A.02 Attachment_1_SOUTH_SITES_AND_FREQUENCIES_working_12JAN2022.pdf
PDF 131 KB Posted
- Solicitation number
- W9127N22R0011
About this file
This document includes a scope of work for janitorial services at multiple facilities within the South Willamette Valley Project in Oregon. The selected contractor shall provide all management, tools, equipment, labor, materials and vehicles necessary to perform cleaning tasks at Lookout Point Powerhouse, Dexter Powerhouse, Cougar Powerhouse, Fall Creek Powerhouse, Fern Ridge Dam, Cottage Grove Dam, Hills Creek Powerhouse and their related offices. Services include restroom cleaning, floor maintenance, window cleaning, carpet cleaning and floor finish stripping at minimum frequencies established in the scope of work. The contract will be awarded by the Department of the Army Corps of Engineers Engineering District Portland. Pricing shall be provided using contract line item numbers for each facility as detailed in the attachments.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN Location/Facility (attached drawing) surface type area sq ft/or total
Cleaning Frequency
Price
0001 Lookout Point Project Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Lookout Point Powerhouse - EL. 731
2xWeek
Generator Floor Tile 9217 Conference Room Carpet 337
Control Room - Operators Area Tile 165 Control Room - Carpet Carpet 987
Electrical Shop Carpet 342 Equipment Room Tile 117
First Aid Room Tile 75 Janitor's Storage Room Tile 38
Laundry Room Tile 166 Restroom (Employee, Operator and Women's) Tile 572
Kitchen (Employee and Operator) Ceramic Tile 355
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Upstairs Offices - EL. 741
2xWeek
Upstairs Offices Carpet 602
(Paragraph 5.2.1 of PWS) Window Cleaning, (MAR &
OCT)
glass 4327 2x yearly
(Paragraph 5.2.2 of PWS) Strip-Seal Floor Finish MAR & OCT: Restrooms, Generator Floor and Office areas
Tile 18281 2xYear
(Paragraph 5.2.3 of PWS) Steam Carpets Upstairs Office ( Carpet 602 1x yearly Janitorial (Paragraph 5.1.6 - 5.1.7 of PWS) Services - Dam Entrance - EL. 941.75
Concrete 157 4x yearly
CLIN Location/Facility (attached drawing) surface type area sq ft/or total
Cleaning Frequency
Price
0002 Dexter Project Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Dexter Powerhouse - Generator Floor - EL. 660
4xYear
Floor Maintenance concrete 3369 Restroom Cleaning tile 126
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Dexter Powerhouse -Turbine Floor - EL. 646.25 concrete 1166
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - WVP Office, East Office & West Conference Office
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - WVP Office
4xWeek
Manager's Office x4 Carpet 781 Admin Section Carpet 927 Supply Section Carpet 1333
Kitchen Carpet 460 Mechanical Room Concrete 115
Outside Walkways, Vestibule Concrete 732 Restroom Cleaning Ceramic Tile 354
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - WVP Office - 2nd Floor
3xWeek
Drafting Room Carpet 593 Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - West Conference Office
4xWeek
Offices x 3 carpet 375 Kitchen linoleum 300
Restrooms x 2 linoleum 330 Conference Room carpet 630
Walkways linoleum 165 Janitorial Services (Paragraph 5.1.1 - 5.1.12 of PWS) - WVP East Office
3xWeek
Offices x5 Carpet 602 Main Area Carpet 440
Outside Walkways, Vestibule Concrete 293 Mechanic Breakroom Concrete 437
Restroom Cleaning Ceramic Tile 52
(Paragraph 5.2.1 of PWS) Window Cleaning (WVP, East & West), MAR & OCT glass 19067 2x yearly
(Paragraph 5.2.3 of PWS) Steam Carpets (WVP, East & West Offices & 2nd Floor) MAR & OCT
Carpet 7178 2x yearly
(Paragrpah 5.2.2 of PWS) Strip-Seal Floor Finish (WVP, East, West Offices) MAR & OCT
Tile 1473 2x yearly
South Valley Powerhouse, Dams & Project Offices Sites & Frequencies
Cleaning Frequency
Price
0003 Hill Creek Project Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Powerhouse - EL. 1250
4xYear
Generator Floor Concrete 1650 Storage Area Concrete 2110
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Powerhouse - EL. 1235
4xYear
Turbine Floor Concrete 4440 Control Room Concrete 944
Restroom Concrete 61 Oil Room Concrete 546
Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS)Services - Intake Structure - EL. 1548.42, Feb/May/Aug/Nov
4x yearly
Floor Maintenance Concrete 364 Restroom Concrete 37
CLIN Location/Facility (attached drawing) surface type area sq ft/or total
Cleaning Frequency
Price
0004 Cougar Project Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Intake Tower (COU-3)
4xYear
Floor Maintenance concrete 120 Restroom Cleaning concrete 120
Litter Pickup - Parking Lots and Walkway asphalt 4500 Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Cougar PH - Generator Floor (COU-1)
4xYear
Floor Maintenance concrete 2355 Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Turbine Floor (COU-2)
4xYear
Floor Maintenance concrete 2729 Control Room concrete 2050
Restroom concrete 112 4xYear (Paragraph 5.1.1 - 5.1.12 of PWS) Fish Facility - CXT Restroom concrete 64 2xMonthly
CLIN Location/Facility (attached drawing) surface type area sq ft/or total
Cleaning Frequency
Price
0005 Cottage Grove Project Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Cottage Grove Project Office (CG-10) (NOV-MAR)
2x weekly
Copy Room laminate 246 Entryway concrete 120
Foyer laminate 109 Hallway carpet 45 Kitchen laminate 78
Main Room carpet 288 Office x3 carpet 550 Restroom laminate 50
South Office Room laminate 242 Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Cottage Grove Project Office to Include Cottage Grove Garage (CG-10) (CG-11) (APR - OCT)
3x Weekly
Janitorial (Paragraph 5.1.1 - 5.1.12) Services - Cottage Grove Project Garage (CG-11) Restroom (Jan - Dec)
Concrete 2x weekly
(Paragraph 5.2.1 of PWS) Window Cleaning (Shop & Office) OCT & MAR glass 168 2x yearly
(Paragraph 5.2.3 of PWS) Steam Carpets (office X3 Hallway, Main Room) OCT & MAR
Carpet 883 2x yearly
(Paragrpah 5.2.2 of PWS) Strip-Seal Floor Finish (South Office Room, Restroom, Kitchen, Foyer, Copy Room)
OCT & MAR
Tile 725 2x yearly
CLIN Location/Facility (attached drawing) surface type area sq ft/or total
Cleaning Frequency
Price
0006 Fall Creek Project Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Adit Building - EL. 675.67, Jan/Apr/Jul/Oct
4x yearly
Access Gallery - floor only 1417 Equipment Room Concrete 36
Gate Structure - EL. 686.33 - floor only Concrete 1134 Storage Room Concrete 54
Water Treatment Room Concrete 46 Restroom Cleaning Concrete 45 4xYear
Fish Facility (Paragraph 5.1.1 - 5.1.12 of PWS) - Restroom (Mar - Oct)
160 2xMonth
Storage Room/Work Room Concrete 160 2xMonth
Cleaning Frequency
Price
0007 Fern Ridge Project Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Fern Ridge Project Office - Mar through Oct - (FR-2)
2x weekly
Botanist Office Concrete 352 Front Office linoleum 225 Back Office tile 382 Breakroom Concrete 990
Restroom/Storage Room linoleum 225 Shop - Floor Only Concrete 1725
East (Trailer) Office carpet/linoleum 816 Janitorial (Paragraph 5.1.1 - 5.1.12 of PWS) Services - Fern Ridge Project Office - Nov through Feb
1x weekly
Offices and Breakroom tile/concrete 3674 (Paragraph 5.2.1 of PWS) Window Cleaning (Project & East, Shop) OCT & MAR glass 384 2x yearly
(Paragraph 5.2.3 of PWS) Steam Carpets (East Office)
OCT & MAR
Carpet 816 2x yearly
(Paragrpah 5.2.2 of PWS) Strip-Seal Floor Finish (Projcet Office) OCT & MAR
Tile 3899 2x yearly
CLIN Location/Facility (attached drawing) surface type area sq ft/or total
Cleaning Frequency
Price
PH_DAM_OFFICES
File details come from the government source that posted it. Updated .