A04_Haz Waste.pdf

PDF 275 KB Posted

Attached to
SLD 45 Simplified Acquisition for Base Engineering Requirements (SABER)
Solicitation number
FA252126Q0009
Issued by

About this file

This document contains hazardous materials management forms and procedures for transient contractors operating at Patrick Space Force Base (PAFB) and Cape Canaveral Space Force Station (CCAFS) under the 45th Space Wing.

The PAFB/CCAFS Transient Contractor HAZMAT Usage Worksheet is a monthly reporting form that contractors must submit to their Contract/Project Manager by the last business day of each month for the contract duration. The form requires documentation of all hazardous materials used, including Safety Data Sheet (SDS) product trade names, part numbers, manufacturers, container types and sizes, and total quantities used. A separate 45 SW Construction Contractor Spill Notification Form is provided for immediate incident reporting, requiring details on spill location, product type, quantity released, duration, cause, and corrective actions, with instructions to contact 911 or (321) 494-0911 and report to 45 CES/CEIE at (321) 298-7022. The Transient Contractor HAZMAT Tracking Process flowchart outlines the complete lifecycle: contractors submit proposed hazardous materials lists upon contract award, the Installation Hazardous Materials Program (IHMP) Manager reviews and approves materials within five working days, contractors then complete Chemical/Hazardous Material Request/Authorization Forms with current SDSs for each material, the IHMP Manager inputs authorization data into the Enterprise Environmental Safety and Occupational Health Management Information System (EESOH-MIS) within ten working days, and contractors provide quarterly purchase reports by the 10th day of the month following each quarter throughout contract performance, with final reports submitted upon project completion.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

45th Space Wing U.S. Air Force PAFB/CCAFS

PAFB/CCAFS Transient Contractor HAZMAT Usage Worksheet Return this form to the Contract/Project Manager (not later than the last business day of each month until term of contract)

Shop Code: Contractor Name: Date of Report: Reporting Period:

Contractor POC for Haz Mat Information Name: Phone: Email:

Contract # Project # Location: Project Start/End Date:

Safety Data Sheet (SDS) Product Trade Name

Part No. Manufacturer Type of Size of Total Qty EESOH MSN (to be added by Container Container Used Base Environmental Office)

45 SW Construction Contractor Spill Notification Form

Time: Date:

Name and Location of Facility/Building Number:

Name of Individual Making Report:

Contact Phone Number:

Type of Product Spilled: Time of Spill:

Quantity Released: Duration of Release:

Did the Spill Reach Navigable Waters? YES ∆ NO

Cause and Source of Discharge:

Actions Being Taken:

Injuries or Deaths: YES ∆ NO

NOTE: When Reporting the incident using a base telephone line call 911 or using a mobile phone call

(321) 494‐0911 and report to 45 CES/CEIE at (321) 298‐7022.

Contract is Awarded Contractor provides a proposed list of hazardous materials they will be using to the Contracting Officer (CO)

The CO provides this list to the 45CES/CEIE Installation Hazardous Materials Program(IHMP)

Manager

The IHMP will review the proposed list and provide the CO with a list stating which materials will need to be tracked as hazardous materials within 5 working days.

CO relays this information to the contractor

The Contractor will prepare Chemical/Hazardous Material

Request/Authorization Form (Transient Contractor Abbreviated Authorization

Worksheet) for each hazardous material and attach a current manufacturer specific SDS and provide this package to the CO

CO will review the package and submit to the IHMP Manager

IHMP manager will input all data from the Transient Contractor Abbreviated Authorization Worksheet(s) into the Enterprise Environmental

Safety and Occupational Health Management Information System and get authorization from the Hazardous Material Management Process team within ten working days

IHMP Manager informs the CO that the hazardous materials are approved

Contractor is now authorized to use their hazardous materials on base and can begin construction Construction Begins

Contractor provides quarterly purchase reports of all trackable hazardous materials to the CO by the 10th day of the month following each quarter

CO provides quarterly data to the IHMP Manager

IHMP Manager inputs usage data into the

EESOH-MIS

This will continue through the life of the contract

Construction is Completed Contractor provides a final report to reflect any purchases not showing in the last quarterly report to the CO

CO provides the final purchase report to the IHMP Manager and informs them that the contract is complete

IHMP Manager inputs final data and closes out the contract in the EESOH-MIS

Transient Contractor HAZMAT Tracking Process

File details come from the government source that posted it. Updated .