About this file
This document is a geotechnical investigation report prepared by PEA Group for Southgate Community Schools, specifically for the Allen Elementary School Parking Lot Improvements project located at 16500 McCann Avenue in Southgate, Wayne County, Michigan. The investigation involved coring the existing asphalt parking lot at five locations (C-1 through C-5) to determine pavement section thicknesses, which ranged between 2.5 to 5 inches, and conducting hand auger and Dynamic Cone Penetrometer (DCP) testing to evaluate subsurface conditions. The study was performed on May 3, 2025, with the goal of supporting the district's plan to mill and overlay the existing asphalt parking lots.
The subsurface investigation revealed a consistent stratigraphy across the five core locations, with approximately 8-10 inches of crushed limestone aggregate base underlain by brown and gray clay. No groundwater was encountered during testing. The DCP tests conducted at locations C-1, C-3, and C-5 estimated a California Bearing Ratio (CBR) value of 3 for the subgrade, which provides insight into the strength and load-bearing capacity of the existing ground. The report provides a detailed table summarizing the depth and material composition at each core location, which will be valuable for the upcoming parking lot improvement project planned for the summer of 2025.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 2, 2025 Project No.: 23-0981.16
Mr. Jason Hardy Southgate Community Schools 13940 Leroy Southgate, MI 48195
RE: Geotechnical Investigation Southgate Community Schools Allen Elementary School Parking Lot Improvements 16500 McCann Avenue
City of Southgate, Wayne County, MI
Dear Mr. Hardy:
It is our understanding that the Southgate Community School District would like to make improvements to the parking lots at Allen Elementary School. The district is interested in having the existing asphalt parking lots milled and overlayed. To aid in this process, PEA Group has performed the following services:
• Core the asphalt pavement sections at five (5) locations (C-1 through C-5) across the parking lot to determine the thicknesses of the asphaltic concrete sections.
• Hand auger at the coring locations to approximate depths ranging between 26 and 32 inches below the base of the asphaltic concrete to determine the type and existing condition of the base and subgrade.
• Dynamic Cone Penetrometer testing at selected coring locations to evaluate the strength of the subgrade and estimating the CBR value of the subgrade.
PEA Group cored the asphalt pavement sections on 3 May 2025. The coring locations are shown in Figure 1 attached. The coring was performed with a 4-inch diameter diamond tipped pavement-coring bit driven by an electrical drill. The approximate thickness of the asphaltic concrete sections encountered at the coring locations ranged between 2.5 to 5 inches.
Pavement base and subgrade material were sampled with a 3.25-inch diameter bucket type hand auger.
The subgrade conditions encountered at the coring locations below the asphaltic concrete consisted of crushed limestone (aggregate base) and underlain by brown and gray clay. Water was not encountered at any locations. The approximate thickness of the aggregate base ranged between 8 and 10 inches.
The approximate thickness of asphaltic concrete sections and the condition of the gravel base and subgrade at each coring locations are summarized in Table 1 “Summary of Subsurface Conditions Encountered”.
23-0981.16 June 2, 2025 Allen Elementary School Parking Lot Improvement Page 2
Dynamic Cone Penetrometer was used to determine the strength of the subgrade strength at three (3) coring locations, C-1, C-3 and C-5. Based on the tests, the CBR value of the subgrade is estimated to be 3.
The scope of the present investigation was limited to evaluation of the thickness of the pavement materials, determining the existing subgrade conditions, and estimating the CBR of the existing subgrade. If you have any questions regarding this report, or if we may be of further assistance to you in any respect, please feel free to contact us. We appreciate the opportunity to have been of service to you.
Sincerely, PEA Group
Indranil (Neel) Deysarkar, PE D. Jack Sattelmeier, PE Project Engineer Director of Geotechnical Engineering
Attachments:
Fig 1 – Coring Locations Table 1 – Summary of Subsurface Conditions Encountered
Allen Elementary School Parking Lot Improvement Page 3
Figure 1 – Coring Locations
C-2
C-3
C-4 C-1
C-5
Allen Elementary School Parking Lot Improvement Page 4
Table 1 – Summary of Subsurface Conditions Encountered
CORE # DEPTH
(Inches) DESCRIPTION REMARKS
C-1
0 – 2.5
2.5 – 12.5
12.5 - 31.5
Asphalt
Aggregate Base: Crushed Limestone
Brown/Gray Clay
DCP test conducted at this location
C-2
0 – 4.5
4.5 – 12.5
12.5 - 32.5
Crushed Limestone
C-3
0 – 5
5 – 15
15 - 30
Brow/Gray Clay
DCP test conducted at this
C-4
0 – 4
4 – 14
14 - 26
C-5
0 – 4.5
4.5 – 12.5
12.5 - 32.5
Brow/Gray Clay
DCP conducted at this