This document contains hazardous materials management forms and procedures for transient contractors operating at Patrick Space Force Base (PAFB) and Cape Canaveral Space Force Station (CCAFS) under the 45th Space Wing.
The PAFB/CCAFS Transient Contractor HAZMAT Usage Worksheet is a monthly reporting form that contractors must submit to their Contract/Project Manager by the last business day of each month for the contract duration. The form requires documentation of all hazardous materials used, including Safety Data Sheet (SDS) product trade names, part numbers, manufacturers, container types and sizes, and total quantities used. A separate 45 SW Construction Contractor Spill Notification Form is provided for immediate incident reporting, requiring details on spill location, product type, quantity released, duration, cause, and corrective actions, with instructions to contact 911 or (321) 494-0911 and report to 45 CES/CEIE at (321) 298-7022. The Transient Contractor HAZMAT Tracking Process flowchart outlines the complete lifecycle: contractors submit proposed hazardous materials lists upon contract award, the Installation Hazardous Materials Program (IHMP) Manager reviews and approves materials within five working days, contractors then complete Chemical/Hazardous Material Request/Authorization Forms with current SDSs for each material, the IHMP Manager inputs authorization data into the Enterprise Environmental Safety and Occupational Health Management Information System (EESOH-MIS) within ten working days, and contractors provide quarterly purchase reports by the 10th day of the month following each quarter throughout contract performance, with final reports submitted upon project completion.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
45th Space Wing U.S. Air Force PAFB/CCAFS
PAFB/CCAFS Transient Contractor HAZMAT Usage Worksheet Return this form to the Contract/Project Manager (not later than the last business day of each month until term of contract)
Shop Code: Contractor Name: Date of Report: Reporting Period:
Contractor POC for Haz Mat Information Name: Phone: Email:
Contract # Project # Location: Project Start/End Date:
Safety Data Sheet (SDS) Product Trade Name
Part No. Manufacturer Type of Size of Total Qty EESOH MSN (to be added by Container Container Used Base Environmental Office)
45 SW Construction Contractor Spill Notification Form
Time: Date:
Name and Location of Facility/Building Number:
Name of Individual Making Report:
Contact Phone Number:
Type of Product Spilled: Time of Spill:
Quantity Released: Duration of Release:
Did the Spill Reach Navigable Waters? YES ∆ NO
Cause and Source of Discharge:
Actions Being Taken:
Injuries or Deaths: YES ∆ NO
NOTE: When Reporting the incident using a base telephone line call 911 or using a mobile phone call
(321) 494‐0911 and report to 45 CES/CEIE at (321) 298‐7022.
Contract is Awarded Contractor provides a proposed list of hazardous materials they will be using to the Contracting Officer (CO)
The CO provides this list to the 45CES/CEIE Installation Hazardous Materials Program(IHMP)
Manager
The IHMP will review the proposed list and provide the CO with a list stating which materials will need to be tracked as hazardous materials within 5 working days.
CO relays this information to the contractor
The Contractor will prepare Chemical/Hazardous Material
Request/Authorization Form (Transient Contractor Abbreviated Authorization
Worksheet) for each hazardous material and attach a current manufacturer specific SDS and provide this package to the CO
CO will review the package and submit to the IHMP Manager
IHMP manager will input all data from the Transient Contractor Abbreviated Authorization Worksheet(s) into the Enterprise Environmental
Safety and Occupational Health Management Information System and get authorization from the Hazardous Material Management Process team within ten working days
IHMP Manager informs the CO that the hazardous materials are approved
Contractor is now authorized to use their hazardous materials on base and can begin construction Construction Begins
Contractor provides quarterly purchase reports of all trackable hazardous materials to the CO by the 10th day of the month following each quarter
CO provides quarterly data to the IHMP Manager
IHMP Manager inputs usage data into the
EESOH-MIS
This will continue through the life of the contract
Construction is Completed Contractor provides a final report to reflect any purchases not showing in the last quarterly report to the CO
CO provides the final purchase report to the IHMP Manager and informs them that the contract is complete
IHMP Manager inputs final data and closes out the contract in the EESOH-MIS
Transient Contractor HAZMAT Tracking Process