This document is a solicitation for Satellite Communications (SATCOM) Terminals Maintenance Support (STMS) services. The STMS will provide a 24/7 SATCOM Maintenance Center that tracks failures, repairs, and maintenance for various SATCOM terminals and systems used by multiple government programs. The STMS will also manage logistical support, including shipping, receiving, inventory, and maintenance of CONUS and OCONUS warehouses. Additionally, the STMS will provide engineering and technical support for trouble ticketing and terminal remote monitoring.
The requirement is being competed as an 8(a) set-aside with a total period of performance of 58 months, including a 10-month base period and four 12-month option periods. Pricing is structured as cost-plus-fixed-fee, with estimated travel, material, and other direct costs provided. The North American Industry Classification System (NAICS) code is 541330 with a $42.1 million size standard. The agency is the U.S. Army Contracting Command - Aberdeen Proving Ground, and proposals are due 30 calendar days after the formal RFP is issued.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W15P7T-24-R-0026 X
2024APR2912:00pm
DOA7
SEE SCHEDULE
W15P7T
ARMY CONTRACTING CMD-APG
6565 SURVEILLANCE LOOP
APG, MD 21005-1846
ANDREW P. MCCLENDON
(443)861-4996
CCAP-DDB
ANDREW.P.MCCLENDON.CIV@ARMY.MIL
1 55
X 1
X 4
X 12 X 13
X 14
X 16
X 30
X 31
X 42
X 52
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ANDREW P. MCCLENDON
Buyer Office Symbol/Telephone Number: CCAP-DDB/(443)861-4996
Type of Contract 1: Cost Plus Fixed Fee
Type of Contract 2: Cost No Fee
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
GENERAL INFORMATION TO OFFERORS:
Responses must set forth full, accurate and complete information as required by this solicitation (including attachments). "Fill-ins" are provided on the standard form SF 1449 and other solicitation documents. Examine the entire solicitation carefully. The penalty for making false statements is prescribed in 18 U.S.C. 1001.
Responses must be plainly marked with the solicitation number and the date and local time set for receipt of proposals in the solicitation document.
A. BACKGROUND AND OBJECTIVES
This acquisition supports PEO C3Ts mission by providing Satellite Communications (SATCOM) Terminals Maintenance Support (STMS) for
Product Lead Commercial Satellite Terminals Program (PdL CSTP).
The STMS services will provide tracking for all failures and trouble tickets associated to outages, repairs, and maintenance of satellite terminals and systems. The requirement includes managing the SATCOM Maintenance Center (SMC), a 24 hours a day/seven (7) days a week (24/7) facility located on Aberdeen Proving Ground, MD (APG, MD), that provides tracking for all assets, operational or spared, worldwide, as well as logistical warehouse support for multiple programs and systems to include, but not limited to, Deployable Ku Earth
Terminal (DKET), Secure Internet Protocol Router and Non-classified Internet Protocol Router (SIPR/NIPR) Access Point (SNAP), Micro Very
Small Aperture Terminal (VSAT), Ground to Air Transmit and Receive (GATR), United States Marine Corps (USMC) Very Small Aperture
Terminal System (VSATs), Transportable Tactical Command Communications (T2C2), and Inflatable SATCOM Antenna.
The STMS will allow for data share amongst programs to identify mean time between failures (MTBF), repair or replacement costs, shipping, configuration management, Item Unique Identification (IUID) implementation and tracking, trend, and fault analysis. The STMS support includes managing and maintaining logistical capabilities through logistics personnel support that manage shipping, receiving, tracking, inventorying, maintenance, and the organization of the Continental United States (CONUS) and Outside of Continental United
States (OCONUS) warehouses. Additionally, the STMS provides Engineering and Technical support services to assist with technical requirements, Trouble Ticketing, and maintaining the SATCOM Terminal Remote Monitoring and Management (STRMM). The STRMM network provides near real time remote access to all Terminals, so the SMC has the visibility needed to provide the support needed to maintain mission success.
B. ACQUISITION STRATEGY
The program will be acquired on an 8(a) Set-Aside (FAR 19.8) competitive basis utilizing Tradeoff procedures to obtain best value for the Government. The Source Selection Evaluation Board (SSEB) will establish the Factors and Subfactors to be evaluated utilizing a hybrid approach. Technical will be evaluated on an acceptable or unacceptable basis against minimum stated requirements. Past
Performance will be evaluated based on a Confidence Assessment approach.
This is acquisition is restricted to certified 8(a) vendors as a small business set aside.
The acquisition will be conducted using competitive negotiations procedures. Once the formal RFP is issued, potential Offerors will be provided thirty (30) calendar days to prepare proposals. All proposals will be evaluated in accordance with an approved SSP and the terms of the RFP. The Government intends to issue one (1) contract for STMS services to an eligible 8(a) vendor.
The North American Industry Standard Classification Code assigned to this requirement is 541330, size standard $42.1 Million. The period of performance is for a total of 58 months which includes one (1) 10 month Base Period, and four (4) separate twelve month Option
Periods.
1. Issuing Office:
United States Army Contracting Command/Aberdeen Proving Ground
Office symbol: ACC-APG
2. Point of Contact Information:
Name: Andrew McClendon
Title: Contract Specialist
2 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Email: andrew.p.mcclendon.civ@army.mil Phone: (520)-671-2257
II. SOLICITATION PROVISIONS
The Government is conducting this source selection in accordance with the competitive source selection procedures.
Offerors are cautioned that the Government may make award based on initial proposal submissions without discussions. Therefore, the
Offeror's initial proposal should contain the Offeror's best terms from a Technical and Cost/Price standpoint. Proposals with an omission or unclear proposals may be judged to mean the contractor does not fully understand the requirements or understand what it takes to meet or exceed the requirements, regardless of the proposed cost/price. In that case, the Offeror may be found unacceptable and ineligible for award. The Government reserves the right to conduct discussions if the Contracting Officer determines them to be necessary.
The Government will not reimburse any offeror for bid and proposal costs, as a contract line item, associated with responding to this solicitation. The award of this contract is subject to the availability of adequate funds. The Government reserves the right to cancel this requirement at any time without being responsible for bid and proposal costs.
According to clause 52.217-8 "Option to Extend Services", The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 14 days.
It will be half the value of Option Year 4.
*** END OF NARRATIVE A0001 ***
3 55
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 STMS BASE SERVICES LABOR 1 LO $ ________________________ __________________
SERVICE REQUESTED: STMS BASE SUPPORT SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2025
0002 STMS BASE TRAVEL 1 LO $ ________________ __________________
SERVICE REQUESTED: STMS BASE TRAVEL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2025
0003 STMS BASE MATERIAL 1 LO $ __________________ __________________
SERVICE REQUESTED: STMS BASE MATERIAL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2025
0004 STMS BASE ODC 1 LO $ _____________ __________________
4 55
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: STMS BASE ODC
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2025
1001 STMS OPTION YEAR 1 LABOR 1 LO $ ________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 1 LABOR
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2026
1002 STMS OPTION YEAR 1 TRAVEL 1 LO $ _________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 1 TRAVEL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2026
1003 STMS OPTION YEAR 1 MATERIAL 1 LO $ ___________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 1 MATERIAL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
5 55
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2026
1004 STMS OPTION YEAR 1 ODC 1 LO $ ______________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 1 ODC
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2026
2001 STMS OPTION YEAR 2 LABOR 1 LO $ ________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 2 LABOR
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2027
2002 STMS OPTION YEAR 2 TRAVEL 1 LO $ _________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 2 TRAVEL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
6 55
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
001 1 23-JUN-2027
2003 STMS OPTION YEAR 2 MATERIAL 1 LO $ ___________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 2 MATERIAL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2027
2004 STMS OPTION YEAR 2 ODC 1 LO $ ______________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 2 ODC
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2027
3001 STMS OPTION YEAR 3 LABOR 1 LO $ ________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 3 LABOR
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2028
3002 STMS OPTION YEAR 3 TRAVEL 1 LO $ _________________________ __________________
7 55
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: STMS OPTION YEAR 3 TRAVEL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2028
3003 STMS OPTION YEAR 3 MATERIAL 1 LO $ ___________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 3 MATERIAL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2028
3004 STMS OPTION YEAR 3 ODC 1 LO $ ______________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 3 ODC
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2028
4001 STMS OPTION YEAR 4 LABOR 1 LO $ ________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 4 LABOR
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
8 55
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2029
4002 STMS OPTION YEAR 4 TRAVEL 1 LO $ _________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 4 TRAVEL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2029
4003 STMS OPTION YEAR 4 MATERIAL 1 LO $ ___________________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 4 MATERIAL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2029
4004 STMS OPTION YEAR 4 ODC 1 LO $ ______________________ __________________
SERVICE REQUESTED: STMS OPTION YEAR 4 ODC
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
9 55
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
REL CD QUANTITY DATE ________ ______________ __________
001 1 23-JUN-2029
10 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Travel, Material, & ODC Costs
Contract Year Travel Costs Material Costs ODCs
Base $148,766 $1,125,313 $387,316
Option 1 $156,204 $1,181,578 $406,682
Option 2 $164,015 $1,240,657 $427,016
Option 3 $172,215 $1,302,690 $448,367
Option 4 $180,826 $1,367,825 $470,785
Totals $822,026 $6,218,063 $2,140,166
*** END OF NARRATIVE B0001 ***
11 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT APR/1984
12 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
13 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) JAN/2023
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this
Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items--
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
-1-
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
-2-
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
14 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0338
Issue By DoDAAC W15P7T
Admin DoDAAC -5-
Inspect By DoDAAC -6-
Ship To Code -7-
Ship From Code -8-
Mark For Code -9-
Service Approver (DoDAAC) -10-
Service Acceptor (DoDAAC) -11-
Accept at Other DoDAAC -12-
LPO DoDAAC -13-
DCAA Auditor DoDAAC -14-
Other DoDAAC(s) -15-
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and
Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
-16-
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
G.5 INVOICING FOR RATES THAT DEVIATE FROM PROPOSED RATES:
G.5.1 Contract Performance Assessment Reporting System- CPARS
G.5.1.1 If in any performance period, the Contractor is projecting a cost overrun in excess of 10% of the proposed estimated cost for that period, which is determined to not be a result of Government direction and not attributable to Forward Pricing Rate Agreement
(FPRA) changes, the projected cost overrun may trigger a Show Cause or Termination for Default subject to the Contracting Officers discretion. Note: Contractors proposing at current FPRA rates and invoicing at current Provisional Billing rates will not trigger a Show
Cause or termination for Default.
G.5.1.2 If in performance of the TO, the Contractor incurs a cost overrun of greater than 5% and less than 10% during that CPARS evaluation period, which is determined not to be a result of Government direction or Contractor Provisional Billing rates, the
Contractor shall receive a Marginal rating for that periods CPARS cost element.
G.5.1.3 If in performance of the TO, the Contractor incurs a cost overrun greater than 10% during that CPARS evaluation period, which is determined not to be a result of Government direction or Contractor Provisional Billing rates, the Contractor shall receive an
Unsatisfactory rating for that periods CPARS cost element.
G.5.1.4 In regards to cost overruns and estimated costs mentioned in paragraphs G.5.1.1 through G.5.1.3, the Government will be comparing actual cost of work performed to estimated cost at the end of each contract period. Contractors are cautioned that costs should be directly proportional to hours expended, and if in excess, may be considered a cost overrun by the Government.
*** END OF NARRATIVE G0001 ***
15 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
I-1 52.202-1 DEFINITIONS JUN/2020
I-2 52.203-3 GRATUITIES APR/1984
I-3 52.203-5 COVENANT AGAINST CONTINGENT FEES MAY/2014
I-4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT JUN/2020
I-5 52.203-7 ANTI-KICKBACK PROCEDURES JUN/2020
I-6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR MAY/2014
IMPROPER ACTIVITY
I-7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY/2014
I-8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS JUN/2020
I-9 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS JAN/2017
OR STATEMENTS
I-10 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER MAY/2011
I-11 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS JUN/2020
I-12 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT/2018
I-13 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG/2020
I-14 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEC/2023
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES
(DEC 2023)
I-15 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH NOV/2021
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
I-16 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY OCT/2018
MATTERS
I-17 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS APR/2008
I-18 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS OCT/2010
I-19 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS (PRB) JUL/2005
OTHER THAN PENSIONS
I-20 52.216-8 FIXED FEE JUN/2011
I-21 52.216-11 COST CONTRACT--NO FEE APR/1984
I-22 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (FEB 2024) FEB/2024
I-23 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015
I-24 52.222-26 EQUAL OPPORTUNITY SEP/2016
I-25 52.222-37 EMPLOYMENT REPORTS ON VETERANS JUN/2020
I-26 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS DEC/2010
ACT
I-27 52.222-50 COMBATING TRAFFICKING IN PERSONS NOV/2021
I-28 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION MAY/2022
I-29 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING JUN/2020
I-30 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES FEB/2021
I-31 52.227-1 AUTHORIZATION AND CONSENT JUN/2020
I-32 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT JUN/2020
I-33 52.228-7 INSURANCE--LIABILITY TO THIRD PERSONS MAR/1996
I-34 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) APR/1984
I-35 52.232-25 PROMPT PAYMENT (JAN 2017) - ALTERNATE I (FEB 2002) FEB/2002
I-36 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN/2013
I-37 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS(MAR MAR/2023
2023)
I-38 52.233-1 DISPUTES MAY/2014
I-39 52.233-3 PROTEST AFTER AWARD (AUG 1996) -- ALTERNATE I (JUN 1985) JUN/1985
I-40 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT/2004
I-41 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS APR/1984
16 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
I-42 52.242-3 PENALTIES FOR UNALLOWABLE COSTS DEC/2022
I-43 52.242-13 BANKRUPTCY JUL/1995
I-44 52.243-2 CHANGES - COST-REIMBURSEMENT (AUG 1987) -- ALTERNATE I (APR 1984) APR/1984
I-45 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB FEB/2024
2024)
I-46 52.245-1 GOVERNMENT PROPERTY SEP/2021
I-47 52.245-9 USE AND CHARGES APR/2012
I-48 52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS JUN/2003
I-49 52.249-6 TERMINATION (COST REIMBURSEMENT) MAY/2004
I-50 52.249-14 EXCUSABLE DELAYS APR/1984
I-51 52.253-1 COMPUTER GENERATED FORMS JAN/1991
I-52 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011
I-53 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT- JAN/2023
RELATED FELONIES (JAN 2023)
I-54 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) DEC/2022
I-55 252.204-7000 DISCLOSURE OF INFORMATION OCT/2016
I-56 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR/1992
I-57 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING JAN/2023
(JAN 2023)
I-58 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT JAN/2023
(JAN 2023)
I-59 252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS JAN/2023
EQUIPMENT OR SERVICES (JAN 2023)
I-60 252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023) NOV/2023
I-61 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (JUN 2023) JUN/2023
I-62 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE MAY/2019
GOVERNMENT OF A TERRORIST COUNTRY
I-63 252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS (JAN JAN/2023
2023)
I-64 252.225-7048 EXPORT-CONTROLLED ITEMS JUN/2013
I-65 252.225-7056 PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN JAN/2023
2023)
I-66 252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC JAN/2023
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (JAN 2023)
I-67 252.227-7013 RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND MAR/2023
COMMERCIAL SERVICES (MAR 2023
I-68 252.227-7014 RIGHTS IN NONCOMMERCIAL COMPUTER SOFTWARE AND NONCOMMERCIAL COMPUTER MAR/2023
SOFTWARE DOCUMENTATION(MAR 2023)
I-69 252.227-7015 TECHNICAL DATA--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR MAR/2023
2023)
I-70 252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION (JAN 2023) JAN/2023
I-71 252.227-7019 VALIDATION OF ASSERTED RESTRICTIONS?COMPUTER SOFTWARE (JAN 2023) JAN/2023
I-72 252.227-7025 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED JAN/2023
INFORMATION MARKED WITH RESTRICTIVE LEGENDS (JAN 2023)
I-73 252.227-7027 DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE APR/1988
I-74 252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT MAR/2000
I-75 252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA(JAN 2023) JAN/2023
I-76 252.231-7000 SUPPLEMENTAL COST PRINCIPLES DEC/1991
I-77 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS DEC/2018
I-78 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006
I-79 252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR PERSONNEL JAN/2023
(JAN 2023)
I-80 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2022) DEC/2022
I-81 252.244-7000 SUBCONTRACTS FOR COMMERCIAL PRODUCTS OR COMMERCIAL SERVICES (NOV NOV/2023
2023)
I-82 252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION APR/2012
I-83 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC (JAN 2023) JAN/2023
I-84 52.216-7 ALLOWABLE COST AND PAYMENT AUG/2018
(a) Invoicing.
17 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal
Acquisition Regulation (FAR) Subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.
(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains
Alternate I to the clause at 52.232-25.
(3) The designated payment office will make interim payments for contract financing on the TBD day after the designated billing office receives a proper payment request. In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(b) Reimbursing costs.
(1) For the purpose of reimbursing allowable costs (except as provided in subparagraph (b)(2) of this clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term costs includes only --
(i) Those recorded costs that, at the time of the request for reimbursement, the Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;
(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for --
(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made
(1) In accordance with the terms and conditions of a subcontract or invoice; and
(2) Ordinarily within 30 days of the submission of the Contractors payment request to the Government;
(B) Materials issued from the Contractors inventory and placed in the production process for use on the contract;
(C) Direct labor;
(D) Direct travel;
(E) Other direct in-house costs; and
(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and
(iii) The amount of financing payments that have been paid by cash, check or other form of payment to subcontractors.
(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless--
(i) The Contractors practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractors indirect costs for payment purposes).
(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) of this clause, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) of this clause.
(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractors expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.
(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.
(d) Final indirect cost rates.
(1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with Subpart 42.7 of the Federal
18 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.
(2)(i) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. Reasonable extensions, for exceptional circumstances only, may be requested in writing by the Contractor and granted in writing by the Contracting Officer. The
Contractor shall support its proposal with adequate supporting data.
(ii) The proposed rates shall be based on the Contractors actual cost experience for that period. The appropriate Government representative and the Contractor shall establish the final indirect cost rates as promptly as practical after receipt of the
Contractors proposal.
(iii) An adequate indirect cost rate proposal shall include the following data unless otherwise specified by the cognizant Federal agency official:
(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.
(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).
(C) Overhead expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.
(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts) and expense reallocation to final indirect cost pools.
(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.
(F) Facilities capital cost of money factors computation.
(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost element.
(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.
(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.
(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contact information).
(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.
(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.
(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.
(N) Certificate of final indirect costs (see 52.242-4, Certification of Final Indirect Costs).
(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).
(iv) The following supplemental information is not required to determine if a proposal is adequate, but may be required during the audit process:
(A) Comparative analysis of indirect expense pools detailed by account to prior fiscal year and budgetary data.
(B) General Organizational information and limitation on allowability of compensation for certain contractor personnel. See
31.205-6(p). Additional salary reference information is available at:
https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedBeforeJune24.pdf and https://www.whitehouse.gov/wp-content/uploads/2017/11/ContractorCompensationCapContractsAwardedafterJune24.pdf
(C) Identification of prime contracts under which the contractor performs as a subcontractor.
(D) Description of accounting system (excludes contractors required to submit a CAS Disclosure Statement or contractors where the
19 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
description of the accounting system has not changed from the previous year's submission).
(E) Procedures for identifying and excluding unallowable costs from the costs claimed and billed (excludes contractors where the procedures have not changed from the previous year's submission).
(F) Certified financial statements and other financial data (e.g., trial balance, compilation, review, etc.).
(G) Management letter from outside CPAs concerning any internal control weaknesses.
(H) Actions that have been and/or will be implemented to correct the weaknesses described in the management letter from subparagraph (G) of this section.
(I) List of all internal audit reports issued since the last disclosure of internal audit reports to the Government.
(J) Annual internal audit plan of scheduled audits to be performed in the fiscal year when the final indirect cost rate submission is made.
(K) Federal and State income tax returns.
(L) Securities and Exchange Commission 10-K annual report.
(M) Minutes from board of directors meetings.
(N) Listing of delay claims and termination claims submitted which contain costs relating to the subject fiscal year.
(O) Contract briefings, which generally include a synopsis of all pertinent contract provisions, such as: Contract type, contract amount, product or service(s) to be provided, contract performance period, rate ceilings, advance approval requirements, pre-contract cost allowability limitations, and billing limitations.
(v) The Contractor shall update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed, as required in paragraph (d)(2)(iii)(I) of this section, within 60 days after settlement of final indirect cost rates.
(3) The Contractor and the appropriate Government representative shall execute a written understanding setting forth the final indirect cost rates. The understanding shall specify
(i) the agreed-upon final annual indirect cost rates,
(ii) the bases to which the rates apply,
(iii) the periods for which the rates apply,
(iv) any specific indirect cost items treated as direct costs in the settlement, and
(v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates.
The understanding shall not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.
(4) Failure by the parties to agree on a final annual indirect cost rate shall be a dispute within the meaning of the Disputes clause.
(5) Within 120 days (or longer period if approved in writing by the Contracting Officer) after settlement of the final annual indirect cost rates for all years of a physically complete contract, Contractor shall submit a completion invoice or voucher to reflect the settled amounts and rates. The completion invoice or voucher shall include settled subcontract amounts and rates. The prime contractor is responsible for settling subcontractor amounts and rates included in the completion invoice or voucher and providing status of subcontractor audits to the contracting officer upon request.
(6)(i) If the Contractor fails to submit a completion invoice or voucher within the time specified in paragraph (d)(5) of this clause, the Contracting Officer may--
(A) Determine the amounts due to the Contractor under the contract; and
(B) Record this determination in a unilateral modification to the contract.
20 55
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(ii) This determination constitutes the final decision of the Contracting Officer in accordance with the Disputes clause.
(e) Billing rates. Until final annual indirect cost rates are established for any period, the Government shall reimburse the Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates --
(1) Shall be the anticipated final rates; and
(2) May be prospectively or retroactively revised by mutual agreement, at either partys request, to prevent substantial overpayment or underpayment.
(f) Quick-closeout procedures. Quick-closeout procedures are applicable when the conditions in FAR 42.708(a) are satisfied.
(g) Audit. At any time or times before final payment, the Contracting Officer may have the Contractors invoices or vouchers and statements of cost audited. Any payment may be --
(1) Reduced by amounts found by the Contracting Officer not to constitute allowable costs; or
(2) Adjusted for prior overpayments or underpayments.
(h) Final payment.
(1) Upon approval of a completion invoice or voucher submitted by the Contractor in accordance with paragraph (d)(5) of this clause, and upon the Contractors compliance with all terms of this contract, the Government shall promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.
(2) The Contractor shall pay to the Government any refunds, rebates, credits, or other amounts (including interest, if any) accruing to or received by the Contractor or any assignee under this contract, to the extent that those amounts are properly allocable to costs for which the Contractor has been reimbursed by the Government. Reasonable expenses incurred by the Contractor for securing refunds, rebates, credits, or other amounts shall be allowable costs if approved by the Contracting Officer. Before final payment under this contract, the Contractor and each assignee whose assignment is in effect at the time of final payment shall execute and deliver --
(i) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including interest, if any) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and
(ii) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, except --
(A) Specified claims stated in exact amounts, or in estimated amounts when the exact amounts are not known;
(B) Claims (including reasonable incidental expenses) based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided, that the claims are not known to the Contractor on the date of the execution of the release, and that the Contractor gives notice of the claims in writing to the Contracting Officer within 6 years following the release date or notice of final payment date, whichever is earlier; and
(C) Claims for reimbursement of costs, including reasonable incidental expenses, incurred by the Contractor under the patent clauses of this contract, excluding, however, any expenses arising from the Contractors indemnification of the Government against patent liability.
(End of Clause)
I-85 52.217-8 OPTION TO EXTEND SERVICES NOV/1999
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .