A004 DID Contractor Configuration Management Plan.pdf

PDF 121 KB Posted

Attached to
F16 BSCR Federal contract opportunity
Solicitation number
SPRHA1-20-R-7003
Issued by
Defense Logistics Agency Aviation

About this file

This Data Item Description provides the format and content requirements for a Supplier's Configuration Management Plan related to the F-16 Brake Control System solicitation issued by Defense Logistics Agency Aviation. The Supplier's CM Plan must identify the supplier's processes and procedures for configuration management and planning over the product lifecycle, configuration identification, configuration change management to control and document the product and its configuration information through end of life, and configuration status accounting to record and report information needed to trace and manage the product configuration, including hardware, software, and firmware. Verification and audits must also be established to ensure consistency of product information. The plan shall be prepared in the supplier's own format and provided to the government for review, evaluation, and monitoring of the supplier's CM program and associated proposed components.

View the file

Other files for this federal contract opportunity

Other files attached to F16 BSCR, newest first.
File Type Posted
A004 CDRL Contractors Plan.pdf PDF
A012 TDP Special MILSTD31000.pdf PDF
A012 DID SIE.pdf PDF
B001 Computer end product drawings.pdf PDF
A013 TDP MILSTD31000.pdf PDF
PPISSample.pdf PDF
ClientLtr.pdf PDF
PastPerformanceQuestionnaire.pdf PDF
Subcont_Consent.pdf PDF
A002 DID SRR.pdf PDF
A013 DID TDP TOOLING.pdf PDF
A005 CDRL Qualification Test Plan.pdf PDF
A001 DID Integrated Master Schedule.pdf PDF
A001 CDRL - Integrated Master Schedule.pdf PDF
A003 DID Conference Agenda.pdf PDF
A015 LMI Attach 3 Data Elements.pdf PDF
A014 - CDRL - Air Force Technical Manual Contract Requirement.pdf PDF
B001 CDRL - Computer Generated Engineering Products.pdf PDF
B001 DID TDP Product Drawings.pdf PDF
A014 DID Air Force Techical Manural Contract Reqirements.pdf PDF
A015 CDRL - Logistic Management Information Data Products.pdf PDF
A009 DID Test Readiness Review.pdf PDF
SPRHA120R7003.pdf PDF
A010 CDRL - Test Inspection Report.pdf PDF
A015 DID Logistic Managment Information.pdf PDF
A008 CDRL - Test Inspection Report.pdf PDF
A007 CDRL - Critical Design Review.pdf PDF
A002 CDRL System Requirement Review.pdf PDF
B001 Product Drawing Models MIL-STD-3100.pdf PDF
A016 DID Test Inspection Report.pdf PDF
A009 CDRL - Test Readiness Review.pdf PDF
A018 DID Test Inspection Hardware Report.pdf PDF
A006 DID Preliminary Design Review.pdf PDF
B001 CDRL - Production Drawings Models.pdf PDF
A010 DID Test Inspection Report.pdf PDF
A008 DID Test Inspection Report.pdf PDF
A016 CDRL - Test Inspection Report VACR.pdf PDF
A018 CDRL - Test Inspection Report.pdf PDF
A015 LMI Attach 1 Performance Schedule.pdf PDF
A005 DID Qualification Test Plan.pdf PDF
B001 CDRL - Production Drawings Models and Associated Lists.pdf PDF
A007 DID Critical Design Review.pdf PDF
A013 CDRL - SPECIAL TOOLING DRAWINGSMODELS AND.pdf PDF
A011 DID Commercial Engineering Design Dataand Associated Lists.pdf PDF
A017 CDRL - Supplier Status Report.pdf PDF
A003 CDRL Conference Agenda.pdf PDF
A017 DID Contractor Progress Report.pdf PDF
A006 CDRL Preliminary Design Review.pdf PDF
A015 LMI Attach 2 Summary Worksheet.pdf PDF
A012CDRL.pdf PDF
Show all 50

F16 BSCR has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: SUPPLIER’S CONFIGURATION MANAGEMENT PLAN

Number: DI-SESS-80858D Approval Date: 20200211

AMSC Number: N10144 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: NM Project Number: SESS-2020-007

Applicable Forms: N/A

Use/relationship: The Supplier’s Configuration Management (CM) Plan describes the organization, procedures, and controls of the Supplier’s CM program. The principle use is to provide the

Government a basis for review, evaluation, and monitoring of the CM program and associated proposed components.

a. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in EIA-649-1 and the principles of EIA-649 (Copies of these standards are available online at www.sae.org or from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 [inside USA and Canada] or 724-776-4970 [outside

USA]).

b. This DID supersedes DI-SESS-80858C.

Requirements:

1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The Supplier’s CM plan shall be prepared in Supplier format.

3. Content. The Supplier’s CM plan shall identify the Supplier’s processes and procedures for:

a. Configuration management and planning over the lifecycle of a product.

b. Configuration identification throughout the product lifecycle.

c. Configuration change management involves controlling and documenting the product and its product configuration information to the product’s end of life.

d. Configuration status accounting involves recording and reporting of information needed to trace and manage configuration of a product.

e. Verification and audits to ensure consistency of product information are established and maintained in the execution of the total configuration, including hardware, software, and firmware.

End of DI-SESS-80858D

DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.

Source: http://assist.dla.mil -- Downloaded: 2020-07-15T18:59Z

Check the source to verify that this is the current version before use.

http://www.sae.org/

File details come from the government source that posted it. Updated .