A05_SCHEDULE_OF_ITEMS.pdf
PDF 44 KB Posted
- Attached to
- BLM-CO GJFO AUTOMATIC GATE Federal contract opportunity
- Solicitation number
- 140L1726Q0007
About this file
This is a Schedule of Items pricing template for a federal contract opportunity issued by the Bureau of Land Management, Upper Colorado River District in Colorado for the Grand Junction Auto Gate Replacement project.
The contract includes both base line items and optional items with pricing to be completed by offerors. Base items include: Replace West Auto Gate (Line 10), Option Year Base Maintenance for West Auto Gate (Line 11), Option Year 1-4 Maintenance for West Auto Gate (Lines 12-15), and Relocate existing Personnel Gate (Line 20). Optional items include: Replace North Auto Gate with four years of maintenance (Lines 30-35), Install Intercom and Video System (Live video ONLY) at West Auto Gate location (Line 40), and Remove Ground Detection Loops and Replace with Wireless Option that Complies with BLM/DOI Security Requirements (Line 50). All line items are measured in units (AU) with blank spaces for offerors to provide unit prices and extended prices. A total price field is provided at the conclusion of the schedule for the overall contract value calculation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L1726Q0007_Amd_0001.pdf | ||
| B12_140L1726Q0007_SITE_VISIT_ROSTER_0001.pdf | ||
| B12_VENDOR_Q_A_0001.pdf | ||
| A05_PWS_GJFO_AUTOMATIC___PED_GATES.pdf | ||
| A06_Attachment_2_Site_Photos.pdf | ||
| Sol_140L1726Q0007.pdf | ||
| B03_DAVIS_BACON_ACT_CO20250002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items Grand Junction Auto Gate Replacement
Bureau of Land Management Upper Colorado River District, Colorado
Contract Line Item Number Description Quantity Unit of Measure Unit Price Price
10 Replace West Auto Gate 1 AU _____________ ______________
11 Option Year Base Maintenance for 1 AU _____________ ______________ West Auto Gate
12 Option Year 1 Maintenance for West 1 AU _____________ ______________ Auto Gate
13 Option Year 2 Maintenance for West 1 AU _____________ ______________ Auto Gate
14 Option Year 3 Maintenance for West 1 AU _____________ ______________ Auto Gate
15 Option Year 4 Maintenance for West 1 AU _____________ ______________ Auto Gate
20 Relocate existing Personnel Gate 1 AU _____________ ______________
30 Option - Replace North Auto Gate 1 AU _____________ ______________
31 Option Year Base Maintenance for 1 AU _____________ ______________ North Auto Gate
32 Option Year 1 Maintenance for North 1 AU _____________ ______________ Auto Gate
33 Option Year 2 Maintenance for North 1 AU _____________ ______________ Auto Gate
34 Option Year 3 Maintenance for North 1 AU _____________ ______________ Auto Gate
35 Option Year 4 Maintenance for North 1 AU _____________ ______________ Auto Gate
40 Option - Install Intercom and Video 1 AU _____________ ______________ System (Live video ONLY) at West Auto Gate location
50 Option - Remove Ground Detection 1 AU _____________ ______________ Loops and Replace with Wireless Option that Complies with BLM/DOI Security Requirements
Total Price: $_________________________
File details come from the government source that posted it. Updated .