This document is an Amendment (Amendment 01) to Solicitation Number 140L3725R0002 for the NIFC 300 JWH Standby and Emergency Power project issued by the Department of the Interior Bureau of Land Management. The amendment provides updates to the original solicitation, including a site visit roster, responses to contractor questions, and revisions to technical drawings and specifications. Key changes include extending potential electrical service shutdowns from 8 to 24 hours, updating electrical sheets E101, E600, and E601, and modifying door hardware specifications for Door 22.1, which now requires a specific lever and exit device configuration.
The solicitation covers electrical work for standby and emergency power systems, with a performance period from 04/01/2025 to 12/15/2025. The amendment addresses multiple technical clarifications from contractors, such as conduit routing, generator installation details, and existing infrastructure considerations. Notable responses include confirming the use of existing conduit racks, explaining access to generator enclosures, and clarifying that wall outlets will not need to be replaced with red-colored units. The bid due date remains unchanged, and contractors are required to acknowledge the amendment according to the solicitation instructions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3725R0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LFA
BOISE ID 83705
3833 S. DEVELOPMENT AVE.
BLM FA-NTL INTRAGCY FIRE CTR(FA250)
03/11/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/13/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PROJECT: NIFC 300 JWH Standby and Emergency Power
The purpose of this amendment is to:
1. Provide Site Visit Roster, (see attached roster).
2. Provide responses to questions received, (see Q&A doc).
3. Provide Amendment Notes, (see Amendment Notes doc).
4. Provide updated drawings E101, E600 and E601, (see attached NIFC 300 JWH Standby - E101
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Matthew Steele
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L3725R0002/0001
E600 E601 Rev1).
This amendment must be acknowledged in accordance with the solicitation.
All other terms and conditions set forth within this solicitation remain unchanged.
Period of Performance: 04/01/2025 to 12/15/2025
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Fire and Aviation 3833 S Development Ave
Boise, Idaho 83705-5354
POST SITE VISIT Q&A March 10, 2025
NIFC 300 JWH Standby and Emergency Power Solicitation Number 140L3725R0002
CONTRACTOR QUESTIONS GOVERNMENT RESPONSE
1. AE101 notes states see specifications for door hardware schedule.
Please specify finishes of hardware and if a push pad is required for entry at room 010.
See Amendment item #5
2. Per E‐601 Keynote 1, are these accessible to extend or do they feed underground to the panel locations.
2. Refer to revised sheet E‐601 for clarification.
3. If they feed underground to their panel locations what is the solution to intercept them and extend.
3. Refer to revised sheet E‐601 for clarification.
4. Are there any red line drawing for the existing building? 4. There are original construction drawings available that will be provided upon request after award. Refer to the existing information from the plan sheets including the one line drawing.
5. The generator sits on a concrete slab, that extend under the termination cabinet for the generator. How are we going to install the new 3” conduits?
5. Exiting conduit and pull box may be reused. Refer to revised sheet E‐601 for clarification.
6. There is an existing conduit rack that the existing generator feeders are ran on, is it acceptable to utilize this rack? If so, can the tree be trimmed back so the new conduits can pass by?
6. Yes, conduit rack may be utilized. Refer to revised sheet E‐101 for clarification.
7. Will the chain‐link fence be taken down so there is accessibility to the generator termination cabinet?
7. The chain link fence has swing gates on the southeast side of the generator enclosure that can be swung out for access.
8. If there is room can the GDB be mounted next to the
MTS?
8. This is acceptable if space is adequate.
9. Is any concrete saw cutting required or anticipated for any part of the project?
9. It is not the intent of the design to require saw cutting beyond penetrations indicated on plan sheet E‐101 but means and methods may require otherwise.
10. On Sheet E‐601 Keynote #1 calls out to intercept the existing conductors and extend as required through a splice box. These feeds are underground and cannot be intercepted and extended through a splice box. Possible options would be to splice in the existing MSB and then extend to the new SDB, or we would have to completely install new runs to each panel/equipment being refed from SDB. Please advise on an approved solution.
10. Refer to revised drawings indicating to splice at the existing MSB as proposed.
11. The existing feeds between the exterior emergency equipment and the interior switchboards are run in rigid conduit above grade on a strut rack (See Attached Picture). Can this rack and installation method be used for the new feeds or does it need to be fed underground as called out on Sheet E‐101 Keynote #3.
11. Yes, conduit rack may be utilized.
Refer to revised sheet E‐101 for clarification.
12. Sheet E‐100 General note D calls out that shutdowns can only be for 8 hours or less. With the amount of work required to refeed existing equipment, it appears that this window will not be long enough to complete this work.
We would request a full 24 hours to complete this swap over.
12. See Amendment item #1
13. The existing devices backed up by emergency power in the building are red in color. Will all devices that will now have emergency backup be required to be changed out to red in color? IF so, we will need counts for all devices to be replaced as they are not shown on the bid documents for this project.
13. No, wall outlets won’t need to be replaced with red‐colored wall outlets.
14. Do you happen to have a picture of the door hardware/lock?
14. The door hardware and lock required are to comply with the plans and specs.
15. The hardware spec doesn't specify the lock type or style; it just says "Match Existing"
15. See Amendment item #5
16. Will the Government consider extending the bid due date 5 days after answers to the questions are released?
16. The bid due date is not being extended at this time.
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Fire and Aviation 3833 S Development Ave
Boise, Idaho 83705-5354
AMENDMENT 01 March 10, 2025
NIFC 300 JWH Standby and Emergency Power Solicitation Number 140L3725R0002
The following items are revised:
1. E‐100 General Note D: SERVICE INTERRUPTIONS OF BUILDING ELECTRICAL SYSTEMS SHALL ONLY
OCCUR OUTSIDE OF REGULAR OFFICE HOURS AND BE LIMITED TO 8 24 HOURS OR LESS.
ELECTRICAL SERVICE SHUTDOWN SCHEDULE SHALL BE APPROVED BY THE GOVERNMENT.
2. E‐101 revision dated 3/10/25 as attached.
3. E‐600 revision dated 3/10/25 as attached.
4. E‐601 revision dated 3/10/25 as attached.
5. Specification section 087111.2 Exit Devices, for Door 22.1 on Plan sheet AE101:
o Entry side: Lever with cylinder, satin nickel finish, with Lock/unlock selector switch on mortise.
o Exit side: In lieu of Rim Exit Device, replace with Mortise Exit Devices Grade 1 Type 3, Narrow Stile Touch Bar as the Actuating Bar, Aluminum material.
File details come from the government source that posted it. Updated .