This solicitation is for the replacement of the HVAC system at Battery Randolph, located at the U.S. Army Museum at Fort Derussy in Hawaii. The project magnitude is estimated between $5-10 million. This invitation for bid is being solicited as a competitive set-aside for women-owned small businesses. An organized site visit for interested parties will be held within the next two weeks, with attendees required to pre-register by email. The Department of the Army Corps of Engineers Engineering District Honolulu is the agency managing this project.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO. 468335
REPLACE HVAC SYSTEM, BATTERY RANDOLPH
FORT DERUSSY, OAHU, HAWAII
RTA SUBMITTAL
SPECIFICATIONS
PREPARED FOR:
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, HONOLULU DISTRICT
FORT SHAFTER, HAWAII
SUBMITTED BY:
NAGAMINE OKAWA ENGINEERS INC.
1003 BISHOP STREET
PAUAHI TOWER, SUITE 2025
HONOLULU, HI 96813
OCTOBER 15, 2020
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 91 00.15 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 83 13.00 20 LEAD IN CONSTRUCTION
DI VI SI ON 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 24 00 EXTERIOR FINISH SYSTEMS
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 87 00 GLAZING SURFACE FILMS
DI VI SI ON 09 - FI NI SHES
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.20 INTERIOR SIGNAGE
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
PROJECT TABLE OF CONTENTS Page 1
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 32 COMPOSITE FENCES AND GATES
DI VI SI ON 33 - UTI LI TI ES
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 27 PAGES
FORT DERUSSY ARMY MUSEUM
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.9 GSolid Waste Management Permit
1.5.2 GRegulatory Notifications
1.7.4.1 GDirt and Dust Control Plan
1.5.5 GEmployee Training Records
1.5.4 GEnvironmental Manager
Qualifications
SD-06 Test Reports
3.6.1.1.2Laboratory Analysis
3.6.2.1 GSolid Waste Management Report
SD-07 Certificates
1.5.5 GEmployee Training Records
SD-11 Closeout Submittals
3.6.1 GWaste Determination
Documentation
3.6.3.4 GDisposal Documentation for
Hazardous and Regulated Waste
1.5.5 GAssembled Employee Training
Records
1.9 GSolid Waste Management Permit
3.6.2.1 GSolid Waste Management Report
3.6.3.1 GHazardous Waste/Debris
Management
1.5.2 GRegulatory Notifications
3.6.2.1 GSales Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 27 PAGES
01 57 19 3.6.2.1Contractor Certification
01 91 00.15 SD-01 Preconstruction Submittals
1.7 G DOCommissioning Firm
1.7.1 G DOLead Commissioning Specialist
1.7.2 G DOTechnical Commissioning
Specialists
1.7 G DOCommissioning Firm's Contract
SD-05 Design Data
3.1.2 G DODesign Phase Commissioning
Plan
SD-06 Test Reports
3.1.3 G DODesign Review Report
3.2.3 G DODesign Review Report
3.2.2.1 G DOInterim Construction Phase
Commissioning Plan
3.2.2.2 G DOFinal Construction Phase
Commissioning Plan
3.2.2.1.2 G DOTemplate Building Envelope
Inspection Checklists
3.2.5.2 G DOPre-Functional Checklists
1.9Issues Log
3.3 G DOCommissioning Report
SD-07 Certificates
1.10 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 27 PAGES
01 91 00.15 3.2.6 G ROTraining Plan
3.2.6 G ROTraining Attendance Rosters
3.2.7 G DOSystems Manual
3.2.8 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.2.2.1Construction Phase
Commissioning Plan
3.3Final Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
1.6.1Notification of Demolition and
Renovation Form
SD-11 Closeout Submittals
3.2.3Receipts
02 83 13.00 20 SD-01 Preconstruction Submittals
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.2 GLead Compliance Plan
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.8 GLead Waste Management Plan
3.5.2.1 GWritten Evidence
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 27 PAGES
02 83 13.00 20 1.5.2.4 GMedical Examinations
SD-06 Test Reports
1.5.2.3 GSampling Results
1.5.2.3 GOccupational and Environmental
Assessment Data Report
SD-07 Certificates
1.5.1.3 GTesting Laboratory
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 Ghazardous waste manifest
3.5.2.1 Gturn-in documents or weight
tickets
03 30 53 SD-02 Shop Drawings
1.4Installation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Water-Reducing or Retarding
Admixture
2.2.9Curing Materials
2.2.6Joint Sealants - Field Molded
Sealants
2.4.1Chemical Floor Hardener
3.2Conveying and Placing Concrete
2.2.7Formwork
2.3Mix Design Data
2.3Ready-Mix Concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 27 PAGES
03 30 53 2.4.2Curing Compound
2.2.5Mechanical Reinforcing Bar
Connectors
SD-06 Test Reports
2.2.2Aggregates
2.1.3Concrete Mixture Proportions
3.9.3Compressive Strength Testing
3.9.3Slump
3.9.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.2Aggregates
2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
2.4.1Chemical Floor Hardener
2.4.2Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.2.1Cut CMU
3.4.1.1Detail Drawings
SD-03 Product Data
1.5.1Hot Weather Procedures
2.2.2.2.1Cement
2.4.1.1Cementitious Materials
SD-04 Samples
2.2.2.2Concrete Masonry Units (CMU)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 27 PAGES
04 20 00 2.6.2Bar Positioners
SD-05 Design Data
2.1.2Masonry Compressive Strength
3.2.5Bracing Calculations
SD-06 Test Reports
3.6.1.1Field Testing of Grout
SD-07 Certificates
1.3.1Special Masonry Inspector
Qualifications
2.2.2.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.2.2Admixtures for Grout
2.6.2Bar Positioners
SD-08 Manufacturer’s Instructions
2.4.2.2Admixtures for Grout
05 12 00 SD-01 Preconstruction Submittals
1.5.1.1Erection Drawings
SD-02 Shop Drawings
1.5.2Fabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2Tension Control Bolts
SD-06 Test Reports
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 27 PAGES
05 12 00 3.7.2Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Fabrication Plant Quality
Certification
1.3AISC Erector Quality Certification
1.5.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
05 40 00 SD-02 Shop Drawings
1.5.1Framing Components
SD-03 Product Data
2.1Studs, Joists
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
07 24 00 SD-03 Product Data
2.5Accessories
2.2Base Coat
2.3Primer
2.4Finish Coat
1.7Warranty
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 27 PAGES
07 24 00 1.4.3 GSample Boards
SD-06 Test Reports
1.2.1.1Abrasion Resistance
1.2.1.2Accelerated Weathering
1.2.1.3Mildew Resistance
1.2.1.4Salt Spray Resistance
1.2.1.5Water Resistance
SD-07 Certificates
1.4.1Qualifications of EFS
Manufacturer
1.4.2Qualification of EFS Installer
SD-08 Manufacturer’s Instructions
3.3Installation
SD-10 Operation and Maintenance
Data
1.7EFS
07 84 00 SD-02 Shop Drawings
2.1Firestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
2.2Firestopping Materials
1.5.1Installer Qualifications
07 92 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 27 PAGES
07 92 00 2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
1.4.1 GIndoor Air Quality
2.1.1 GIndoor Air Quality
2.5 GIndoor Air Quality
2.1.2 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.3 GFrames
2.3 GFrames
SD-03 Product Data
2.1 GDoors
2.3 GFrames
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.4 GHardware Schedule
SD-03 Product Data
2.2 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 27 PAGES
08 71 00 SD-10 Operation and Maintenance
Data
1.4 GHardware Schedule
08 87 00 SD-03 Product Data
2.2Solar Control Film
SD-04 Samples
2.2Solar Control Film
09 29 00 SD-03 Product Data
2.1.4Accessories
1.3Certifications
2.1.1Gypsum Board
SD-07 Certificates
2.1 GAsbestos Free Materials
1.3.1 GIndoor Air Quality
2.1.1 GIndoor Air Quality
2.1.2 GIndoor Air Quality
09 51 00 SD-03 Product Data
2.2 GAcoustical Units
1.3 GCertifications
SD-04 Samples
2.2Acoustical Units
SD-07 Certificates
1.3.1Indoor Air Quality
09 68 00 SD-02 Shop Drawings
3.4Installation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 27 PAGES
09 68 00 2.1Carpet
2.4Moldings
SD-04 Samples
2.1Carpet
2.4Moldings
SD-06 Test Reports
3.2Moisture and Alkalinity Tests
SD-07 Certificates
1.3.1Indoor Air Quality
1.6Warranty
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
SD-11 Closeout Submittals
1.6Warranty
09 90 00 SD-03 Product Data
2.1 GCoating
SD-04 Samples
1.9 GColor
SD-07 Certificates
1.3Applicator's Qualifications
1.4.1.2Qualification Testing
SD-08 Manufacturer’s Instructions
3.2.1Application Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 27 PAGES
09 90 00 3.4.2Mixing
1.7.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
10 14 00.20 SD-02 Shop Drawings
1.3.2Detail Drawings
SD-03 Product Data
3.1Installation
1.5Warranty
SD-04 Samples
1.3.1Interior Signage
SD-10 Operation and Maintenance
Data
3.1Approved Manufacturer's
Instructions
3.1.2Protection and Cleaning
13 48 00 SD-02 Shop Drawings
3.1Bracing
3.4Resilient Vibration Isolation
Devices
2.1Equipment Requirements
SD-03 Product Data
3.1Bracing
2.1Equipment Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 27 PAGES
13 48 00 SD-06 Test Reports
3.3Anchor Bolts
13 48 00.00 10 SD-02 Shop Drawings
3.1Coupling and Bracing
3.3Flexible Couplings or Joints
2.1Equipment Requirements
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
2.1 GEquipment Requirements
1.2.4 GContractor Designed Bracing
SD-07 Certificates
2.3Flexible Ball Joints
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.10.1.1Metallic Flexible Duct
2.10.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.10.1.2Duct Connectors
2.10.2Duct Access Doors
2.10.3Fire Dampers
2.10.4Manual Balancing Dampers
2.10.8Sound Attenuation Equipment
2.10.9.1Diffusers
2.10.9.2Registers and Grilles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 27 PAGES
23 00 00 2.11.1.1Ceiling Exhaust Fans
2.12 GAir Handling Units
2.13.1 GFan-Coil Units
2.13.2.1 GVariable Volume, Single Duct
Terminal Units
1.4.6Test Procedures
1.2.1.2Diagrams
SD-06 Test Reports
3.12 GPerformance Tests
SD-07 Certificates
1.4.7Certification
1.4.3Ozone Depleting Substances
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Installation
Instructions
3.14.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.14.1Operation and Maintenance
Manuals
2.11.1.1Ceiling Exhaust Fans
2.12Air Handling Units
2.13.1Fan-Coil Units
2.13.2.1 GVariable Volume, Single Duct
Terminal Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 27 PAGES
23 05 15 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2Record Drawings
1.2Connection Diagrams
1.2Coordination Drawings
1.2Fabrication Drawings
3.1Installation Drawings
SD-03 Product Data
2.1Pipe and Fittings
2.2Piping Specialties
2.3Valves
2.4Miscellaneous Materials
2.5Supporting Elements
1.2Equipment Foundation Data
SD-04 Samples
1.2Manufacturer's Standard Color
Charts
SD-05 Design Data
2.1Pipe and Fittings
2.2Piping Specialties
2.3Valves
SD-06 Test Reports
3.1Hydrostatic Tests
3.1Valve-Operating Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 27 PAGES
23 05 15 3.1Drainage Tests
3.1Pneumatic Tests
3.1Non-Destructive Electric Tests
3.1System Operation Tests
SD-07 Certificates
1.4.2Record of Satisfactory Field
Operation
1.4.3List of Qualified Permanent
Service Organizations
1.2Listing of Product Installations
1.2Records of Existing Conditions
3.1Surface Resistance
3.1Shear and Tensile Strengths
3.1Temperature Ratings
3.1Bending Tests
3.1Flattening Tests
3.1Transverse Guided Weld Bend
Tests
SD-10 Operation and Maintenance
Data
3.8Operation and Maintenance
Manuals
23 05 93 SD-01 Preconstruction Submittals
1.3.3Records of Existing Conditions
1.5.4.1TAB Firm
1.2TAB Team Assistants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 27 PAGES
23 05 93 1.2TAB Team Engineer
1.5.4.2 GTAB Specialist
1.2TAB Team Field Leader
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.4.4 GTAB Related HVAC Submittals
1.5.2TAB Procedures
1.5.2Calibration
1.3.3 GSystems Readiness Check
1.5.5 GTAB Execution
1.5.5.3 GTAB Verification
SD-06 Test Reports
3.3.5Completed Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
1.7.2.1 GTAB Design Review Report
1.5.6.2 GTAB Report
SD-07 Certificates
1.5.1Independent TAB Agency and
Personnel Qualifications
1.7.2DALT and TAB Submittal and
Work Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 27 PAGES
23 05 93 1.7.2.3TAB Pre-Field Engineering
Report
1.3.3 GDesign Review Report
1.7.2.2Pre-field DALT Preliminary
Notification
1.7.2 GAdvanced Notice for TAB Field
Work
1.7.2 GPrerequisite HVAC Work Check
Out List
23 07 00 SD-02 Shop Drawings
2.4Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
SD-03 Product Data
2.4Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
SD-04 Samples
2.3.1.2Thermal Insulation
SD-08 Manufacturer’s Instructions
2.4Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 27 PAGES
23 07 00 SD-11 Closeout Submittals
2.1.1Reduce Volatile Organic
Compounds (VOC)
2.1.2Recycled Content
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GDraft As-Built Drawings
3.2 GFinal As-Built Drawings
SD-03 Product Data
1.7.1 GProgramming Software
1.7.5 GProgramming Software
1.7.2 GController Application Programs
1.7.6 GController Application Programs
1.7.3 GConfiguration Software
1.7.4 GController Configuration Settings
2.2 GManufacturer's Product Data
SD-06 Test Reports
3.4.2 GStart-Up Testing Report
3.5.1 GPVT Procedures
3.5.3 GPVT Report
1.8.1 GPre-Construction Quality Control
(QC) Checklist
1.8.2 GPost-Construction Quality Control
(QC) Checklist
3.6.5 GPerformance Verification Testing
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 27 PAGES
23 09 00 3.6.3.1 GEquipment Supplier’s
Performance Verification Testing
Plan
3.6.8.3 GEndurance Testing Results
3.6.9 GPerformance Verification Test
Report
SD-10 Operation and Maintenance
Data
3.8 GOperation and Maintenance
(O&M) Instructions
3.10.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.1.6.1 GPassword Summary Report
1.8.3 GCloseout Quality Control (QC)
Checklist
23 64 10 SD-03 Product Data
2.5 GWater Chiller
3.2.3Posted Instructions
1.5.1Verification of Dimensions
2.9Factory Tests
3.7System Performance Tests
3.8Demonstrations
SD-06 Test Reports
3.6Field Acceptance Testing
2.9Factory Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 27 PAGES
23 64 10 3.7System Performance Tests
SD-07 Certificates
3.2.9Refrigeration System
SD-10 Operation and Maintenance
Data
3.8 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
2.1.1Energy Efficient Equipment for
Chillers
3.1.1Indoor Air Quality During
Construction
2.1.2Ozone Depleting Substances
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure
26 12 19.10 SD-02 Shop Drawings
1.5.1 GPad-mounted Transformer
Drawings
SD-03 Product Data
2.2 GPad-mounted Transformers
SD-06 Test Reports
3.7.1 GAcceptance Checks and Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 27 PAGES
26 12 19.10 SD-07 Certificates
2.2.2.1 GTransformer Efficiencies
SD-09 Manufacturer’s Field
Reports
2.8.1 GTransformer Test Schedule
2.8.2 GDesign Tests
2.8.3 GRoutine and Other Tests
SD-10 Operation and Maintenance
Data
1.6.1 GTransformer(s)
26 20 00 SD-02 Shop Drawings
2.10Panelboards
SD-03 Product Data
2.9Receptacles
2.10.3Circuit breakers
2.8Switches
2.11Enclosed circuit breakers
2.13Motor controllers
SD-06 Test Reports
3.5.2600-volt wiring test
3.5.4Grounding system test
3.5.3Ground-fault receptacle test
26 51 00 SD-02 Shop Drawings
1.5.1Luminaire Drawings
SD-03 Product Data
2.2Luminaires
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 27 PAGES
26 51 00 2.4Light Sources
2.3Drivers
1.6.1LED Luminaire Warranty
1.5.2Luminaire Design Data
2.5.1Exit Signs
SD-06 Test Reports
1.5.3LED Luminaire - IES LM-79 Test
Report
1.5.4LED Light Source - IES LM-80
Test Report
1.5.5LED Light Source - IES TM-21
Test Report
1.5.8.3Energy Efficiency
SD-07 Certificates
1.6.1.1 GLuminaire Useful Life Certificate
28 31 64.00 10 SD-02 Shop Drawings
1.3.2Detail Drawings
SD-03 Product Data
2.5Storage Batteries
2.1.2Low Battery Voltage
1.6Special Tools and Spare Parts
1.4 GTechnical Data and Computer
Software
3.4Training
3.5Testing
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 27 PAGES
28 31 64.00 10 3.5Testing
SD-07 Certificates
2.1.6Equipment
1.3.1Qualifications
SD-10 Operation and Maintenance
Data
3.4 GOperating and Maintenance
Instructions
31 00 00 SD-01 Preconstruction Submittals
3.5 GShoring
1.3.3 GDewatering Work Plan
SD-03 Product Data
3.9 GUtilization of Excavated Materials
1.3.1.2Rock Excavation
3.4Opening of any Excavation or
Borrow Pit
SD-06 Test Reports
3.17Testing
2.1Borrow Site Testing
SD-07 Certificates
3.17Testing
31 05 19 SD-03 Product Data
2.1.2Thread
2.2Manufacturing Quality Control
Sampling and Testing
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 27 PAGES
31 05 19 3.1Quality Assurance Samples and
Tests
SD-07 Certificates
2.1.1Geotextile
31 23 00.00 20 SD-01 Preconstruction Submittals
1.6.1Shoring and Sheeting Plan
1.6.2Dewatering work plan
SD-06 Test Reports
1.5 GBorrow Site Testing
3.10.2.1Fill and backfill
3.10.2.2Select material
3.10.2.3Porous fill
3.10.2.4Density tests
3.10.2.5Moisture Content Tests
32 31 32 SD-02 Shop Drawings
1.3Installation Drawings
1.3Gate Assembly
1.3Gate Assembly
SD-03 Product Data
1.3Manufacturer's Instructions
1.3Gate Assembly
1.3Gate Assembly
2.2Materials
SD-04 Samples
2.3 GColor Material Samples
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 27 PAGES
32 31 32 2.1.1Design Analysis
SD-10 Operation and Maintenance
Data
3.5Maintenance Instructions
33 40 00 SD-04 Samples
2.1Pipe for Culverts and Storm
Drains
SD-07 Certificates
2.1.1Resin Certification
2.1.2Resin Certification
3.6.1.1Hydrostatic Test on Watertight
Joints
3.6.1.2Determination of Density
2.2.2Frame and Cover for Gratings
3.6.2.1.2Post-Installation Inspection
Report
3.3Placing Pipe
33 71 02 SD-02 Shop Drawings
1.5.1 GPrecast underground structures
SD-03 Product Data
2.4 GMedium voltage cable
2.6 GMedium voltage cable joints
2.5 GMedium voltage cable
terminations
2.11.1.1 GPrecast concrete structures
2.11.1.4Sealing Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 27 PAGES
33 71 02 3.5.2Pulling-In Irons
2.12 GCable supports
SD-06 Test Reports
2.14.2 GMedium voltage cable
qualification and production tests
3.18.1 GField Acceptance Checks and
Tests
2.14.1 GArc-proofing test
3.3 GCable Installation Plan and
Procedure
SD-07 Certificates
1.5.2 GCable splicer/terminator
1.5.3 GCable Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
This Page Intentionally Left Blank
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
11/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA SW-846 (Third Edition; Update IV) Test Methods for Evaluating Solid Waste:
Physical/Chemical Methods
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.120 Hazardous Waste Operations and Emergency Response
40 CFR 260 Hazardous Waste Management System: General
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 261.7 Residues of Hazardous Waste in Empty Containers
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 262.31 Standards Applicable to Generators of Hazardous Waste-Labeling
40 CFR 262.34 Standards Applicable to Generators of Hazardous Waste-Accumulation Time
40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities
40 CFR 268 Land Disposal Restrictions
SECTION 01 57 19 Page 1
40 CFR 273 Standards For Universal Waste Management
40 CFR 279 Standards for the Management of Used Oil
40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan
40 CFR 300.125 National Oil and Hazardous Substances Pollution Contingency Plan - Notification and Communications
40 CFR 355 Emergency Planning and Notification
40 CFR 50 National Primary and Secondary Ambient Air Quality Standards
49 CFR 171 General Information, Regulations, and Definitions
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
49 CFR 172.101 Hazardous Material Regulation-Purpose and Use of Hazardous Material Table
49 CFR 173 Shippers - General Requirements for Shipments and Packagings
49 CFR 178 Specifications for Packagings
1.2 DEFINITIONS
1.2.1 Class I and II Ozone Depleting Substance (ODS)
Class I ODS is defined in Section 602(a) of The Clean Air Act. A list of Class I ODS can be found on the EPA website at the following weblink.
http://www.epa.gov/ozone/science/ods/classone.html .
Class II ODS is defined in Section 602(s) of The Clean Air Act. A list of Class II ODS can be found on the EPA website at the following weblink.
http://www.epa.gov/ozone/science/ods/classtwo.html .
1.2.2 Contractor Generated Hazardous Waste
Contractor generated hazardous waste is materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene), waste thinners, excess paints, excess solvents, waste solvents, excess pesticides, and contaminated pesticide equipment rinse water.
1.2.3 Electronics Waste
Electronics waste is discarded electronic devices intended for salvage, recycling, or disposal.
SECTION 01 57 19 Page 2
1.2.4 Environmental Pollution and Damage
Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life; affect other species of importance to humankind; or degrade the environment aesthetically, culturally or historically.
1.2.5 Environmental Protection
Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction.
The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.
1.2.6 Hazardous Debris
As defined in paragraph SOLID WASTE, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) in accordance with 40 CFR 261 . Hazardous debris also includes debris that exhibits a characteristic of hazardous waste in accordance with 40 CFR 261 .
1.2.7 Hazardous Materials
Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172 .
Hazardous material is any material that: Is regulated as a hazardous material in accordance with 49 CFR 173 ; or requires a Safety Data Sheet (SDS) in accordance with 29 CFR 1910.120 ; or during end use, treatment, handling, packaging, storage, transportation, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D.
Designation of a material by this definition, when separately regulated or controlled by other sections or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this section for "control" purposes. Such material includes ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs).
1.2.8 Hazardous Waste
Hazardous Waste is any material that meets the definition of a solid waste and exhibit a hazardous characteristic (ignitability, corrosivity, reactivity, or toxicity) as specified in 40 CFR 261 , Subpart C, or contains a listed hazardous waste as identified in 40 CFR 261 , Subpart D.
1.2.9 Installation Pest Management Coordinator
Installation Pest Management Coordinator (IPMC) is the individual officially designated by the Installation Commander to oversee the Installation Pest Management Program and the Installation Pest Management
SECTION 01 57 19 Page 3
Plan.
1.2.10 Land Application
Land Application means spreading or spraying discharge water at a rate that allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur.
Comply with federal, state, and local laws and regulations.
1.2.11 Municipal Separate Storm Sewer System (MS4) Permit
MS4 permits are those held by installations to obtain NPDES permit coverage for their stormwater discharges.
1.2.12 National Pollutant Discharge Elimination System (NPDES)
The NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.
1.2.13 Oily Waste
Oily waste are those materials that are, or were, mixed with Petroleum, Oils, and Lubricants (POLs) and have become separated from that POLs.
Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, POLs and may be appropriately tested and discarded in a manner which is in compliance with other state and local requirements.
This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: It is not prohibited in other state regulations or local ordinances; the amount generated is "de minimus" (a small amount);
it is the result of minor leaks or spills resulting from normal process operations; and free-flowing oil has been removed to the practicable extent possible. Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, perform a hazardous waste determination prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.
1.2.14 Regulated Waste
Regulated waste are solid wastes that have specific additional federal, state, or local controls for handling, storage, or disposal.
1.2.15 Sediment
Sediment is soil and other debris that have eroded and have been transported by runoff water or wind.
1.2.16 Solid Waste
Solid waste is a solid, liquid, semi-solid or contained gaseous waste. A solid waste can be a hazardous waste, non-hazardous waste, or non-Resource Conservation and Recovery Act (RCRA) regulated waste. Types of solid waste typically generated at construction sites may include:
SECTION 01 57 19 Page 4
1.2.16.1 Debris
Debris is non-hazardous solid material generated during the construction, demolition, or renovation of a structure that exceeds 2.5-inch particle size that is: a manufactured object; plant or animal matter; or natural geologic material (for example, cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics; roofing paper and shingles. Inert materials may be reinforced with or contain ferrous wire, rods, accessories and weldments. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.
1.2.16.2 Green Waste
Green waste is the vegetative matter from landscaping, land clearing and grubbing, including, but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to remain, be re-located, or be re-used are not included.
1.2.16.3 Material not regulated as solid waste
Material not regulated as solid waste is nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended; suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges;
regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.
1.2.16.4 Non-Hazardous Waste
Non-hazardous waste is waste that is excluded from, or does not meet, hazardous waste criteria in accordance with 40 CFR 263 .
1.2.16.5 Recyclables
Recyclables are materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable, and structural components. It also includes commercial-grade refrigeration equipment with Freon removed, household appliances where the basic material content is metal, clean polyethylene terephthalate bottles, cooking oil, used fuel oil, textiles, high-grade paper products and corrugated cardboard, stackable pallets in good condition, clean crating material, and clean rubber/vehicle tires.
Metal meeting the definition of lead contaminated or lead based paint contaminated may be included as recyclable if sold to a scrap metal company. Paint cans that meet the definition of empty containers in accordance with 40 CFR 261.7 may be included as recyclable if sold to a scrap metal company.
1.2.16.6 Scrap Metal
This includes scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe, and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included.
SECTION 01 57 19 Page 5
1.2.16.7 Wood
Wood is dimension and non-dimension lumber, plywood, chipboard, hardboard. Treated or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included. Treated wood includes, but is not limited to, lumber, utility poles, crossties, and other wood products with chemical treatment.
1.2.17 Surface Discharge
Surface discharge means discharge of water into drainage ditches, storm sewers, creeks or "waters of the United States". Surface discharges are discrete, identifiable sources and require a permit from the governing agency. Comply with federal, state, and local laws and regulations.
1.2.18 Wastewater
Wastewater is the used water and solids from a community that flow to a treatment plant.
1.2.18.1 Stormwater
Stormwater is any precipitation in an urban or suburban area that does not evaporate or soak into the ground, but instead collects and flows into storm drains, rivers, and streams.
1.2.19 Waters of the United States
Waters of the United States means Federally jurisdictional waters, including wetlands, that are subject to regulation under Section 404 of the Clean Water Act or navigable waters, as defined under the Rivers and Harbors Act.
1.2.20 Wetlands
Wetlands are those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions.
1.2.21 Universal Waste
The universal waste regulations streamline collection requirements for certain hazardous wastes in the following categories: batteries, pesticides, mercury-containing equipment (for example, thermostats), and lamps (for example, fluorescent bulbs). The rule is designed to reduce hazardous waste in the municipal solid waste (MSW) stream by making it easier for universal waste handlers to collect these items and send them for recycling or proper disposal. These regulations can be found at
40 CFR 273 .
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SECTION 01 57 19 Page 6
SD-01 Preconstruction Submittals
Preconstruction Survey
Solid Waste Management Permit; G
Regulatory Notifications; G
Dirt and Dust Control Plan; G
Employee Training Records; G
Environmental Manager Qualifications; G
SD-06 Test Reports
Laboratory Analysis
Solid Waste Management Report; G
SD-07 Certificates
Employee Training Records; G
SD-11 Closeout Submittals
Waste Determination Documentation; G
Disposal Documentation for Hazardous and Regulated Waste; G
Assembled Employee Training Records; G
Solid Waste Management Permit; G
Solid Waste Management Report; G
Hazardous Waste/Debris Management; G
Regulatory Notifications; G
Sales Documentation; G
Contractor Certification
1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS
Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during construction practice.
Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Protect the environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. Comply with federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution.
SECTION 01 57 19 Page 7
Tests and procedures assessing whether construction operations comply with Applicable Environmental Laws may be required. Analytical work must be performed by qualified laboratories; and where required by law, the laboratories must be certified.
1.4.1 Conformance with the Environmental Management System
Perform work under this contract consistent with the policy and objectives identified in the installation's Environmental Management System (EMS).
Perform work in a manner that conforms to objectives and targets of the environmental programs and operational controls identified by the EMS.
Support Government personnel when environmental compliance and EMS audits are conducted by escorting auditors at the Project site, answering questions, and providing proof of records being maintained. Provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, take corrective and preventative actions.