A04_Attachment_0001_SOW_440443365_FRSP_HTR.pdf
PDF 188 KB Posted
- Attached to
- Provide Tree Thinning Services - Hazardous Tree Pr Federal contract opportunity
- Solicitation number
- 140P5126Q0057
About this file
This is a Statement of Work for hazardous tree removal services at Fredericksburg and Spotsylvania National Military Park (FRSP) for Fiscal Year 2026.
The contract requires removal of high-risk and dead trees identified by National Park Service staff across multiple park battlefields, with work including tree felling, dismantling, rigging operations, debris chipping, and hauling. The base bid deliverables comprise removal of 40 trees (12"-24" DBH) at Spotsylvania Battlefield, 45 trees at Chancellorsville Battlefield, 30 trees at Wilderness Battlefield, 20 trees at Fredericksburg Battlefield, 20 trees (24"-36" DBH) parkwide, and 1 tree (40"+ DBH) at Brock Road. Two options are available for additional work: Option 1 includes removal of 40 additional trees (12"-24" DBH) parkwide, and Option 2 includes 30 additional trees with identical specifications. All stumps must be cut to 4" or lower above grade, and all debris must be removed from job sites. The performance period is 90 days, with work conducted at multiple battlefield sites and the Chancellorsville Visitor Center. The contractor must provide an ISA-certified Arborist as primary supervisor, comply with OSHA 1910 and ANSI Z 133.1 safety standards, clean all equipment prior to park entry to prevent invasive species introduction, obtain GIS coordinates and tree species data for each removal, and implement site protection measures in archaeologically sensitive areas and around earthworks. No tree cutting is permitted during June and July without COR approval due to protected wildlife species. Base bid and options must be bid as separate line items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5126Q0057_Amd_0002.pdf | ||
| B09_Attachment_0009_Questions_and_Answers_140P5126Q0057__0002.pdf | ||
| B09_Attachment_0008_Revised_SVI_140P5126Q0057_Amend_0001_0001.pdf | ||
| Sol_140P5126Q0057_Amd_0001.pdf | ||
| B08_Attachment_0007_PPQ_140P5126Q0057.pdf | ||
| B08__Attachment_0003_Price_Schedule_140P5126Q0057.xlsx | XLSX spreadsheet | |
| B08_Attachment_0006_SVI_140P5126Q0057.pdf | ||
| A06_Attachment_0002_Hazardous_Tree_Plan_440443365_FRSP_HTR.pdf | ||
| Sol_140P5126Q0057.pdf | ||
| A06_Attachment_0004_MAP_440443365_FRSP_HTR.pdf | ||
| B03_Attachment_0005_WDOL_WD_440443365_FRSP_HTR.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fredericksburg and Spotsylvania NMP (FRSP) Statement of Work
Remove Hazardous Trees FY26
1. BACKGROUND
The proposed work will include hazard tree removal of trees identified by park staff on roadsides and grounds parkwide.
Through tree assessments performed by National Park Service staff, the park has identified high risk trees in the park. The work identified will need to be completed through tree felling, tree dismantling, and /or rigging operations, chipping and hauling dependent upon the individual jobsite specific requirements.
2. PURPOSE
The purpose of this contract is to provide technical services for the removal and disposal of high risk or dead trees along roadsides, trails, buildings, and common areas without damage to the resource including but not limited to trees, earthworks, and markers.
3. SCOPE OF WORK
The contractor shall provide all services including labor, equipment, and tools required to remove identified high risk trees, trim the roadsides and protect the resource while accessing the work sites and adjacent to trees being removed in the park. The work shall include the access of sensitive sites where site protection may be needed to prevent damage to the resource, the removal of trees through tree felling operations if it is determined that there is adequate room for falling (after considering the resource and any below ground resources), tree dismantling and or rigging operations for trees without adequate room for felling, debris staging and removal from site, traffic control on road sides where work will be performed, and the control of jobsites where pedestrian traffic may be a factor.
4. REQUIREMENTS
4.1 Access / Exit Battlefields and associated job sites
4.1.1 The contractor shall communicate with the
Contracting Officer Representative (COR) or park contact to be directed to the best access to the job sites.
4.1.2
4.1.3
The contractor shall access the job sites without causing damage to anything within or surrounding the jobsites or the access to them following the guidance of the COR or park contact.
The Contractor shall not cut any trees during the months of June and July unless directed by the COR due to protected species of wildlife.
4.1.4
The Contractor shall provide GIS coordinates, DBH, and tree species of each tree removed.
4.2 Equipment set up
4.2.1
4.2.2
Prior to entering the park, the contactor shall clean with water, all vehicles, equipment, and tools to reduce the chance invasive non-native plants, spotted lantern fly, or other harmful organisms from entering the park. The contactor shall provide self-inspection confirmation prior to beginning the project. (Refer to FRSP Hazardous Tree Abatement Plan for more information)
Once the job site has been accessed the contractor will only travel with their equipment in areas approved by the COR or park contact.
4.2.3
Once the individual trees have been accessed the equipment shall be set up in a way as to not cause damage to the resource including but not limited to trees, graves, roads, earthworks and markers.
4.3 Tree removal process
4.3.1 Trees shall be removed in accordance with OSHA
1910 General Industry Standards and ANSI Z
133.1 Safety Standards for Arboricultural
Operations and shall not cause damage to any part of the resource including but not limited to trees, earthworks and markers.
4.4 Debris cleanup and removal
4.4.1 Any debris of a size that can be chipped shall be
chipped and removed from the job site by the end of the performance period or as directed by the
COR.
4.4.2 Any debris too large to chip shall be removed from
the site by the end of the performance period or as directed by the COR.
5. DELIVERABLES
Base Bid: 1
5.1
• Remove 40 trees on roadsides 12”-24” DBH Spotsylvania
Battlefield
• Remove 45 trees on roadsides 12”-24” DBH Chancellorsville
Battlefield
• Remove 30 trees on roadsides 12”-24” DBH Wilderness Battlefield
• Remove 20 trees on roadsides 12”-24” DBH Fredericksburg
Battlefield
• Remove 20 trees on roadside 24”-36” DBH Parkwide
• Remove 1 tree 40+” DBH (Brock Road)
Option 1
Remove 40 additional trees on roadsides 12”-24” DBH Parkwide
Option 2
Remove 30 additional trees on roadsides 12”-24” DBH Parkwide
*All options are in addition to base bid
*Bid base and options as separate line items
5.2 All stumps shall be cut to 4” or lower above grade.
5.3 The contractor shall remove all logs, brush, chips and wood created debris from the tree removals from the job sites by the end of the performance period or sooner – as directed by the COR.
6. PLACE OF PERFORMANCE
Maintenance Division:
207 Freedom Court, Fredericksburg VA 22408 Area of Work/Job Site:
All Park Battlefields, Chancellorsville Visitor Center, National Cemetery
7. PERFORMANCE PERIOD
7.1 90 days
8. SPECIAL CONSIDERATIONS
8.1 The contractor understands that all work shall be under the direction and general supervision of an Arborist(s) certified by the International Society of Arboriculture (ISA), or equivalent state certification, who, possess verifiable experience and technical competence in tree physiology, identification, diagnosis of disorders, and current tree care and safety practices in accordance with accepted industry standards. The Arborist shall be the primary contact with the Government's technical representative and shall be responsible for controlling the quality of work and inspecting all completed work to ensure that contract performance requirements are met.
8.2 The contractor understands that all tree workers shall, through related training and on the job experience, be familiar with the technical aspects and hazards of tree removal operations and equipment used in such operations. All tree workers shall abide by any code of ethics or professional conduct established by the Tree Care Industry Association and the International Society of Arboriculture.
8.3 The contractor understands that all equipment must meet all federal OSHA, state and local safety requirements and must be properly licensed. This includes equipment such as bucket trucks, aerial lifts, cranes, chipper trucks, wood trucks etc. which may be needed to correctly perform tree removal in accordance with the specifications stated herein.
8.4 The contractor understands that NO vehicles including but not limited to (Bucket trucks, Aerial lifts, Cranes, Bobcats, Log loaders, Chipper trucks, etc.…) shall be driven on any lawn areas without the use of protection mats (Example... Alturna mat), without the permission of the COR or park contact.
8.5 The contractor understands that some of the required work is in archeologically sensitive areas.
8.6 The contractor shall use site protection to protect resources if there is a chance that the tree being removed may damage such resources.
8.7 The contractor understands that any trees located on or around Earthworks may not be fallen if there exists the possibility of disturbing the Earthworks.
8.8 The contractor understands that if trees to be removed are located on or around Earthworks and these trees need to be dismantled, they shall be rigged if there exists the possibility of disturbing the Earthworks.
8.9 The contractor understands that some job sites shall have restricted access for equipment.
File details come from the government source that posted it. Updated .