This transmittal provides the 100% design submittal for concrete walls to replace CMU walls in the construction of permanent housing units on Saipan under a FEMA contract. The Army Corps of Engineers transmittal details minor revisions to the drawings and specifications to change the wall material from CMU to concrete, including updating sheet titles and material symbols, clarifying footing reinforcement, adding window and door details, and revising plumbing walls.
The related federal contract opportunity posted by FEMA Region 9 solicits proposals for the construction of 1-2-3 bedroom houses on Saipan using government-provided designs and specifications. Offerors must be small businesses licensed for residential construction in the CNMI. The requirement includes two phases - the first for design and permitting, and the second for physical construction. A separate notice to proceed will be issued for each phase. The site visit is scheduled for July 29th, with questions due by August 2nd and proposals by August 8th. The contract will be fixed price, with evaluation considering both price and non-price factors. The solicitation is restricted to CNMI businesses.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers Honolulu District
Regional Engineering Center
TRANSMITTAL
PROJECT: FEMA Permanent Housing – 100% Design Submittal for Concrete Walls
LOCATION: Saipan
DATE: 13 December 2019 (HST)
TO: FEMA Region IX
PHC Group
REMARKS:
• Specifications are remain same but deleted Section 04 20 00 UNIT MASONRY.
• On the drawings, previsouly used CMU patterns on Architectural and Electrical drawings indicate concrete material on this package.
• Drawing changes are limited to convert CMU walls to Concrete walls except for following revisions for clarifications:
o G-001 (all unit types): Updated sheet title for S-006 o G-002 (all unit types): Updated Material Symbols o S-004 (all unit types) : Drawing A1, revised note to clarify that the wall footing reinforcement is per plan o S-007 (all unit types): Drawing A8, added window and door component and cladding pressure o S-101 (all unit types): Added saw cut joints o M-102 (1BD and 3BD units): Updated pluming wall o M-102A (1BD and 3BD units): Updated pluming wall o M-103 (1BD and 3BD units): Updated pluming wall