A017 CDRL - Supplier Status Report.pdf

PDF 216 KB Posted

Attached to
F16 BSCR Federal contract opportunity
Solicitation number
SPRHA1-20-R-7003
Issued by
Defense Logistics Agency Aviation

About this file

This Contract Data Requirements List outlines reporting requirements for the F-16 Brake Control System Redesign project. The contractor must submit monthly Supplier Status Reports providing a summary table of project milestones, completion percentages, and narrative updates on key actions, status details, and corrective measures. Reports are due on the first of each month following contract award to Defense Logistics Agency Aviation and other agencies including the Landing Gear Office. The reports require a draft submission as well as distribution of three final copies controlled under Distribution Statement B for administrative use by U.S. government agencies only. Pricing is grouped based on the level of customization required to conform to reporting specifications.

View the file

Other files for this federal contract opportunity

Other files attached to F16 BSCR, newest first.
File Type Posted
B001 Computer end product drawings.pdf PDF
A013 TDP MILSTD31000.pdf PDF
A011 TDP Commercia MIL STD 31000.pdf PDF
A012 TDP Special MILSTD31000.pdf PDF
A012 DID SIE.pdf PDF
PPISSample.pdf PDF
ClientLtr.pdf PDF
Subcont_Consent.pdf PDF
PastPerformanceQuestionnaire.pdf PDF
A005 DID Qualification Test Plan.pdf PDF
A004 DID Contractor Configuration Management Plan.pdf PDF
B001 CDRL - Production Drawings Models and Associated Lists.pdf PDF
A007 DID Critical Design Review.pdf PDF
A013 CDRL - SPECIAL TOOLING DRAWINGSMODELS AND.pdf PDF
A011 DID Commercial Engineering Design Dataand Associated Lists.pdf PDF
A003 CDRL Conference Agenda.pdf PDF
A017 DID Contractor Progress Report.pdf PDF
A006 CDRL Preliminary Design Review.pdf PDF
A015 LMI Attach 2 Summary Worksheet.pdf PDF
A012CDRL.pdf PDF
A002 DID SRR.pdf PDF
A013 DID TDP TOOLING.pdf PDF
A005 CDRL Qualification Test Plan.pdf PDF
A001 DID Integrated Master Schedule.pdf PDF
A001 CDRL - Integrated Master Schedule.pdf PDF
A010 CDRL - Test Inspection Report.pdf PDF
A015 DID Logistic Managment Information.pdf PDF
A008 CDRL - Test Inspection Report.pdf PDF
A007 CDRL - Critical Design Review.pdf PDF
A002 CDRL System Requirement Review.pdf PDF
B001 Product Drawing Models MIL-STD-3100.pdf PDF
A016 DID Test Inspection Report.pdf PDF
A009 CDRL - Test Readiness Review.pdf PDF
A018 DID Test Inspection Hardware Report.pdf PDF
A006 DID Preliminary Design Review.pdf PDF
B001 CDRL - Production Drawings Models.pdf PDF
A010 DID Test Inspection Report.pdf PDF
A008 DID Test Inspection Report.pdf PDF
A016 CDRL - Test Inspection Report VACR.pdf PDF
A018 CDRL - Test Inspection Report.pdf PDF
A015 LMI Attach 1 Performance Schedule.pdf PDF
A003 DID Conference Agenda.pdf PDF
A015 LMI Attach 3 Data Elements.pdf PDF
A014 - CDRL - Air Force Technical Manual Contract Requirement.pdf PDF
B001 CDRL - Computer Generated Engineering Products.pdf PDF
B001 DID TDP Product Drawings.pdf PDF
A014 DID Air Force Techical Manural Contract Reqirements.pdf PDF
A015 CDRL - Logistic Management Information Data Products.pdf PDF
A009 DID Test Readiness Review.pdf PDF
SPRHA120R7003.pdf PDF
Show all 50

F16 BSCR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A017
title: SUPPLIER STATUS REPORT (SSR)
sub: F-16 Brake Control System Redesign (BCSR)
auth: DI-MGMT-80227/T
ref: IAW TRD PARAGRAPH 2.1
req_ofc: 417 SCMS/GUEA
dd250: LT
appcode: A
dist: B
freq: SEE BLK 16
asof: SEE BLK 16
firstsub: SEE BLK 16
subsub: SEE BLK 16
addressee1: DLA-AUB
draft1:
reg1: 1
repro1:
addressee2: 6050 Gum Lane
draft2:
reg2:
repro2:
addressee3: Bldg 1225
draft3:
reg3:
repro3:
addressee4: Hill AFB, UT
draft4:
reg4:
repro4:
addressee5: 84056-5820
draft5:
reg5:
repro5:
addressee6: (SEE BLOCK 16)
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8: Landing Gear Office
draft8:
reg8: 1
repro8:
addressee9: 417 SCMS/GUEA
draft9:
reg9:
repro9:
addressee10: 6040 Gum Lane
draft10:
reg10:
repro10:
addressee11: Bldg 1216
draft11:
reg11:
repro11:
addressee12: Hill AFB, UT
draft12:
reg12:
repro12:
addressee13: 84056-5811
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20: WAWF
draft20:
reg20:
repro20:
addressee21: (SEE BLOCK 16)
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23: AFLCMC/EZGEM-OL
draft23: 1
reg23: 1
repro23:
addressee24: 6020 Gum Lane
draft24:
reg24:
repro24:
addressee25: Bldg 1218
draft25:
reg25:
repro25:
addressee26: Hill AFB, UT
draft26:
reg26:
repro26:
addressee27: 84056-5825
draft27:
reg27:
repro27:
addressee28: ATTN: Wendy Heugly
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_reg: 3
total_repro: 0
remarks: Block 2: The SSR indicates the current activities, their status, and plans for the forthcoming milestone, any anticipated problems, and anticipated problems, and estimated completion dates.

Block 4 Changes: 10.2 - Customer format acceptable, however, as a minimum the report shall include a table summary consisting of milestones, corresponding milestone start dates, completion dates, and percentage completed categories. A short narrative synopsizing key actions, status details and any corrective actions taken to ensure milestones are met shall also be provided.

Block 4 Tailored Out: 10.3 - D, F, G, H, I, J, K, L

Block 9: Distribution Statement B: Distribution authorized to U.S. Government agencies only, administrative or operational use, dated 2019/12/13. Other requests for this document shall be referred to OO-ALC/417 SCMS/GUEA, Hill AFB, Utah 84056-5811.

Block 10, 12 and 13:

A. The initial report shall be submitted on the first day of the month following contract award. Subsequent monthly submittals (with updated information/status) shall be delivered on the first day of each month.

Warning - This document contains technical data whose export is restricted by the arms export control act (Title 22, U.S.C., SEC. 2751 ET SEQ.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. APP 2401 ET SEQ. violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice - Destroy by any method that will prevent disclosure of contents or reconstruction of the document

group:
total_price:
prep_name: Michael Schow, 417 SCMS/GUEA
line_item: 0001AS
exhibit: A
xtdp: Off
xtm: Off
othercat: ADMN
system: F-16 Brake Control System
ctr_no: FD20202001103
contr: TBD
remarksb:
Page2:
Reset:
prep_date:
app_by: Ron Montgomery, 417 SCMS/GUEA
app_date:
Page: 1
of_pages: 1
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .