A02-TECHNICAL EXHIBIT 1 PRS.docx

DOCX document 15 KB Posted

Attached to
Full Food Service - Wisconsin Military Academy
Solicitation number
W912J2-21-R-0002
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

Performance Requirements Summary

This Performance Requirements Summary includes performance standards. Lot size shall be equal to the total number of operational days for each month. Even if the Dining Facility is only open for one meal, that shall count as an operational day. The Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

PWS Paragraph
Task
Performance Standard
Lot Size and Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
Payment %
5.1 – 5.1.7
(PRS-1) Contractor shall perform Dining Facility Sanitation and Custodial Operations

Service Meets Standards of Paragraph 5.1

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Random Inspection / COR will review
7% (.05)
5.2 – 5.2.11
(PRS-2) The Contractor shall maintain the dining facility to Support Daily Operations

Service Meets Standards of Paragraph 5.2

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Random Inspection / COR will review
5% (.05)
5.3. – 5.3.5
(PRS-3) The Contractor shall Maintain Dining Room to Support Daily Operations

Service Meets Standards of Paragraph 5.3

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Random Inspection / COR will review
7% (.07)
5.4 – 5.4.5
(PRS-4) The Contractor shall manage food service operations for the dining facility

Service Meets Standards of Paragraph 5.4

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Random Inspection / COR will review
7% (.07)
5.5 – 5.5.5
(PRS-5) The Contractor shall properly receive subsistence deliveries

Service Meets Standards of Paragraph 5.5

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Planned Inspection / COR will review
5% (.05)
5.6 – 5.6.6
(PRS-6) The Contractor shall properly store subsistence items

Service Meets Standards of Paragraph 5.6

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Random Inspection / COR will review
5% (.05)
5.7 – 5.7.11
(PRS-7) The Contractor shall properly prepare meals that meet or exceed approved menu guidelines

Service Meets Standards of Paragraph 5.7

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Random Inspection / COR will review
7% (.07)
5.8 – 5.8.5
(PRS-8) The Contractor shall provide headcount/ cashier services for each meal period

Service Meets Standards of Paragraph 5.8

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Random Inspection / COR will review
7% (.07)
5.9 – 5.9.11
(PRS-9) The Contractor shall safeguard and properly serve food during meal periods.

Service Meets Standards of Paragraph 5.9

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Random Inspection / COR will review
5% (.05)
5.10 – 5.10.6
(PRS-10) The Contractor shall prepare bulk meals for remote site feeding

Service Meets Standards of Paragraph 5.10

Lot size shall be equal to the total number of operational days each month; AQL = (10%)
Periodic Planned Inspection / COR will review
5% (.05)

File details come from the government source that posted it. Updated .