A04 SOW-LWS Nursery floor.pdf

PDF 165 KB Posted

Attached to
WA-Little White Salmon NFH-Floor Painting
Solicitation number
140F0321Q0016
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Little White Salmon National Fish Hatchery (2021 01 11) Statement of Work

Nursery Building Floor Resurfacing and Repainting

1. General:

1.1 The nursery building at Little White Salmon National Fish Hatchery (56961 SR-14, Cook, WA

98605) needs to have the floor stripped of all paint and repainted with a waterproof paint/epoxy to provide a non-slip, safe surface.

1.2 The hatchery staff painted over existing paint after attempting to remove as much loose paint as possible which ultimately has proven ineffective. Patches of the new paint is pulling off the older paint as it breaks loose from the floor. The nursery floor is wet much of the year. The goal of this project is to provide a good traction floor surface to prevent slip and fall accidents.

2. Place of Performance and Period of Performance

2.1 The nursery building is located at Little White Salmon National Fish Hatchery 56961 SR-14, Cook, WA 98605.

2.2 Work needs to be performed between June 1st, 2021 and completed by July 7th, 2021. The nursery building is in use for fish production outside of this date range. This date range is firm.

Final invoices shall be submitted in ipp.gov on or before July 26, 2021.

2.3 Normal Hatchery operating hours are Monday – Friday, 7:30 a.m. – 4:00 p.m. Hatchery is closed July 5th,, 2021. Work is to be performed during these hours. After hours and weekend work times may be permitted by hatchery manager. In the event of emergencies, Contractor shall provide contact information.

3. Scope

3.1

A. The contractor will provide product submittals that include product data, application requirements, etc. for the coating product to be utilized. The product selected shall be industrial grade and provide a durable, waterproof seal with a non-slip surface when wet.

Further the coating shall be low VOC, impact-resistant, and chemical resistant.

B. Hatchery staff will remove as much equipment from the floor as possible. The contractor shall tent/cover all structures/equipment that remain in the building during project work.

C. The water will be shut off weeks prior to the work to be done. The contractor is responsible for ensuring the proper floor conditions exist and meet all manufacturer’s requirements prior to starting the floor preparation and application of paint.

D. The contractor shall remove all existing paint down to bare concrete, excluding the “curbs” that stacks sit upon. The contractor shall prepare the floor as much as possible around and under remaining equipment (tanks) to a reasonable effort.

E. The dust from stripping the floor must be contained and collected as much as possible.

F. The drains in the floor lead to the river and must be sealed so as not to allow any dust/debris or paint to enter the waterway. Any debris the enters the floor channels must be immediately removed. All debris/dust that is collected must be disposed of in an approved manner.

G. The paint color will match the existing blue paint as close as possible. Provide hatchery staff color options as part of the product submittal.

H. Texture/Grit will be added to the paint to provide a suitable level of traction for a wet floor surface.

I. The approximate area to be treated and painted is 145’ x 48’ J. The contractor is responsible for installation, removal and cleanup of all tenting/cover material and debris generated during the project appropriately.

4. Deliverables and/or Delivery Schedule: (for extended list a bid schedule and/or use of line item detail on the PR is recommended

4.1 Completed floor/site preparation and paint.

5. Evaluation and Acceptance

5.1 See FAR 52.246-12 Inspection of Construction.

6. Technical Coordinator:

Bob Turik, Little White Salmon NFH, Hatchery Manager Email: bob_turik@fws.gov Office Phone: (509) 538-2755

Jorge Alcala, Columbia River Gorge National Fish Hatchery Complex Facility Operations Specialist Email: Jorge_alcala@fws.gov Phone: (509) 493-2989 mailto:bob_turik@fws.gov mailto:Jorge_alcala@fws.gov

Little White Salmon National Fish Hatchery (2021 01 11)
1. General:
1.1 The nursery building at Little White Salmon National Fish Hatchery (56961 SR-14, Cook, WA 98605) needs to have the floor stripped of all paint and repainted with a waterproof paint/epoxy to provide a non-slip, safe surface.
1.2 The hatchery staff painted over existing paint after attempting to remove as much loose paint as possible which ultimately has proven ineffective. Patches of the new paint is pulling off the older paint as it breaks loose from the floor. The nurs...
2. Place of Performance and Period of Performance
2.1 The nursery building is located at Little White Salmon National Fish Hatchery 56961 SR-14, Cook, WA 98605.
2.2 Work needs to be performed between June 1st, 2021 and completed by July 7th, 2021. The nursery building is in use for fish production outside of this date range. This date range is firm. Final invoices shall be submitted in ipp.gov on or before ...
2.3 Normal Hatchery operating hours are Monday – Friday, 7:30 a.m. – 4:00 p.m. Hatchery is closed July 5th,, 2021. Work is to be performed during these hours. After hours and weekend work times may be permitted by hatchery manager. In the event of e...
3. Scope
3.1
A. The contractor will provide product submittals that include product data, application requirements, etc. for the coating product to be utilized. The product selected shall be industrial grade and provide a durable, waterproof seal with a non-slip...
B. Hatchery staff will remove as much equipment from the floor as possible. The contractor shall tent/cover all structures/equipment that remain in the building during project work.
C. The water will be shut off weeks prior to the work to be done. The contractor is responsible for ensuring the proper floor conditions exist and meet all manufacturer’s requirements prior to starting the floor preparation and application of paint.
D. The contractor shall remove all existing paint down to bare concrete, excluding the “curbs” that stacks sit upon. The contractor shall prepare the floor as much as possible around and under remaining equipment (tanks) to a reasonable effort.
E. The dust from stripping the floor must be contained and collected as much as possible.
F. The drains in the floor lead to the river and must be sealed so as not to allow any dust/debris or paint to enter the waterway. Any debris the enters the floor channels must be immediately removed. All debris/dust that is collected must be dispos...
G. The paint color will match the existing blue paint as close as possible. Provide hatchery staff color options as part of the product submittal.
H. Texture/Grit will be added to the paint to provide a suitable level of traction for a wet floor surface.
I. The approximate area to be treated and painted is 145’ x 48’
J. The contractor is responsible for installation, removal and cleanup of all tenting/cover material and debris generated during the project appropriately.
4. Deliverables and/or Delivery Schedule: (for extended list a bid schedule and/or use of line item detail on the PR is recommended
4.1 Completed floor/site preparation and paint.

File details come from the government source that posted it. Updated .