETS OF 3" C. EACH
WITH 4#400, 1#3/0 GND
3-4 & 1-8(G)-1"
3-4 & 1-8(G)-1"
3-8 & 1-10(G)-3/4"
3-8 & 1-10(G)-1"
4#3, 1#8 GND
IN 1-1/4" C.
3-8 & 1-10-3/4"
4-3(CU) &
1-8(G)-1 1/4"
SIZE '2'
W/HOA
3-6(CU) &
1-8(G)-1"
3-3(CU) &
1-8(G)-1 1/4"
3-12 & 1-12(G)-3/4"
3 #6 & 1 #10(G)-3/4"
3 #1/0(CU);
1 #1/0(CU)(N)
& 1 #6(G)-2"
3-4 & 1-8(G)-1"
3-4 & 1-8(G)-1"
4#3/0, 1#6
GND IN 2" C.
PUE METER
DISCONNECT
3-4 & 1-8(G)-1"
(2) SETS OF 3" C. EACH
W ITH 4#350, 1#1 AWG GND
(2)3 1/2"C'S.
4-500MCM(CU)
& 1-1/0(G)
800/3 100/3
600A800/3
GENERATOR
CONNECTOR
800A 3P
NEUTRAL
1#3/0(CU)-3/4"
WATER
SERVICE
20' of 3/0 B.C. IN BOTTOM
OF FOOTING
SS
SS
A
V
300-JWH ENERGY
CONSUMPTION METER 7350
150/3
G N
CB-1
150/3
150/3
150/3
TO E.F.'S 1,2,3,4
ON ROOF
20A 4P
CONTACTOR T
C
'3R' '3R'
150/3 150/3
100/3
W.P.
ELEVATOR
30HP; 480/3
150/3
SHUNT
TRIP IN
NEMA1
TO F.A.
SYSTEM
HEAT
DETECTORS
S
FA
200A
LPS-RK
200/3
200A
LPS-RK
200/3
150A
LPS-RK
200/3
250A
FRS-R
400/3
250A
FRS-R
400/3
150A
LPS-RK
200/3
200A
LPS-RK
200/3 200/3
100A
LPS-RK
100/3
800A
KRP-C
800/3
100A
LPS-RK
TO IDAHO POWER
UTILITY TRANSFORMER
SECONDARY
DISTRIBUTION BOARD
'SDB': 480Y/277V, 3ϕ, 4W.
800A, 65,000 AIC
GENERATOR
DISTRIBUTION BOARD
'GDB': 480Y/277V, 3ϕ, 4W.
1000A, 65,000 AIC
NEMA 3R
MTS: 480Y/277V, 4P
100A, 65,000 AIC
NEMA 3R
ATS2: 480Y/277V, 4P
100A, 65,000 AIC
(2) SETS OF 3-1/2" C. EACH
WITH 4#500MCM, 1#1/0 GND
4#3, 1#8 GND
IN 1-1/4" C.
4#3, 1#8 GND
IN 1-1/4" C.
(2) SETS OF 3-1/2" C. EACH
WITH 4#500MCM, 1#1/0 GND
1 1 1 1 1 1 1
300-JWH
EMERGENCY
DIST PANEL
METER PMD-850
300-JWH
MCC ENERGY
CONSUMPTION
METER PMD-5110
300-JWH
ELEVATOR ENERGY
CONSUMPTION
METER PMD-5110
300-JWH
IT EQUIP ENERGY
METER PMD-5560
5 5 5 5 5 5 5
(2)2"C'S EA. W/ 3-4/0(CU)
& 1-2(G)
(2)2"C'S EA. W/ 3-3/0(CU)
& 1-3(G)
225A 225A
4-3/0(CU) & 1-3(G) 4-3/0(CU) & 1-3(G)
MB1
(N.C.)
200A
MB2
(N.C.)
200A
MBP
(N.O.)
400A
MIS
(N.C.)
400A
3-3/0(CU) & 1-6(G)
2" C.
3-4/0(CU) & 1-4(G), 2" C.
SHIELDED CABLE
(2) 2" C. EACH WITH
3-3/0(CU) & 1-3(G)
1000/4
300KVA
480/3 TO
208Y/120
UPSDSB
100/3100/3
100 A 100 A
S S S S
EMERG.
OFF
3"C'S EA. W /
4-400MCM(CU) & 1-3/0(G)
3-2(CU); 1-1/0(CU)
(N) & 1-6(G)-1 1/2"
4-3/0(CU); &
1-6(G)-2"
EMERG.
OFF
EMERG.
OFF
EMERG.
OFF
100 A 100 A
1. INTERCEPT EXISTING CONDUCTORS AND EXTEND AS
REQUIRED, PROVIDE NEW PULL BOX AT SPLICE LOCATION
SIZED PER NEC 314.28.
2. INSTALL 100A/3-PHASE PIN & SLEEVE STYLE CONNECTOR
ADJACENT TO MANUAL TRANSFER SW ITCH FOR
CONNECTION TO GENERATOR. COORDINATE CONNECTOR
TYPE W ITH OWNER TO VERIFY GENERATOR COMPATIBILITY.
3. PROVIDE NEW FUSE COMPATIBLE WITH EXISTING
SW ITCHBOARD.
4. PROVIDE SEPARATE SECTIONS FOR STANDARD AND
EMERGENCY BREAKERS WITHIN GDB.
5. RELABEL FUSED DISCONNECT AS SPARE.
# KEYNOTES
GENERAL NOTES
A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE
CODES/STANDARDS.
B. SHARED NEUTRALS ARE NOT ALLOW ED FOR SINGLE PHASE
BRANCH CIRCUITS.
C. FIRE CAULK ALL NEW PENETRATIONS MADE TO FIRE RATED
W ALLS TO MAINTAIN FIRE RATING.
D. SERVICE INTERRUPTIONS OF BUILDING ELECTRICAL
SYSTEMS SHALL ONLY OCCUR OUTSIDE OF REGULAR OFFICE
HOURS AND BE LIMITED TO 8 HOURS OUR LESS. ELECTRICAL
SERVICE SHUTDOW N SCHEDULE SHALL BE APPROVED BY
THE GOVERNMENT.
E. ELECTRICAL CONTRACTOR SHALL ADJUST PROGRAMMING
OF SCHNEIDER ELECTRIC PME POWER METERING DEVICES
AND SOFTW ARE FOR ALL CHANGES TO THE POWER
METERING, USING MANUFACTURER AUTHORIZED SUPPORT,
AND PROVIDE A ONE YEAR SCHNEIDER ELECTRIC PME
POW ER METERING SERVICE CONTRACT FOR THE LOCAL
CAMPUS SERVER HOSTED PLATFORM UPON COMPLETION OF
THE PROJECT.
LINE TYPE LEGEND
EXISTING
NEW
DEMO
1 2 3 4 5
D
C
B
A
S h e e t T it le
D e s ig n e d b y
D ra w n b y
C h e c k e d b y
A p p ro v e d b y
R e v is io n s
U n it e d S ta te s D e p a rt m e n t o f th e
I n te ri o r
B u re a u o f L a n d M a n a g e m e n t
BLM Project #
Project #
Date:
ALW AYS THINK SAFETY Sheet of
/1
/2
:1 :2
P
M C
U s e rs
\a lf o n s o ra m ir e z \D o c u m e n ts
R e v it L o c a lT e m p \L
B Y
D B
L M
T
O e le c a lf o n s o ra m ir e z .r v t
N E
W W
O R
K O
N E
-L
IN
E D
IA
G
R A
M
V
IC
T O
R
IN
O
H E
S T
A N
D
V
IC
T O
R
IN
O
H E
S T
A N
D
N
IF
C
-J W
H S
T A
N D
B Y
A N
D E
M E
R G
E N
C Y
P O
W E
R
N
IF
C C
A M
P U
S
S
D E
V E
L O
P M
E N
T A
V E
B O
IS
E
ID
140L0619D0008
LBYDBLM24_TO21
11.15.2024
E-601
8 9
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
A1
NEW W ORK ONE-LINE DIAGRAM
D es cr ip tio n D at e
22284
LICE
NSED
P RRO
FE
SSIO
NAL ENGINEE
S OT AT E OF IDA
HTYLE W HEST
AR
1 2 3 4 5
D
C
B
A
S h e e t T it le
D e s ig n e d b y
D ra w n b y
C h e c k e d b y
A p p ro v e d b y
R e v is io n s
U n it e d S ta te s D e p a rt m e n t o f th e
I n te ri o r
B u re a u o f L a n d M a n a g e m e n t
BLM Project #
Project #
Date:
ALW AYS THINK SAFETY Sheet of
/1
/2
:1 :2
P
M C
U s e rs
\a lf o n s o ra m ir e z \D o c u m e n ts
R e v it L o c a lT e m p \L
B Y
D B
L M
T
O e le c a lf o n s o ra m ir e z .r v t
P A
N E
L S
C H
E D
U L
E S
V
IC
T O
R
IN
O
H E
S T
A N
D
V
IC
T O
R
IN
O
H E
S T
A N
D
N
IF
C
-J W
H S
T A
N D
B Y
A N
D E
M E
R G
E N
C Y
P O
W E
R
N
IF
C C
A M
P U
S
S
D E
V E
L O
P M
E N
T A
V E
B O
IS
E
ID
140L0619D0008
LBYDBLM24_TO21
11.15.2024
E-602
9 9
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
NOTES:
TOTAL EST. DEMAND AMPS: 785 A
TOTAL EST. DEMAND: 652958 VA
TOTAL CONNECTED AMPS: 628 A
TOTAL CONNECTED LOAD: 522366 VA
EXISTING MAX DEMAND OVER LAST 12 MO 522366 VA 125.00% 652958 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL PHASE AMPS: 628.6 628.6 628.6
TOTAL PHASE VA: 174122 174122 174122
SPACE 11 3 -- -- -- -- --
SPARE 10 3 200 200 0 0 0
SPARE 9 3 200 200 0 0 0
PANEL HA 8 3 200 200 0 0 0
PANEL HB 7 3 200 200 0 0 0
PANEL HD 6 3 200 150 0 0 0
AHU-2 5 3 400 250 0 0 0
AHU-1 4 3 400 250 0 0 0
PANEL HF 3 3 200 150 0 0 0
PANEL HC 2 3 200 200 0 0 0
EDSB 1 3 600 600 0 0 0
CIRCUIT DESCRIPTION
CKT
NO
POLE FRAME BKR AMP A B C
NOTES: 120 kA SPD W/FUSIBLE DISCONNECT
MODEL TYPE: DISTRIBUTION PANELBOARD WIRES: 4 ENCLOSURE: NEMA 1
MANUFACTURER: SEE SPECIFICATIONS PHASES: 3 FED FROM: GDB
MOUNTING TYPE: SURFACE VOLTAGE: 480/277 Wye MINIMUM AIC RATING: 65,000
LOCATION: ELECTRICAL 022 AMPS: 800 A MAIN TYPE: MCB
PANEL: SDB
NOTES: 1. PROVIDE SEPARATE SECTIONS FOR STANDARD AND EMERGENCY BREAKERS AS SHOWN ON THE ONE-LINE DIAGRAM.
TOTAL EST. DEMAND AMPS: 829 A
TOTAL EST. DEMAND: 688995 VA
TOTAL CONNECTED AMPS: 663 A
TOTAL CONNECTED LOAD: 551196 VA
EXISTING MAX DEMAND OVER LAST 12 MO 551196 VA 125.00% 688995 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL PHASE AMPS: 664.4 658.3 668.8
TOTAL PHASE VA: 183802 182352 185042
PANEL HE VIA ATS2 (NOTE #1) 2 3 100 100 9680 8230 10920
SDB VIA ATS (NOTE #1) 1 3 800 800 174122 174122 174122
CIRCUIT DESCRIPTION
CKT
NO
POLE FRAME BKR AMP A B C
NOTES:
MODEL TYPE: DISTRIBUTION PANELBOARD WIRES: 4 ENCLOSURE: NEMA 3R
MANUFACTURER: SEE SPECIFICATIONS PHASES: 3 FED FROM:
MOUNTING TYPE: SURFACE VOLTAGE: 480/277 Wye MINIMUM AIC RATING: 65,000
LOCATION: AMPS: 1000 A MAIN TYPE: MLO
PANEL:GDB
D es cr ip tio n D at e
22284
LICE
NSED
P RRO
FE
SSIO
NAL ENGINEE
S OT AT E OF IDA
HTYLE W HEST
AR
File details come from the government source that posted it. Updated .