This document is an amendment to a solicitation for replacing the HVAC system in Building 2 at a Veterans Affairs medical center. The amendment provides additional instructions to offerors, including that no further questions will be accepted and no extensions granted, with proposals due by August 21, 2020 at 3:30 PM Central Time. A brand name justification is also attached. Offerors are responsible for obtaining all amendments and following submittal instructions. The Department of Veterans Affairs Veterans Health Administration is the contracting agency for replacing the HVAC system located at 2495 Shreveport Highway in Pineville, Louisiana under project number 502-16-10417-108.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0002 Att 1 M 601 REV 2.pdf | ||
| A0002 Att 6 JA.pdf | ||
| 36C25620R0079 0002.docx | DOCX document | |
| A0002 Att 4 RFI Register.docx | DOCX document | |
| A0002 Att 2 MH104 REV 2.pdf | ||
| A0002 Att 5 Sign in Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
17'-10" 12'-9" 9'-0" 12'-9" 18'-6" 18'-6" 18'-3" 10'-6" 1'-2" 14'-9" 10'-8" 18'-4" 18'-3" 18'-3" 12'-7" 9'-3" 12'-8" 17'-9"
I RQP0NMLKJI.1HGFEDCBA
3.7
7.5
3.8
6.2
4.5
2.8
3.7
7.5
3.8
6.2
4.5
2.8
2-CP-2
(EX) HX 2-1
(EX) HWP 2-7
(EX) HWP 2-8
(EX) HX 2-2
2-ST-2 2-ST-1
3" PCR
P C
R
3" PCR
4" PCR
2" LPR
EX. 2 1/2" SVR
EX. 3" HPR
2" LPR
2" LPR
2" PCR
2" PCR
2" PCR
2" PCR
2-ST-42-ST-3
2-ST-5
2 1/2" MPR
4" PCR
4" PCR
2-CP-1
(EX) CWP 2-5
(EX) CWP 2-2
(EX) CWP 2-1
(EX) CHP 2-6
(EX) CHP 2-4
(EX) CHP 2-3
6" PCR
4" PCR
4" PCR
6" CHS
6" CHS
6" CHS
2-CWP-2
2-CWP-1
(EX) 2-CWP-4
(EX) 2-CWP-3
4" CHS
4" CHS
4" CHS
(EX) ET-1
(EX) ET-2
(EX) ET-3
(EX) ET-4
(EX) HWP2-10
(EX) HWP 2-9
CP-EX
EX. 4" LPS
3" HPS
6" HPS
1" HPS
4'' CHS/R UP
3 1/2'' CHS/R UP
EX. 4'' HWS/R UP
EX. 4'' CHS/R UP
EX. 3'' HWS/R UP
EX. 2 1/2'' CHS/R UP
EX. 2 1/2" SVR
EX. 4" HPR
EX. 8" CHR
EX. 8" CHS
EX. 6" HPS
EX. 2 1/2" SVR
EX. 4" HPR
EX. 8" CHR
EX. 6" HPS
EX. 8" CHS
E X
C H
R
E X
C H
S
E X
H P
S
E X
H W
S
E X
H W
R
EX. 4" HPS
E X
H P
S
6" CHS
6" CHS07 08
(TYP) (TYP)
EX. 4" HPS
EXIST. STEAM
SUPPLY TO
CONDENSATE
PUMP PACKAGE
P C
R
P H
A S
E
S
E E
S H
E E
T G
C
P H
A S
E
S
E E
S H
E E
T G
C
6" CHS
2-AS-1
6"
6"
C H
S
2-CF-1
3/4"
6" BUTTERFLY
VALVE W/
BLIND
FLANGE
2-AS-2
6" BUTTERFLY
VALVE W/
BLIND
FLANGE
6" CHS 6"
6" CHS
3/4"
2-CF-2
EX. 6" V
8" V
6" V
6" V
6" V 6" V
6" V
6" V
3/4"
MAIN STEAM LINE TO BOILER PLANT.
E X
D E
X
D
EX. 2" D
E X
D
EX. 2" D
1 1/4" LPR
2" HPS
4" HPR
EX. 4" HPR
EX. 2 1/2" MPR
2" HPS
1 1/4" LPR
1" HPR
1 1/4" LPR
2" HPS
1" HPR
1" HPR
1" HPR
1" HPR
1" HPR
1" HPR
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
LINE TYPE LEGEND
NEW PIPING
EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE DEMOLISHED
NEW RECTANGULAR FRP BASIN
CONDENSATE PIPE
PUMPED CONDENSATE
DISCHARGE
4" CONCRETE BASE
PRESSURE POWERED STEAM
CONDENSATE PUMP PACKAGE.
UNIT LENGTH IS APPROXIMATELY
78 INCHES FOR TRIPLEX UNIT AND
100 INCHES FOR QUADRIPLEX UNIT.
3 FEET MIN FOR MAINTENANCE
I N
C H
E S
M A
X
IM
U M
F
E E
T D
E E
P
38 INCHES UNIT WIDTH
BASIS OF BASIN DESIGN
IS ORENCO COMPOSITES
(OR EQUAL).
DIRT CRAWLSPACE
FLOOR (FIELD VERIFY
CRAWLSPACE FLOOR
COMPOSITION).
01 PROVIDE NEW STEAM PUMP TRAP, SUPPORTS, AND
INSULATION COMPLETE.
02 PROVIDE NEW CONDENSATE PUMP, SUPPORTS, AND
INSULATION COMPLETE. DIG OUT AREA IN BASEMENT
"FLOOR" (CONSISTING OF DIRT AND CONCRETE).
REFER TO DETAIL 2/MP101.
03 PROVIDE NEW CHILLED WATER PUMP, SUPPORTS,
AND INSULATION COMPLETE.
04 PROVIDE CHILLED WATER PIPING, HANGERS, AND
INSULATION COMPLETE.
05 PROVIDE SHUTOFF VALVE. PREPARE FOR
CONNECTION TO CHILLED WATER DISTRIBUTION
SYSTEM.
06 PROVIDE PUMPED CONDENSATE PIPING, HANGERS,
AND INSULATION COMPLETE.
07 NEW SIEMENS DDC PROGRAMMABLE CONTROLLER
FOR 2-CWP-1 AND 2-CWP-2. FULLY INTEGRATE WITH
CAMPUS-WIDE SIEMENS DDC SYSTEM.
08 NEW SIEMENS DDC PROGRAMMABLE CONTROLLER
FOR 2-CWP-3 AND 2-CWP-4. FULLY INTEGRATE WITH
CAMPUS-WIDE SIEMENS DDC SYSTEM.
09 VFD FOR PUMP, INSTALLED ON UNISTRUT (PROVIDED
BY DIVISION 23, INSTALLED BY DIVISION 26).
10 EXISTING PRESSURE REDUCING STATION. INSTALL
NEW GATE VALVES, TRAPS AND DRIP LEG AS
INDICATED BY DETAIL 1 ON SHEET M-502.
11 INSTALL NEW BUTTERFLY VALVE IN EXISTING
CHILLED WATER PIPING.
12 INSTALL NEW GATE VALVE IN EXISTING STEAM AND
STEAM CONDENSATE PIPING. AFTER SHUTOFF
VALVES ON STEAM SUPPLY PIPES, PROVIDE A STEAM
CONDENSATE TRAP.
13 CONNECT TO CONDENSATE INLET OF CONDENSATE
RECEIVER IN EXISTING CONDENSATE PUMP
PACKAGE.
14 CONNECT TO EXISTING CONDENSATE PUMP
PACKAGE DISCHARGE CONNECTION.
15 CONNECT TO EXSITING STEAM CONDENSATE LINE
PENETRATING OUTER WALL.
16 ROUTE STEAM RECIEVER VENT PIPING TO EXISTING
12" STEAM VENT PIPE GOING TO ROOF.
17 GLOBE VALVE.
18 FILL (PRESSURE REGULATING) VALVE.
19 BALL VALVE (TYPICAL 2).
20 3/4" BACKFLOW PREVENTER FOR CONNECTION TO
DOMESTIC WATER. BACKFLOW PREVENTER SHALL
CONFORM TO NSF 61 AND NSF 372.
21 EXTEND TO CONNECT TO NEAREST 3/4" OR LARGER
DOMESTIC COLD WATER LINE, CONFIRM LOCATION IN
FIELD. ALL MATERIALS FROM DOMESTIC COLD
WATER LINE TO BACKFLOW PREVENTER SHALL BE
LEAD FREE.
22 AT EACH PAIR OF HEAT EXCHANGERS AND HOT
WATER PUMPS, REMOVE ALL GATE AND GLOBE
VALVES ASSOCIATED WITH STEAM, STEAM
CONDENSATE AND HOT WATER. REPLACE WITH THE
FOLLOWING: (9) 2" GATE VALVES, (3) 2" GLOBE
VALVES, (11) 3" GATE VALVES FOR STEAM AND STEAM
CONDENSATE; AND (10) 4" BUTTERFLY VALVES FOR
HOT WATER. CONFIRM QUANTITIES, LOCATIONS AND
SIZES OF EXISTING VALVES IN FIELD.
23 HIGH PRESSURE STEAM AND LOW PRESSURE
CONDENSATE UP TO ROOF. SEE MH105 FOR
CONTINUATION.
Scale: 1/8" = 1'-0"
BASEMENT PHASE 1 PIPING PLAN 0 4 8 16
N O
R
TH
TRUE
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
N
KEY PLAN
SCALE: NO SCALE
BUILDING 2
TRUE
SCOPE OF WORK
FULLY SPRINKLERED
100% CONSTRUCTION
DOCUMENTS
S S S S
/3
/2
:1
:5
A
M
MP101
BASEMENT MECHANICAL PIPING PLAN
PHASE 1
12 21
TAMEKA J. TAYLOR
SWR
REPLACE HVAC SYSTEM
2495 SHREVEPORT HWY. PINEVILLE,
LA 71360
1-9-2020
502-16-10417-108
PLH
A CHILLED WATER SYSTEM TO BE PROVIDED
IN PHASE 1 SHALL BE INTEGRATED INTO
THE CHILLED WATER LOOP IN PHASE 2.
PREPARE CONNECTIONS IN PHASE 1 FOR
SWITCHOVER WHEN PHASE 2 BASEMENT
DEMOLITON TAKES PLACE.
B BASEMENT PHASE 1 AND PHASE 2 DOES
NOT RELATE TO THE GENERAL PHASING
PLAN. THE PHASES SHOWN ON MD101,
MD102, MP101, AND MP102 ARE TO PHASE
THE WORK OF THE BASEMENT
INDEPENDENTLY.
C COORDINATE SHUTDOWN OF CHILLED
WATER SYSTEM WITH ARCHITECTURAL
PHASES.
D REMOVE ALL INSULATION ON EXISTING
PIPING TO REMAIN IN BASEMENT AND
REPLACE WITH NEW INSULATION. THIS
INCLUDES CHILLED WATER, HEATING HOT
WATER, STEAM AND STEAM CONDENSATE
PIPING. FIELD VERIFY SIZES OF EXISTING
PIPING.
E DRAIN, REFILL AND PRESSURE TEST
CHILLED WATER PIPING SYSTEM.
STEAM RELIEF
VENT (TYP.)
2 PRE - BID RFI RESPONSES 7/31/2020
Scale: N.T.S.
NEW TRENCH AND BASIN FOR CONDENSATE PUMP PACKAGE DETAIL
DocuSign Envelope ID: 50215E3C-4A46-4E24-BEB4-7E1B422EEEB3
7/31/2020
| Sheets |
| MP101 - BASEMENT MECHANICAL PIPING PLAN PHASE 1 |
| 2020-07-31T08:51:46-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .