A.02 Columbia Rehab Final CD Submission Combined Specifications 21R4000 1.22.21.pdf
PDF 13 MB Posted
- Attached to
- VA Rehabilitation Center, Columbia, SC
- Solicitation number
- W912HP21R4000
About this file
This document provides details for a federal solicitation seeking proposals for rehabilitation work at the VA Center in Columbia, South Carolina. The solicitation number is W912HP21R4000 and is being issued by the Department of the Army Corps of Engineers Engineering District Charleston. Proposals are due by February 22, 2021 at 2:00 PM EST and should pertain to rehabilitation and construction services at the VA Center in Columbia as outlined in the attached specifications dated January 22, 2021. The specifications provide lower-level requirements for the rehabilitation work across various construction disciplines to modernize and improve facilities at the Center.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
544-328
Construct Center for Rehabilitative Services
Combined Specifications
Division 00 – 34, Reference Attachments
July 17, 2020
Department of Veterans Affairs William Jennings Bryan Dorn VA Medical Center
Final Construction Documents Submission
A/E Design- Center for Rehabilitative Services VA247-16-C-0064
William Jennings Bryan Dorn VAMC
Columbia, SC HDG #16005
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS
00 01 13 Seals Page
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00
SPECIAL INSPECTIONS
01 58 00
DIVISION 02 – EXISTING CONDITIONS
02 21 00 Site Surveys
02 41 00 Demolition
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring
04 05 16 Masonry Grouting
04 20 00 Unit Masonry
04 72 00 Cast Stone Masonry
00 01 10-1
01 32 01.00 10
01 57 19
01 74 19 01 78 01 81
01 91 00 01 81
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SUSTAINABLE CONSTRUCTION REQUIREMENTS
SUSTAINABILITY CERTIFICATION REQUIREMENTS – LEED HC V3
01 45 35 01 45 00.15 10
GENERAL COMMISSIONING REQUIREMENTS
13.11
CLOSEOUT SUBMITTALS
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
PROJECT IDENTIFICATION
0 0000 01 List of Drawing Sheets 15
02 82 13.13 02 83 33.13
Glovebag Asbestos Abatement Lead-Based Paint Removal and Disposal
00 73 10
SUPPLIMENTAL CONDITIONS
Columbia, South Carolina HDG #16005
00 01 10-2
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02-16
05 21 00 Steel Joist Framing 03-10
05 31 00 Steel Decking 02-16
05 36 00 Composite Metal Decking 10-15
05 40 00 Cold-Formed Metal Framing 05-16
05 50 00 Metal Fabrications 07-14
05 51 00 Metal Stairs 10-15
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-15
06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 52 Modified Bituminous Sheet Waterproofing 08-16
07 16 16 Crystalline Waterproofing
07 21 13 Thermal Insulation 02-16
07 21 19 Foamed-in-Place Insulation
07 22 00 Roof and Deck Insulation 02-16
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16
07 40 00 Roofing and Siding Panels 02-16
07 54 19 Polyvinyl-Chloride (PVC) Roofing 02-16
07 60 00 Flashing and Sheet Metal 07-14
07 72 00 Roof Accessories 02-16
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-15
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
08 14 00 Interior Wood Doors 02-16
08 31 13 Access Doors and Frames 02-16
08 41 13 Aluminum-Framed Entrances and Storefronts 08-16
08 42 29 Sliding Automatic Entrances
08 44 13 Glazed Aluminum Curtain Walls 10-15
08 71 00 Door Hardware 01-16
08 71 13 Automatic Door Operators 02-16
08 80 00 Glazing 10-15
08 90 00 Louvers and Vents 05-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 06 00 Schedule for Finishes 04-15
09 22 16 Non-Structural Metal Framing 05-16
09 24 00 Portland Cement Plastering 02-16
00 01 10-3
09 29 00 Gypsum Board 11-14
09 30 13 Ceramic/Porcelain Tiling 09-15
09 51 00 Acoustical Ceilings 08-16
09 65 13 Resilient Base and Accessories 02-16
09 65 16 Resilient Sheet Flooring 02-16
09 65 19 Resilient Tile Flooring 12-15
09 67 23.20 Resinous Epoxy Base with Vinyl Chip Broadcast (RES 2) 12-15
09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 11 13 Chalkboards and Markerboards 10-15
10 14 00 Signage 10-15
10 21 23 Cubicle Curtain Tracks 05-15
10 26 00 Wall and Door Protection 10-15
10 28 00 Toilet, Bath, and Laundry Accessories 02-16
10 44 13 Fire Extinguisher Cabinets 08-14
10 51 13 Metal Lockers
10 53 00 Aluminum Canopies and Shades 02-16
10 75 00 Flagpoles 02-16
DIVISION 11 – EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift System 09-14
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 09-15
12 32 00 Manufactured Wood Casework 09-15
12 36 00 Countertops 12-15
12 48 16 Entrance Floor Grilles
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-14
DIVISION 14– CONVEYING EQUIPEMENT
14 24 00 Electric Hydraulic Elevator 08-16
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16
00 01 10-4
22 05 12 General Motor Requirements for Plumbing Equipment 09-15
22 05 19 Meters and Gages for Plumbing Piping 09-15
22 05 23 General-Duty Valves for Plumbing Piping 09-15
22 07 11 Plumbing Insulation 09-15
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 09-15
22 11 23 Domestic Water Pumps 09-15
22 13 00 Facility Sanitary and Vent Piping 09-15
22 14 00 Facility Storm Drainage 09-15
22 14 29 Sump Pumps 09-15
22 35 00 Domestic Water Heat Exchangers 09-15
22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-15
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
11-10
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15
23 07 11 HVAC Plant Insulation 09-15
23 08 00 Commissioning of HVAC Systems 11-16
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 09-12
23 21 23 Hydronic Pumps 02-15
23 22 13 Steam and Condensate Heating Piping 02-15
23 22 23 Steam Condensate Pumps 02-15
23 23 00 Refrigerant Piping 02-15
23 25 00 HVAC Water Treatment 02-15
23 31 00 HVAC Ducts and Casings 03-13
23 34 00 HVAC Fans 02-15
23 36 00 Air Terminal Units 02-15
23 37 00 Air Outlets and Inlets 02-15
23 40 00 HVAC Air Cleaning Devices 02-12
23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11
23 81 00 Decentralized Unitary HVAC Equipment 02-11
23 82 00 Convection Heating and Cooling Units 04-11
23 82 16 Air Coils 04-11
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13
26 05 26 Grounding and Bonding for Electrical Systems 12-12
26 05 33 Raceway and Boxes for Electrical Systems 05-14
00 01 10-5
26 05 41 Underground Electrical Construction 12-12
26 05 73 Overcurrent Protective Device Coordination Study 12-15
26 08 00 Commissioning of Electrical Systems 11-16
26 09 23 Lighting Controls 05-14
26 24 16 Panelboards 05-14
26 27 26 Wiring Devices 01-16
26 29 11 Motor Controllers 08-14
26 29 21 Enclosed Switches and Circuit Breakers 12-12
26 32 13 Engine Generators 07-15
26 36 23 Automatic Transfer Switches 12-12
26 41 00 Facility Lightning Protection 12-12
26 43 13 Surge Protective Device 12-12
26 51 00 Interior Lighting 08-14
26 56 00 Exterior Lighting 05-14
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 06-15
27 08 00 Commissioning of Communications Systems 11-16
27 10 00 Control, Communication and Signal Wiring 06-15
27 11 00 Communications Equipment Room Fittings 06-15
27 15 00 Communications Structured Cabling 01-16
27 52 23 Nurse Call and Code Blue Systems 10-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 09-11
28 05 13 Conductors and Cables for Electronic Safety and
Security
09-11
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16
28 13 00 Physical Access Control System 10-11
28 16 00 Intrusion Detection System 10-11
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 10-11
28 52 31 Emergency Call System 06-15
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 07-16
31 23 19 Dewatering 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
00 01 10-6
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
32 14 16 Brick Unit Paving 08-16
32 17 23 Pavement Markings 08-16
32 31 13 Chain Link Fences and Gates 08-16
32 84 00 Planting Irrigation 08-16
32 90 00 Planting 08-16
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 11-16
33 10 00 Water Utilities 01-14
33 30 00 Sanitary Sewer Utilities 06-13
33 40 00 Storm Sewer Utilities 10-11
33 63 00 Steam Energy Distribution 06-13
DIVISION 34 – TRANSPORTATION
34 71 13 Vehicle Barriers 06-13
DIVISION 48 – ELECTRICAL POWER GENERATION
REFERENCE ATTACHMENTS VOLUME
Soils Report
Risk Assessment
Final Occupancy Review Checklist
Jonathan M. Carr, AIA, NCARB, CDT
2020.07.17 09:20:17 -04'00'
Donald J. Carsto, Jr., PE
2020.07.17 09:20:34 -04'00'
John G. Ross, PE
2020.07.17 09:20:51 -04'00'
Columbia, South Carolina HDG #16005
Ross Oakley, PE Thomas and Hutton 1501 Main Street Suite 760 Columbia, SC 29201 Phone: 803-451-6786
- - E N D - - -
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI001 TITLE SHEET
GI002 ACCESSIBILITY LEGEND
GI101 FIRST FLOOR LIFE SAFETY PLAN
GI102 SECOND FLOOR LIFE SAFETY PLAN
GI501 PROJECT-WIDE PARTITION TYPES AND STANDARD
DETAILS
GI502 PROJECT-WIDE FIRE STOPPING DETAILS
GI901 PROJECT 3D VIEWS
GI902 PROJECT 3D VIEWS
GI903 PROJECT 3D VIEWS
GI904 PROJECT 3D VIEWS
GENERAL CONDITIONS
GC001 SCHEDULE OF SPECIAL INSPECTIONS
GC101 ICRA PLAN - B100
SURVEY
VF101 EXISTING CONDITIONS
VF102 OVERALL EXISTING CONDITIONS
VF103 ENLARGED EXISTING CONDITIONS
00 01 15 - 2
CIVIL
CD101 DEMOLITION PLAN
CD102 FIBER ALIGNMENT DEMOLITION PLAN
CS101 BASE-BID SITE PLAN
CS102 ADD-ALTERNATE SITE PLAN
CI101 EROSION & SEDIMENT CONTROL - INITIAL PHASE
CI102 EROSION & SEDIMENT CONTROL – CONSTRUCTION
PHASE
CI501 EROSION & SEDIMENT CONTROL DETAILS
CG101 BASE GRADING PLAN
CG102 ADD-ALTERNATE GRADING PLAN
CG201 STORM DRAINAGE PROFILES
CG501 PAVING, GRADING & DRAINAGE DETAILS
CG502 PAVING, GRADING & DRAINAGE DETAILS
CG503 PAVING, GRADING & DRAINAGE DETAILS
CU101 UTILITY PLAN
CU102 FIBER OPTIC ALIGNMENT PLAN
CU103 WATER ALIGNMENT PLAN
CU201 UTILITY PROFILES
CU501 UTILITY DETAILS
CU502 UTILITY DETAILS
CU503 UTILITY DETAILS
LS101 LANDSCAPE PLAN
LS501 LANDSCAPE DETAILS AND NOTES
00 01 15 - 3
STURCTURAL
SS001 STRUCTURAL GENERAL NOTES
SS002 STRUCTURAL GENERAL NOTES
SS003 TYPICAL SECTIONS & DETAILS
SS004 TYPICAL SECTIONS & DETAILS
SS005 TYPICAL SECTIONS & DETAILS
SS100 FOUNDATION PLAN
SS101 SECOND FLOOR FRAMING PLAN
SS102 LOW ROOF FRAMING PLAN
SS103 ROOF FRAMING PLAN
SS301 FOUNDATION SECTIONS & DETAILS
SS302 FOUNDATION SECTIONS & DETAILS
SS401 FRAMING SECTIONS & DETAILS
SS402 FRAMING SECTIONS & DETAILS
SS403 FRAMING SECTIONS & DETAILS
SS404 FRAMING SECTIONS & DETAILS
SS405 FRAMING SECTIONS AND DETAILS
ARCHITECTURAL
AI001 LEGENDS AND GENERAL NOTES
AI002 ARCHITECTURAL ABBREVIATIONS
AI003 EQUIPMENT MOUNTING LEGEND
AS101 ARCHITECTURAL SITE PLAN
AS102 ARCHITECTURAL SITE PLAN - ENLARGED
00 01 15 - 4
AE100 B100 BASEMENT PLAN
AE101 FIRST FLOOR PLAN
AE101A FIRST FLOOR DIMENSION PLAN
AE102 SECOND FLOOR PLAN
AE102A SECOND FLOOR DIMENSION PLAN
AE111 FIRST FLOOR REFLECTED CEILING PLAN
AE112 SECOND FLOOR REFLECTED CEILING PLAN
AE151 ROOF PLAN
AE201 EXTERIOR ELEVATIONS
AE202 EXTERIOR ELEVATIONS
AE301 BUILDING SECTIONS
AE401 STAIR PLANS AND SECTIONS
AE402 STAIR PLANS AND SECTIONS
AE403 ELEVATOR PLANS AND SECTIONS
AE411 INTERIOR ELEVATIONS
AE412 INTERIOR ELEVATIONS
AE413 INTERIOR ELEVATIONS
AE414 INTERIOR ELEVATIONS
AE415 INTERIOR ELEVATIONS
AE416 INTERIOR ELEVATIONS
AE417 INTERIOR ELEVATIONS
AE418 INTERIOR ELEVATIONS
AE501 EXTERIOR WALL / ROOF / SOFFIT TYPES
AE502 WALL SECTIONS
AE503 WALL SECTIONS
00 01 15 - 5
AE504 WALL SECTIONS
AE505 WALL SECTIONS
AE506 ENLARGED WALL DETAILS
AE507 CANOPY SECTION
AE508 STOREFRONT WINDOW DETAILS
AE509 DOOR AND WINDOW DETAILS
AE510 ELEVATOR DETAILS
AE512 EXTERIOR DETAILS
AE513 EXTERIOR DETAILS
AE514 CANOPY DETAILS
AE519 ROOF DETAILS
AE520 INTERIOR DETAILS
AE521 STAIR DETAILS
AE522 WALL AND CEILING DETAILS
AE523 INTERIOR DETAILS
AE524 CASEWORK DETAILS
AE525 MANUFACTURED CASEWORK AND MILLWORK DETAILS
AE601 DOOR / WINDOW SCHEDULES
