Multiple Aw ard Task Order Contract (MATOC) for Design Build (DB) and Design-Bid-Build (DBB) Construction Services for Kw ajalein Atoll, Republic of the Marshall Islands, U.S. Army Corps of Engineers (USACE), Honolulu Engineer District (POH)

The North American Industry Classif ication System (NAICS) code for this acquisition is 236220, w ith a size standard of $39,500,000.

This requirement is full and open unrestricted.

Offers must submit a complete Phase 1 Proposal to considered for Phase 2.

Phase 1 does not involve pricing submission.

* See individual Task Orders *

TRACY N TENHOLDER (808) 835-4382

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

22-Dec-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________15 Dec 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

BLDG 230 OTAKE ST.

FORT SHAFTER HI 96858

W9128A

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W9128A22R0002 138

08 Feb 2022

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W9128A22R0002

Section 00 01 10 - Table of Contents

MAIN TABLE OF CONTENTS

MAIN TABLE OF CONTENTS

Request for Proposal (RFP) No. W9128A-22-R-0002, $200M Multiple Award Task Order Contract (MATOC) for Design-Build (DB) and Design-Bid-Build (DBB) Construction Services for Kwajalein Atoll, Republic of the Marshall Islands

Section 00 10 00 SF 1442 Section 00 21 16 Instructions to Proposers – Phase 1 Submission and Evaluation Factors Section 00 22 16 Supplemental Instructions to Proposers – Phase 2 Submission and Evaluation

Phase 2 Seed Project: Request for Proposal Statement of Work, Repair FN 808 Vehicle Maintenance Facility U.S. Army Garrison, Kwajalein Atoll

Section 00 10 00 Proposal Schedule for the Seed Project Section 00 45 00 Representations and Certifications Section 00 70 00 Conditions of the Contract Section 00 72 00 General Conditions

Attachment 1, Financial Policy and Rate Manual/USAG-KA Catalog of Services Attachment 2, RMI Alert MMR Vaccination Required for Entry Attachment 3, COVID19 USAG-KA Quarantine Expectation Package

Section 00 73 00 Supplementary Conditions Division 01 Technical General Requirements

Section 00 10 00 – Solicitation

MATOC PROPOSAL SCHEDULE

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 200,000,000 Job

KWAJALEIN MATOC (5 YEARS BASE PERIOD)

FFP

The duration of this MATOC will be a maximum of five (5) years – a base ordering period of five (5) years. The MATOC will not exceed a cumulative total of $200,000,000.00 for all task orders awarded under this solicitation.

The MATOC will not exceed a cumulative total of $200M shared amongst all awardees.

FOB: Destination

PSC CD: C1AZ

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0002 Job OPTION Option if 52.217-8 is exercised

FFP

PSC CD: C1AZ

MAX

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 5 yrs. ADC 200,000,000 KWAJALEIN AREA OFFICE

CHARLES B. JONES

USAED HONOLULU BLDG 230

FT SHAFTER HI 96858-5440

8053550689

J3L1MJ0

0002 6 mths. ADC 0 (SAME AS PREVIOUS LOCATION)

J3L1MJ0

Section 00 21 16 - Instructions to Proposers

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-6 Brand Name or Equal AUG 1999 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (Jan 2017) -

Alternate I

OCT 1997

52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort

OCT 2009

52.216-27 Single or Multiple Awards OCT 1995 52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation FEB 1999 52.222-56 Certification Regarding Trafficking in Persons Compliance

Plan.

OCT 2020

52.232-13 Notice Of Progress Payments APR 1984 52.236-28 Preparation of Proposals--Construction OCT 1997 52.252-3 Alterations in Solicitation APR 1984 252.209-7002 Disclosure Of Ownership Or Control By A Foreign

Government

JUN 2010

252.215-7010 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data

JUL 2019

CLAUSES INCORPORATED BY FULL TEXT

52.215-5 FACSIMILE PROPOSALS (OCT 1997)

*(To be provided as applicable, in accordance with individual task order(s))

(a) Definition. Facsimile proposal, as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.

(b) Offerors may submit facsimile proposals as responses to this solicitation. Facsimile proposals are subject to the same rules as paper proposals.

(c) The telephone number of receiving facsimile equipment is: (808) 835-4396.

(d) If any portion of a facsimile proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document--

(1) The Contracting Officer immediately shall notify the offeror and permit the offeror to resubmit the proposal;

(2) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the offeror; and

(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.

The Government reserves the right to make award solely on the facsimile proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal.

(End of provision)

52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN COST

OR PRICING DATA (OCT 2010)—ALTERNATE III (OCT 1997)

(a) Exceptions from cost or pricing data. (1) In lieu of submitting cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following subparagraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Commercial item exception. For a commercial item exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include--

(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.

(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.

(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation , access does not extend to cost or profit information or other data relevant solely to the offeror's determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for cost or pricing data. If the offeror is not granted an exception from the requirement to submit cost or pricing data, the following applies:

(1) The offeror shall prepare and submit cost or pricing data and supporting attachments in accordance with Table 15-2 of FAR 15.408.

(c) Submit the cost portion of the proposal via the following electronic media: TBD in Phase 2.

As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm fixed-price construction contract resulting from this solicitation.

52.216-27 SINGLE OR MULTIPLE AWARDS. (OCT 1995)

The Government may elect to award a single delivery order contract or task order contract or to award multiple delivery order contracts or task order contracts for the same or similar supplies or services to two or more sources under this solicitation.

52.217-3 EVALUATION EXCLUSIVE OF OPTIONS (APR 1984)

The Government will evaluate offers for award purposes by including only the price for the basic requirement, i.e., options will not be included in the evaluation for award purposes.

52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD (JUN 1988)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

69.1% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor.

(2) Employer's identification number of the subcontractor.

(3) Estimated dollar amount of the subcontract.

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Kwajalein Atoll, Republic of Marshall Islands

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

DEPARTMENT OF ARMY

Contracting Division (CEPOH-CT) U.S. Army Corp of Engineers, Honolulu District Attn: Contracting Officer Bldg. 252 Fort Shafter, Hawaii 96858-5440

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

*(To be provided as applicable, in accordance with individual task order(s))

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

In Phase 2 of this solicitation, the Government will provide Offerors a pre-proposal teleconference and electronic copy of site photos and information for the seed project in lieu of physical site visit due to current RMI travel restrictions and quarantine requirements.

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

(End of provision)

252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2020)

(a) Definitions.

Basic Assessment, Medium Assessment, and High Assessment have the meaning given in the clause 252.204-7020, NIST SP 800-171 DoD Assessments.

Covered contractor information system has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this solicitation.

(b) Requirement. In order to be considered for award, if the Offeror is required to implement NIST SP 800-171, the Offeror shall have a current assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204-7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order. The Basic, Medium, and High NIST SP 800-171 DoD Assessments are described in the NIST SP 800-171 DoD Assessment Methodology located at https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800- 171.html.

(c) Procedures.

https://www.acquisition.gov/ https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800-171.html https://www.acq.osd.mil/dpap/pdi/cyber/strategically_assessing_contractor_implementation_of_NIST_SP_800-171.html

(1) The Offeror shall verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) for all covered contractor information systems relevant to the offer.

(2) If the Offeror does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the Offeror may conduct and submit a Basic Assessment to webptsmh@navy.mil for posting to SPRS in the format identified in paragraph (d) of this provision.

(d) Summary level scores. Summary level scores for all assessments will be posted 30 days post-assessment in SPRS to provide DoD Components visibility into the summary level scores of strategic assessments.

(1) Basic Assessments. An Offeror may follow the procedures in paragraph (c)(2) of this provision for posting Basic Assessments to SPRS.

(i) The email shall include the following information:

(A) Cybersecurity standard assessed (e.g., NIST SP 800-171 Rev 1).

(B) Organization conducting the assessment (e.g., Contractor self-assessment).

(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--

(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and

(2) A brief description of the system security plan architecture, if more than one plan exists.

(D) Date the assessment was completed.

(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).

(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(ii) If multiple system security plans are addressed in the email described at paragraph (d)(1)(i) of this section, the Offeror shall use the following format for the report:

Brief CAGE codes description of Date of Total Date score of System security plan supported by this the plan assessment score 110 will plan architecture achieved

(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system assessed:

https://www.sprs.csd.disa.mil/ mailto:webptsmh@navy.mil

(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).

(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).

(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.

(iv) A brief description of the system security plan architecture, if more than one system security plan exists.

(v) Date and level of the assessment, i.e., medium or high.

(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).

(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.

(3) Accessibility.

(i) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).

(ii) Authorized representatives of the Offeror for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.

(iii) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this section.

DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).

252.215-7008 ONLY ONE OFFER (JUL 2019)

(a) Cost or pricing data requirements. After initial submission of offers, if the Contracting Officer notifies the Offeror that only one offer was received, the Offeror agrees to--

(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C. 2306a and FAR 15.403-3); and

(2) Except as provided in paragraph (b) of this provision, if the acquisition exceeds the certified cost or pricing data threshold and an exception to the requirement for certified cost or pricing data at FAR 15.403-1(b)(2) through (5) does not apply, certify all cost or pricing data in accordance with paragraph (c) of DFARS provision 252.215-7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data, of this solicitation.

(b) Canadian Commercial Corporation. If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required. If the Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with DFARS 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:

https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf

(1) Profit rate or fee (as applicable).

(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at FAR 15.404-1).

(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S. Contracting Officer that the proposed price is fair and reasonable [U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3(a)(1) with the notification].

(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.

(c) Subcontracts. Unless the Offeror is the Canadian Commercial Corporation, the Offeror shall insert the substance of this provision, including this paragraph (c), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.

252.215-7010 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN

CERTIFIED COST OR PRICING DATA (DEVIATION 2020-O0020) (AUG 2020)

*(To be provided as applicable, in accordance with individual task order(s))

(a) Definitions. As used in this provision—

“Market prices” means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from sources independent of the offerors.

“Non-Government sales” means sales of the supplies or services to non-Governmental entities for purposes other than governmental purposes.

“Relevant sales data” means information provided by an offeror on sales of the same or similar items that can be used to establish price reasonableness taking into consideration the age, volume, and nature of the transactions (including any related discounts, refunds, rebates, offsets, or other adjustments).

“Sufficient non-Government sales” means relevant sales data that reflects market pricing and contains enough information to make adjustments covered by FAR 15.404-1(b)(2)(ii)(B).

“Uncertified cost data” means the subset of “data other than certified cost or pricing data” (see FAR 2.101) that relates to cost.

(b) Exceptions from certified cost or pricing data.

(1) In lieu of submitting certified cost or pricing data, the Offeror may submit a written request for exception by submitting the information described in paragraphs (b)(1)(i) and (ii) of this provision. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted and whether the price is fair and reasonable.

(i) Exception for price set by law or regulation - Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Commercial item exception. For a commercial item exception, the Offeror shall submit, at a minimum, information that is adequate for evaluating the reasonableness of the price for this acquisition, including prices at which the same item or similar items have been sold in the commercial market. Such information shall include—

(A) For items previously determined to be commercial, the contract number and military department, defense agency, or other DoD component that rendered such determination, and if available, a Government point of contact.

(B) For items priced based on a catalog—

(1) A copy of or identification of the Offeror’s current catalog showing the price for that item; and

(2) If the catalog pricing provided with this proposal is not consistent with all relevant sales data, a detailed description of differences or inconsistencies between or among the relevant sales data, the proposed price, and the catalog price (including any related discounts, refunds, rebates, offsets, or other adjustments).

(C) For items priced based on market pricing, a description of the nature of the commercial market, the methodology used to establish a market price, and all relevant sales data. The description shall be adequate to permit DoD to verify the accuracy of the description.

(D) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item; or

(E) For items provided by nontraditional defense contractors, a statement that the entity is not currently performing and has not performed, for at least the 1-year period preceding the solicitation of sources by DoD for the procurement or transaction, any contract or subcontract for DoD that is subject to full coverage under the cost accounting standards prescribed pursuant to 41 U.S.C. 1502 and the regulations implementing such section.

(2) The Offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and to determine the reasonableness of price.

(c) Requirements for certified cost or pricing data. This acquisition is accomplished under the authority of section 890 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2019 (Pub. L. 115-232), as amended by section 825 of the NDAA for FY 2020 (Pub. L. 116-92). The intent of this pilot program is to test the efficacy of basing price reasonableness determinations primarily on actual costs of performance for prior purchases of the same or similar products for the Department of Defense. If the Offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(1) In lieu of providing complete cost or pricing data, as defined in FAR 2.101, the Offeror shall submit a subset of cost or pricing data and supporting attachments as follows: [Contracting Officer shall list the specific cost or pricing data deemed necessary to establish price reasonableness for this acquisition, and describe the required submission format for each type of data. At a minimum, the Contracting Officer shall identify the specific prior DoD purchases of the same or similar products for which the Offeror is required to submit the actual cost of performance. The Offeror is not required to submit cost or pricing data that is not listed within this provision. If the Contracting Officer finds that additional cost or pricing data are needed in order to determine that the price is fair and reasonable, the Contracting Officer shall issue an amendment to the solicitation, revising this paragraph as needed to require the submission of the additional data.]

(2)(i) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the Offeror shall submit a Certificate of Current Cost or Pricing Data, using the following language:

Certificate of Current Cost or Pricing Data for Acquisitions Accomplished under the Authority of Section 890 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2019, as amended by Section 825 of the NDAA for FY

This is to certify that, to the best of my knowledge and belief, the cost or pricing data required by the provision at 252.215- 7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (DEVIATION 2020-O0020) of the Request for Proposal for this action, and submitted either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer's Representative in support of ________* are accurate, complete, and current as of ________**. This certification includes the cost or pricing data supporting any advance agreements and forward pricing rate agreements between the Offeror and the Government that are part of the proposal.

Firm _____________________________________________

Signature _________________________________________

Name ____________________________________________

Title _____________________________________________

Date of execution***________________________________

* Identify the proposal involved, giving the appropriate identifying number (e.g., RFP No.).

** Insert the day, month, and year when price negotiations were concluded and price agreement was reached or, if applicable, an earlier date agreed upon between the parties that is as close as practicable to the date of agreement on price.

***Insert the day, month, and year of signing, which should be as close as practicable to the date when the price negotiations were concluded, and the contract price was agreed to.

(ii) The certificate does not constitute a representation as to the accuracy of the Offeror’s judgment on the estimate of future costs or projections. It applies to the data upon which the judgment or estimate was based. This distinction between fact and judgment should be clearly understood. With respect to the certified cost or pricing data required by paragraphs (c)(1) or (e) of this provision (as revised by solicitation amendment, if applicable), if the Offeror had information reasonably available at the time of agreement showing that the negotiated price was not based on accurate, complete, and current data, the Offeror’s responsibility is not limited by any lack of personal knowledge of the information on the part of its negotiators.

(iii) The Contracting Officer and Offeror are encouraged to reach a prior agreement on criteria for establishing closing or cutoff dates when appropriate in order to minimize delays associated with proposal updates. Closing or cutoff dates applicable to the certified cost or pricing data required by paragraphs (c)(1) or (e) of this provision should be included as part of the data submitted with the proposal and, before agreement on price, data should be updated by the contractor to the latest closing or cutoff dates for which the data are available. Use of cutoff dates coinciding with reports is acceptable, as certain data may not be reasonably available before normal periodic closing dates (e.g., actual indirect costs). Data within the Offeror’s or a subcontractor’s organization on matters significant to contractor management and to the Government will be treated as reasonably available, if that data was required to be submitted by paragraph (c)(1) or (e) of this provision.

What is significant depends upon the circumstances of each acquisition.

(iv) Possession of a Certificate of Current Cost or Pricing Data is not a substitute for examining and analyzing the Offeror’s proposal.

(v) If certified cost or pricing data are requested by the Government and submitted by the Offeror, but an exception is later found to apply, the data shall not be considered certified cost or pricing data and shall not be certified in accordance with this subsection.

(3) The Offeror is responsible for determining whether a subcontractor qualifies for an exception from the requirement for submission of certified cost or pricing data on the basis of adequate price competition, i.e., two or more responsible offerors, competing independently, submit priced offers that satisfy the Government's expressed requirement in accordance with FAR 15.403-1(c)(1).

(d) Requirements for data other than certified cost or pricing data.

(1) Data other than certified cost or pricing data submitted in accordance with this provision shall include all data necessary to permit a determination that the proposed price is fair and reasonable, to include the requirements in DFARS 215.402(a)(i) and 215.404-1(b).

(2) In cases in which uncertified cost data is required, the information shall be provided in the form in which it is regularly maintained by the Offeror or prospective subcontractor in its business operations.

(3) The Offeror shall provide information described as follows: [Insert description of the data and the format that are required, including access to records necessary to permit an adequate evaluation of the proposed price in accordance with

FAR 15.403-3].

(4) Within 10 days of a written request from the Contracting Officer for additional information to support proposal analysis, the Offeror shall provide either the requested information, or a written explanation for the inability to fully comply.

(5) Subcontract price evaluation.

(i) The Offeror shall obtain from subcontractors the minimum information necessary to support a determination of price reasonableness, as described in FAR part 15 and DFARS part 215.

(ii) No cost information may be required from a prospective subcontractor in any case in which there are sufficient non- Government sales of the same item to establish reasonableness of price.

(iii) If the Offeror relies on relevant sales data for similar items to determine the price is reasonable, the Offeror shall obtain only that technical information necessary—

(A) To support the conclusion that items are technically similar; and

(B) To explain any technical differences that account for variances between the proposed prices and the sales data presented, but excluding paragraph (c), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.

(e) Subcontracts.

(1) For subcontracts above the threshold for submission of certified cost or pricing data in FAR 15.403-4 to which the authority of the Section 890 pilot has been flowed down, in lieu of the requirements in paragraphs (a) and (b) of the clause at 52.215-12, Subcontractor Certified Cost or Pricing Data, of this solicitation, the Offeror shall require the subcontractor to submit a subset of cost or pricing data (actually or by specific identification in writing) as follows:

(i)(A) [Contracting Officer shall add paragraphs as necessary to identify each first-tier subcontract to which the authority of the Section 890 pilot has been flowed down, and the specific certified cost or pricing data required for each subcontract.

Contracting Officer shall list the specific cost or pricing data deemed necessary to determine that the price is fair and reasonable for each subcontract and describe the required submission format for each type of data. The type and extent of data required may differ based on the dollar value of the subcontract proposal, or other appropriate considerations. At a minimum, the Contracting Officer shall identify the specific prior subcontracts awarded in support of the DoD purchases of the same or similar products for which the subcontractor is required to submit the actual cost of performance. The Contracting Officer shall specify whether the authority of the Section 890 pilot is further flowed down to any lower-tier subcontract pertaining to each first-tier subcontract. Where the pilot authority is flowed down to lower-tier subcontracts, the Contracting Officer shall describe the specific certified cost or pricing data that is to be provided by each affected lower-tier subcontractor. The subcontractor and lower tier subcontractors to which the pilot authority is flowed down are not required to submit certified cost or pricing data that is not listed within this provision. If the Contracting Officer finds that additional certified cost or pricing data are needed in order to determine that the price is fair and reasonable, the Contracting Officer shall issue an amendment to the solicitation, revising this paragraph as needed to require the submission of the additional data.]

(ii) In the event a subcontractor denies the Offeror access to the data described in paragraph (e)(1)(i) of this provision, the data may be provided directly to the Contracting Officer.

(iii) If a subcontractor is unable to provide the extent of historical actual cost experience required by paragraph (e)(1)(i), then the Offeror shall require the subcontractor to provide certified cost or pricing data in accordance with paragraph (e)(2) of this clause.

(iv) The Offeror shall require the subcontractor to certify in substantially the form prescribed in paragraph (c)(2) of this provision that, to the best of its knowledge and belief, the data submitted under paragraph (e)(1)(i) of this provision were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract.

(2) For subcontracts above the threshold for submission of certified cost or pricing data in FAR 15.403-4 to which the authority of the Section 890 pilot has not been flowed down, the Offeror shall require the subcontractor to provide certified cost or pricing data in accordance with the clause at 52.215-12, Subcontractor Certified Cost or Pricing Data, of this solicitation and shall require the subcontractor to certify in substantially the form prescribed in FAR 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (a) of the clause at 52.215-12 were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract.

252.215-7012 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)

The Offeror shall submit the cost portion of the proposal via the following electronic media: [Insert media format, e.g., electronic spreadsheet format, electronic mail, etc.]

INSTRUCTIONS TO PROPOSERS

Section 00 21 16

Instructions to Proposers – PHASE 1 of 2

1.0 Overview – Phase 1

2.0 General Proposal Submission Instructions

3.0 Proposal Format and Submittal Requirements

3.1 General Information

3.2 Proposal Characteristics

4.0 Inquiries/Questions

5.0 Joint Ventures (Submissions)

1) A certified copy of their Joint Venture agreement

2) A detailed statement outlining the following in terms of percentages, where appropriate

6.0 Basis for Award

7.0 Source Selection Process

8.0 Combined Technical/Risk Rating Method

9.0 Definitions

10.0 Debriefing Offerors

11.0 Technical Factors to be Evaluated in Phase 1

• Volume 1, Tab B – Factor 1, Past Performance (Confidence Assessment) Submission Requirements Evaluation Criteria

• Volume 1, Tab C – Factor 2, Management Plan Submission Requirements Evaluation Criteria

• Volume 1, Tab D – Factor 3, Bonding Capability Submission Requirements Evaluation Criteria

12.0 Attachments

• Attachment A – Construction Project information Sheet

• Attachment B – Design Project Information Sheet

• Attachment C – NAVFAC/USACE Past Performance Questionnaire

1.0 OVERVIEW

In Phase 1 of the two-phase selection procedure, Offerors will submit certain specified performance capability proposals, demonstrating their capability to successfully execute design-build and design-bid- build construction work under the contract resulting from this solicitation. The Government will evaluate the qualifications and intends to invite a maximum of five most highly qualified Phase 1 offerors who submitted proposals to compete for the base MATOC pool contracts and one construction seed task order contract under Phase 2 Construction Services for Repair Vehicle Maintenance Shop (FN808).

Offerors must submit a complete Phase 1 proposal to be considered for Phase 2.

PHASE 1 DOES NOT INVOLVE A PRICING SUBMISSION.

Prior to Phase 2, an amendment will be issued to only the selected offerors from Phase 1 inviting them to submit a design-build technical approach and price proposals for consideration. The amendment will request additional information needed to complete the submission of Phase 2 proposals. In Phase 2, the Contracting Officer will award a target of three to five multiple-award task-order contracts, as well as the seed task order award, to the offeror (s) whose proposal(s) represent the best value to the Government, considering the price and non-price factors described in Phase 2.

Offerors must submit a complete Phase 2 proposal to be considered for award of a contract. Failure to submit a complete proposal may result in the entire proposal being rejected.

2.0 GENERAL PROPOSAL SUBMISSION INSTRUCTIONS

For Phase 1, all offerors are required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals will be received until the date and time indicated on the Standard Form 1442.

The Offeror's proposal shall be submitted electronically, as described below. The RFP will provide the Government address and receipt date for proposal submittal. The Offeror's proposal shall not contain classified data. The use of hyperlinks in a proposal is prohibited. Elaborate brochures or documentation, detailed artwork, or other embellishments are unnecessary and are not desired. The proposals will be submitted in electronic copies. No models, mockups, or videos will be accepted.

NOTE: The only authorized transmission method for a proposal in response to this solicitation is electronically via SAFE online submission. NO OTHER TRANSMISSION METHOD WILL BE ACCEPTED.

The Offeror's proposal must be received by the Government no later than the date and time specified in the solicitation.

An Offeror shall use the following link for proposal submission: https://safe.apps.mil/

Please send proposals using the link above to Contract Specialist, Ms. Merbby Joyce Nicolas, at MerbbyJoyce.N.Nicolas@usace.army.mil AND to Contracting Officer, Ms. Tracy Tenholder, at Tracy.N.Tenholder@usace.army.mil.

INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS:

In an effort to reduce paperwork and cost, each proposal shall be submitted electronically through the SAFE site.

Submission shall be in Adobe PDF format. There is a limit of five (5) files per upload (total size cannot exceed 2GB).

If the proposal contains a large number of files, recommend that the files be combined or condensed (ZIP files) before uploading to the SAFE site. An Offeror may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

REQUEST FOR DROP-OFF LINK:

An Offeror must email the Contract Specialist Ms. Merbby Joyce Nicolas, at MerbbyJoyce.N.Nicolas@usace.army.mil AND to Contracting Officer, Ms. Tracy Tenholder, at https://safe.apps.mil/ mailto:MerbbyJoyce.N.Nicolas@usace.army.mil mailto:Tracy.N.Tenholder@usace.army.mil mailto:MerbbyJoyce.N.Nicolas@usace.army.mil

Tracy.N.Tenholder@usace.army.mil no later than five (5) working days prior to the proposal due date to request a drop-off link to upload files via the SAFE site. An Offeror that fails to submit an email for request at least five (5) working days before the proposal submission date might not be able to receive a drop-off link in time to upload the submission.

Once the drop-off request is submitted by the Government, you will receive an automated email from noreplyto@mail.mil with “[DoD SAFE]” in the subject line.