A006 CDRL Preliminary Design Review.pdf
PDF 215 KB Posted
- Attached to
- F16 BSCR Federal contract opportunity
- Solicitation number
- SPRHA1-20-R-7003
- Issued by
- Defense Logistics Agency Aviation
About this file
This Contract Data Requirements List outlines deliverables required for the Preliminary Design Review of the F-16 Brake Control System Redesign. Key deliverables include briefing materials, recommendation reports, engineering milestone approval documentation, and Type 2D conceptual technical data packages and 3D solid models. Draft documentation must be provided at least 15 days before the scheduled Preliminary Design Review, with final documentation and any corrections due 30 days after government comments. Up to two revisions will be permitted to address government concerns. Deliverables requiring more than two revisions could impact the contractor's past performance rating. Digital copies of all deliverables must be submitted to organizations including the Landing Gear Office and 417th Supply Chain Management Squadron at Hill Air Force Base.
View the file
Other files for this federal contract opportunity
Show all 50
F16 BSCR has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| data_item: A006 |
| title: Preliminary Design Review (PDR) |
| sub: F-16 Brake Control System Redesign (BCSR) |
| auth: DI-SESS-81766 |
| ref: IAW TRD PARAGRAPH 2.4 |
| req_ofc: 417 SCMS/GUEA |
| dd250: LT |
| appcode: A |
| dist: B |
| freq: Block 16 |
| asof: Block 16 |
| firstsub: Block 16 |
| subsub: Block 16 |
| addressee1: Landing Gear Office |
| draft1: |
| reg1: 1 |
| repro1: |
| addressee2: 417 SCMS/GUEA |
| draft2: |
| reg2: |
| repro2: |
| addressee3: 6040 Gum Lane |
| draft3: |
| reg3: |
| repro3: |
| addressee4: Hill AFB, UT |
| draft4: |
| reg4: |
| repro4: |
| addressee5: 84056-5285 |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: DLA-AUB |
| draft11: |
| reg11: |
| repro11: |
| addressee12: 6050 Gum Lane |
| draft12: |
| reg12: |
| repro12: |
| addressee13: Bldg 1225 |
| draft13: |
| reg13: |
| repro13: |
| addressee14: Hill AFB, UT 84056 |
| draft14: |
| reg14: |
| repro14: |
| addressee15: (SEE BLOCK 16) |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: WAWF |
| draft17: |
| reg17: |
| repro17: |
| addressee18: (SEE BLOCK 16) |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_reg: 1 |
| total_repro: 0 |
| remarks: Block 4: |
DI-SESS-81766 shall be the basis from which design and airworthiness milestones are satisfied. Landing Gear Systems redesigns shall comply with MIL-HDBK-516 and AFMCI63-1201, each of which shall be tailored for landing gear systems redesign, and 417 SCMS/GUEA Systems Engineering Plan (SEP) and GUEA Business Practice 63-03 Decision Analysis in their entirety. Changes to DI-SESS-81766, as follows:
Use/relationship:
Paragraph a: Delete "of the aircraft design" and replace with "of the Landing Gear Systems design"
Requirements:
2. Format: Delete and replace with:
PDR documentation may be in Contractor's Format, but all drafts and the Final PDR for each requirement will be delivered in fully-modifiable Word (and/or Powerpoint) format, including all text, tables, charts, and calculations. All draft revisions supplied in Word format will be supplied with tracked-changes from all previous draft revisions until Final acceptance by the Government. Final PDR documentation will also be delivered in PDF format. PDF of approved PDR Documentation will be the only copies with digital signatures, if applicable.
3. Content: After "preparation of the Airworthiness Specification." insert "Each discrete Airworthiness Specification deliverable outlines a subset of the overall Airworthiness Requirement and must comply with the process outlined in 417 SCMS/GUEA SEP. The PDR subset of the Airworthiness Specification shall include:"
3.2 System Description: Delete and replace with:
PDR documentation shall include the information outlined in 417 SCMS/GUEA SEP, Section 2.3.1.1.10 Technical Management & Controls, for the Preliminary Design Review and all other documentation outlined in the contract deliverables for PDR (See "Deliverables").
3.3, 3.4, and 3.5: Delete
Blocks 10 through 13:
Draft PDR documentation must be provided no later than (NLT) 15 days before Preliminary Design Review occurs or the date for PDR outlined in the Contract Integrated Master Schedule (IMS), whichever occurs first. Contract SOO/SOW may outline
| group: |
| total_price: |
| prep_name: Michael Schow, 417 SCMS/GUEA |
| line_item: 0001AF |
| exhibit: A |
| xtdp: Off |
| xtm: Off |
| othercat: X |
| system: F-16 Brake Control System |
| ctr_no: FD20202001103 |
| contr: TBD |
| remarksb: additional revisions or drafts. PDR corrections to be delivered NLT 30 days after receipt of Government comments. |
Government comments will be provided NLT 30 days after each submittal. If Government review is delayed, contract milestones may be postponed until the review is completed.
Contractor must satisfy Government concerns/comments with no more than 2 revisions (i.e. 1st draft, 2nd draft, Final revision accepted by Government), as outlined in PWS Service Summary, Table 2. PDR deliverables requiring more than 2 revisions may affect the Contractor's CPARS Quality rating.
Block 14:
Deliver digital copies via electronic submission to applicable addresses listed.
PDR Deliverables include:
• Briefing materials and supporting data
• Recommendation reports
• All PDR-level Engineering Milestone Approval Documentation
• Type 2D conceptual-level TDPs per MIL-STD-31000 and 3D solid models/data. If this data was not separately priced, Government shall be permitted to access/review applicable data at the contractor's facility.
Contract SOO/SOW may outline modifications to these requirements and/or additional deliverables.
| Page2: 2 |
| Reset: |
| prep_date: |
| app_by: Ron Montgomery, 417 SCMS/GUEA |
| app_date: |
| Page: 1 |
| of_pages: 3 |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .