- Utility Point Of Repair - Addendum no. 1
- Solicitation number
- 923456-26-32-2
- Issued by
- St. Tammany Parish, Louisiana
About this file
Utility Point Of Repair Bid Package Summary
This is a Notice to Bidders and Bid Package issued by St. Tammany Parish Government in Louisiana for utility point of repair services. The project encompasses scheduled and emergency repairs, rehabilitation, and replacement of water and sewer infrastructure throughout St. Tammany Parish, including the municipalities of Slidell, Lacombe, Abita Springs, Mandeville, Madisonville, Covington, and Goodbee. Work includes handling and disposing of raw sewage and potable water in accordance with federal, state, and local regulations, with emergency call-outs potentially occurring outside normal business hours. A non-mandatory pre-bid meeting is scheduled for June 4, 2026, at 10:00 AM at Tyler Street Hall of Excellence in Covington, Louisiana. The bid submission deadline is 2:00 p.m. on Tuesday, June 23, 2026, with sealed bids delivered to the Parish's Department of Procurement at 21454 Koop Drive, Suite 2F, Mandeville, Louisiana 70471. The initial contract term runs from the date of award through December 31, 2026, with two optional one-year renewal periods available by mutual written agreement. The contract includes over 150 unit price line items covering mobilization, pavement work, gravity sewer lines, force mains, directional drilling, water mains, valves, hydrants, and related infrastructure components with estimated quantities ranging from 2 to 3,200 units depending on the work type.
Bidders must submit a Louisiana Uniform Public Work Bid Form with a bid guarantee equal to five percent of the total bid amount, either as a cashier's check, certified check, or bid bond from an approved surety company. The successful bidder must obtain a Performance and Payment Bond equal to one hundred percent of the contract price. All contractors must hold an active Louisiana contractor's license and comply with LSA-R.S. 38:2224 and 38:2227 affidavit requirements. The Parish will award the contract to the lowest responsible bidder within forty-five days of bid opening, with bids remaining binding for that period. For optional renewal terms, a single escalation adjustment is permitted not to exceed the U.S. Bureau of Labor Statistics National Index for all Urban Consumers. Liquidated damages are assessed daily based on contract amount, ranging from $500 per day for contracts valued $0–$250,000 to $3,000 per day for contracts exceeding $10 million. The Parish reserves the right to reject any or all bids and has the authority to increase the daily liquidated damages rate if additional provisions are required for project completion. All materials and equipment must conform to ASTM, AWWA, NSF, and LDOTD standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 923456-26-32-2-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST. TAMMANY PARISH
MICHAEL B. COOPER
PARISH PRESIDENT
NOTICE TO BIDDERS
ST. TAMMANY PARISH
Sealed bids will be received by the Department of Procurement until 2:00 p.m., Tuesday, June
23, 2026, and then opened and read publicly at that time by the Procurement Staff for the following project:
Bid # 26-32-2– Utility Point Of Repair
This bid package is available online at www.bidexpress.com or LaPAC https://wwwcfprd.doa.louisiana.gov/osp/lapac/dspBid.cfm?search=department&term=185. It is the Vendor’s responsibility to check Bid Express, or LaPAC frequently for any possible addenda that may be issued. The Parish is not responsible for a Vendor’s failure to download any addenda documents required to complete a submission.
The project classification is:
Highway, Street and Bridge Construction
Paper Bids must be sealed. In addition, the outside of the envelope, box, or package containing the Bid shall be marked with the following information. Name and Address of the Bidder, the State
Contractor’s License Number of the Bidder (if the work is estimated at $50k or more), the Bid
Name, and the Bid Number. Bids submitted without this information may be deemed non-responsive.
A Non-Mandatory pre-bid meeting will be held on Thursday, June 4, 2026, at 10:00 AM at the Tyler Street Hall of Excellence, located at 620 N. Tyler St., Covington, LA 70433.
Attendance is strongly encouraged.
Bids will be received at 21454 Koop Dr., Suite 2F, Mandeville, LA 70471 from each bidder or his agent and given a written receipt, by certified mail with return receipt requested, or electronically at www.bidexpress.com.
The Procurement Department can be contacted by telephone at (985) 898-2520 or via e-mail at
Procurement@stpgov.org. St. Tammany Parish Government reserves the right to reject any or all quotes and to waive informalities.
PROCUREMENT DEPARTMENT
P.O. BOX 628 | COVINGTON, LOUISIANA | 70434 | PROCUREMENT@STPGOV.ORG | 985-898-2520
WWW.STPGOV.ORG
Version 2026.1 http://www.bidexpress.com/ http://www.bidexpress.com/ mailto:Procurement@stpgov.org
Version 2025.2
BID PROPOSAL
ST. TAMMANY PARISH
GOVERNMENT
BID PACKAGE FOR
UTILITY POINT OF REPAIR
BID NO.: 26-32-2
April 20, 2026
Version 2025.1
Section 01
Table of Contents
Section 01 Table of Contents
Section 02 Instructions to Bidders
Section 03 Summary of Work
Section 04 LA Uniform Public Work Bid Form
Unit Price Form
Section 05
Affidavits, Louisiana
(Pursuant to LSA-R.S. 38:2224, 38:2227 and 38:2212.10)
Section 06 Insurance Requirements
Section 07 Project Sign (Omitted)
Section 08 General Conditions
Section 09 Sample Corporate Resolution
Section 10 Sample Certificate of Insurance
Section 11 Sample Contract
Section 12 Technical Specifications
Section 13 Standard Notes and Details
Section 02
Instructions to Bidders
Bidders are urged to promptly review the requirements of this specification and submit questions for resolution as early as possible during the bid period. Questions or concerns must be submitted in writing to the Procurement Department no later than 2:00 CST seven (7) working days prior to the bid opening date. Otherwise, this will be construed as acceptance by the bidders that the intent of the specifications is clear and that competitive bids may be obtained as specified herein. Protests with regard to the specification documents will not be considered after bids are opened.
1. Bid security is required. Be sure that your bid includes such security as is necessary to meet Parish requirements and is properly signed. The bid must be fully completed. All applicable Louisiana license numbers must be affixed.
2. The Owner is the St. Tammany Parish Government (the “Parish”).
3. The terms “he/his” and “it/its” may be used interchangeably.
4. The terms “Owner,” the “Parish,” and “St. Tammany Parish” may be used interchangeably.
5. The successful Bidder understands the contract term is from the date of award through
December 31, 2026, with an option to extend for two (2) additional one (1) year terms, by written agreement of both parties. The Parish will allow one (1) escalation for either of the optional renewal terms. The escalation may not exceed the U.S. Bureau of Labor Statistics
National Index for all Urban Consumers, unadjusted 12-month figure. The most recently published figure issued at the time an adjustment is requested will be used. A request must be made in writing by the Contractor, and the escalation will only be applied to purchases made after the request is made and the Contract is amended.
6. Bidder specifically understands that acknowledgment of the General Conditions is required. Bidder specifically understands that signature of receipt of the General
Conditions is mandated. The Bidder’s signature on the “Louisiana Uniform Public
Work Bid Form” will serve as acknowledgment of the Bidder’s receipt and understanding of the General Conditions as well as any Supplementary Conditions.
7. If any additional work is performed by the contractor without written approval by owner, the cost of the work will be borne by the contractor and will not be reimbursed by the Parish.
8. Only the Louisiana Uniform Public Bid Form, the Unit Price Form (if necessary), the bid security, and written evidence of authority of person signing the bid shall be submitted on or before the bid opening time and date provided for in the Bid Documents. Necessary copies of the Louisiana Uniform Public Work Forms and Unit Price Forms (if necessary) will be furnished for Bidding. Bound sets of the Contract Documents are for Bidder's information and should not be used in submitting Bids.
9. All other documents and information required are to be submitted by the low Bidder within ten (10) days after the opening of the bids, and at the same time of day and location as given for the opening of the bids in the Bid Documents.
10. Each Bid must be submitted in a sealed envelope, unless submitted electronically. The outside of the envelope shall show the name and address of the Bidder, the State
Contractor’s License Number of the Bidder (if work requires contractor’s license), and the
Project name and the Bid number. In the case of an electronic bid proposal, a contractor may submit an authentic digital signature on the electronic bid proposal accompanied by the contractor's license number, Project name and the Bid number.
11. The price quoted for the Work shall be stated in words and figures on the Bid Form, and in figures only on the Unit Price Form. The price in the Bid shall include all costs necessary for the complete performance of the Work in full conformity with the conditions of the
Contract Documents, and shall include all applicable Federal, State, Parish, Municipal or other taxes and is the responsibility of the contractor to obtain tax exemption if applicable.
The price bid for the items listed on the Unit Price Form will include the cost of all related items not listed, but which are normally required to do the type of Work bid.
12. The Bid shall be signed by the Bidder. The information required on the Louisiana Uniform
Public Work Bid Form must be provided. Evidence of agency, corporate, or partnership authority is required and shall be provided in conformance with LSA-R.S. 38:2212(B).
13. Only a Contractor licensed by the State to do the type of Work as indicated on the Notice to Bidders can submit a Bid. The Bidder’s signature on the Bid Form certifies that he holds an active license under the provisions of Chapter 24 of Louisiana Revised Statutes Title
37. Failure to be properly licensed constitutes authority for the Owner to reject the Bid.
14. Bidders shall not attach any conditions or provisions to the Bid. Any conditions or provisions so attached may, at the sole option of the Owner, cause rejection of the Bid.
15. A Bid Guarantee of five percent (5%) of the amount of the total Bid, including Alternates, must accompany the Proposal and, at the option of the Bidder, may be a cashier's check, certified check or a satisfactory Bid Bond. The Bid Guarantee must be attached to the
Louisiana Uniform Public Work Bid Form. No Bid will be considered unless it is so guaranteed. Cashier's check or certified check must be made payable to the order of the
Owner. Cash deposits will not be accepted. The Owner reserves the right to cash or deposit the cashier's check or certified check. Such guarantees shall be made payable to the Parish of St. Tammany. In accordance with LSA-R.S. 38:2218(C), if a bid bond is used, it shall be written by a surety or insurance company currently on the U.S. Department of the
Treasury Financial Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A.M. Best's Key Rating Guide to write individual bonds up to ten percent of policyholders' surplus as shown in the A.M. Best's
Key Rating Guide or by an insurance company in good standing licensed to write bid bonds which is either domiciled in Louisiana or owned by Louisiana residents. It is not required to be on any AIA form.
16. Bid securities of the three (3) lowest Bidders will be retained by the Owner until the
Contract is executed or until final disposition is made of the Bids submitted. Bid securities of all other Bidders will be returned promptly after the canvas of Bids. Bids shall remain binding for forty-five (45) days after the date set for Bid Opening. The Parish shall act within the forty-five (45) days to award the contract to the lowest responsible bidder or reject all bids. However, the Parish and the lowest responsible bidder, by mutual written consent, may agree to extend the deadline for award by one or more extensions of thirty
(30) calendar days. In the event the Owner issued the Letter of Award during this period, or any extension thereof, the Bid accepted shall continue to remain binding until the execution of the Contract.
17. A Proposal may be withdrawn at any time prior to the scheduled closing time for receipt of Bids, provided the request is in writing, executed by the Bidder or its duly authorized representative and is filed with the Owner prior to that time. When such a request is received, the Proposal will be returned to the Bidder unopened. A bid withdrawn under the provisions of LSA-R.S. 38:2214(C) cannot be resubmitted.
18. Written communications, over the signature of the Bidder, to modify Proposals will be accepted and the Proposal corrected in accordance therewith if received by the Owner prior to the scheduled closing time for receipt of Bids. Oral, telephonic or telegraphic
Modifications will not be considered.
19. No oral interpretation obligating the Owner will be made to any Bidder as to the meaning of the Drawings, Specifications and Contract Documents. Every request for such an interpretation shall be made in writing and addressed and forwarded to the Owner.
Inquiries received within seven (7) days prior to the day fixed for opening of the Bids may not be given consideration. Every interpretation made to the Bidder shall be in the form of an addendum to the Specifications. All such Addenda shall become part of the Contract
Documents. Failure of the Owner to send or failure of Bidder to receive any such interpretation shall not relieve any Bidder from any obligation under this Bid as submitted without Modification. All Addenda shall be issued in accordance with the Public Bid Law, LSA-R.S. 38:2212(O).
20. The Owner reserves the right to reject any or all Bids for just cause in accordance with the
Public Bid Law, LSA-R.S. 38:2214(B). Incomplete, informal, illegible, or unbalanced Bids may be rejected. Reasonable grounds for belief that any one Bidder is concerned directly or indirectly with more than one Bid will cause rejection of all Bids wherein such Bidder is concerned. If required, a Bidder shall furnish satisfactory evidence of its competence and ability to perform the Work stipulated in its Proposal. Incompetence will constitute cause for rejection. If the Parish determines that the bidder is not responsive or responsible for any reason whatsoever, the bid may be rejected in accordance with State law.
21. Contractor shall be liable without limitation to the Parish for any and all injury, death, damage, loss, destruction, damages, costs, fines, penalties, judgments, forfeitures, assessments, expenses (including attorney fees), obligations, and other liabilities of every name and description, which may occur or in any way arise out of any act or omission of
Contractor, its owners, agents, employees, partners or subcontractors.
22. Upon notice of any claim, demand, suit, or cause of action against the Parish, alleged to arise out of or be related to this Contract, Contractor shall investigate, handle, respond to, provide defense for, and defend at its sole expense, even if the claim, demand, suit, or cause of action is groundless, false, or fraudulent. The Parish may, but is not required to, consult with or assist the Contractor, but this assistance shall not affect the Contractor’s obligations, duties, and responsibilities under this section. Contractor shall obtain the
Parish’s written consent before entering into any settlement or dismissal.
23. It is understood and agreed that neither party can foresee the exigencies beyond the control of each party which arise by reason of an Act of God or force majeure; therefore, neither party shall be liable for any delay or failure in performance beyond its control resulting from an Act of God or force majeure. The Parish shall determine whether a delay or failure results from an Act of God or force majeure based on its review of all facts and circumstances. The parties shall use reasonable efforts, including but not limited to, use of continuation of operations plans (COOP), business continuity plans, and disaster recovery plans, to eliminate or minimize the effect of such events upon the performance of their respective duties under this Contract.
24. Contractor shall fully indemnify and hold harmless the Parish, without limitation, for any and all injury, death, damage, loss, destruction, damages, costs, fines, penalties, judgments, forfeitures, assessments, expenses (including attorney fees), obligations, and other liabilities of every name and description, which may occur or in any way arise out of any act or omission of Contractor, its owners, agents, employees, partners or subcontractors.
The Contractor shall not indemnify for the portion of any loss or damage arising from the
Parish’s act or failure to act.
25. Contractor shall fully indemnify and hold harmless the Parish, without limitation, from and against damages, costs, fines, penalties, judgments, forfeitures, assessments, expenses
(including attorney fees), obligations, and other liabilities in any action for infringement of any intellectual property right, including but not limited to, trademark, trade-secret, copyright, and patent rights.
When a dispute or claim arises relative to a real or anticipated infringement, the Contractor, at its sole expense, shall submit information and documentation, including formal patent attorney opinions, as required by the Parish.
