This document contains electrical engineering design drawings for a Bureau of Land Management project at the NIFC (National Interagency Fire Center) Campus in Boise, Idaho, specifically focused on standby and emergency power systems. The drawings (E-101, E-600, and E-601) detail a comprehensive electrical infrastructure upgrade involving demolition and new work for power distribution, including a 600KW/750KVA standby generator, emergency distribution switchboard, and multiple electrical panels with specific power requirements.

Key technical specifications include replacing existing electrical infrastructure with new equipment configurations, integrating power metering devices from Schneider Electric, and implementing precise power distribution across various panels and systems. The project involves complex electrical work with specific requirements such as service interruptions limited to 8 hours outside regular office hours, compliance with NEC standards, and a one-year power metering service contract. The project is associated with Solicitation Number 140L3725R0002 and is being executed by the Department of the Interior's Bureau of Land Management Idaho Region.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 1312

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

2A

GDBMTS

1. EXISTING 600 KW GENERATOR, FIELD COORDINATE

PATHW AYS FOR NEW CONNECTIONS AS SHOWN ON THE

ONE-LINE DIAGRAM.

2. PROPOSED LOCATION OF MTS AND GDB, COORDINATE

LOCATION WITH EXISTING CONDITIONS PRIOR TO ROUGH-IN.

3. APPROXIMATE ROUTE FROM OUTDOOR GEAR TO AUTOMATIC

TRANSFER SWITCHES LOCATED IN BASEMENT ELECTRICAL

ROOM. REFER TO SHEET E-601 FOR CONDUIT AND

CONDUCTOR SIZING. CONTRACTOR TO UTILIZE EXISTING

UNISTRUT RACKING AND FOLLOW PATHWAY OF EXISTING

CONDUIT. PROVIDE ADDITIONAL UNISTRUT RACKING AS

REQUIRED FOR CONNECTIONS SHOW N.

4. FIELD COORDINATE PENETRATION LOCATION OF BASEMENT

EXTERIOR WALL FOR ACCESS TO BASEMENT ELECTRICAL

ROOM. COORDINATE WITH OTHER TRADES AS REQUIRED

FOR PATCH AND REPAIR.

# KEYNOTES

GENERAL NOTES

A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE

CODES/STANDARDS.

B. SHARED NEUTRALS ARE NOT ALLOWED FOR SINGLE PHASE

BRANCH CIRCUITS.

C. FIRE CAULK ALL NEW PENETRATIONS MADE TO FIRE RATED

WALLS TO MAINTAIN FIRE RATING.

D. SERVICE INTERRUPTIONS OF BUILDING ELECTRICAL

SYSTEMS SHALL ONLY OCCUR OUTSIDE OF REGULAR OFFICE

HOURS AND BE LIMITED TO 8 HOURS OUR LESS. ELECTRICAL

SERVICE SHUTDOWN SCHEDULE SHALL BE APPROVED BY

THE GOVERNMENT.

E. ELECTRICAL CONTRACTOR SHALL ADJUST PROGRAMMING

OF SCHNEIDER ELECTRIC PME POWER METERING DEVICES

AND SOFTWARE FOR ALL CHANGES TO THE POWER

METERING, USING MANUFACTURER AUTHORIZED SUPPORT,

AND PROVIDE A ONE YEAR SCHNEIDER ELECTRIC PME

POW ER METERING SERVICE CONTRACT FOR THE LOCAL

CAMPUS SERVER HOSTED PLATFORM UPON COMPLETION OF

THE PROJECT.

1 2 3 4 5

D

C

B

A

S h e e t T it le

D e s ig n e d b y

D ra w n b y

C h e c k e d b y

A p p ro v e d b y

R e v is io n s

U n it e d S ta te s D e p a rt m e n t o f th e

I n te ri o r

B u re a u o f L a n d M a n a g e m e n t

BLM Project #

Project #

Date:

ALWAYS THINK SAFETY Sheet of

/1

/2

:1

:1

P

M C

U s e rs

\t y le rv ic to ri n o \D o c u m e n ts

R e v it L o c a lT e m p \L

B Y

D B

L M

T

O e le c ty le rv ic to ri n o .r v t

F

IR

S T

F L

O O

R P

O W

E R

P L

A N

V

IC

T O

R

IN

O

H E

S T

A N

D

V

IC

T O

R

IN

O

H E

S T

A N

D

N

IF

C

-J W

H S

T A

N D

B Y

A N

D E

M E

R G

E N

C Y

P O

W E

R

N

IF

C C

A M

P U

S

S

D E

V E

L O

P M

E N

T A

V E

B O

IS

E

ID

140L0619D0008

LBYDBLM24_TO21

11.15.2024

E-101

6 9

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

A1

FIRST FLOOR POW ER PLAN

N

0 8' 16' 32'

D es cr ip tio n D at e

R ev is io n

3/

/2

14056

HADIFOET

AT

OSTY LER B. V ICTO

RI

RE

EN

IG

NELANOISSEFORP

DESNECIL

NO

M

PANEL

HE

PANEL

LE

PANEL

LF

(2 SECT.)

PANEL

LC

(2 SECT.)

PANEL

LD

(2 SECT.)

PANEL

LB

PANEL

LA-2

PANEL

LA-3

PANEL

LA-1

PANEL

HC

PANEL

HB

PANEL

HD

PANEL

HF

PANEL

HA

M

G

SPD

MOTOR

CONTROL

CENTER

"MCC"

ELEVATOR

CNTRLR

M M

IB1

(N.C.)

IB2

(N.C.)

UPS 1

BATTERY UPS 1

UPS 2

BATTERY UPS 2

M

PANEL

LED

PANEL

LEC

PDU

1A

PDU

PDU

3A

PDU

PDU

PDU

200A

LPS-RK

200/3

200A

LPS-RK

200/3

150A

LPS-RK

200/3

250A

FRS-R

400/3

250A

FRS-R

400/3

150A

LPS-RK

200/3

200A

LPS-RK

200/3 200/3

100A

LPS-RK

100/3

750A

KRP-C

800/3

45/3

30KVA

480/3 TO

208Y/120

400/3 400/3

AHU-1

480/3

AHU-2

480/3

60/3

45KVA

480/3 TO

208Y/120

60/3

45KVA

480/3 TO

208Y/120

60/3

45KVA

480/3 TO

208Y/120

60/3

45KVA

480/3 TO

208Y/120

75KVA

480/3 TO

208Y/120

600KW/750KVA;

480Y/277 3ϕ, 4W

STANDBY

GENERATOR

(E) 800A 4P

ATS

100/3

150/3

LA-42

HA-10

HA-9,11,13,

15,17,19

EXT. LGT.

BLDG. SEC.

LGT.

20A 2P LTG

CONTACTOR

20A 2P LTG

CONTACTOR

20A 4P LTG

CONTACTOR

(6)4" C'S. EACH W /

4-500MCM (CU)

2000/3

SOLID STATE

W/ADJUST. TRIP

& GRND. FAULT

4 #3/0(CU)

& 1 #6(G)-2"

4 #1/0(CU)

& 1 #6(G)-2"

3 #250MCM

(CU) & 1

#4(G)-2"

4 #1/0(CU)

& 1 #6(G)-2"

4 #3/0(CU)

& 1 #6(G)-2"

3 #250MCM

(CU) & 1

#4(G)-2"

3 #3 & 1 #8(G)-1"

3 #1/0(CU); 1

#3/0(CU)(N) &

1 #6(G)-2"

3 #2/0, #4/0 & 1 #6(G)-2"

3 #2/0, #4/0 & 1 #6(G)-2"

(6) #12-3/4"C

(2) SETS OF

(4) 600MCM(CU)

& (1) 2/0 GND

4-3(CU) &

1-8(G)-1 1/4"

3-8 & 1-10-3/4"

4-3(CU) &

1-8(G)-1 1/4"

3 #6 & 1 #10(G)-3/4"

3 #1/0(CU);

1 #1/0(CU)(N)

& 1 #6(G)-2"

4 #3/0(CU)

& 1 #6(G)-2"

3 1/2"C'S.

4-500MCM(CU)

& 1-1/0(G)

(2)3 1/2"C'S.

4-500MCM(CU)

& 1-1/0(G)

NEUTRAL

1#3/0(CU)-3/4"

WATER

SERVICE

20' of 3/0 B.C.

IN BOTTOM OF

FOOTING

SS

SS

A

V

300-JWH

ENERGY CONSUMPTION

METER 7350

150/3

G N

CB-1

150/3

150/3

150/3

TO E.F.'S 1,2,3,4

ON ROOF

20A 4P

CONTACTOR

T C

'3R' '3R'

150/3 150/3

100/3

SPARE

1 1111 11

MSB: 480Y/277V, 3ϕ, 4W.

2000A, 75,000 AIC

TO IDAHO POWER

UTILITY TRANSFORMER

300-JWH

EMERGENCY

DIST PANEL

METER PMD-850

100A100A

100/3

60A60A60A60A100A100A60A60A100A100A400A450A

100/3100/3100/3100/3100/3100/3100/3100/3100/3100/3100/3600/3600/3

1000/4

DRY COOLERS 480/3 EACH

30/3

20A.FRS

'3R'

PUMP-3

480/3

PUMP-4

480/3

300KVA

480/3 TO

208Y/120

UPSDSB

EMERGENCY

DISTRIBUTION

SWITCHBOARD

100/3100/3

100 A 100 A

S S S S

EMERG.

OFF

EMERG.

SHUT

OFF

60/3

CAC-3

EMERG.

SHUT

OFF

100/3

VAV BOX

EMERG.

SHUT

OFF

60/3

CAC-2

EMERG.

SHUT

OFF

60/3

CAC-1

EMERG.

SHUT

OFF

60/3

CAC-5

3-4 & 1-8(G)-1"

3-4 & 1-8(G)-1"

3-8 & 1-10(G)-3/4"

3-8 & 1-10(G)-1"

SIZE '2'

W/HOA

3-6(CU) &

1-8(G)-1"

3-3(CU) &

1-8(G)-1 1/4"

3-12 & 1-12(G)-3/4"

3"C'S EA. W/

4-400MCM(CU) & 1-3/0(G)

3-2(CU); 1-1/0(CU)

(N) & 1-6(G)-1 1/2"

4-3/0(CU); &

1-6(G)-2"

EMERG.

OFF

EMERG.

OFF

EMERG.

OFF

3-4 & 1-8(G)-1"

3-4 & 1-8(G)-1"

PUE METER

DISCONNECT

3-4 & 1-8(G)-1"

600A800/3

W.P.

ELEVATOR

30HP; 480/3

150/3

SHUNT

TRIP IN

NEMA1

TO F.A.

SYSTEM

HEAT

DETECTORS

S

FA

300-JWH

MCC ENERGY

CONSUMPTION

METER PMD-5110

300-JWH

ELEVATOR ENERGY

CONSUMPTION

METER PMD-5110

(2)2"C'S EA. W/ 3-4/0(CU)

& 1-2(G)

(2)2"C'S EA. W/ 3-3/0(CU)

& 1-3(G)

225A 225A

4-3/0(CU) & 1-3(G) 4-3/0(CU) & 1-3(G)

MB1

(N.C.)

200A

MB2

(N.C.)

200A

MBP

(N.O.)

400A

MIS

(N.C.)

400A

3-3/0(CU) & 1-6(G)

2" C.

3-4/0(CU) & 1-4(G), 2" C.

SHIELDED CABLE

(2) 2" C. EACH WITH

3-3/0(CU) & 1-3(G)

300-JWH

IT EQUIP ENERGY

METER PMD-5560

100 A 100 A

1. REMOVE EXISTING FUSIBLE SWITCH AND ASSOCIATED

CONNECTION. MAINTAIN CONDUIT AND CONDUCTORS TO

DOWNSTREAM EQUIPMENT TO THE FURTHEST EXTEND

POSSIBLE FOR RECONNECTION, REFER TO NEW WORK ONE-

LINE DIAGRAM. FIELD COORDINATE SPLICING OF NEW WORK

WITHIN EXISTING SWITCHGEAR SECTION.

2. REMOVE FUSE WITHIN SWITCHBOARD, DOWNSTREAM

CONDUIT CONDUCTORS TO REMAIN, REFER TO SHEET E-601

FOR NEW FUSE RATING.

3. EXISTING CONNECTION TO BE REMOVED. EXISTING CONDUIT

TO REMAIN FOR REUSE AS PER SHEET E-601. REMOVE ANY

UNUSED RACEWAYS.

4. REMOVE EXISTING CONNECTION FROM ATS TO EXISTING PULL

BOX LOCATED ADJACENT TO EMERGENCY DISTRIBUTION

SWITCHBOARD. PULL BOX TO REMAIN FOR REUSE.

# KEYNOTES

GENERAL NOTES

A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE

CODES/STANDARDS.

B. SHARED NEUTRALS ARE NOT ALLOWED FOR SINGLE PHASE

BRANCH CIRCUITS.

C. FIRE CAULK ALL NEW PENETRATIONS MADE TO FIRE RATED

WALLS TO MAINTAIN FIRE RATING.

D. SERVICE INTERRUPTIONS OF BUILDING ELECTRICAL

SYSTEMS SHALL ONLY OCCUR OUTSIDE OF REGULAR OFFICE

HOURS AND BE LIMITED TO 8 HOURS OUR LESS. ELECTRICAL

SERVICE SHUTDOWN SCHEDULE SHALL BE APPROVED BY

THE GOVERNMENT.

E. ELECTRICAL CONTRACTOR SHALL ADJUST PROGRAMMING

OF SCHNEIDER ELECTRIC PME POWER METERING DEVICES

AND SOFTWARE FOR ALL CHANGES TO THE POWER

METERING, USING MANUFACTURER AUTHORIZED SUPPORT,

AND PROVIDE A ONE YEAR SCHNEIDER ELECTRIC PME

POW ER METERING SERVICE CONTRACT FOR THE LOCAL

CAMPUS SERVER HOSTED PLATFORM UPON COMPLETION OF

THE PROJECT.

LINE TYPE LEGEND

EXISTING

NEW

DEMO

1 2 3 4 5

D

C

B

A

S h e e t T it le

D e s ig n e d b y

D ra w n b y

C h e c k e d b y

A p p ro v e d b y

R e v is io n s

U n it e d S ta te s D e p a rt m e n t o f th e

I n te ri o r

B u re a u o f L a n d M a n a g e m e n t

BLM Project #

Project #

Date:

ALWAYS THINK SAFETY Sheet of

/1

/2

:1

:1

P

M C

U s e rs

\t y le rv ic to ri n o \D o c u m e n ts

R e v it L o c a lT e m p \L

B Y

D B

L M

T

O e le c ty le rv ic to ri n o .r v t

D E

M O

L

IT

IO

N

O N

E -L

IN

E

D

IA

G R

A M

V

IC

T O

R

IN

O

H E

S T

A N

D

V

IC

T O

R

IN

O

H E

S T

A N

D

N

IF

C

-J W

H S

T A

N D

B Y

A N

D E

M E

R G

E N

C Y

P O

W E

R

N

IF

C C

A M

P U

S

S

D E

V E

L O

P M

E N

T A

V E

B O

IS

E

ID

140L0619D0008

LBYDBLM24_TO21

11.15.2024

E-600

7 9

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

A1

DEMOLITION ONE-LINE DIAGRAM

D es cr ip tio n D at e

R ev is io n

3/

/2

14056

HADIFOET

AT

OSTY LER B. V ICTO

RI

RE

EN

IG

NELANOISSEFORP

M

MOTOR

CONTROL

CENTER

"MCC"

ELEVATOR

CNTRLR

PANEL

HE

PANEL

LE

PANEL

LF

(2 SECT.)

PANEL

LC

(2 SECT.)

PANEL

LD

(2 SECT.)

PANEL

LB

PANEL

LA-2

PANEL

LA-3

PANEL

LA-1

M M

M

PANEL

HC

PANEL

HB

PANEL

HD

PANEL

HF

PANEL

HA

M

G

SPD

SPD

600A 3P

200A 3P

150A 3P

250A 3P

250A 3P

150A 3P

200A 3P

200A 3P

200A 3P

SPARE

200A 3P

SPARE

J

IB1

(N.C.)

IB2

(N.C.)

UPS 1

BATTERY UPS 1

UPS 2

BATTERY UPS 2

PANEL

LED

PANEL

LEC

PDU

1A

PDU

PDU

3A

PDU

PDU

PDU

100A100A

100/3

60A60A60A60A100A100A60A60A100A100A400A450A

100/3100/3100/3100/3100/3100/3100/3100/3100/3100/3100/3600/3600/3

DRY COOLERS 480/3 EACH

30/3

20A.FRS

'3R'

PUMP-3

480/3

PUMP-4

480/3

45/3

30KVA

480/3 TO

208Y/120

400/3 400/3

AHU-2

480/3

AHU-1

480/3

60/3

45KVA

480/3 TO

208Y/120

60/3

45KVA

480/3 TO

208Y/120

60/3

45KVA

480/3 TO

208Y/120

60/3

45KVA

480/3 TO

208Y/120

75KVA

480/3 TO

208Y/120

EMERGENCY

DISTRIBUTION

SWITCHBOARD

MSB: 480Y/277V, 3ϕ, 4W.

2000A, 75,000 AIC

600KW, 750KVA;

480Y/277 3ϕ, 4W

STANDBY

GENERATOR

(E) 800A 4P

ATS

100/3

150/3

EMERG.

SHUT

OFF

60/3

CAC-3

EMERG.

SHUT

OFF

100/3

VAV BOX

EMERG.

SHUT

OFF

60/3

CAC-2

EMERG.

SHUT

OFF

60/3

CAC-1

EMERG.

SHUT

OFF

60/3

CAC-5

LA-42

HA-10

HA-9,11,13,

15,17,19

EXT. LGT.

BLDG. SEC.

LGT.

20A 2P LTG

CONTACTOR

20A 2P LTG

CONTACTOR

20A 4P LTG

CONTACTOR

(6)4" C'S. EACH W /

4-500MCM (CU)

2000/3

SOLID STATE

W/ADJUST. TRIP

& GRND. FAULT

4#3/0, 1#6

GND IN 2" C.

4#1/0, 1#6

GND IN 2" C.

3#250, 1#4

GND IN 2" C.

4#1/0, 1#6

GND IN 2" C.

4#3/0, 1#6

GND IN 2" C.

3#250, 1#4

GND IN 2" C.

3 #3 & 1 #8(G)-1"

3 #1/0(CU); 1

#3/0(CU)(N) &

1 #6(G)-2"

3 #2/0, #4/0 & 1 #6(G)-2"

3 #2/0, #4/0 & 1 #6(G)-2"

(6) #12-3/4"C

CONTROL CONDUCTORS

(2) SETS OF 4" C. EACH

WITH 4#600, 1#2/0 GND

3-4 & 1-8(G)-1"

3-4 & 1-8(G)-1"

3-8 & 1-10(G)-3/4"

3-8 & 1-10(G)-1"

4#3, 1#8 GND

IN 1-1/4" C.

3-8 & 1-10-3/4"

4-3(CU) &

1-8(G)-1 1/4"

SIZE '2'

W/HOA

3-6(CU) &

1-8(G)-1"

3-3(CU) &

1-8(G)-1 1/4"

3-12 & 1-12(G)-3/4"

3 #6 & 1 #10(G)-3/4"

3 #1/0(CU);

1 #1/0(CU)(N)

& 1 #6(G)-2"

3-4 & 1-8(G)-1"

3-4 & 1-8(G)-1"

4#3/0, 1#6

GND IN 2" C.

PUE METER

DISCONNECT

3-4 & 1-8(G)-1"

(2) SETS OF 3" C. EACH

WITH 4#350, 1#1 AWG GND

(2)3 1/2"C'S.

4-500MCM(CU)

& 1-1/0(G)

800/3 100/3

600A800/3

GENERATOR

CONNECTOR

800A 3P

NEUTRAL

1#3/0(CU)-3/4"

WATER

SERVICE

20' of 3/0 B.C. IN BOTTOM

OF FOOTING

SS

SS

A

V

300-JWH ENERGY

CONSUMPTION METER 7350

150/3

G N

CB-1

150/3

150/3

150/3

TO E.F.'S 1,2,3,4

ON ROOF

20A 4P

CONTACTOR T

C

'3R' '3R'

150/3 150/3

100/3

W.P.

ELEVATOR

30HP; 480/3

150/3

SHUNT

TRIP IN

NEMA1

TO F.A.

SYSTEM

HEAT

DETECTORS

S

FA

200/3

100A

LPS-RK

100/3

800A

KRP-C

800/3

100A

LPS-RK

TO IDAHO POWER

UTILITY TRANSFORMER

SECONDARY

DISTRIBUTION BOARD

'SDB': 480Y/277V, 3ϕ, 4W.

800A, 65,000 AIC

GENERATOR

DISTRIBUTION BOARD

'GDB': 480Y/277V, 3ϕ, 4W.

1000A, 65,000 AIC

NEMA 3R

MTS: 480Y/277V, 4P

100A, 65,000 AIC

NEMA 3R

ATS2: 480Y/277V, 4P

100A, 65,000 AIC

(2) SETS OF 3-1/2" C. EACH

WITH 4#500MCM, 1#1/0 GND

4#3, 1#8 GND

IN 1-1/4" C.

4#3, 1#8 GND

IN 1-1/4" C.

(2) SETS OF 3-1/2" C. EACH

WITH 4#500MCM, 1#1/0 GND

1 1 1 1 1 1 1

300-JWH

EMERGENCY

DIST PANEL

METER PMD-850

300-JWH

MCC ENERGY

CONSUMPTION

METER PMD-5110

300-JWH

ELEVATOR ENERGY

CONSUMPTION

METER PMD-5110

300-JWH

IT EQUIP ENERGY

METER PMD-5560

(2)2"C'S EA. W/ 3-4/0(CU)

& 1-2(G)

(2)2"C'S EA. W/ 3-3/0(CU)

& 1-3(G)

225A 225A

4-3/0(CU) & 1-3(G) 4-3/0(CU) & 1-3(G)

MB1

(N.C.)

200A

MB2

(N.C.)

200A

MBP

(N.O.)

400A

MIS

(N.C.)

400A

3-3/0(CU) & 1-6(G)

2" C.

3-4/0(CU) & 1-4(G), 2" C.

SHIELDED CABLE

(2) 2" C. EACH WITH

3-3/0(CU) & 1-3(G)

1000/4

300KVA

480/3 TO

208Y/120

UPSDSB

100/3100/3

100 A 100 A

S S S S

EMERG.

OFF

3"C'S EA. W/

4-400MCM(CU) & 1-3/0(G)

3-2(CU); 1-1/0(CU)

(N) & 1-6(G)-1 1/2"

4-3/0(CU); &

1-6(G)-2"

EMERG.

OFF

EMERG.

OFF

EMERG.

OFF

100 A 100 A

1. INTERCEPT EXISTING CONDUCTORS AND EXTEND AS

REQUIRED TO RECONNECT EQUIPMENT SHOWN. MAKE

SPLICE IN EXISTING MAIN SWITCHBOARD SECTION MADE

VACANT BE DEMOLITION.

2. INSTALL 100A/3-PHASE PIN & SLEEVE STYLE CONNECTOR

ADJACENT TO MANUAL TRANSFER SWITCH FOR

CONNECTION TO GENERATOR. COORDINATE CONNECTOR

TYPE WITH OWNER TO VERIFY GENERATOR COMPATIBILITY.

3. PROVIDE NEW FUSE COMPATIBLE WITH EXISTING

SWITCHBOARD.

4. PROVIDE SEPARATE SECTIONS FOR STANDARD AND

EMERGENCY BREAKERS WITHIN GDB.

5. EXISTING SWITCHGEAR SECTION MADE VACANT BY

DEMOLTION. MAKE SPLICES INDICATED WITH KEYNOTE 1 AT

THIS LOCATION. PROVIDE BLANK COVER COMPATIBLE WITH

EXISTING EQUIPMENT AS REQUIRED.

6. RELOCATE CONNECTION TO ADJACENT SW ITCHBOARD

SECTION AS REQUIRED TO VACATE ONE SWITCHBOARD

SECTION.

7. CONTRACTOR MAY UTILIZE EXISTING CONDUIT AND

CONDUCTORS FOR ROUTING FROM GENERATOR

ENCLOSURE TO GDB.

8. UTILIZE EXISTING PULL BOX LOCATED ADJACENT TO

EMERGENCY DISTRIBUTION PANEL FOR CONDUCTOR

SPLICES.

# KEYNOTES

GENERAL NOTES

A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE

CODES/STANDARDS.

B. SHARED NEUTRALS ARE NOT ALLOWED FOR SINGLE PHASE

BRANCH CIRCUITS.

C. FIRE CAULK ALL NEW PENETRATIONS MADE TO FIRE RATED

WALLS TO MAINTAIN FIRE RATING.

D. SERVICE INTERRUPTIONS OF BUILDING ELECTRICAL

SYSTEMS SHALL ONLY OCCUR OUTSIDE OF REGULAR OFFICE

HOURS AND BE LIMITED TO 8 HOURS OUR LESS. ELECTRICAL

SERVICE SHUTDOWN SCHEDULE SHALL BE APPROVED BY

THE GOVERNMENT.

E. ELECTRICAL CONTRACTOR SHALL ADJUST PROGRAMMING

OF SCHNEIDER ELECTRIC PME POWER METERING DEVICES

AND SOFTWARE FOR ALL CHANGES TO THE POWER

METERING, USING MANUFACTURER AUTHORIZED SUPPORT,

AND PROVIDE A ONE YEAR SCHNEIDER ELECTRIC PME

POW ER METERING SERVICE CONTRACT FOR THE LOCAL

CAMPUS SERVER HOSTED PLATFORM UPON COMPLETION OF

THE PROJECT.

LINE TYPE LEGEND

EXISTING

NEW

DEMO

1 2 3 4 5

D

C

B

A

S h e e t T it le

D e s ig n e d b y

D ra w n b y

C h e c k e d b y

A p p ro v e d b y

R e v is io n s

U n it e d S ta te s D e p a rt m e n t o f th e

I n te ri o r

B u re a u o f L a n d M a n a g e m e n t

BLM Project #

Project #

Date:

ALWAYS THINK SAFETY Sheet of

/1

/2

:1

:1

P

M C

U s e rs

\t y le rv ic to ri n o \D o c u m e n ts

R e v it L o c a lT e m p \L

B Y

D B

L M

T

O e le c ty le rv ic to ri n o .r v t

N E

W W

O R

K O

N E

-L

IN

E D

IA

G

R A

M

V

IC

T O

R

IN

O

H E

S T

A N

D

V

IC

T O

R

IN

O

H E

S T

A N

D

N

IF

C

-J W

H S

T A

N D

B Y

A N

D E

M E

R G

E N

C Y

P O

W E

R

N

IF

C C

A M

P U

S

S

D E

V E

L O

P M

E N

T A

V E

B O

IS

E

ID

140L0619D0008

LBYDBLM24_TO21

11.15.2024

E-601

8 9

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

A1

NEW W ORK ONE-LINE DIAGRAM

D es cr ip tio n D at e

R ev is io n

3/

/2

14056

HADIFOET

AT

OSTY LER B. V ICTO

RI

RE

EN

IG

NELANOISSEFORP

Sheets
E-101 - FIRST FLOOR POWER PLAN
E-600 - DEMOLITION ONE-LINE DIAGRAM
E-601 - NEW WORK ONE-LINE DIAGRAM

File details come from the government source that posted it. Updated .