A006 ECP LFI Strips.pdf

PDF 90 KB Posted

Attached to
Manufacturing of LFI Strips
Solicitation number
W911SR-23-R-0005
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) outlining reporting requirements for engineering change proposals related to a manufacturing contract for Liquid Flow Indicator (LFI) strips. The CDRL requires submission of ECPs as required to the Army Contracting Command at Aberdeen Proving Ground for approval. ECPs must be submitted via email in Microsoft Office or CAD formats to two government points of contact. The CDRL does not specify pricing or delivery schedules but rather establishes the process for proposing and approving engineering changes to government-owned technical documentation during contract performance for the manufacturing of LFI strips.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

A_CONTRACT_LINE_ITEM_NO: TBD
B_EXHIBIT:
TDP:
TM:
OTHER: x
DSYSTEMITEM:
E_CONTRACTPR_NO: TBD
FCONTRACTOR: TBD
1_DATA_ITEM_NO: A006
2_TITLE_OF_DATA_ITEM: Engineering Change Proposal (ECP)
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: DI-CMAN-80639C
5_CONTRACT_REFERENCE:
6_REQUIRING_OFFICE: JPL CBRND EB-DBPAO
7_DID_250_REQ:
8_APP_CODE: A
DIST_STATEMENT:
10_FREQUENCY: ASREQ
11_AS_OF_DATE:
12_DATE_OF_FIRST_SUBMISSI: see blk 16
13_DATE_OF_SUBSEQUENT_SUB:
addressee1: See address in
draft1:
reg1:
repro1:
addressee2: blk 16
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 0
16_REMARKS: Blk 4. DIDs can be obtained from https://quicksearch.dla.mil/qsSearch.aspx.

Blk 8. Government will respond with comments or approval 15 days post receipt.

Blk 10. and Blk 12. Submit for permanent changes to existing Government owned technical documentation such as performance specifications and engineering drawings.

Blk 14. and Blk 15. Submit via e-mail (in Microsoft Office format for text and documentation and Mechanical Desktop or Solidworks for CAD drawings) to:

susan.e.ruzicka2.civ@army.mil and bryan.d.necciai.civ@army.mil

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE: 1/6/2023
1_APPROVED_BY:
J_DATE:
Page:
of_pages:
Reset:
reg38t: 0
2023-01-06T13:51:14-0500
REDMOND.BRADY.WAYNE.1280051590

File details come from the government source that posted it. Updated .