A-bldg_1st_flr_plumbing_plan_(P-111).pdf

PDF 335 KB Posted

Attached to
Brown Water System Replacement for FKNMS
Solicitation number
1305M225Q0188
Issued by

About this file

This document is a plumbing design and riser diagram architectural drawing for the Dr. Nancy Foster Florida Keys Environmental Center, prepared by Baker+Dumes+Ripple architectural firm. The drawing includes four key sections: a Plumbing Mezzanine Floor Section Plan, Overflow Drain Riser Diagrams, a Plumbing First Floor Section Plan, and Storm Drain Riser Diagrams. The technical drawings provide detailed schematics for plumbing infrastructure, with specific annotations and notes about pipe routing, drain connections, and placement of plumbing elements across different floor levels. The drawings include a comprehensive set of plumbing keynotes that provide technical specifications and installation guidelines for the project's plumbing systems.

View the file

Other files

File Type Posted
1352_213-70_SAP_Eval_Clause_V_2.pdf PDF
9_Wage_Determination.pdf PDF
A_bldg_plumbing_-_as_built_(_P-111).pdf PDF
Brown_Water_Room_Layout.jpg JPG image
Sol_1305M225Q0188.pdf PDF
Brown_Water_System_Final_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .