A04_SOW01.pdf
PDF 169 KB Posted
- Attached to
- Dozer Storage Facility and Fencing
- Solicitation number
- 140A1626Q0084
About this file
This is a Statement of Work (SOW) for the BIA Choctaw Agency Fire Building project located at 425 Hospital Street, Philadelphia, MS 39350.
The project involves constructing a new 40x80x14 metal equipment storage building with 8-foot-tall sides on three sides (fourth side open) positioned between existing Buildings 39 and 2. The contractor must provide all labor, materials, and services required to complete the work, including: installing 6-10 inches of compacted NO57 slag material as the equipment base with proper grading and drainage; installing 10-14 concrete footers (typically 26-inch diameter x 3-foot deep piers with reinforcement and embeds); erecting the prefabricated metal building with specified column sizes (w8x10 end wall, w12x14 intermediate, w6x9 breezeway); installing a 60-amp electrical panel with one outlet per column (two receptacles per column) on the west side for battery maintenance; installing 8 LED high bay-lights total (2 per bay); and removing all debris from the site. The contractor is responsible for verifying all site conditions, ensuring utility lines are marked before work begins, providing disposal bins for daily cleanup, and coordinating material staging locations with the Point of Contact. Standard work hours are Monday-Friday 7:30 AM to 4:30 PM; weekend or after-hours work requires 48-hour advance approval. The Point of Contact is Adam Rogers, BIA Fire Management Specialist, at 421 Powell Street, Philadelphia, MS 39350, Adam.Rogers@bia.gov, (706) 835-9640.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140A1626Q0084_Amd_0001.pdf | ||
| Attachment_1_-_SOW_01_Rev1_0001.pdf | ||
| Sol_140A1626Q0084.pdf | ||
| A04_SOW02.pdf | ||
| Attachment_3_-_IEE_Reps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
BIA Choctaw Agency
Fire Building 39 and 2
A. Project Information:
Project Location: Fire Building - 425 Hospital Street, building 39 and building 2, Philadelphia MS 39350. New 3 sided equipment storage facility will be set between existing building 39 and building 2.
Project Description: This project consists of constructing new large equipment storage building for Choctaw Agency Fire department. Project will consist of installing new 40x80x14 metal building with 8-foot-tall sides on three sides. Building will require pre-landscape installation of 6-10 inches of compacted NO 57-slag material for the ground coverage under the building. Installing 10-14 footers, depending on the manufacturing requirement. Install electrical panel and have electrical outlets available in each bay and install 2 shop LED lights for each bay.
B. Scope of Work:
The contractor shall provide all services, material, labor and installation required to perform the work described in this SOW, i.e. BIA Choctaw Fire building 39 and building 2 installing new 40x80x14 metal building with 8-foot-tall sides on three sides, and fourth side will remain open.
Work shall include but is not limited to the following for Appendix A:
Install 6-10 inches of compacted NO57 Slag material for equipment base of new building, material cover will tie into the existing drive.
Grade and move material to ensure proper drainage away from the project site.
Install 10-14 footers per the manufactures design, typically will be 26 inch diameter x 3-foot concrete dep piers with cold roll around re-enforcement (3/8 inch) with ½ inch uprights. The columns will weld to embeds with 2 (8” x 4”x ½” L shape) leg anchors. The end wall columns are w8 x 10 and the intermediate columns are w12 x 14. The breezeway columns are w6 x 9.
Construct a new Pre- fabricated metal building 40x80x14 with 8-foot sides on three sides
Install electrical panel 60 Amp to supply 1 outlet on each column located on west side of building with 2 receptacles per column, for battery maintenance, and install 2 LED high bay-lights per bay to make total of 8 LED lights. Power source will come either from Building 39 or building 2.
Remove all debris from site
C. Contractor responsibilities:
Contractor shall verify all site conditions, quantities, measurements, and project requirements.
Contractors shall be responsible for damaging any existing utilities while digging/grading work areas. Contractor must make sure all utilities lines are marked before project begins.
Contractor shall cleanup work site daily and dispose of all construction debris to an appropriate dumpster provided by the contractor.
D. Disposal of Materials and Cleanup:
The contractor shall provide the appropriate disposal bins/trash receptacles. Approval for the location of the disposal bins shall be coordinated through the Point of Contact (POC).
The contractor shall clean up work site daily and dispose of all debris to an appropriate bin and /or receptacle provided by the contractor. Contractor may not use any Agency/Government disposal bins, dumpsters or trash receptacles for any reason at any time.
E. Project Material Storage:
The contractor shall coordinate and get approval prior to stage of any material on project site. Contractor must coordinate with POC for location of staging material for storage.
F. General Requirements:
Work hour: Monday-Friday 7:30Am – 4:30 pm. Coordinate work hours with POC, Mr.
Adam Rogers. If weekend work or after hours is required, the contractor shall coordinate with the POC and request approval 48 hours in advance.
G. Pont of Contact:
POC- Adam Rogers, BIA Fire Management Specialist
BIA Choctaw Agency
421 Powell Street
Philadelphia, MS 39350
Adam.Rogers@bia.gov
Cell (706) 835-9640 mailto:Adam.Rogers@bia.gov
File details come from the government source that posted it. Updated .