AE602 INTERIOR WINDOW TYPES
AE605 ENLARGED STOREFRONT PLANS AND DETAILS
INTERIORS
AF101 FIRST FLOOR FINISH PLAN
AF102 SECOND FLOOR FINISH PLAN
AF501 WALL PROTECTION / SIGNAGE TYPES
00 01 15 - 6
AF601 FINISH SCHEDULES
EQUIPMENT
QH101 FIRST FLOOR EQUIPMENT PLAN
QH102 SECOND FLOOR EQUIPMENT PLAN
QH601 EQUIPMENT SCHEDULES
QH602 SPACE ACTIVATION SCHEDULES
FIRE ALARM
FA001 LEGEND, RISER AND GENERAL NOTES
FA101 FIRST FLOOR FIRE ALARM
FA102 SECOND FLOOR FIRE ALARM
FIRE SUPPRESSION
FX001 LEGENDS, ABBREVIATIONS, AND NOTES
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN
FX102 SECOND FLOOR FIRE SUPPRESSION PLAN
FX501 FIRE SUPPRESSION DETAILS
FX601 FIRE SUPPRESSION RISER DIAGRAM
PLUMBING
PL001 LEGEND, SCHEDULES, ABBREVIATIONS AND
GENERAL NOTES
PL101 FIRST FLOOR WASTE PLAN
PL102 SECOND FLOOR WASTE PLAN
00 01 15 - 7
PL151 ROOF PLUMBING PLAN
PP101 FIRST FLOOR SUPPLY PLAN
PP102 SECOND FLOOR SUPPLY PLAN
PL501 PLUMBING DETAILS
PL601 SANITARY RISER DIAGRAM
PL602 STORM WATER RISER DIAGRAM
PL603 SUPPLY RISER DIAGRAM
MECHANICAL
MH001 LEGEND, ABBREVIATIONS AND GENERAL NOTES
MS101 SITE PLAN
MS102 SITE PLAN - FIBER ROUTING
MS301 STEAM PROFILE
MH101 FIRST FLOOR DUCTWORK PLAN
MH102 SECOND FLOOR DUCTWORK PLAN
MP101 FIRST FLOOR PIPING PLAN
MP102 SECOND FLOOR PIPING PLAN
MH301 SECTIONS
MH302 SECTIONS
MH303 SECTIONS
MH401 MECHANICAL ROOM AND ROOF PLANS
MH501 DETAILS
MH502 DETAILS
MH503 DETAILS
MH504 DETAILS
00 01 15 - 8
MH601 SCHEDULES
MH602 SCHEDULES
MH701 CONTROLS
MH702 CONTROLS POINTS LIST
MH703 CONTROL DIAGRAMS AND HOT WATER/BAS POINTS
LIST
ELECTRICAL
EG001 SYMBOL LEGEND AND LIGHT FIXTURE SCHEDULE
ES101 SITE ELECTRICAL DEMOLITION PLAN
ES102 ELECTRICAL SITE PLAN
EL101 FIRST FLOOR LIGHTING
EL102 SECOND FLOOR LIGHTING
EP101 FIRST FLOOR POWER
EP102 SECOND FLOOR POWER
EP103 ROOF POWER PLAN
EY101 FIRST FLOOR SYSTEMS
EY102 SECOND FLOOR SYSTEMS
EP501 ELECTRICAL DETAILS
EP502 ELECTRICAL DETAILS
EP503 ELECTRICAL DETAILS
EP504 ELECTRICAL DETAILS
EP505 ELECTRICAL DETAILS
EP601 POWER ONE-LINE DIAGRAM
EP701 PANELBOARD SCHEDULES
00 01 15 - 9
EP702 PANELBOARD SCHEDULES
EP703 PANELBOARD SCHEDULES
EP801 EQUIPMENT CONNECTION SCHEDULES
- - - END - - -
A/E Design-Construct Center for Rehabilitative Services V A247-16-C-0068 William Jennings Bryan Dorn VAMC Columbia, SC
DOCUMENT 00 73 10 Page 1
DOCUMENT 00 73 00
SUPPLEMENTARY CONTRACT CONDITIONS
02/14
PART 1 GENERAL
This Supplemental Contract Requirements section provides additional information and requirements for subsequent Division 01 Specifications.
1.1 DEFINITIONS
References to ‘Offeror”, “Bidder”, “Design-Build Contractor”, “DB Contractor”, “D/B Contractor”, “Design-Builder”, "DB", “D-B”, “Architect”, “Engineer”, or simply the “Contractor” in this Contract or in the commercially available guide specifications used for the technical specifications for this Contract shall refer to the contractor who is the signatory to this Contract. References to “Contracting Officer” and “owner” refer to the Government.
