About this file

This Contract Data Requirements List (CDRL) outlines deliverables required for the System Requirements Review (SRR) associated with the B-52 Wheel and Brake System Improvement Program (WBSI). Key deliverables include SRR documentation and briefing materials delivered in Word and PowerPoint format addressing the system description, requirements, and preparation of the Airworthiness Specification. Draft SRR documentation must be provided no later than 15 business days before program kickoff, with corrections delivered within 30 days of government comments. The final SRR and briefing materials will be delivered to offices within the Defense Logistics Agency and 417th Supply Chain Management Squadron. Pricing is required for the CDRL deliverables and shall be categorized into one of four groups based on the level of effort required.

This federal contract opportunity posting provides details for solicitation number SPRHA1-20-R-0005 regarding the B-52 WBSI program. Interested offerors should review the attached Request for Proposal and associated documents for requirements. The Defense Logistics Agency Aviation will serve as the contracting agency. The opportunity posting does not include additional salient information beyond referring offerors to the solicitation documents.

View the file

Other files for this federal contract opportunity

Other files attached to B-52 WBSI, newest first.
File Type Posted
SPRHA120R0005_______0004.pdf PDF
SPRHA120R0005_______0002.pdf PDF
B001 CDRL - TDP Product - Wheel (v2).pdf PDF
A015 LMI ATTACH 3 - Data Elements Sheet (v2).pdf PDF
Subcont Consent.pdf PDF
B001 MIL-STD31000 - TDP - Wheel.pdf PDF
A015 CDRL - LMI.pdf PDF
A015 LMI ATTACH 3 - Data Elements Sheet.pdf PDF
C001 CDRL - Computer Generated Eng Products - Brake.pdf PDF
B001 CDRL - Computer Generated Eng Products - Wheel.pdf PDF
A015 LMI ATTACH 1 - Performance Schedule.pdf PDF
A016 DID - VACR.pdf PDF
B001 DID - Computer Software Product End Items.pdf PDF
A017 CDRL - Supplier Status Reports.pdf PDF
PPIS Sample.pdf PDF
C001 DID - TDP - Product Drawings.pdf PDF
A015 DID - LMI.pdf PDF
C001 DID - Computer Software Product End Items.pdf PDF
A016 CDRL - VACR.pdf PDF
Past Performance Questionnaire.pdf PDF
A014 DID - TMCR.pdf PDF
A018 DID - Hardware Inspection Reports.pdf PDF
A014 CDRL - TMCR.pdf PDF
A017 DID - Contractor Progress Report.pdf PDF
A015 LMI ATTACH 2 - Summary Worksheet.pdf PDF
Client Ltr.pdf PDF
B001 CDRL - Product Drawings Models - Wheel.pdf PDF
A009 CDRL - TRR.pdf PDF
A012 MIL-STD-31000 - TDP Special Inspection Equipment.pdf PDF
A012 CDRL - TDP - SIE.pdf PDF
A013 DID - TDP - Tooling.pdf PDF
SPRHA1-20-R-0005.pdf PDF
B-52 WBSI - TRD-SOW - 20200303 - Rev-A.pdf PDF
A013 MIL-STD-31000 - TDP Repair Tooling.pdf PDF
A002 DID - SRR.pdf PDF
A004 CDRL - CMP.pdf PDF
A006 CDRL - PDR.pdf PDF
A010 CDRL - QTR.pdf PDF
A006 DID - PDR.pdf PDF
A001 DID - IMS.pdf PDF
A013 CDRL - TDP - Tooling.pdf PDF
A001 CDRL - IMS.pdf PDF
A005 DID - QTP.pdf PDF
A011 DID - TDP - Commercial Drawings.pdf PDF
A011 CDRL - TDP - Commercial Drawings.pdf PDF
A011 MIL-STD-31000 - TDP Commercial Drawing Models.pdf PDF
A007 DID - CDR.pdf PDF
A012 DID - TDP - SIE.pdf PDF
A008 CDRL - CDR Analysis Reports.pdf PDF
A003 DID - Conference Agenda.pdf PDF
Show all 50

B-52 WBSI has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages twalker Highlight twalker Highlight

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A002
title: SYSTEM REQUIREMENTS REVIEW (SRR)
sub: B-52 Wheel and Brake System Improvement Program (WBSI)
auth: DI-SESS-81766
ref: IAW TRD PARAGRAPH 2.2
req_ofc: 417 SCMS/GUEA
dd250: LT
appcode: A
dist: B
freq: SEE BLK 16
asof: SEE BLK 16
firstsub: SEE BLK 16
subsub: SEE BLK 16
addressee1: Landing Gear Office
draft1:
reg1: 1
repro1:
addressee2: 417 SCMS/GUEA
draft2:
reg2:
repro2:
addressee3: 6040 Gum Lane
draft3:
reg3:
repro3:
addressee4: Hill AFB, UT
draft4:
reg4:
repro4:
addressee5: 84056-5811
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11: DLA-AUB
draft11:
reg11:
repro11:
addressee12: 6050 Gum Lane
draft12:
reg12:
repro12:
addressee13: Bldg 1225
draft13:
reg13:
repro13:
addressee14: Hill AFB, UT 84056
draft14:
reg14:
repro14:
addressee15: 84056-5820
draft15:
reg15:
repro15:
addressee16: (SEE BLOCK 16)
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18: WAWF
draft18:
reg18:
repro18:
addressee19: (SEE BLOCK 16)
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 1
total_repro: 0
remarks: Block 4:

DI-SESS-81766 shall be the basis from which design and airworthiness milestones are satisfied. Landing Gear Systems redesigns shall comply with MIL-HDBK-516 and AFMCI63-1201, each of which shall be tailored for landing gear systems redesign, and 417 SCMS/GUEA Systems Engineering Plan (SEP) and GUEA Business Practice 63-03 Decision Analysis in their entirety. Changes to DI-SESS-81766, as follows:

Use/relationship:

Paragraph a: Delete "of the aircraft design" and replace with "of the Landing Gear Systems design"

Requirements:

2. Format: Delete and replace with:

SRR documentation, including briefing materials, may be in Contractor's Format, but all drafts and the Final SRR will be delivered in fully-modifiable Word format (or PowerPoint for the briefing), including all text, tables, charts, and calculations. All draft revisions supplied in Word format will be provided with tracked-changes from all previous draft revisions until Final acceptance by the Government. Final SRR will also be delivered in PDF format. PDF of the Final SRR will be the only copy with digital signatures, if applicable.

3. Content: After "preparation of the Airworthiness Specification." insert "Each discrete Airworthiness Specification deliverable outlines a subset of the overall Airworthiness Requirement and must comply with the process outlined in 417 SCMS/GUEA SEP. The SRR subset of the Airworthiness Specification shall include:"

3.2 System Description: Delete and replace with:

The SRR shall include the information outlined in 417 SCMS/GUEA SEP, Section 2.3.1.1.10 Technical Management & Controls, for the System Requirements Review.

3.3, 3.4, and 3.5: Delete

Blocks 10 through 13:

Draft SRR documentation must be provided no later than (NLT) 15 business days before program Kickoff meeting occurs or the date outlined in the Contract Integrated Master Schedule (IMS) for program Kickoff, whichever occurs first. Contract SOO/SOW may outline additional revisions or drafts. SRR corrections to be delivered NLT 30 days after receipt of Government comments.

group:
total_price:
prep_name: Michael Schow, 417 SCMS/GUEA
line_item: 0001AB
exhibit: A
xtdp: Off
xtm: Off
othercat: X
system: B-52 Wheel & Brake System
ctr_no:
contr:
remarksb: Government comments will be provided NLT 30 days after each submittal. If Government review is delayed, contract milestones may be postponed until the review is completed.

Contractor must satisfy Government concerns/comments with no more than 2 revisions (i.e. 1st draft, 2nd draft, Final revision accepted by Government), as outlined in PWS Service Summary, Table 2. SRR deliverables requiring more than 2 revisions may affect the Contractor's CPARS Quality rating.

Block 14:

Deliver digital copies via electronic submission to applicable addresses listed.

SRR Deliverables include:

• Briefing materials and supporting data

• SRR documentation

Page2: 2
Reset:
2020-03-16T09:54:18-0600
SCHOW.MICHAEL.N.1252332606
prep_date: 20200316
app_by: Ron Montgomery, 417 SCMS/GUEA
2020-03-16T12:19:47-0600
MONTGOMERY.RONALD.L.1243849620
app_date: 20200316
Page: 1
of_pages: 3
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .