A04_0040624043-01_Attach_0001_SOW_FOSU_Replace_Flooring.pdf

PDF 4 MB Posted

Attached to
REPLACE LOOSE/STAINED FLOOR COVERING-LS Federal contract opportunity
Solicitation number
140P5123Q0035
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ft Sumter & Ft Moultrie National Historic Park

STATEMENT OF WORK:

Replace Loose and Stained Floor Coverings at Fort Sumter

Visitor Education Center at Liberty Square

DATED:

April 2023

PMIS 330881

NATIONAL PARK SERVICE

SOUTHEAST REGION

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty Square - SOW

Contents Introduction:

Objective:

Scope & Specifications

Removal & Installation

1. Removal of existing Quarry tile & Carpet tile:

2. Specifications that apply to Tiled Surfaces:

3. Specifications that apply to Carpeted Surfaces:

4. Transitions

Responsibilities

Government Responsibilities –

Contractor Responsibilities –

Period of Performance

Evaluation Factors

Submittals/Transmittals:

1. Project Schedule

2. Work Plan

3. Property Protection Plan

4. Proof of Qualifications & Similar Project Experience

5. Disposal/Recycling Plan:

6. Special Requirements & Considerations

7. Inspections-Testing-Maintenance, & Warranty

8. Samples and Options

9. Safety

Other Requirements & Information

Project Meetings, Scheduling, and Coordination

1. Pre-Construction Meeting:

2. Project Schedule:

3. Site visits & prior notice:

4. Working Hours:

Materials and Equipment

Project Management

Deliveries

Jobsite Conditions

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

5. Location Description

6. Loading / Unloading

7. Material Storage

8. Parking

9. signage

10. hot work –

11. Site Conditions and Disposal

12. Property Damage

13. Other

SECURITY & WORK HOURS:

Inspection Deliverables & Acceptance Terms

14. Final Inspections

15. Safety Data Sheets (SDS)

16. Replacement Parts

Standards Incorporated by Reference

Photos

INTRODUCTION:

Historical Context: Fort Sumter is an island fortification located in Charleston Harbor, South Carolina.

Originally constructed in 1829 as a coastal garrison, Fort Sumter is most famous for being the site of the first shots of the Civil War (1861-65). U.S. Major Robert Anderson occupied the unfinished fort in December 1860 following South Carolina’s secession from the Union, initiating a standoff with the state’s militia forces. When President Abraham Lincoln announced plans to resupply the fort, Confederate General P.G.T. Beauregard bombarded Fort Sumter on April 12, 1861. After a 34-hour exchange of artillery fire, Anderson and 86 soldiers surrendered the fort on April 13. Confederate troops then occupied Fort Sumter for nearly four years, resisting several bombardments by Union forces before abandoning the garrison prior to William T. Sherman’s capture of Charleston in February 1865. After the Civil War, Fort Sumter was restored by the U.S.

military and manned during the Spanish-American War (1898), World War I (1914-18) and World War II (1939-45). It became a unit of the National Park System in 1948.

This facility is a major departure site for visitors to board the concession-operated ferry boats to Fort Sumter, it is open to the public 363 days per year and hosts about 350,000 visitors per year.

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

OBJECTIVE:

This project will replace the tile and carpet flooring in the Liberty Square education center. The existing tile has started to lose its bond and pop loose, and needs replaced. There is approximately 750 sf of tiled surfaces located at the entryways at both ends of the building, and in the windowsills on the harborside entryway. The project will also include the replacement of the carpeting. There is roughly 2,430 sf of carpet tiles, located in the museum, the Park store, and the offices. There are 3 different office areas 2 on the main/2nd level and one on the top/3rd level. All base trim is to be included with this project the carpeted surfaces have cove base, and the tiled surfaces have a matching base tile. The bathroom floors will not be included in this project.

The Contractor shall provide all management, labor, safety, tools, supplies, materials, equipment, personal protective equipment, and transportation to remove and install the carpet and tile flooring specified at this facility. The Contractor shall be responsible for all facets of the removal and replacement unless otherwise noted, in accordance with all applicable Federal, State, and local laws and regulations, manufacturer specifications, American National Standards Institute (ANSI), and the Architectural Barriers Act (ABA). The Contractor shall be responsible for off-site refuse disposal. The Contractor shall be responsible for work area cleanup, which shall result in a neat and professional appearance. The Contractor shall be required to coordinate with the Contracting Officer’s Representative (COR) for site access to accomplish this work. Upon completion of these work objectives, the Contractor shall have provided new tile and carpet flooring to the Liberty Square Education Center to the satisfaction of Park officials/COR. The Contractor shall perform the following services:

SCOPE & SPECIFICATIONS

REMOVAL & INSTALLATION

1. REMOVAL OF EXISTING QUARRY TILE & CARPET TILE:

a) All existing materials, bonding agents, dust and or build up must be completely removed.

2. SPECIFICATIONS THAT APPLY TO TILED SURFACES:

a) Tile and grout must be approved by park official/COR to match interior aesthetics.

b) Materials and products must be durable enough to withstand the intended use.

c) Must provide 150 Sf of extra stock for future replacement and repairs.

3. SPECIFICATIONS THAT APPLY TO CARPETED SURFACES:

a) Replace with matching material.

b) Must provide 480 sf of extra stock for future replacement and repairs.

4. TRANSITIONS

a) All new flooring must transition smoothly at each applicable location. Any installation that creates a tripping hazard will not be accepted.

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

b) Wall to floor and wall to base transition, must match aesthetically and be approved by Park official/COR.

RESPONSIBILITIES

GOVERNMENT RESPONSIBILITIES –

NPS shall provide the following

1) Provide access to the installation site during the hours specified. (Contractor to supply their own transportation.)

2) Provide electricity for vendor hand tools.

3) Provide water for mortar, and grout mixing and cleaning purposes.

CONTRACTOR RESPONSIBILITIES –

The Contractor shall provide the following:

1) All work specified in this document.

2) Upon award of the contract, the contractor shall perform an in-depth inspection of the site to ensure that the products and materials will work sufficiently for the intended use. Any required facilities modifications will be made known to the NPS Contracting Officer’s Representative at this time.

3) Provide all utility requirements and expected arrival date of equipment/materials 10 days prior to delivery. At this time the contractor shall also provide a firm installation start date.

4) Supply all equipment, parts, labor, and materials necessary for shipping, offloading, storage, demolition, and installation.

5) Contractor will provide all material, equipment, parts and labor required to perform all of the work of this contract in a timely manner.

6) Contractor shall verify all measurements and quantity of materials needed to complete the task identified in this Statement of Work (SOW).

PERIOD OF PERFORMANCE

90 calendar days after notice to proceed is issued.

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

EVALUATION FACTORS

1. Quality of proposed Products.

2. Price.

3. Duration of Project

4. Prevention of extended closure.

5. Maintenance Requirements.

6. Availability and Timeliness of materials.

7. Response Time.

8. Any innovative features or salient characteristics.

9. Recycling plan

SUBMITTALS/TRANSMITTALS:

Contractor will submit cut sheets to the COR for material approval prior to use for the following items:

1. PROJECT SCHEDULE

a. Within 30 calendar days of contract award and prior to pre-construction conference, provide a legible project schedule in PDF format to the Contracting Officer (CO) and Contracting Officer’s Representative (COR) to include:

i. Dates and number of anticipated site visits.

ii. Lead time for any ordered items.

iii. Date items will be ordered.

iv. Date ordered items will be received by contractor.

v. Tentative dates for onsite delivery of Materials, equipment, and waste collection.

vi. Proposed team meetings.

vii. Other milestone dates.

2. WORK PLAN

a. Within 30 days of on-site mobilization, the contractor will submit a work plan for approval prior to beginning work including a daily work plan to be coordinated closely with NPS staff in order to coordinate closures in advance.

b. Delivery, Storage, Staging of Materials, Equipment, and Waste Collection Bins.

a. Onsite delivery dates and times.

b. Are closures required? Where? When? How Long?

c. Equipment on-site; timing, delivery, pick-up, locations, path of travel, weight, mitigations (swamp mats for ground protection.)

c. Requests to Drive, Park, or Stow on Bluestone pad please include.

a. Type of vehicle or equipment.

b. Weight of vehicle or equipment.

c. Intensions of arrangement.

d. Detailed bluestone protection plan.

e. Any special requirements.

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

f. Statement acknowledging NPS is not liable in the event of injury or damage resulting from vehicle or equipment access on bluestone pad.

d. Request to store materials, tool, or equipment, on NPS property.

a. Items to be stored.

b. Store interior or exterior.

c. Any special requirements.

d. Statement acknowledging NPS is not liable for loss or damage to items for any reason while being stored on premises.

3. PROPERTY PROTECTION PLAN

a. Structures

b. Walkways

c. Driveways

d. Underground Utilities

4. PROOF OF QUALIFICATIONS & SIMILAR PROJECT EXPERIENCE.

5. DISPOSAL/RECYCLING PLAN:

e. Ft Sumter and Ft Moultrie National Park are committed to diverting disposed items from landfills to recycling programs, or repurposing. Please consider this while planning for disposal.

f. Provide documentation outlining what will be disposed of and the manner of disposal (Landfill, Recycled, or reused.) Please provide approximate weights to document, and disposal site manifests if applicable.

6. SPECIAL REQUIREMENTS & CONSIDERATIONS

a. Within 30 calendar days of contract award and prior to the pre-construction conference, provide a list of requirements and/or site conditions needed prior to mobilization for anything this contract will interface with.

b. Note: This will allow the NPS time to prepare the site for the requirements specific to the accepted proposal, ensure the site is ready for mobilization and a successful project launch, while reducing the chance for avoidable delays.

7. INSPECTIONS-TESTING-MAINTENANCE, & WARRANTY

c. Within 30 calendar days of contract award and prior to the pre-construction conference, the contractor will provide written documentation showing the intended use, conditions, and installation processes for this requirement are acceptable for coverage under manufacturer warranties.

d. Inspection/Testing/Maintenance/Warranty Requirements.

a. Within 30 calendar days of contract award and prior to the pre-construction conference, identify and provide information on initial, and lifecycle requirements related to

a. Code requirements

b. Inspections

c. Maintenance

d. Warranty

b. If required by manufacturer, code, or regulation, final testing and/or inspections must be conducted/coordinated by, and at the expense of, the contractor. The NPS must be present for all testing/inspections.

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

c. Written proof that all tests/inspections passed and satisfy the code or manufacturer requirement

a. Any certification must be furnished to the government prior to final acceptance.

b. The contractor is responsible for filing and fully executing all inspection/testing/warranty information listed as

i. Ft Sumter & Ft Moultrie NP, 1214 Middle Street, Sullivan’s Island, South Carolina, 29482

8. SAMPLES AND OPTIONS

c. Within 30 calendar days of contract award and prior to the pre-construction conference, provide information on all options related to materials, color, finish, texture, and durability.

d. The NPS reserves the right to request physical samples if needed.

9. SAFETY

1. Contractor will provide a work site and environment that is safe for employees, for visitors to the Park, and NPS staff. The work area will be cordon off (if necessary) and secure.

2. All work performed on government property will be accomplished in accordance with OSHA, EPA, Federal, State, and local regulations and requirements. Prior to starting work on government property, the contractor will submit to the Contracting Officer (CO) and Contracting Officer’s Representative (COR) for approval a copy of their company safety plan pertaining to this particular contract. Although not all-inclusive, the safety plan must address at a minimum the following areas:

1) Employee Safety

2) Visitor Safety

3) Site Safety

4) Confined space operations (if required)

5) Heavy equipment operations (if required)

6) Public/visitor safety (barriers/signage, etc…)

7) Traffic safety plan (if required)

8) Trenching/sloping of soil

9) Personal protective equipment to be used

10) Hazardous materials (HAZMAT) to be used

11) Copies of Safety Data Sheets must be provided to the NPS.

12) Storage of HAZMAT

13) Emergency response protocols

14) Personnel training requirements

15) OSHA DART rate

16) OSHA 300A Summary for last three years

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

Other Requirements & Information

PROJECT MEETINGS, SCHEDULING, AND COORDINATION

1. PRE-CONSTRUCTION MEETING:

a. An onsite pre-construction meeting will be required, which at this time the contractor shall verify site measurements.

2. PROJECT SCHEDULE:

b. Contactor will supply a project schedule to the COR 30 days prior to scheduling work.

3. SITE VISITS & PRIOR NOTICE:

c. The Prime contractor or their representative will notify NPS staff of scheduled site visits at least 48 hours in advance to ensure access to secure areas.

4. WORKING HOURS:

d. All work will be performed Monday through Friday from 7:30 am until 4:30

pm. No work will be performed on weekends or federal holidays without prior written approval.

e. Evening and Overnight work will be considered if special request is submitted.

MATERIALS AND EQUIPMENT

1. Contractor will provide all material, equipment, parts, and labor required to perform the work of this contract.

2. Once Product is approved, Installation must meet Manufacturers, Federal, State, International Code Council's 2018 International Building codes.

3. Contractor is responsible for disposing of waste generated by this contract work including all existing material and related debris. The government reserves the right to maintain possession of any materials generated by this scope of work.

PROJECT MANAGEMENT

4. The contractor shall identify, and provide a project manager/site supervisor who will be the sole contact point for all subcontractors, delivery/freight services etc. This designee shall not be a sub-contractor or any subcontractor’s staff. NPS staff cannot and will not coordinate with anyone other than the prime contractor or their previously designated supervisor. No last-minute changes in site supervisor for convenience will be accepted.

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

DELIVERIES

5. Deliveries will be scheduled by the prime contractor or representative within designated work hours with enough time to offload and be handled in its entirety prior to the end of the established workday. Deliveries that cannot be completed within established work hours will be rejected and re-scheduled.

JOBSITE CONDITIONS.

5. LOCATION DESCRIPTION

a. Liberty Square Visitor Center is located at 340 Concord St. Charleston, SC.

29401. This site is located downtown, parking is very scarce and only vehicles loading, and unloading are permissible to park in round about without prior written approval. The contractor is responsible for providing transportation of all crew and materials to the site.

6. LOADING / UNLOADING

a. The closest vehicle access point to the building is in the round about adjacent to the building this will likely be the most suitable location for loading and unloading.

b. If access is needed for vehicles or equipment to go beyond round about and onto bluestone pad requests will need to be submitted as previously stated.

7. MATERIAL STORAGE

a. Storage of any materials, tools, equipment is not guaranteed and must be requested and coordinated in advance with NPS. The NPS is not responsible for any loss or damage if stored onsite.

8. PARKING

a. Liberty Square – Parking at this site is extremely limited. There may be no parking available. Staging of tools and equipment must be coordinated with NPS in advance.

b. Park service is not liable for parking misconduct, or providing parking.

9. SIGNAGE

a. Closure, Safety, and Employee Rights.

a. The contractor is responsible for the installing and maintaining these signs for the duration of the project.

b. No company signs shall be installed on government property.

10. HOT WORK –

a. Hot Work of any kind requires a hot work permit to be approved by NPS staff.

Any hot work performed without a permit will be shut down immediately and will not resume until a hot work permit has been issued. If applicable, request a hot work permit from your COR.

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

b. Hot work is any activity or process that involves open flames or that generates sparks or heat and includes Welding and allied processes; heat treating;

grinding; thawing pipes; powder-driven fasteners; hot riveting; torch-applied roofing; sweating pipes and any similar applications producing or using sparks, flame or heat.

11. SITE CONDITIONS AND DISPOSAL

c. All equipment, material and waste removed or generated by work of this contract shall be properly disposed of offsite by the contractor.

d. Contractor shall leave the worksite clean and free of construction debris each day.

e. Work areas will be maintained in a neat and orderly fashion as work is conducted to avoid accidents and provide a professional work atmosphere.

f. Use of tobacco products, including, but not limited to smoking, chewing tobacco, snuff, vaping, or similar products is prohibited on in the park. This includes all buildings and grounds.

g. All waste and debris created from onsite work must be cleaned and left in broom-clean condition every day prior to departing the job site.

12. PROPERTY DAMAGE

a. Property damage will be avoided. Any damage will be corrected at the expense of the contractor.

b. Damage to Historic Resources due to neglect or failure to follow required procedure has serious consequences, at times punishable by law.

a. Please ensure you understand

a. National Historic Preservation Act (NHPA)

b. National Environmental Policy Act (NEPA)

13. OTHER

a. Employees will conduct themselves in a professional manner at all times.

b. Employees shall wear appropriate clothing at all times.

c. All buildings and grounds are non-smoking.

d. Breaks and eating will be performed in areas designated by the COR

e. No pets, other than service animals, are allowed on jobsites.

f. Contractor shall use “green” products whenever possible and all HAZMAT must be pre-approved for use by the FOSU/CHPI Collateral Duty Safety Coordinator.

g. The contractor will be responsible for the safety and security of the site to ensure unauthorized personnel (park visitors & employees) do not enter the construction area.

SECURITY & WORK HOURS:

The contractor shall only perform this work during normal operating hours (7:30am – 4:03pm), unless approval is given by Park.

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

INSPECTION DELIVERABLES & ACCEPTANCE TERMS

14. FINAL INSPECTIONS

Final acceptance will require the contractor to have completed installation of floors in full and in a manner which satisfies the requirements of this contract, all submittals, transmittals, and deliverables have been provided.

15. SAFETY DATA SHEETS (SDS)

a. Provide printed SDS sheets for any substances used on the floors for demolition, installation, or final cleaning.

16. REPLACEMENT PARTS

a. List of all common replacement parts including part numbers and source of supply.

STANDARDS INCORPORATED BY REFERENCE

a. Occupational Health and Safety Administration (OSHA)

a. Home | Occupational Safety and Health Administration (osha.gov)

b. Architectural Barriers Act (ABA)

a. Architectural Barriers Act (ABA) | U.S. Department of Labor (dol.gov)

c. National Fire Protection Association (NFPA)

a. NFPA

d. ANSI A17

a. American National Standards Institute - ANSI Home

e. National Historic Preservation Act (NHPA)

a. An Introduction to Section 106 | Advisory Council on Historic

Preservation (achp.gov)

b. National Historic Preservation Act - Historic Preservation (U.S.

National Park Service) (nps.gov)

f. National Environmental Policy Act (NEPA)

a. NEPA | National Environmental Policy Act (doe.gov)

b. A Citizen's Guide to NEPA (doe.gov)

g. South Carolina Department of Health and Environmental Control

a. Homepage | SCDHEC

h. The Davis Bacon Act applies to this contract

a. Davis-Bacon and Related Acts | U.S. Department of Labor (dol.gov)

i. Any other codes or regulations that may apply.

https://www.osha.gov/ https://www.dol.gov/agencies/oasam/centers-offices/civil-rights-center/dlms2-0600#:%7E:text=The%20Architectural%20Barriers%20Act%20(ABA)%20of%201968,%20as,fully%20accessible%20to%20and%20usable%20by%20handicapped%20individuals.

https://www.dol.gov/agencies/oasam/centers-offices/civil-rights-center/dlms2-0600#:%7E:text=The%20Architectural%20Barriers%20Act%20(ABA)%20of%201968,%20as,fully%20accessible%20to%20and%20usable%20by%20handicapped%20individuals.

https://www.nfpa.org/ https://www.ansi.org/ https://www.achp.gov/protecting-historic-properties/section-106-process/introduction-section-106 https://www.achp.gov/protecting-historic-properties/section-106-process/introduction-section-106 https://www.nps.gov/subjects/historicpreservation/national-historic-preservation-act.htm https://www.nps.gov/subjects/historicpreservation/national-historic-preservation-act.htm https://ceq.doe.gov/ https://ceq.doe.gov/docs/get-involved/citizens-guide-to-nepa-2021.pdf https://scdhec.gov/ https://www.dol.gov/agencies/whd/government-contracts/construction

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

PHOTOS

Yellow – Liberty Square Visitor Center.

Red – Round about, short term parking (loading and unloading) Orange – Parking Garage, additional parking.

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

Front Entryway

Rear Entryway

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

Museum area

Museum area (2)

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

Park Store

Main/2nd Level Office

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

Top Level/3rd floor Office

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

Top level/3rd floor Office (2)

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

Main/2nd Level Tiled areas – In orange

Main/2nd Level Carpeted areas – In Blue

PMIS 330881 – Replace Loose and Stained Floor Coverings at Ft Sumter Visitor Education Center at Liberty

Top/3rd Level Carpeted areas – In blue

Introduction:
Objective:
Scope & Specifications
Removal & Installation
1. Removal of existing Quarry tile & Carpet tile:
2. Specifications that apply to Tiled Surfaces:
3. Specifications that apply to Carpeted Surfaces:
4. Transitions
Responsibilities
Government Responsibilities –
1) Provide access to the installation site during the hours specified. (Contractor to supply their own transportation.)
2) Provide electricity for vendor hand tools.
3) Provide water for mortar, and grout mixing and cleaning purposes.
Contractor Responsibilities –
1) All work specified in this document.
2) Upon award of the contract, the contractor shall perform an in-depth inspection of the site to ensure that the products and materials will work sufficiently for the intended use. Any required facilities modifications will be made known to the NPS C...
3) Provide all utility requirements and expected arrival date of equipment/materials 10 days prior to delivery. At this time the contractor shall also provide a firm installation start date.
4) Supply all equipment, parts, labor, and materials necessary for shipping, offloading, storage, demolition, and installation.
5) Contractor will provide all material, equipment, parts and labor required to perform all of the work of this contract in a timely manner.
6) Contractor shall verify all measurements and quantity of materials needed to complete the task identified in this Statement of Work (SOW).
Period of Performance
Evaluation Factors
Submittals/Transmittals:
1. Project Schedule
2. Work Plan
3. Property Protection Plan
4. Proof of Qualifications & Similar Project Experience.
5. Disposal/Recycling Plan:
6. Special Requirements & Considerations
7. Inspections-Testing-Maintenance, & Warranty
8. Samples and Options
9. Safety
Other Requirements & Information
Project Meetings, Scheduling, and Coordination
1. Pre-Construction Meeting:
2. Project Schedule:
3. Site visits & prior notice:
4. Working Hours:
Materials and Equipment
Project Management
Deliveries
Jobsite Conditions.
5. Location Description
6. Loading / Unloading
7. Material Storage
8. Parking
9. signage
10. hot work –
11. Site Conditions and Disposal
12. Property Damage
13. Other
SECURITY & WORK HOURS:
Inspection Deliverables & Acceptance Terms
14. Final Inspections
Final acceptance will require the contractor to have completed installation of floors in full and in a manner which satisfies the requirements of this contract, all submittals, transmittals, and deliverables have been provided.
15. Safety Data Sheets (SDS)
16. Replacement Parts
Standards Incorporated by Reference
Photos