1.2 ADDITIONAL GOVERNMENT SAFETY REQUIREMENTS
A. TRAINING
In Addition to the training requirements required for the SSHO, all other contractor and subcontractor personnel shall have the OSHA 10-hour Construction Safety Outreach course and any necessary safety training to be able to identify hazards within their work environment.
B. INFECTION CONTROL
construction activities causing disturbance of existing dust, or creating new dust, must be conducted within ventilation-controlled areas that minimize the flow of airborne particles into patient areas. Exterior construction activities causing disturbance of soil or creates dust in some other manner must be controlled.
An AHA associated with infection control will be performed by VA personnel in accordance with FGI Guidelines (i.e. Infection Control Risk Assessment (ICRA)). The ICRA procedure found on the American Society for Healthcare Engineering (ASHE) website will be utilized. Risk classifications of Class II or lower will require approval by the Contracting Officer before beginning any construction work. Risk classifications of Class III or higher will require a permit before beginning any construction work.
Infection Control permits will be issued by the Contracting Officer. The Infection Control Permits will be posted outside the appropriate construction area. More than one permit may be issued for a construction project if the work is located in separate areas requiring separate classes. The primary project scope area for this project is: Class 1, however, work outside the primary project scope area may vary. The required infection control precautions with each class are as follows:
1. Class I requirements:
a. During Construction Work:
2) Execute work by methods to minimize raising dust from constructions operations.
DOCUMENT 00 73 10 Page 2
b. Upon Completion:
1) Clean work area upon completion of task
Products and Materials:
1. Sheet Plastic: Fire retardant polystyrene, 6-mil thickness meeting local fire codes
2. Exhaust Hoses: Heavy duty, flexible steel reinforced; Ventilation Blower Hose
3. Disinfectant: Hospital-approved disinfectant or equivalent product
Before any construction on site begins, all contractor personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.
A dust control program will be establish and maintained as part of the contractor's infection preventive measures in accordance with the FGI Guidelines for Design and Construction of Healthcare Facilities. Prior to start of work, prepare a plan detailing project-specific dust protection measures with associated product data, including periodic status reports, and submit to the Contracting Officer for review for compliance with contract requirements in accordance with Section 01 32 00 Submittal Procedures. Medical center Infection Control personnel will monitor for airborne disease (e.g. aspergillosis) during construction. A baseline of conditions will be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality with safe thresholds established. In general, the following preventive measures shall be adopted during construction to keep down dust and prevent mold.
1. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents, or building openings. HEPA filtration is required where the exhaust dust may re-enter the Medical Center buildings.
2. Exhaust hoses shall be exhausted so that dust is not reintroduced to the medical center.
3. Adhesive Walk-off/Carpet Walk-off Mats shall be used at all interior transitions from the construction area to occupied medical center area. These mats shall be changed as often as required to maintain clean work areas directly outside construction area at all times.
4. Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA filtration. Maintain surrounding area frequently.
Remove debris as it is created. Transport these outside the construction area in containers with tightly fitting lids.
5. The contractor shall not haul debris through patient-care areas without prior approval of the Contracting Officer and the Medical
Center. When, approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape. No sharp objects should be allowed to cut through the plastic. Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming and wipe down.
DOCUMENT 00 73 10 Page 3
6. There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.
7. At completion, remove construction barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal.
Final Cleanup:
1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.
2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.
3. All new air ducts shall be cleaned prior to final inspection.
Exterior Construction
1. Contractor shall verify that dust will not be introduced into the medical center through intake vents, or building openings. HEPA filtration on intake vents is required where dust may be introduced.
2. Dust created from disturbance of soil such as from vehicle movement will be wetted with use of a water truck as necessary
3. All cutting, drilling, grinding, sanding, or disturbance of materials shall be accomplished with tools equipped with either local exhaust ventilation (i.e. vacuum systems) or wet suppression controls.
1.3 PHYSICAL DATA REQUIREMENTS
a. Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
b. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.
c. A copy of the soil report shall be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical Center, and shall be considered part of the contract documents.
d. Government does not guarantee that other materials shall not be encountered nor that proportions, conditions or character of several materials shall not vary from those indicated by explorations.
Bidders are expected to examine site of work and logs of borings;
and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application
DOCUMENT 00 73 10 Page 4 to Department of Veterans Affairs, bidders shall be permitted to make subsurface explorations of their own at site.
1.4 LAYOUT OF WORK REQUIREMENTS
a. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the COR may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
(FAR 52.236-17)
b. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, parking lots, are in accordance with lines and elevations shown on contract drawings.
c. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the Contracting Officer before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.
D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings. Furnish such certification to the Contracting Officer before any major items of concrete work are placed. In addition, Contractor shall also furnish to the Contracting Officer certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.
1. Lines of each building and/or addition.
DOCUMENT 00 73 10 Page 5
2. Elevations of bottoms of footings and tops of floors of each building and/or addition.
3. Lines and elevations of sewers and of all outside distribution systems.
4. Lines of elevations of all swales and interment areas.
5. Lines and elevations of roads, streets and parking lots.
E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to the Contracting Officer.
F. Upon completion of the work, the Contractor shall furnish the Contracting Officer one electronic copy and reproducible drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial monuments and fifty foot stationing along new road centerlines. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.
G. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services".
1.5 TEMPORARY USE OF NEW ELEVATORS
A. The Contractor and his personnel will be permitted use of new elevator(s) subject to the following provisions:
1. Contractor shall make arrangements with the Contracting Officer for use of elevator(s). Contractor may obtain elevator(s) for exclusive use.
2. Prior to the use of elevator(s), the Contractor shall have the elevator(s) inspected and accepted by an ASME accredited, certified elevator safety inspector. The acceptance report shall be submitted to the Contracting Officer.
3. Submit to the Contracting Officer the schedule and procedures for maintaining equipment. Indicate the day or days of the week and total hours required for maintenance. A report shall be submitted to the Contracting Officer monthly indicating the type of maintenance Conducted, hours used, and any repairs made to the elevator(s).
4. The Contractor shall be responsible for enforcing the maintenance procedures as per VA and manufacturers recommendations and requirements.
5. During temporary use of elevator(s) all repairs, equipment replacement and cost of maintenance shall be the responsibility of the Contractor.
6. Personnel for operating elevator(s) will not be provided by the Department of Veterans Affairs.
DOCUMENT 00 73 10 Page 6
7. Contractor shall cover and provide maximum protection of the entire elevator(s) installation.
8. The Contractor shall arrange for the elevator company to perform operation of the elevator(s) so that an ASME accredited, certified elevator safety inspector can evaluate the equipment. The Contractor shall be responsible for any costs of the elevator company.
9. All elevator(s) parts worn or damaged during temporary use shall be removed and replaced with new parts at the contractor's expense.
This shall be determined by an ASME accredited certified elevator safety inspector after temporary use and before acceptance by the Government. Submit report to the Contractor Officer for approval.
10. Elevator shall be tested as required by the testing section of the elevator(s) specifications before acceptance by the Department of Veterans Affairs. The Contractor shall be responsible for all cost associated with testing and inspection.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --
A/E Design-Construct Center for Rehabilitative Services VA247-16-C-0068
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Salvage Plan; G
1.2 GENERAL INTENT
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Department of
Veterans Affairs WJB Dorn VA Medical Center 6439 Garners Road, Columbia, SC, 29209 as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Contracting Officer.
C. Offices of Apogee Consulting Group as Architect-Engineers will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the
Contractor shall notify the Contracting Officer in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the Contracting Officer.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
1.3.1 Project Description
The work includes preparing site for new building and all incidental related work.
SECTION 01 11 00 Page 2
1.3.2 Location
The work is located at the Columbia VAMC, Columbia, SC 29209, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.4 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor's employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week's notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor's employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting
Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting Officer for the purpose of security inspections of every area of the project including toolboxes and parked machines and take any emergency action.
Provide the Contracting Officer and the VA with keys to any construction fencing locks used by the contractors on site.
2. Refer to Section 08 71 00, DOOR HARDWARE, for coordination with the Contracting Officer and VA locksmith and process for permanent lock cylinders installation.
D. Document Control
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
SECTION 01 11 00 Page 3
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive
Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project.
Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of the Contracting
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify the Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering
Document Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits shall be issued for General
Contractor and its employees for parking in designated contractor staging areas only.
1.5 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.
Occupancy notifications will be posted in a prominent location in the work area.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
SECTION 01 11 00 Page 4
1.6 ALTERATIONS
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
A. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
B. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
C. Survey: Before any work is started, the Contractor shall make a thorough survey with the Contracting Officer and a representative of VA
Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by Contractor and
Contracting Officer.
D. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of
Contracting Officer, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.
Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and
VAAR 852.236-88).
E. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of building involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
SECTION 01 11 00 Page 5
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by
Contractor's workmen in executing work of this contract.
F. Protection: Provide the following protective measures:
1. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
2. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.7 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation and comply with
Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating
Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.7.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.8 RELOCATED EQUIPMENT ITEMS
A. Contractor shall disconnect, dismantle as necessary, remove and reinstall in new location, all existing equipment and items indicated by symbol "R" or otherwise shown to be relocated by the Contractor.
B. Perform relocation of such equipment or items at such times and in such a manner as directed by the Contracting Officer.
C. Suitably cap existing service lines, such as steam, condensate return, water, drain, gas, air, vacuum and/or electrical, at the main whenever such lines are disconnected from equipment to be relocated.
Remove abandoned lines in finished areas and cap as specified herein before under paragraph "Abandoned Lines".
SECTION 01 11 00 Page 6
D. Provide all mechanical and electrical service connections, fittings, fastenings and any other materials necessary for assembly and installation of relocated equipment; and leave such equipment in proper operating condition.
E. All service lines such as noted above for relocated equipment shall be in place at point of relocation ready for use before any existing equipment is disconnected. Make relocated existing equipment ready for operation or use immediately after reinstallation.
1.9 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT
Contractor shall request Government furnished equipment be delivered not less than 60 days in advance of the needed date. Contractor shall be responsible for storage of materials and equipment in accordance with the manufacturer's written instructions. Contractor shall also indicate delivery dates by the VAMC of indicated materials and equipment of the project schedule.
1.10 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01 14 00 Page 1
SECTION 01 14 00
WORK RESTRICTIONS
11/11 submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with
Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
List of Contact Personnel;
1.2 NOT USED
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Working Hours
Regular working hours must consist of an 8 1/2 hour period established by the Contracting Officer, between 7 a.m. and 3:30 p.m., Monday through
Friday, and 7 a.m. to 11 p.m. on Saturday, excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
SECTION 01 14 00 Page 2
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the
Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.3.5 Occupied Buildings
The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the
Contracting Officer.
The existing buildings and their contents must always be kept secure.
Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in existing buildings during the construction period.
1.3.6 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, are considered utility cutovers pursuant to the paragraph WORK
OUTSIDE REGULAR HOURS.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.4 SECURITY REQUIREMENTS
Contract Clause FAR 52.204-2 Security Requirements and Alternate II and the following apply:
1.4.1 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply
SECTION 01 14 00 Page 3 with these regulations.
B. Security Procedures:
1. General Contractor's employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week's notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor's employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting Officer’s representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See
Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
"sensitive information".
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked "Law Enforcement Sensitive" or "Sensitive
Unclassified". Secure such information in separate containers and limit the access to only those who will need it for the project.
Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
5. All paper waste or electronic media such as CD's and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
SECTION 01 14 00 Page 4
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of "sensitive information".
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering
Document Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. "Sensitive information" including drawings and other documents may be attached to e-mail provided all VA encryption…