923456-26-32-2-1.pdf

PDF 1 MB Posted

Attached to
Utility Point Of Repair - Addendum no. 1
Solicitation number
923456-26-32-2
Issued by
St. Tammany Parish, Louisiana

About this file

This is Addendum No. 1 to a technical specifications document issued by St. Tammany Parish Government's Procurement Department for a Utility Point of Repair contract. The addendum, dated June 17, 2026, modifies the original bid specifications for scheduled and emergency repairs to water and sewer infrastructure throughout St. Tammany Parish and its municipalities. The scope encompasses over 150 unit-price line items including mobilization, pavement work, gravity and force sewer mains, directional drilling, water mains, valves, hydrants, and related appurtenances. Key modifications in this addendum include: the addition of Municipal and Public Work Construction as a qualifying contractor classification; removal of Contractor's Errors and Omissions insurance requirement; and clarification of measurement and payment procedures for tapping sleeves, proposal items, pipe materials, and mobilization timelines. The bid due date is Tuesday, June 23, 2026, with work performance commencing within 24 hours of a 72-hour utility locate period for standard repairs, or within two hours for emergency response. The contract term runs through December 31, 2026, with two optional one-year renewal periods available by mutual written agreement, subject to a single escalation adjustment not exceeding the U.S. Bureau of Labor Statistics National Index.

The addendum provides ten questions and answers addressing critical technical specifications, including clarification that tapping sleeve sizes denote the diameter of the main being tapped rather than the connecting pipe; confirmation that HDPE is the approved pipe material; and specification that valves are paid separately from sleeve installations. Bid items include quantity corrections (e.g., Item 3070 adjusted from 4 each to 400 linear feet), payment methodology for tie-ins and valve installations, and procedures for manhole resetting and adjustments. All materials must conform to ASTM, AWWA, NSF, and Louisiana Department of Transportation & Development standards. The contractor must submit utility locate requests within 24 hours of service requests and commence repairs within 24 hours following the 72-hour utility locate response period. The addendum includes revised Section 12 Technical Specifications, Unit Price Form, and Insurance Requirements as attachments, with contractor insurance requirements reduced to remove the Errors and Omissions coverage previously mandated.

View the file

Other files

File Type Posted
923456-26-32-2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ST. TAMMANY PARISH

MICHAEL B. COOPER

PARISH PRESIDENT

PROCUREMENT DEPARTMENT

P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | PROCUREMENT@STPGOV.ORG | 985-898-2520

WWW.STPGOV.ORG

Version 2026.1

June 17, 2026

Please find the following addendum to the below-mentioned BID.

Addendum No.: 1

Bid#: 26-32-2

Project Name: Utility Point of Repair

Bid Due Date: Tuesday, June 23, 2026

GENERAL INFORMATION:

1. MUNICIPAL AND PUBLIC WORK CONSTRUCTION has been added as a qualifying classification

2. Contractor’s Errors and Omissions is not required and has been removed from the Insurance

Requirements.

QUESTIONS & ANSWERS:

Question 1. Do proposal Items 2007 through 2013 on pages 6 and 7 include any valves?

Answer 1. No. Measurement and payment of stainless-steel tapping sleeve are covered by bid items 2007 through 2013. Payment shall constitute compensation for complete installation of tapping sleeves, including tap. Valves shall be separately paid under the respective bid items in Sections 3 and 4.

Question 2. Using proposal Item 2009 as an example, is this interpreted as a tapping sleeve for an 8-inch valve and attached to a pipe that is at least 8 inches in diameter but could be as large as 16 inches in diameter?

Answer 2. The sizes denoted for tapping sleeves are based on the diameter of the water main or sewer force main to be tapped and connected to. For example, if a 4” water main will connect to an existing 12” water main, payment will made under “FURNISH

& INSTALL/ TEST/ TAP SS SLEEVE – 12” X ALL SIZES”.

Question 3. Proposal Item 3070 on page 19 has a quantity of 4 and a unit measure of EA. Is this correct?

Answer 3. Line item has been corrected to a quantity of 400 and a unit measure of Linear Feet.

http://www.stpgov.org/

Question 4. In general, where the proposal form uses the notation of “HPDE”, should this read

“HDPE”?

Answer 4. The approved by pipe material is high-density polyethylene (HDPE).

Question 5. If the contractor must tie into a water main or sewer force main and a tapping sleeve and valve is not used, how will payment be made for the tie in?

Answer 5. Tie-ins on water mains and sewer force mains not using a tapping sleeve shall be done with the appropriate ductile iron fittings, valves, and other required appurtenances. Payment for these items shall be made in accordance with applicable specifications in the sections

Question 6. Proposal Items 4062 and 4063 on page 33 use the language “Up 2” Pipe”. This language is repeated in the specifications for this item of work. Is this “Up to 2”

Pipe” diameter?

Answer 6. Bid items 4062 and 4063 for long and short side water service connections are for polyethylene (PE) water service lines up to 2” in diameter.

Question 7. Will valves only be used when new main line utilities are installed? If not and a valve is installed into an existing water or sewer force main will a point repair pay item also be used to install the valve?

Answer 7. A combination of applicable items shall be used to install new valves on existing sewer or water mains. The combination of bid items shall be mutually agreed upon by the contractor and St. Tammany Parish prior to proceeding with the repair.

Payment for these items shall be in accordance with the applicable specification sections.

Question 8. The specifications for proposal item 3102 “Resetting Existing Manhole Rings &

Covers” is unclear. Are the rings riser rings? Are the rings flaring rings attached to the structure? Is the cost to remove or replace any pavement included with this item?

Answer 8. This item is for resetting and resecuring existing manhole covers and supporting frame on existing manholes. Payment for precast concrete riser rings or bricks required to reset the manhole cover and supporting frame to the correct grade shall be made under the “ADJUSTING SEWER MANHOLE” item. Payment for removal and replacement of pavement shall be made under the applicable bid items

Question 9. Are the valves for fire hydrants paid for under the “Valve” items?

Answer 9. Yes, an isolation valve as shown on the fire hydrant detail shall be paid separately under the applicable item.

Question 10. Will adapters and transition couplings be paid for under proposal item 2014

“Ductile Fittings & Accessories All Types All Sizes”? For example, HDPE to PVC adapters / Couplings.

Answer 10. There shall be no direct payment for Harvey adapters, transitional couplings or similar adapters required to connect HDPE pipes to other dissimilar pipe materials.

Question 11. Please add another 24 hours to the requirement of mobilizing on a task order in 72 hours. It now takes 72 hours for a LA One Call ticket to take effect, moving on a job before the LA One Call ticket is processed is not a reasonable request.

Answer 11. The contractor shall submit his utility locate request to Louisiana One Call (811) within twenty-four (24) hours of receiving a written request for service. The contractor shall be allotted seventy-two (72) hours to allow utility owners to respond to the utility locate request. The contractor shall commence repair of sewer and/or water facilities within twenty-four (24) hours of this allotment period.

ATTACHMENTS:

1. Section 12 – Technical Specifications (Revised)

2. Unit Price Form (Revised)

3. Insurance Requirements (Revised)

End of Addendum # 1

Section 12

Revised Per Addendum No. 1

TECHNICAL SPECIFICATIONS

Utility Point of Repair Technical Specifications - 1 Addendum No. 001 June 17, 2026

Technical Specifications

TABLE OF CONTENTS

MOBILIZATION

SECTION 1: ROADWAY AND PAVEMENT

TRAFFIC CONTROL

FIBER-REINFORCED PCC ROADWAYS

EXTRUDED CURBS

ASPHALTIC PAVEMENTS

ASPHALTIC TACK COAT

SAW CUT PAVEMENT

REMOVE AND RESTORE COMBINATION CONCRETE CURB & GUTTER

PCC REMOVAL

ASPHALT REMOVAL

GRANULAR MATERIAL BASE COURSE

LIMESTONE BASE COURSE

REMOVAL OF CONCRETE WALKS AND DRIVES

FIBER-REINFORCED PCC DRIVEWAYS & SIDEWALKS

SECTION 2: GENERAL WATER AND SEWER WORK

EXPLORATORY EXCAVATION

EROSION AND SEDIMENT RUN-OFF CONTROL

SHEETING, SHORING AND BRACING

WELL POINTING

ST. AUGUSTINE GRASS SOD/ CENTIPEDE SOD

SEED & FERTILIZE (CENTIPEDE)

INSPECTION AND TESTING OF THE SEWER AND WATER SYSTEMS

FURNISH AND INSTALL/ TEST/ TAP SS SLEEVE

DUCTILE FITTINGS AND ACCESSORIES (ALL TYPES, ALL SIZES)

PIPE JOINT RESTRAINTS FOR WATER AND SEWER PIPE

TRACER WIRE, IDENTIFICATION TAPE AND UTILITY MARKERS

REMOVAL OF EXISTING SEWER OR WATER LINES

FLOWABLE FILL GROUT FOR FILLING ABANDONED PIPE

SECTION 3: SANITARY SEWER SYSTEM

GRAVITY SEWER LINE

GRAVITY SEWER POINT REPAIR

SEWER FORCE MAIN

FORCE MAIN POINT REPAIR

SEWER FORCE MAIN, DIRECTIONAL DRILL

FURNISH AND INSTALL SEWER VALVE

Utility Point of Repair Technical Specifications - 2

FURNISH AND INSTALL SEWER VALVE BOX (ALL SIZES AND DEPTHS)

RESETTING EXISTING MANHOLE RINGS & COVERS

ADJUSTING SEWER MANHOLE

REPAIR MANHOLE/ LINE CONNECTION

REHABILITATE MANHOLE BENCH/ TROUGH

CLEANING OF THE MANHOLE OR WET WELL

FURNISH & INSTALL NEW MANHOLE RINGS & COVERS

FURNISH AND INSTALL SEWER MANHOLE

REPAIR/ ADJUST CLEANOUT

INSTALLATION OF SEWER CLEANOUT

INSTALLATION/REPLACEMENT OF SEWER HOUSE CONNECTIONS

SECTION 4: WATER SYSTEM

DISINFECTION OF WATER MAIN AND APPURTENANCES

WATER MAIN

WATER POINT REPAIR

WATER MAIN, DIRECTIONAL DRILL

WATER VALVE

FURNISH AND INSTALL WATER VALVE BOX (ALL SIZES AND DEPTHS)

INSTALLATION OF WATER SERVICES

HIGH SECURITY FIRE HYDRANT – 5 ¼”, 3-WAY

FIRE HYDRANTS – RAISING (EXTENSION)

Utility Point of Repair Technical Specifications - 3

MOBILIZATION

UPON EXECUTION OF THE CONTRACT, THE CONTRACTOR SHALL HAVE ALL NECESSARY

PERSONNEL, MATERIALS, EQUIPMENT, INSURANCE, BONDS AND OTHER INCIDENTALS

REQUIRED BY THIS WORK. PAYMENT FOR “MOBILIZATION” SHALL BE MADE

QUARTERLY AT THE PER EACH PRICE STATED IN THE BID FORM. PAYMENT SHALL BE

MADE WITH THE FIRST PAY APPLICATION OF THE QUARTER.

THE CONTRACTOR SHALL SUBMIT HIS UTILITY LOCATE REQUEST OT LOUISIANA ONE

CALL (811) WITHIN TWENTY -FOUR (24) HOURS OF RECEIVING A WRITTEN REQUEST FOR

SERVICE. THE CONTRACTOR SHALL BE ALLOTTED SEVENTY-TWO (72) HOURS TO ALLOW

UTILITY OWNERS TO RESPOND TO THE UTILITY LOCATE REQUEST. THE CONTRACTOR

SHALL COMMENCE REPAIR OF SEWER AND/OR WATER FACILITIES WITHIN TWENTY-FOUR

(24) HOURS OF THIS ALLOTMENT PERIOD. THE CONTRACTOR SHALL MOBILIZE THE

APPROPRIATE CREW, EQUIPMENT AND MATERIALS TO THE SITE(S) THEREAFTER.

MOBILIZATION OF PERSONNEL, EQUIPMENT AND MATERIALS TO THE SITE(S) SHALL BE

PAID PER EACH UNDER “SUPPLEMENTAL MOBILIZATION” LINE ITEM.

IN THE EVENT OF AN EMERGENCY, THE CONTRACTOR SHALL BE REQUIRED TO BE ON-

SITE FOR AN EMERGENCY REPAIR OF SEWER AND/OR WATER FACILITIES WITHIN TWO (2)

HOURS OF RECEIVING NOTIFICATION FROM THE PARISH WITH A SUPERINTENDENT OR

FOREMAN TO ASSESS THE SITUATION. THE CONTRACTOR SHALL MOBILIZE THE

APPROPRIATE CREW, EQUIPMENT AND MATERIALS TO THE SITE IMMEDIATELY

THEREAFTER. THE CONTRACTOR SHALL PROVIDE THE CREW, EQUIPMENT AND

MATERIALS NECESSARY TO WORK CONTINUOUSLY UNTIL THE REPAIR IS COMPLETE OR

UNTIL DIRECTED OTHERWISE BY THE PARISH. PAYMENT FOR MOBILIZATION DURING AN

EMERGENCY SHALL BE MADE UNDER THE “EMERGENCY MOBILIZATION” LINE ITEM.

ADDITIONAL SUPPLEMENTAL MOBILIZATION CHARGE WILL BE ALLOWED ONLY WHEN

RE-MOBILIZATION IS DUE TO ACTION OF THE PARISH.

IT IS THE CONTRACTOR’S RESPONSIBILITY TO CHECK WORK SITES PRIOR TO

MOBILIZING WORK FORCE TO ENSURE SITE IS READY FOR WORK TO BE DONE. THE

APPROPRIATE MOBILIZATION PAY ITEM(S) SHALL BE INCLUDED WITH OTHER

APPROPRIATE PAY ITEMS REQUIRED TO COMPLETE THE REPAIRS AS APPROVED BY

THE PARISH.

Pay Item

Item No. Item Unit

001 MOBILIZATION EA

002 SUPPLEMENTAL MOBILIZATION EA

003 EMERGENCY MOBILIZATION EA

Utility Point of Repair Technical Specifications - 4

SECTION 1: ROADWAY AND PAVEMENT

TRAFFIC CONTROL

The contractor shall provide all materials, traffic control devices, signage, labor and equipment required for proper traffic control in accordance with all local, State and Federal laws and regulations.

Traffic control devices and signage shall conform with the most current version of the MUTCD and

LADOTD standard specifications and plans. All flagmen shall be trained and certified in traffic control.

Contractor shall provide copies of traffic control certifications to the Parish. There shall be no direct measurement for payment for TRAFFIC CONTROL. Establishing traffic control shall be considered incidental to the respective item(s) of work.

FIBER-REINFORCED PCC ROADWAYS

This item covers the furnishing of all materials and installation of Portland Cement Concrete

(PCC) roadway pavements for thickness as shown.

Mix for 1 C.Y. of Fiber-Reinforced Concrete – PCC Roadways 28-day strength 4000 psi Cement (ASTM C-150, Type I/II) 4.64 sacks (436 lbs.)

Fly Ash (ASTM C-618) 1.16 sacks(109 lbs.)

Gravel (ASTM C-33, Grade A) 1775 lbs.

Sand (ASTM C-33) 1226 lbs.

Water (potable) 30 gallons (250 lbs.)

Type A Water Reducer (ASTM C-494) 16.35 lbs.

Air entrainment 5% by volume, use per manufacturers specifications Fiber reinforcement 1.5 lbs/ CY microfibers, as specified below

The fiber reinforcement for all concrete pavement shall be the brand “Matrix Monofilament

Microfiber” as manufactured by FRC Industries or prior approved equal, applied throughout the concrete mixture. The cellulose (treated or untreated), AR glass, nylon, and polyester fibers are specifically prohibited from use. The fibrillated and self-fibrillating fibers are also specifically prohibited. The fiber reinforcement shall be applied at the plant. The bags must be broken before mixing. Bag size shall be one (1) pound.

Damaged and/or missing dowel bars (longitudinal/transverse) and Starlugs shall be replaced with new dowel bars. 1-1/8" x 18" painted smooth dowel bars on 12" centers shall be used unless directed otherwise by St. Tammany Parish Government (Parish). The bars shall be drilled and doweled into the existing pavement by drilling 1½" holes to a depth of 9" and filling with an approved epoxy grout before insertion of the dowel bars. Any deformed bars for longitudinal joints or welded wire fabric will be incidental to the bid unit prices under this item. All costs incurred for this task will be incidental to bid unit prices under concrete paving. The bid prices shall also include adequate curing of the concrete placed and the proper sealing of contraction and expansion joints.

The Contractor is advised that the work along roadways will necessarily be done with a split-paving method. It will be important to have at least one side of the roadway open to traffic when workers are not present.

Utility Point of Repair Technical Specifications - 5

The bid prices should include all costs for labor, equipment, and materials necessary to provide finished PCC paving including curing compound, in place, as described under this item of the bid. All required jointing materials should be included in price bid under each item. The method of jointing shall be the same as the existing joints in the area of work.

The bid prices under this item shall also include cost of providing engineering/ surveying for alignment, grade, profile, survey stakes, and topography when necessary and as required to improve the roadway alignment, curb and gutter layout, drain line installation, etc. The compensation for this shall be incidental to corresponding bid items in the maintenance contract. There is no other compensation. This includes new roads, extension of existing roads, turning lanes, parking lots, bike and walking trails, etc. All layouts shall be the responsibility of the Contractor. The Contractor shall be responsible for disposal of all construction materials.

The concrete pavement shall be for cured seven (7) days unless otherwise approved by the

Parish. If the Contractor uses "high early" strength concrete (3-day curing period) at his discretion, without the approval of the Parish, payment shall be made under the regular (7-day curing) concrete paving item. The Contractor shall be responsible for proper oversight and protection of the pavement during the initial curing time until the concrete is sufficiently set to resist marring or vandalism.

Roadway pavement shall be in accordance with these specifications and/or the Louisiana

Department of Transportation & Development (LDOTD) Standard Specifications for Roads and

Bridges, latest edition and revisions, Section 601; whichever is more stringent.

EXTRUDED CURBS

The PCC mixture for curb construction shall be a minimum of 4000 psi at 28 days concrete and also provide proper workability, curb strength, and minimum contraction cracking. The PCC curbing may be placed by extruding machine or by forming and hand placement at the Contractor's option and will be bonded to holding surface in a manner approved by the Parish, which may include dowelling and/or an approved bonding agent.

The accepted quantities of curbs will be paid at the contract unit price per linear foot per type, including all labor, equipment, and materials incidental to the work.

1001 8" THICK PCCP, FIBER REINFORCED (IN PLACE) SY

1002 8" THICK PCCP, HIGH EARLY FIBER REINFORCED SY

Item No. Item Unit

1003 PCC ROLL-OVER CURB W/ CURB DOWELS LF

1004 PCC BARRIER CURB W/ CURB DOWELS LF

Utility Point of Repair Technical Specifications - 6

ASPHALTIC PAVEMENTS

All work and materials for construction of asphaltic pavements shall be in accordance with the Louisiana Department of Transportation & Development (LDOTD) Standard Specifications for

Roads and Bridges, latest edition and revisions, Section 501.

The bid prices for this item shall include all cost of labor, equipment and materials necessary to provide finished asphaltic concrete pavement in place as described in the above mentioned speci-fication manual. All survey, initial and final layout of roadway re-construction is incidental to bid items. There is no separate compensation for this work.

The accepted quantities of asphaltic concrete will be paid for at the contract unit price per ton (2,000 pound). No other type of mix will be allowed without prior approval of the Parish. Haul and/ or loading tickets will be issued for each truckload of asphalt delivered by vendor's trucks and placed on the job.

ASPHALTIC TACK COAT

This work consists of preparing and treating existing asphaltic or concrete surface with asphaltic material in accordance with the Louisiana Department of Transportation & Development

(LDOTD) Standard Specifications for Roads and Bridges, latest edition and revisions, Section 504.

The tack coat shall be Ultrafuse, NTSS-1HM, or other prior approved equal trackless tack.

Tack shall be handled and stored per manufacturer’s recommendations. The Contractor shall provide equipment for preparation of the surface to be tacked and applying the tack per manufacturer’s recommendation. The surface shall be cleaned by sweeping or other approved methods. The edges of existing pavements, which will form joints with new pavement, shall be satisfactorily cleaned before tack coat is applied. The asphalt shall be uniformly applied to a clean dry surface with no bare areas, streaks or puddles using an asphalt distributor at a rate specified by the tack manufacturer.

The tack coats shall be applied in such a manner as to cause the least inconvenience to traffic.

The Contractor will be permitted to apply the tack coat one (1) calendar day prior to the mixture laydown; however, when tack coat has been damaged by traffic or contaminated by dirt, dust or mud, the surface shall be cleaned and re-tacked prior to the mixture laydown at no additional cost. The tacked surfaces exposed to traffic for more than 24 hours or damaged due to inclement weather shall be re-tacked at no additional cost. The payment for the asphaltic tack coat shall be included in asphalt pay item.

SAW CUT PAVEMENT

The bid prices for this item shall include all costs for labor, material, and equipment necessary to machine cut the full-depth of either PCC or Asphaltic Pavements. The payment shall be paid at the unit per inch of depth per linear foot of cut. All saw cutting shall be pre-approved by the Parish and measured in the field.

1005 BITUMINOUS HOT MIX ASPHALT TON

Utility Point of Repair Technical Specifications - 7

REMOVE AND RESTORE COMBINATION CONCRETE CURB & GUTTER

The bid prices should include all costs for labor, equipment and materials necessary to remove and dispose of existing combination concrete curb & gutter and the replacement of the concrete curb and gutter in accordance with the Louisiana Department of Transportation &

Development (LDOTD) Standard Specifications for Roads and Bridges, latest edition and revisions, Section 707. All of the excavated material and broken curb shall be hauled off from the job site and disposed by the contractor in accordance with all federal, state and local regulations.

Contractor shall exercise care so that jointing materials and pavement structures adjacent to the concrete curb and gutter to be removed shall not be damaged. Any pavement structure damaged by the Contractor as a result of negligence, either willful or accidental, will be replaced at the

Contractor's expense.

The PCC Mixture for curb and gutter construction shall be a minimum of 4000-psi and also will provide proper workability, curb and gutter strength, and minimum contraction cracking. The

PCC curbing may be placed by extruding machine or by forming and hand placement at Contractor's option and will be bonded to holding surface in a manner approved by the Parish, which may include dowelling and/or an approved bonding agent. Joints and jointing materials conform to the requirements of the LADOTD standard details and specifications.

The accepted quantities for curb and gutter will be paid for at the contract unit price per linear foot, including all labor, equipment and materials incidental to the work.

PCC REMOVAL

These items cover work generally associated with breaking up, and removing existing PCC

Pavements, including curbs. Concrete shall be removed from joint to joint. Breaking up of PCC

Pavement shall be done with a pneumatic pavement breaker. Use of brute force and pounding with excavation buckets will not be an acceptable means of breaking pavement. Where concrete to be removed has been overlaid with asphalt, the asphaltic thickness is to be added to the concrete thickness and paid as concrete removal. Should the Parish desire, the Contractor will dump the broken concrete at a designated disposal site at no additional expense to the Parish.

The accepted quantities of concrete removed shall be paid for at the contract unit price per square yard for the nominal thickness measured at the site. The bid prices should include all costs for labor, equipment, transportation and materials necessary to remove and dispose existing PCC

Pavement.

1006 SAW CUT PAVEMENT IN/LF

1007 REMOVE AND RESTORE COMBINATION CONCRETE CURB AND GUTTER LF

Utility Point of Repair Technical Specifications - 8

ASPHALT REMOVAL

These items cover work generally associated with breaking up, and removal of an existing

Asphaltic Pavement in order to eliminate a badly deteriorated and/ or failed section of roadway.

Breaking up of asphaltic pavement shall be done with a pneumatic or hydraulic pavement breaker. Use of brute force and pounding with excavation buckets will not be an acceptable means of breaking pavement.

The accepted quantities of asphalt removed will be paid for at the contract unit price per square yard for the nominal thickness measured at the site. The bid prices should include all costs for labor, equipment, and transportation necessary to remove and dispose existing Asphaltic

Pavement for thickness shown.

GRANULAR MATERIAL BASE COURSE

The specifications for base course shall be in accordance with the Louisiana Department of

Transportation & Development (LDOTD) Standard Specifications for Roads and Bridges, latest edition and revisions, Sections 301 & 1003.09. Granular material shall conform to the following requirements:

Liquid limit (maximum) 25% (percent)

Plasticity index (maximum) 6% (percent)

The granular material will be paid for by the cubic yard truck measure. The bid price shall include all costs for material, labor, equipment, hauling, placing, spreading, compacting and grading for this item. This pay item shall be used for repairs to roadway base and for patching roadway base.

LIMESTONE BASE COURSE

The specifications for limestone shall be in accordance with the Louisiana Department of

Transportation & Development (LDOTD) Standard Specifications for Roads and Bridges, latest edition and revisions, Sections 301, 1003.01, & 1003.03.1. In addition, the material shall be calcitic or dolomitic with calcium carbonate not less than 85 percent and the silica content (impurities) not to exceed 5 percent. The limestone used on asphalt pavement shoulder shall be comparable to

Mexican limestone in color and gradation.

Item No. Item Unit

1008 PCCP ROADWAY REMOVAL 8” THICK OR LESS SY

1009 PCCP ROADWAY REMOVAL GREATER THAN 8” THICK SY

Item No. Item Unit

1010 ASPHALT REMOVAL SY

1011 FURNISH AND PLACE GRANULAR BASE COURSE CY

Utility Point of Repair Technical Specifications - 9

The material shall conform to the following gradation:

U.S. Sieve Percent Passing 1 1/2" 100 3/4” 50-100 No. 4 35-65 No.40 10-32 No.200 3-15

The aggregate shall conform to LA DOTD approved materials. The fraction of stone passing the No. 40 sieve shall be non-plastic. The limestone material will be paid for by the cubic yard truck measure. The bid price shall include all costs for material, labor, equipment, hauling, placing, spreading, compacting and grading for this item. This pay item shall be used for repairs to roadway base and for patching roadway base.

REMOVAL OF CONCRETE WALKS AND DRIVES

These items cover work generally associated with breaking up and removing existing concrete sidewalks and drives. Concrete shall be removed from joint to joint, where possible. Prior to removal of the sidewalk and/or driveway, the contractor shall notify the property owner at least

24-hours prior. The bid prices should include all costs for labor, equipment and transportation necessary to remove and dispose of existing concrete walks and drives. Breaking up of PCC

Pavement shall be done with a pneumatic pavement breaker. Use of brute force and pounding with excavation buckets will not be an acceptable means of breaking pavement. Should the

Parish desire, the Contractor will dump the broken sidewalks and drives at a designated site at no additional cost to the Parish.

Upon completion of the required work, the contractor shall restore driveway and/or sidewalk access by installing temporary surfacing aggregate. Surfacing aggregate shall be paid in accordance with “FURNISH AND PLACE LIMESTONE BASE COURSE” bid item. Final replacement of concrete drives and/or sidewalks shall be paid in accordance with the respective bid items. Final restoration of concrete drives and/or sidewalks shall be completed within seven (7) calendar days of completion of the required work.

The accepted quantities of sidewalks and drives removed will be paid for at the contract unit price per square yard measured at the site.

FIBER-REINFORCED PCC DRIVEWAYS & SIDEWALKS

This item covers the furnishing of all materials and installation of PCC driveway and sidewalk pavements for thickness as shown. All sidewalk and driveway work and materials shall be

Item No. Item Unit

1012 FURNISH AND PLACE LIMESTONE BASE COURSE CY

1013 REMOVAL OF CONCRETE WALKS & DRIVES SY

Utility Point of Repair Technical Specifications - 10 in accordance with the Louisiana Department of Transportation & Development (LDOTD) Standard

Specifications for Roads and Bridges, latest edition and revisions, Section 706.

The bid prices shall include all costs for labor, equipment, and materials necessary to provide finished PCC paving, in place, as described under this item of the proposal. The contractor shall notify the property owner at least 24-hours prior to installing replacement concrete drives and walks. All required jointing materials should be included in price bid under each item. The method of jointing shall be the same as the existing joints in the area of work.

The bid prices under this item shall also include cost of providing engineering/ surveying for alignment, grade, profile, survey stakes, and topography when necessary and as required to improve the roadway alignment, curb and gutter layout, drain line installation, etc. The compensation for this shall be incidental to corresponding bid items. There is no other compensation. All layouts shall be the responsibility of the Contractor. The Contractor shall be responsible for disposal of all construction materials.

1014 FIBER REINFORCED 4" THICK PCC PAVING, IN PLACE FOR SIDEWALK SY

1015 FIBER REINFORCED 6" THICK PCC PAVING, IN PLACE FOR DRIVEWAYS

(OR SIDEWALKS, IF SPECIFIED IN TASK ORDER)

SY

Utility Point of Repair Technical Specifications - 11

SECTION 2: GENERAL WATER AND SEWER WORK

The price and payment for pay items in this section shall be inclusive of all labor, materials, and equipment for the prescribed work.

EXPLORATORY EXCAVATION

The exploratory excavation shall include all materials, equipment, tools, labor, backfill and incidentals necessary to locate and expose existing water or sewer pipes, fittings or valves as directed by the Department of Utilities. Excavation for the purpose of the identifying other utilities within the work area as required by the State of Louisiana “Dig Laws”, also known as potholing, shall be considered incidental to respective items of work. There shall no direct payment for potholing. The

Contractor shall backfill the excavation and return the surface to its previous condition in accordance with the standard trench details and specifications. This item will be measured per each Exploratory

Excavation completed and accepted. The replacement of pavement, sod, and other incidentals necessary to return topside to original conditions shall be paid under applicable separate bid item.

EROSION AND SEDIMENT RUN-OFF CONTROL

The contractor shall provide all materials, labor and equipment required for proper erosion control in accordance with all local, State and Federal laws and regulations. There shall be no direct measurement for payment for EROSION AND SEDIMENT RUN-OFF CONTROL. Establishing erosion and sediment run-off control shall be considered incidental to the respective item(s) of work.

SHEETING, SHORING AND BRACING

The contractor shall provide all materials, labor and equipment required for safely maintaining and securing an open excavation in accordance with all local, State and Federal laws and regulations.

There shall be no direct measurement for payment for SHEETING, SHORING AND BRACING. Securing and maintaining the excavation shall be considered incidental to the respective item(s) of work.

WELL POINTING

The well pointing shall be used when directed by the Parish to facilitate proper construction techniques. The well points shall include providing, setting up, operating, and removing a properly-sized pump, header pipes, and well points. If the well points are operated 24 hours a day, the motors shall be equipped with super silencers, unless otherwise approved by the Parish. The item Well

Pointing (Set-Up) shall include:

1. A minimum of four (4) well points operated for a minimum period of eight (8) hours, at a maximum depth of 20 feet and 40 feet of header pipe

2. Sufficient pumping capacity to dewater the construction site

2001 EXPLORATORY EXCAVATION EA

Utility Point of Repair Technical Specifications - 12

Well point pumping, when required, shall be measured and paid per day for each day of operation. A day shall be defined as a continuous twenty-four (24) hours of period.

Additional well points may be installed to dewater the construction area, as safety dictates.

The header pipe shall be measured per linear foot and shall include one (1) well point for each 3 feet of header. No additional payment will be made for increased pumping capacity, if required.

ST. AUGUSTINE GRASS SOD/ CENTIPEDE SOD

This work consists of furnishing, hauling, planting, rolling, watering, and maintaining live grass sod at locations directed by the Parish. The approved sod shall be either field grown or nursery grown grass. The sod should be St. Augustine or Centipede unless otherwise directed by the Parish.

Furnishing, hauling, planting, rolling, and watering shall be in accordance with the Louisiana

Department of Transportation & Development (LADOTD) Standard Specifications for Roads and

Bridges, latest edition and revisions, Section 714.

Payment for this item shall be made at the contract unit price bid per square yard.

SEED & FERTILIZE (CENTIPEDE)

This work consists of preparing seedbeds, furnishing and sowing grass seed on the areas designated by the Parish. Preparing of seedbeds shall consist of furnishing and applying fertilizer.

The grass shall be centipede or an approved quick-growing species suitable to the area and season.

The seeding and associated work shall be in accordance with the appropriate section of the Louisiana

Department of Transportation & Development (LDOTD) Standard Specifications for Roads and

Bridges, latest edition and revisions, Section 717.

Payment for seeding and fertilizing shall be made at the contract unit price bid per pound.

INSPECTION AND TESTING OF THE SEWER AND WATER SYSTEMS

Work performed on the sewer and/or water systems shall be subject to inspection and testing by the Department of Utilities or its designated representative. The contractor shall furnish all equipment, labor, materials, and other incidentals for field testing and inspection of the work on

Item No. Item Unit

2002 WELL POINTING (INITIAL SET-UP) EA

2003 WELL POINT PUMPING DAY

Item No. Item Unit

2004 ST. AUGUSTINE GRASS SOD SY

2005 CENTIPEDE GRASS SOD SY

2006 SEED & FERTILIZE (CENTIPEDE) LB

Utility Point of Repair Technical Specifications - 13 the sewer and/or water system. There shall be no direct measurement for payment of INSPECTION

AND TESTING OF THE SEWER AND WATER SYSTEMS.

All gravity sewer mains shall be field-tested for alignment and water-tightness. Repaired and newly constructed gravity sewer mains shall undergo smoke testing to check for water-tightness. All repaired or newly constructed gravity sewer mains shall be checked for alignment and overall roundness using CCTV and/or mandrel. The Contractor shall supply all labor, equipment, material, gages, pumps, and incidentals required for testing.

All newly constructed sewer force mains and water mains shall be field-tested prior to connection to the existing system. The Contractor shall supply all labor, equipment, material, gages, pumps, and incidentals required for testing. The test pressure shall be measured at the highest point along the test section. The testing shall be conducted after backfilling has been completed and before placement of permanent surface. The testing procedure shall be as follows:

• Fill line slowly with potable water;

• Maintain flow velocity less than 2 feet per second;

• Expel air completely from the line during filling and again before applying test pressure;

• Air shall be expelled by means of taps at points of highest elevation;

• Apply test pressure;

• Measure the quantity of water that must be pumped into the line to maintain pressure within 2 PSI of the test pressure for a period of two (2) hours;

• This quantity is defined as leakage; and

• Carefully examine any exposed pipe, fittings, and joints during the test.

The following shall be determined at the discretion of the Parish.

1) Minimum test pressure of 150 psig unless otherwise noted.

2) Test duration shall be a minimum of two (2) hours.

3) All visible leaks are to be repaired regardless of the amount of leakage. If any test of pipe laid discloses leakage, the Contractor shall, at his own expense, locate and repair the cause of leakage and retest the line. The method of repair must be approved by the Parish.

4) Scheduling of testing: the Contractor shall notify the Parish at least 24 hours prior to each testing. Pipe may be subjected to pressure testing and leakage testing at any convenient time after partial completing of backfill.

FURNISH AND INSTALL/ TEST/ TAP SS SLEEVE

The install, test and tap shall include furnishing the full circle all stainless-steel tapping sleeve, brand “Mueller H-304SS”, “Romac Industries SST" or approved equal, testing according to the manufacturer's recommendation and tapping the carrier pipe in a sanitary manner recognized by

AWWA, and the Louisiana Department of Health & Hospitals.

The size of the tapping sleeve denotes the diameter of the water or sewer main to be tapped for connection. Valves for sewer force mains and water mains shall be paid separately in accordance with these specifications.

The payment for this work shall be made at the contract unit price bid per each and shall include all labor and materials required to complete the installation.

Utility Point of Repair Technical Specifications - 14

DUCTILE FITTINGS AND ACCESSORIES (ALL TYPES, ALL SIZES)

Compact, mechanical joint ductile iron fittings for water and sewer mains shall conform to

AWWA C153 and other applicable standards. Full-bodied, flanged ductile iron fittings for 3” diameter and larger water and sewer mains shall conform to AWWA C110. Gaskets, seals and joints for ductile iron fittings shall conform to AWWA C111. Fusion bonded epoxy conforming to AWWA C116 shall be applied to the interior and exterior of all ductile iron fittings. When approved for use by the

Department of Utilities, ductile iron fittings with a cement-mortar lining maybe be used for emergency repair of water mains and sewer force mains. The cement-mortar lining shall conform to

AWWA C104/A21.4 and shall be applied to the interior and exterior of the ductile iron fitting. The interior liner of ductile iron fittings used in potable water applications shall conform to all requirements governing potable water, including but not limited to NSF, AWWA, etc. All ductile iron fittings shall be free of lead per applicable state and federal regulations and industry standards such as NSF and AWWA.

Ductile iron fittings used in potable water use shall be installed in a sanitary manner recognized by AWWA, and the Louisiana Department of Health & Hospitals. Disinfection of ductile iron fittings shall in accordance with this document in addition to state and federal regulations.

All ductile iron fittings shall be adequately restrained to prevent movement. Restrainer glands required for connection of mechanical joint, ductile iron fittings to water/sewer pipe shall be constructed of ductile iron conforming to ASTM A536. Set screws, nuts, t-bolts and other fasteners on and for the restrainer gland shall be cupped, hardened and coated with a blue Teflon coating. The body of restrainer glands shall be coated with a thermoset epoxy. Nuts and bolts required for flanged ductile iron fittings shall be 316 stainless steel.

The payment for ductile iron fittings and accessories shall be made at the contract unit price bid per pound and shall include all fastener, gasket seals marking tape, testing, etc. Prior to invoice, the Contractor shall submit the manufacturer’s literature or specification sheet on the weight for each fitting used and the NSF 61 certification.

2007 FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – UP TO 4” X ALL SIZES EA

2008 FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 6” X ALL SIZES EA

2009 FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 8” X ALL SIZES EA

2010 FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 10” X ALL SIZES EA

2011 FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 12” X ALL SIZES EA

2012 FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 14” X ALL SIZES EA

2013 FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 16” X ALL SIZES EA

Item No. Item Unit

2014 DUCTILE FITTINGS AND ACCESSORIES

(ALL TYPES, ALL SIZES)

LB

Utility Point of Repair Technical Specifications - 15

PIPE JOINT RESTRAINTS FOR WATER AND SEWER PIPE

PVC pipe with unrestrained, bell-and-spigot joints shall be properly restrained using a split restraining harness, such as the EBAA Iron, Inc. series 1900 PV, 2800 Megalug or prior approved equal. The EBAA Iron series 1900 PV or 2800 Megalug assembly shall be cast completely of closely controlled Ductile Iron conforming to ASTM A536, latest revision, and furnished with Silicone Bronze

IFI140 grade 655 bolts. All glands shall be coated with a thermoset epoxy; nuts and bolts shall be

316 stainless steel.

All pipe, fittings and restraints shall be subjected to a rigid inspection after delivery to the site and before being placed in the work. Any piece found defective by such field inspection will be rejected and shall be immediately removed from the premises. All restrained joints shall be inspected at the job site after installation. Field touch-up and repair if needed shall be made by the Contractor under the supervision and inspection of a representative of the coating supplier. Pressure testing of sewer force mains and water mains shall be in accordance with state and federal regulations, industry standards including AWWA, and requirements of this document.

There shall be no direct payment for PIPE JOINT RESTRAINTS. Pipe joint restraints and related accessories for water or sewer pipes shall be considered incidental to the respective item(s) of work.

TRACER WIRE, IDENTIFICATION TAPE AND UTILITY MARKERS

Tracer wire and related accessories shall be installed with all newly constructed sewer or water mains. Tracer wire shall be 12-gauge, copper clad steel wire encased in a HDPE sheath manufactured by Copperhead Industries. Tracer wire accessories shall be part of a system manufactured by

Copperhead Industries used to identify and locate buried sewer or water mains. Tracer wire and related accessories shall be installed per the manufacturer’s instructions and recommendations. The color of the tracer wire and accessories shall correlate to sewer or water. Tracer wire and related accessories shall be activated and tested; failed tracer wire shall be repaired or replaced in accordance with the manufacturer’s instructions at no additional cost. There shall be no direct measurement for payment for TRACER WIRE AND ACCESSORIES. Tracer wire and related accessories for water or sewer pipe shall be considered incidental to the respective item(s) of work.

The non-metallic or non-conductive (current) water and sewer lines must be installed with a non-corrosive metallic tape placed directly over and on the center of the facility for its entire length.

This applies to both parallel installations and crossings. The tape must be connected to all facilities and appurtenances. The detect tape shall have a 3 inches width and the words "buried waterline" or

“buried sewer” shall be printed on it along its entire length. The detect tape shall be manufactured by the Allen Systems, Inc., or approved equal.

Utility markers shall be installed on the surface at the location of all point repairs and tie-ins for sewer or water mains. Utility markers shall be UV stabile, plastic disc with an integral soil or pavement anchor manufactured by Rhino Markers. Utility markers shall be used to identify and locate buried sewer or water mains. Utility markers shall be installed per the manufacturer’s instructions and recommendations. The color of the utility markers shall correlate to sewer or water.

There shall be no direct measurement for payment for UTILITY MARKERS. Utility markers shall be considered incidental to the respective item(s) of work.

Utility Point of Repair Technical Specifications - 16

REMOVAL OF EXISTING SEWER OR WATER LINES

All existing sewer or water lines shall be removed as directed by the Department of Utilities and disposed of in accordance with all local, State and Federal laws and regulations. There shall be no direct measurement for payment for REMOVAL OF EXISTING SEWER OR WATER LINES. Removal of water or sewer pipes shall be considered incidental to the respective item(s) of work.

FLOWABLE FILL GROUT FOR FILLING ABANDONED PIPE

This work includes all equipment, labor, and materials to furnish and install flowable fill inside abandoned pipe. The mix design for flowable fill shall be either the brand “Rheocell Rheofill, Mix 2” or other prior approved equal. When specified by the Parish (generally, when line is not under a roadway), air holes shall be dug every 200 feet to avoid airlocks. Flowable fill shall be in accordance with the Louisiana Department of Transportation & Development (LDOTD) Standard Specifications for Roads and Bridges, latest edition and revisions, Section 710.

The flowable fill shall be produced and delivered at a minimum temperature of 50o F. Do not place flowable fill if ambient air temperature of 35o F or less is anticipated within the 24-hour period following placement. Water shall not be added to the mixture after batching. All pipes, manholes, catch basins, and other areas not intended to be filled shall be tightly sealed prior to placement.

The payment for flowable fill shall be made per cubic yard of flowable fill placed. All preliminary testing, furnishing mix design, pump, cleanup, and other materials, equipment or labor necessary to complete the work as described in the task order shall be included in the flowable fill item and will not be paid for separately.

2016 FLOWABLE FILL GROUT CY

Utility Point of Repair Technical Specifications - 17

SECTION 3: SANITARY SEWER SYSTEM

and equipment to construct or repair any segment of the sanitary sewer system. The sanitary sewer system shall consist of all applicable parts of manholes, sewer mains, house connections, fittings, couplings, and any other required incidentals. The work performed under these pay items shall include all excavation, trenching, shoring, dewatering, bedding, pipe laying, backfill, tie-ins to existing sewer lines, acceptance testing of mains, and all incidental work necessary for a complete and functional sewer collection system.

There will be no direct payment for the removal and disposal of sewer pipe, fittings, valves, manholes, etc., unless otherwise specified. The contractor shall be responsible for maintaining the flow of sewage during the work. There shall be no direct payment for bypass pumping. There shall be no direct payment for dewatering, sheeting and/or shoring required to complete the work. There shall be no direct payment for cleaning of new sewer mains and service connections installed by the

Contractor as part of the final inspection and acceptance.

GRAVITY SEWER LINE

GRAVITY SEWER LINE shall include replacement and/or extension of gravity sewer lines at the depth, distance and grade specified by the Department of Utilities. Gravity sewer lines, including service laterals, shall be constructed of polyvinyl chloride (PVC) sewer pipe featuring an integral bell-and-spigot with rubber gasket seal. PVC gravity sewer pipe with a diameter of 6 inches to 15 inches shall conform to ASTM D3034. The integral bell-and-spigot joint on PVC gravity sewer pipe shall conform to ASTM D3212, and the rubber gasket seal shall conform to ASTM F477. PVC gravity sewer pipe shall have a minimum pipe stiffness of 115 psi (SDR26) when tested in accordance with ASTM

D2412. All PVC gravity sewer pipe shall be green in color with text “SEWER”.

All PVC fittings shall be standard manufactured fittings that meet the current requirements of ASTM D3034 and shall be produced by the same company that furnished the PVC sewer pipe. PVC fittings shall consist of an integral bell with a factory installed "locked in" elastomeric gasket. All joints shall meet the current requirements of ASTM D3212. The spigot end of the pipe shall be factory beveled. If the pipe has been field cut, the pipe end shall be field beveled in accordance with manufacturer’s instructions.

Connectors and adaptors for joining pipes of similar materials and sizes shall be Flex-Seal

Shielded Adjustable repair couplings as manufactured by Mission Rubber Company, Fernco, or an approved equal. The coupling shall have a stainless-steel shear ring (shield) to prevent pipe misalignment against shear forces from soil compaction, shifting and settling, and improper backfill with a sealing “O” ring under each sealing clamp band. The repair coupling shall meet the requirements of ASTM C 1173. The payment for the shielded adjustable coupling shall be incidental and included in the bid price.

The connectors and adaptors for joining pipes of different materials and diameters shall be donuts or similar flexible couplings as manufactured by Fernco Joint Sealer Company or prior approved equal. The donuts and couplings must comply with the requirements ASTM C 1173 and/or

ASTM C 425.

Utility Point of Repair Technical Specifications - 18

The Contractor shall furnish all materials, equipment, labor, and incidentals necessary to remove and install sewer gravity pipe at the depths, distance and grade lines specified by the

Department of Utilities. Pipe fittings, couplings and other incidentals required to connect new gravity sewer pipe to existing sewer pipes or structures shall be considered incidental to the GRAVITY

SEWER LINE pay item. There shall be no direct payment for pipe fittings, couplings or other required pieces for connection to the existing sewer system. Payment for GRAVITY SEWER LINE shall be per linear foot of pipe installed measured horizontally through manholes along the centerline of pipeline.

The replacement of pavement, sod, and other incidentals necessary to return topside to original conditions shall be paid under applicable separate bid item.

GRAVITY SEWER POINT REPAIR

GRAVITY SEWER POINT REPAIR shall comprise of the repair and/or replacement of specific length and location of gravity sewer main, sewer service lines, and service line connections. GRAVITY

SEWER POINT REPAIR shall include all materials, equipment, labor, and incidentals necessary to expose an existing sewer line, make necessary repairs, backfill, and return the surface area to conditions that existed prior to construction. This item includes the replacement of up to 14 linear feet of pipe and any fittings needed to make the repair. Payment for additional gravity sewer pipe over initial 14 linear feet shall be paid under applicable GRAVITY SEWER LINE pay items. There shall be no direct payment for sheeting, shoring and dewatering of the excavation. The replacement of pavements, sod and other incidentals necessary to return topside to original conditions shall be paid under applicable separate pay items. All materials used shall conform to the applicable sections of these specifications.

Item No. Item Unit

3001 GRAVITY SEWER LINE (UP TO 6” PIPE) (DEPTH 0’-5’) LF

3002 GRAVITY SEWER LINE (UP TO 6” PIPE) (DEPTH 5’-10’) LF

3003 GRAVITY SEWER LINE (UP TO 6” PIPE) (DEPTH >10’) LF

3004 GRAVITY SEWER LINE (8” PIPE) (DEPTH 0’-5’) LF

3005 GRAVITY SEWER LINE (8” PIPE) (DEPTH 5’-10’) LF

3006 GRAVITY SEWER LINE (8” PIPE) (DEPTH >10’) LF

3007 GRAVITY SEWER LINE (10” PIPE) (DEPTH 0’-5’) LF

3008 GRAVITY SEWER LINE (10” PIPE) (DEPTH 5’-10’) LF

3009 GRAVITY SEWER LINE (10” PIPE) (DEPTH >10’) LF

3010 GRAVITY SEWER LINE (12” PIPE) (DEPTH 0’-5’) LF

3011 GRAVITY SEWER LINE (12” PIPE) (DEPTH 5’-10’) LF

3012 GRAVITY SEWER LINE (12” PIPE) (DEPTH >10) LF

3013 GRAVITY SEWER LINE (15” PIPE) (DEPTH 0’-5’) LF

3014 GRAVITY SEWER LINE (15” PIPE) (DEPTH 5’-10’) LF

3015 GRAVITY SEWER LINE (15” PIPE) (DEPTH >10’) LF

Utility Point of Repair Technical Specifications - 19

If a point repair is performed on a mainline sewer with a sewer house connection, the

Contractor will be responsible for reconnecting this service line to the mainline sewer. Reconnection of the existing service line to the mainline shall be included in the GRAVITY SEWER POINT REPAIR pay item. The depth of the service line at the point of connection for each property owner shall be sufficient to permit connection to existing private sewer lines at a minimum grade of 1/8 inch per foot. The Contractor shall verify house connections during excavation. The sewer service lines shall be connected to existing private lines at the back of the sidewalk with an approved adapter. The location of installation of service lines to accommodate future development may be directed by the

Parish. Lines installed for future use shall be plugged with an approved adapter behind the cleanout that can be removed without…

This is the start of the file's text. The full file is on GovTribe.