This document is a set of design plans for the White Sandy and Devil's Elbow Potable Water Filtration Project, issued by the Bureau of Land Management's Butte Field Office in Western Montana. The project focuses on improving water quality at the White Sandy Campground by installing a comprehensive water treatment system. The pump room, measuring 10ft x 16ft, will be reconfigured to accommodate new filtration equipment, including water softening, iron removal, and sulfate removal systems. The electrical plan details a 240V/30 AMP water treatment controller with specific electrical requirements, while the process system schematic outlines the water filtration infrastructure using Schedule 80 PVC piping, pressure tanks, and various ion exchange components. The project is located in Lewis and Clark County, with specific installation instructions to ensure proper water treatment and system integration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Q_A_Amendment_0002_0002.pdf | ||
| Sol_140L3626Q0001_Amd_0002.pdf | ||
| BID_SCHEDULE_Corrected_0001.docx | DOCX document | |
| Sol_140L3626Q0001_Amd_0001.pdf | ||
| Sol_140L3626Q0001.pdf | ||
| BID_SCHEDULE.docx | DOCX document | |
| A06_SPECS.pdf | ||
| B03_WD_MT20250040_Date_12_05_2025.pdf | ||
| A04_SOW_White_Sandy_Water_Filtration_w-Attachment.pdf | ||
| B08_Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO
CANADA
UNITED STATES
SASKATC
H
EW
AN
ALBERTA
B R
ITIS
H
C O
LU
M
B
IA
N O
R T
H
D
A K
O T
A
S O
U T
H
D
A K
O T
A
WYOMING
ALT
MISSOULA
KALISPELL
GREAT FALLS
HAVRE
HELENA
BUTTE
BILLINGS
MILES CITY
LEWISTOWN
MONTANACHOTEAU
MALTA
GLASGOW
CHESTER
FT BENTON
STATE REFERENCE MAP
(N.T.S)
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
WHITE SANDY AND DEVIL'S ELBOW
POTABLE WATER FILTRATION PROJECT
LEWIS AND CLARK COUNTY
BUTTE FIELD OFFICE
VICINITY MAP
(N.T.S)
DIRECTIONS TO:
WHITE SANDY RECREATION SITE (46°44'31" N, 111°53'17" W):
FROM HELENA, DRIVE NORTH ON I-15 TO EXIT 200. TURN EAST ON LINCOLN RD,
FOLLOW FOR 5 MILES. TURN LEFT ON HAUSER DAM ROAD, FOLLOW FOR 2.9 MILES TO
GREEN GATE. PASS THROUGH GREEN GATE AND DRIVE TO RECREATION SITE.
GENERAL ENGINEER'S NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY
CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS
SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEWHERE IN THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.
3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL
PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.
4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR
INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.
CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE
CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY
THIS PLAN.
5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING
PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE
CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO
UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR BLUE STAKE
(1-800-424-5555, or 811) PRIOR TO ANY EXCAVATION.
6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL
EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW
CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN
ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER WITH
DISCREPANCY.
7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE
LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT
ENGINEER WITH ANY DISCREPANCIES.
8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO
WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH
EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.
\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG
C O
V E
R
S
H E
E T
CITY OF HELENA
PROJECT LOCATION
SHEET LIST TABLE
SHEET
NUMBER
SHEET TITLE
1 COVERSHEET G1
2 EXISTING WHITE SANDY PUMP ROOM LAYOUT C1
3 ELECTRICAL E1
4 PROCESS SYSTEM M1
PROJECT SITE
PROJECT DESCRIPTION
THIS PROJECT ENTAILS WATER FILTRATION FOR POTABLE WATER AT WHITE SANDY
CAMPGROUND. EXISTING POOR WATER QUALITY NECESSITATES FILTRATION. SEE
ATTACHED STATEMENT OF WORK (SOW) AND WATER QUALITY REPORTS FOR
PERTINENT INFORMATION.
G1
W H
I T
E
S
A N
D Y
C
A M
P G
R O
U N
D
B U
R E
U
O
F
L A
N
M
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
H E
I
T E
R I O
R
DESIGNED BY: D. LIRA DRAWN BY: D. LIRA/SPC CHECKED BY: D. LIRA APPROVED BY: D. LIRA
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
B
U T
T
E
L
F
I C
E
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
P O
T A
B L
E
W
A T
R
L T
R A
T I O
N
P
R O
J E
C
W
W W
W
W W
W W
W
PRESSURE
TANK
PRESSURE
TANK
L O
P
B
O
O
S
O P
FROM IRRIGATION WELL
FROM POTABLE WELL
PRESSURE GAUGE
FLOW METER
SMOOTH
NOSE TEST
TAP
INSTALL NEW FLOW METER
FOR IRRIGATION LINES
PRESSURE GAUGE
DOOR
WASHING
MACHINE
DRYER
SHELF
PUMP ROOM INTERIOR WALLL
16 FT
C:\USERS\SCLANCY\DOI\WESTERN DISTRICT OFFICE - WZ-CLANCY\LAKE SITES WATER SYSTEMS\2025 RIVER FUND
WATER FILTRATION\DRAWING FILES\3.WHITE SANDY PUMP_ROOM_FILTRATION.DWG
E X
I S
T I N
G
W
H I T
E
S
A N
O
M
WHITE SANDY PUMP ROOM
NO SCALE
C1
CONSTRUCTION NOTES
1. PUMP ROOM DIMENSIONS ARE 10FT X 16 FT, AS
INDICATED ON THE DRAWING.
2. EXISTING WASHING MACHINE, DRYER, AND
SHELVING CAN BE REMOVED TO MAKE ROOM FOR
FILTRATION EQUIPMENT.
3. DESIGN AND INSTALL WATER FILTRATION SYSTEM
TO ACCOMODATE EXISTING PUMP ROOM LAYOUT,
IF POSSIBLE.
4. VENDOR/CONTRACTOR WILL APPROVE CHANGES
TO PUMP ROOM LAYOUT THROUGH CONTRACTING
OFFICER'S REPRESENTATIVE (COR) BLM ENGINEER.
W H
I T
E
S
A N
M
P G
R O
U N
D
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
DESIGNED BY: D. LIRA DRAWN BY: D. LIRA/SPC CHECKED BY: D. LIRA APPROVED BY: D. LIRA
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
B
U T
E
F
I C
E
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
P O
T A
B L
E
W
A T
L T
R A
T I O
N
P
R O
J E
C
WATERTREATMENT
CONTROLLER
SINGLE PHASE 3- WIRE
240V / 30 AMP
(2) #8 AWG CU
PRESSURE
TRANSDUCER
A
G
WELL PUMP
A
1 - 30 AMP WELL PUMP
3 - 30 AMP WELL PUMP
5 - 20 AMP WATER SOFTENER
7 - 20 AMP IRON REMOVAL SYSTEM
9 - 20 AMP SULFATE REMOVAL SYSTEM
2 - 20 AMP BUILDING LIGHTS --- INSTALLED BY BUILDING MFG.
4 - 20 AMP GFCI RECEPTACLES
6 - 30 AMP BUILDING HEATER -- INSTALLED BY BUILDING MFG.
8 - 30 AMP BUILDING HEATER -- INSTALLED BY BUILDING MFG.
10- SURGE PROTECTOR
12 - SURGE PROTECTOR
WATER TREATMENT BUILDING PANEL SCHEDULE
V
A
M P
A
CONTROLLER INTERNAL WIRING DIAGRAM
GENERAL NOTES;
1. WATER TREATMENT CONTROLLER - SJE -RHOMBUS P/N 1094638 OR EQUAL.
2. ALL ELECTRICAL COMPONENTS THAT INSERT INTO THE POTABLE WATER ARE TO BE NSF
61 COMPLIANT.
3. INSTALL ALL INTERIOR ELECTRICAL TO NFPA 70 WET / DAMP LOCATIONS.
4. STROBE LIGHT -SURFACE MOUNT FEDERAL SIGNAL P/N LP3S-120R OR EQUAL.
WATER TREATMENT BUILDING ELECTRICAL
SCHEMATIC
A
(1) #10 AWG CU
WATER
SOFTENER
RED
STROBE
LIGHT
(3) #12
AWG
CU
DRAWING NOT TO SCALE
JUNCTION BOX
MANUFACTURING WIRING FROM
PRESSURE TRANSDUCER
A
M P
A
A
M P
A
IRON
REMOVAL
SYSTEM
SULFATE
REMOVAL
SYSTEM
E L
E C
T R
I C
A L
DESIGNED BY: D. LIRA DRAWN BY: D. LIRA/SPC CHECKED BY: D. LIRA APPROVED BY: D. LIRA
SHEET
___ OF ___4
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
B U
R E
L
A N
D
M
A N
A G
E M
N E
T
W E
S T
E R
N
M
O N
T A
S
T R
I C
T D
I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
B U
T T
E
F
I E
F
I C
E
I S
S U
R
B
U T
E
F
I C
E I S
S U
E
D
A T
E
M A
R K
X X X X X R
E V
I S
I O
N
R E
V I S
I O
N
R E
V I S
I O
N
R E
V I S
I O
N
R E
V I S
I O
N
R E
V I S
I O
N
D A
T E
M M
D
D Y
Y
M M
D
D Y
Y
M M
D
D Y
Y
M M
D
D Y
Y
M M
D
D Y
Y
A P
P R
O V
E D
X X
X
X X
X
X X
X
X X
X
X X
X
P O
T A
B
T
L T
R A
T I O
N
P
R O
J E
C T
W H
I T
E
S
A N
M
P G
R O
U N
E1
WM
DCV
SV
WP
T
S
F
T I N
G
I O
N
E
X C
H A
N G
E
P R
E S
S U
N
K
P R
E S
S U
N
K
P R
E S
S U
N
K
CV
TO DISTRIBUTION SYSTEM
SV
PT
P R
E F
I L T
E R
PG
PG
PG
" SCHEDULE 80 PVC
" SCHEDULE 80 PVC
" SCHEDULE 80 PVC
BV
BV
BV
BV
BV
BV
BUILDING DRAIN TO
CLASS 5 INJECTION WELL
BV
3 4
S
C H
E D
U
P
V C
55 PSI MINIMUM AT
15 GPM MAXIMUM
40-60
PSIG
GENERAL NOTES:
1.SYMBOLS
A. BV- DOUBLE UNION BALL VALVE
B. SV- SAMPLE VALVE
C. PG-PRESSURE GAUGE
D. PT - ELECTRICAL PRESSURE TRANSDUCER
E. CV- CHECK VALVE
F. DCV-DOUBLE CHECK VALVE
G. WM- WATER METER
H. WP-SUBMERSIBL WELL PUMP
I. HB - HOSEBIB WITH BACKFLOW PROTECTION
2. PNEUMATIC PRESSURE TANK (119 GALLON)
3. WATER SOFTING ION EXCHANGE
4. IRON REMOVAL ION EXCHANGE
5. SULFATE ION EXCHANGE
6. PRE-FILTER 5 CARTRIDGE HOUSING WITH 3 MICRON FILTER CARTRIDGES INSTALLED.
7. SUPPLY 24 REPLACEMENT FILTER CARTRIDGES.
8. INSTALL ALL EQUIPMENT WITH SCHEDULE 80 PVC UNIONS
9. DO NOT INSTALL MANUFACTURE WATER BYPASS ON ALL ION EXCHANGE EQUIPMENT.
" HDPE
INSIDE BUILDING
SCHEDULE
80 PVC
BV
DRAWING NOT TO SCALE
HB
PG
1" SCHEDULE 80 PVC
1" SCHEDULE 80 PVC
1" SCHEDULE 80 PVC
I R
M
O V
A L
I O
N
E
X C
H A
N G
E
BV
S U
L F
A T
E
I O
N
E
X C
H A
N G
E
BV
BRINE TANKS
DRAINDRAINDRAIN
" SCHEDULE
80 PVC
" SCHEDULE
80 PVC
" SCHEDULE
80 PVC
P R
O C
E S
S
S
Y S
T E
M
DESIGNED BY: D. LIRA DRAWN BY: D. LIRA/SPC CHECKED BY: D. LIRA APPROVED BY: D. LIRA
SHEET
___ OF ___4
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
B U
R E
L
A N
D
M
A N
A G
E M
N E
T
W E
S T
E R
N
M
O N
T A
S
T R
I C
T D
I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
B U
T T
E
F
I E
F
I C
E
I S
S U
R
B
U T
E
F
I C
E I S
S U
E
D
A T
E
M A
R K
X X X X X R
E V
I S
I O
N
R E
V I S
I O
N
R E
V I S
I O
N
R E
V I S
I O
N
R E
V I S
I O
N
R E
V I S
I O
N
D A
T E
M M
D
D Y
Y
M M
D
D Y
Y
M M
D
D Y
Y
M M
D
D Y
Y
M M
D
D Y
Y
A P
P R
O V
E D
X X
X
X X
X
X X
X
X X
X
X X
X
P O
T A
B
T
L T
R A
T I O
N
P
R O
J E
C T
W H
I T
E
S
A N
M
P G
R O
U N
M1
| 1.COVERSHEET-C1.pdf |
| Sheets and Views |
| C1 |
| 2.WHITE SANDY PUMP_ROOM_Filtration-Layout1.pdf |
| Sheets and Views |
| Layout1 |
| 3.E1_Electrical.pdf |
| Sheets and Views |
| 11X17 |
| 4.M1_Process System.pdf |
| Sheets and Views |
| 11X17 |
File details come from the government source that posted it. Updated .