- Replace the boilers and heat recovery ventilators Federal contract opportunity
- Solicitation number
- 140P9724Q0020
About this file
This document contains a submittal form and transmittal for a federal contract opportunity with the National Park Service. The form requests information on specifications, sizes, types, manufacturers, and uses of items to be submitted. It outlines the process for transmittal between the contractor and reviewer, including signature approval and distribution. The related federal contract opportunity is to replace the boilers and heat recovery ventilator units in two Marion Creek Employee Housing units located in Glacier Bay National Park and Preserve in Alaska. The solicitation is identified along with the contracting agency as the Department of the Interior National Park Service Alaska Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P9724Q0020_Amd_0001.pdf | ||
| B08_6_Bid_Schedule_Example.pdf | ||
| B08_7_Performance_Bond.pdf | ||
| A06_2_photos_of_residence_C1.pdf | ||
| B08_8_Payment_Bond.pdf | ||
| Sol_140P9724Q0020.pdf | ||
| A06_1_select_original_Construction_Drawings.pdf | ||
| A06_3_photos_of_residence_C2.pdf | ||
| A06_4_ITM_Hot_Work_Permit.pdf | ||
| B08_9_WD_AK20240001_2_23_24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSMITTAL - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 1 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
Specification Section No.
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Contractor Signature
Recommended by
Title, Date
Title
Date
I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
Review Comments
Action By
Date
Contracting Officer’s Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
SUBMITTAL LOG DATES: From contractor [__________], To reviewer [__________], From reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00 (Formerly DSC-
1(CS)
TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 1 of:
Park:
Project:
Contract No.:
Pkg. No.:
Date:
Contractor:
Subcontractor/Supplier:
NPS ACTION
Specification Section No.
Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
CM-16 Rev. 4/00 (Formerly DSC-1(CS)