NEW 1 UNITS FEMA HOUSE MISCELLANEOUS COST BREAKDOWN FORM.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
PHC Housing Construction -Saipan Federal contract opportunity
Solicitation number
70FBR922R00000004
Issued by
Federal Emergency Management Agency Region 9

About this file

This document contains a cost breakdown form and contract breakdown for the construction of FEMA housing in Saipan, CNMI. The cost breakdown form lists miscellaneous costs for a project to construct one new FEMA house, including items such as design civil works, special inspection, quality assurance testing, surveying, permitting, material and labor cost increases due to COVID-19 and fuel prices. The contract breakdown specifies the contract amount for the construction of two new FEMA houses under contract number 70FBR922R0000004, awarding fixed prices for construction of homes, key personnel, and profit, as well as general and administrative costs, equipment, and miscellaneous costs itemized in the cost breakdown form. The related federal contract opportunity posting is seeking to procure the construction of one to six housing projects in Saipan through a best value trade off solicitation. Interested small businesses located in CNMI must be licensed for residential construction and submit proposals by August 8, 2022 for consideration by the Federal Emergency Management Agency Region 9.

View the file

Other files for this federal contract opportunity

Other files attached to PHC Housing Construction -Saipan, newest first.
File Type Posted
FEMA NEW HOUSE PRICE TABULATION FOR ONE - 3 BEDROOMS ( 70FBR922R0000004 ) FORM.xlsx XLSX spreadsheet
FEMA HOUSE MISCELLANEOUS COST BREAKDOWN FORM.xlsx XLSX spreadsheet
2.4.1 Sol_70FBR922R00000004_Amd_0002.pdf PDF
Sol_70FBR922R00000004_Amd_0001.pdf PDF
CNMI-412600243_New_Construction_Scope_Approved.pdf PDF
A01 - 08(b) - PHC_CIP_2BR_Delta E.pdf PDF
A01 - 01. Waiver of Sprinkler Installation for Residential Structures (1).pdf PDF
A01 - 09 - ADARAMP_NC_Scope.pdf PDF
Batch 11 Bid Sheet.xlsx XLSX spreadsheet
2.2.1 70FBR922R00000004.pdf PDF
A01 - 08(c) - PHC_CIP_3BR_Delta E.pdf PDF
A01 - 08(d) - PHC_CIP_Concrete Specs.pdf PDF
A01 - 03. BECQ Property Clearance Permit and Individual Wastewater Disposal System - Legal Ownership Waiver (1).pdf PDF
A01 - 08(a) - PHC_CIP_1BR_Delta E.pdf PDF
A01 - 02. Engineer or Architect Stamp Waiver (1).pdf PDF
A01 - 07. DPW Clarification on IBC Requirements Uninhabitable Outdoor Spaces 2019-09-09 (1).pdf PDF
A01 - 04. Zoning - Legal Ownership Waiver (1).pdf PDF
A01 - 08(d1) - transmittal FEMA 20191213.pdf PDF
A01 - 06. DPW Clarification on IBC Requirements Uninhabitable Outdoor Spaces 2019-09-09 (1)_Redacted.pdf PDF
A01 - 05. Clarification on Design Drawings.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Miscellaneous

PROJECT: CONSTRUCTION OF FEMA 1 NEW HOUSES PROJECT, SAIPAN, CNMI
SUBJECT: MISCEALLANEOUS COST BREAKDOWN

Item no. Description Qty. Unit Unit Cost Amount Remarks

ADESIGN CIVIL WORKS1.00lot$ - 0$ - 0
BSPECIAL INSPECTOR1.00lot$ - 0$ - 0
CQUALITY ASSURANCE TESTING1.00lot$ - 0$ - 0
DSURVEYING & AS-BUILT WORKS1.00lot$ - 0$ - 0
EPERMITING1.00lot$ - 0$ - 0
FMATERIALS INCREASE DUE TO COVID -19 & FUEL INCREASE1.00lot$ - 0$ - 0
GLABOR INCREASE DUE TO CW-1 RATE INCREASE1.00lot$ - 0$ - 0
HSITE CONDITION ( ARCHEOLOGICAL )1.00lot$ - 0$ - 0
ISHIPPING1.00lot$ - 0$ - 0
J5% BGRT1.00lot$ - 0$ - 0

Total Cost $ - 0

Contract Breakdown

PROJECT: CONSTRUCTION OF FEMA 2 NEW HOUSES PROJECT, SAIPAN, CNMI
CONTRACT NO. 70FBR922R0000004
SUBJECT: FEMA CONTRACT AMOUNT BREAKDOWN
CLINDESCRIPTIONQTYUNITRATEAMOUNT
CLIN 0001ACONSTRUCTION OF 1 HOMES1LS$ - 0$ - 0
CLIN 0001BKEY PERSONNEL FOR 1 HOMES1LS$ - 0$ - 0
CLIN 0001CPROFIT FOR THE CONSTRUCTION OF 1 HOMES1LS$ - 0$ - 0
CLIN 0002MISCELLENAEOUS
AG&A1LS$ - 0$ - 0
BEQUIPMENT1LS$ - 0$ - 0
CMISCELLENAEOUS (from GPPC's Cost Breakdown worksheet)
DESIGN CIVIL WORKS$ - 0
SPECIAL INSPECTOR$ - 0
QUALITY ASSURANCE TESTING$ - 0
SURVEYING & AS-BUILT WORKS$ - 0
PERMITING$ - 0
MATERIALS INCREASE DUE TO COVID -19 & FUEL INCREASE$ - 0
LABOR INCREASE DUE TO CW-1 RATE INCREASE$ - 0
SITE CONDITION ( ARCHEOLOGICAL )$ - 0
SHIPPING$ - 0
5% BGRT$ - 0
SUB-TOTAL C$ - 01LS$ - 0$ - 0

TOTAL CONTRACT AMOUNT $ - 0