A03_Vegetation_Management_PWS.docx

DOCX document 17 KB Posted

Attached to
HERBICIDE APPLICATION ON SWPA'S LINE 3001 (GORE)
Solicitation number
89503625QSW000192
Issued by

About this file

This Performance Work Statement (PWS) details vegetation management services for the Department of Energy Southeastern Power Administration's transmission line 3001 in the Ozark-St. Francis National Forest. The project involves herbicide application on a 25-26 mile segment between Structures 616 and 431, targeting woody and brushy vegetation that poses potential hazards to transmission lines. The work must be performed using low-volume back-pack style sprayers between May 1st and August 31st, with trucks and all-terrain vehicles restricted to transportation of personnel and supplies only.

Key requirements include using only herbicides from SWPA's approved list or pre-approved by their Environmental Team, providing experienced team leaders to supervise spraying crews, and submitting a detailed operational plan before project commencement. The plan must outline equipment types and projected project timeline. The solicitation (Number 89503625QSW000192) is specifically for herbicide application on SWPA's Line 3001, with the primary goal of maintaining clear transmission line rights-of-way and preventing vegetation-related infrastructure risks.

View the file

Other files

File Type Posted
Sol_89503625QSW000192_Amd_0002.pdf PDF
Ozark-St. Francis herbicide application map.jpg JPG image
B05 89503625QSW000192 Amd 0001 Released.pdf PDF
A03 Vegetation Management PWS Amend 1.docx DOCX document
IMG_0004.JPG JPG image
IMG_0062.JPG JPG image
IMG_0063.JPG JPG image
IMG_0005.JPG JPG image
IMG_0284.jpg JPG image
B02_WD_2015-5137.pdf PDF
Sol_89503625QSW000192.pdf PDF
A04_SWPA_Approved_Herbicide_List_v1_3_pdf-EPA_Ecorisk_assessment_ID_kkw_6_24_21.pdf PDF
A03_Experience_Data_Sheet.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vegetation Management Performance Work Statement(PWS)

1. Project Scope:

• Herbicide application on SWPA’s 3001 – Dardanelle-Hilltop line, located in the Ozark-St. Francis National Forest.

• The project will cover an estimated 25–26 miles of transmission line, specifically between Structures 616 to 431.

2. Application Method:

• Herbicide application shall target woody and brushy-type vegetation that grows up into the transmission lines, creating potential hazards.

• Application must be conducted using low-volume back-pack style sprayers.

• Trucks and all-terrain vehicles (side x sides) may be used to transport personnel, supplies, and equipment to and from SWPA’s right of way only.

• Trucks, tractors, and all-terrain vehicles cannot be used to spray or apply herbicide.

3. Herbicide Requirements:

• All herbicides used must be either:

· On SWPA’s Approved Herbicide List, or

· Approved by SWPA’s Environmental Team prior to application.

4. Target Timeframe:

• The vegetation management work shall occur between May 1st and August 31st.

5. Supervision and Team Requirements:

• Contractor must provide experienced team leaders/foremen to supervise all spraying crews throughout the duration of the project.

6. Operational Plan Requirement:

• The contractor must submit a Scope of Work or Operational Plan prior to the start of the project. This plan must include:

· Type of equipment to be used.

· Projected timeframe from the start to the completion of the project.