A06_2026_NM_Supply_Overall.pdf
PDF 1 MB Posted
- Attached to
- 2026 NM RANGE SUPPLY Federal contract opportunity
- Solicitation number
- 140L1726Q0037
About this file
This is a project location map prepared by the United States Department of the Interior, Bureau of Land Management (BLM), Pecos District Office in New Mexico. The map depicts a construction site overview across southeastern New Mexico, spanning approximately 160 miles east-west and 130 miles north-south, with coordinates ranging from 106°30' to 104° west longitude and 34°30' to 32° north latitude. The map identifies multiple delivery points throughout the region, including Seven Rivers, Juan Largo, Sterrett Well, High Storage, Red Hill, Little Sinkhole, Sand Ranch, Clay Pit, Bonney, Wiggins, Cuevo, Laguna Toston, McGregor, Neal, Azotea Mesa, Robina Draw, and Medlin. The construction site boundaries are outlined in red and encompass portions of this broader area. The map includes major transportation routes consisting of Interstate highways, New Mexico highways (numbered 60, 54, 62, 70, 82, 84, 285, 380), and US highways (60, 70, 82, 84, 285, 380). The document was drawn by rfox/dakins, designed by Russell Fox, reviewed by Ty Carter, and approved by Michelle Bell, dated July 15, 2026, and constitutes Sheet 1 of 10 in the larger project documentation set.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L1726Q0037_Amd_0003.pdf | ||
| 2026_NM_Range_Supply_contractor_Q_and_A_9-4-26_0003.docx | DOCX document | |
| Sol_140L1726Q0037_Amd_0002.pdf | ||
| Sol_140L1726Q0037_Amd_0001.pdf | ||
| Sol_140L1726Q0037.pdf | ||
| B08_QUOTE_SHEET.xlsx | XLSX spreadsheet | |
| A06_Cup_and_Saucer_combo_trough_and_storage_drawing.pdf | ||
| A06_Angle_Iron_fence_posts_ASTMspecA702-89.pdf | ||
| A06_ASTM-A121-04-Metallic-Coated-Carbon-Steel-Barbed-Wire-28_(1).pdf | ||
| A06_DELIVERY_LOCATION_MAPS.pdf | ||
| A06_2026_SOW___SPECS_PDO_Supply_Contract_7-14-26.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION MAP
New MexicoPecos District Office
DRAWING NO.
DATE:
DRAWN BY:
DESIGNED:
REVIEWED:
APPROVED:
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Michelle Bell
Ty Carter
Russell Fox rfox/dakins
SHEET 1 OF 1015 Jul 26
380380
Laguna Toston
Seven Rivers Juan Largo High Storage
Neal
Cuevo
Azotea Mesa
Medlin
Wiggins
Seven Rivers Juan Largo Sterrett Well
Bonney
Sand Ranch Clay Pit
McGregor
Little Sinkhole
Robina Draw
LCDO
Red Hill
°3
0'
°3 0'
°3
0'
°3
0'
°3 0'
°3
0'
-104°-104°30'-105°-105°30'-106°-106°30'
-104°-104°30'-105°-105°30'-106°-106°30'
0 40 8020
MILES
SCALE: 1:2,000,000
CONSTRUCTION SITE
LEGEND
µ Delivery Points
NM Major Roads
Interstate
NM Highway
US Highway
Overview
File details come from the government source that posted it. Updated .