If the use of the product, material, service, or any component thereof is enjoined for any reason or if the Contractor believes that it may be enjoined, Contractor, while ensuring appropriate migration and implementation, data integrity, and minimal delays of performance, shall at its sole expense and in the following order of precedence: (i) obtain for the Parish the right to continue using such product, material, service, or component thereof; (ii) modify the product, material, service, or component thereof so that it becomes a non-infringing product, material, or service of at least equal quality and performance;
(iii) replace the product, material, service, or component thereof so that it becomes a non-infringing product, material, or service of at least equal quality and performance; or, (iv) provide the Parish monetary compensation for all payments made under the Contract related to the infringing product, material, service, or component, plus for all costs incurred to procure and implement a non-infringing product, material, or service of at least equal quality and performance. Until this obligation has been satisfied, the Contractor remains in default.
The Contractor shall not be obligated to indemnify that portion of a claim or dispute based upon the Parish’s unauthorized: i) modification or alteration of the product, material or service; ii) use of the product, material or service in combination with other products not furnished by Contractor; or, iii) use of the product, material or service in other than the specified operating conditions and environment.
26. Bidders shall familiarize themselves with and shall comply with all applicable Federal and
State Laws, municipal ordinances and the rules and regulations of all authorities having jurisdiction over construction of the Project, which may directly or indirectly affect the
Work or its prosecution. These laws and/or ordinances will be deemed to be included in the Contract, as though herein written in full.
27. Each Bidder shall visit the site of the proposed Work and fully acquaint itself with all surface and subsurface conditions as they may exist so that it may fully understand this
Contract. Bidder shall also thoroughly examine and be familiar with drawings, Specifications and Contract Documents. The failure or omission of any Bidder to receive or examine any form, instrument, Drawing or document or to visit the site and acquaint itself with existing conditions shall in no way relieve any Bidder from any obligation with respect to its Bid and the responsibility in the premises.
28. The standard contract form enclosed with the Proposal documents is a prototype. It is enclosed with the Contract Documents for the guidance of the Owner and the Contractor.
It has important legal consequences in all respects and consultation with an attorney is encouraged. Contractor shall be presumed to have consulted with its own independent legal counsel.
29. When one set of Contract plans show the Work to be performed by two or more prime
Contractors, it is the responsibility of each Bidder to become knowledgeable of the Work to be performed by the other where the Work upon which this bid is submitted is shown to come into close proximity or in conflict with the Work of the other. In avoiding conflicts, pressure pipe lines must be installed to avoid conflict with gravity pipe lines and the Bidder of the smaller gravity pipe line in conflict with the larger gravity pipe line must include in his Bid the cost of a conflict box at these locations. The location of and a solution to the conflicts do not have to be specifically noted as such on the plans.
30. Bidder shall execute affidavit(s) attesting compliance with LSA-R.S. 38:2212.10, 38:2224, 38:2227, each as amended, and other affidavits as required by law, prior to execution of the contract.
31. In accordance with Louisiana Law, all Corporations (See LA R.S. 12:26.1) and Limited
Liability Companies (See LA R.S. 12:1308.2) should be registered and in good standing with the Louisiana Secretary of State in order to hold a contract.
32. Sealed Bids shall be delivered to St. Tammany Parish Government at the office of St.
Tammany Parish Government, Department of Procurement, 21454 Koop Drive, Suite
2-F, Mandeville, LA 70471, and a receipt given, until the time and date denoted in Notice to Bidders, at which time and place the Bids shall be publicly opened and read aloud to those present. In accordance with LSA-R.S. 38:2212(H), the designer’s final estimated cost of construction shall be read aloud upon opening bids. Sealed Bids may also be mailed by certified mail to St. Tammany Parish Government, Department of Procurement, 21454 Koop Drive, Suite 2-F, Mandeville, LA 70471, and must be received before the bid opening. Bids may also be submitted electronically. Information concerning links for electronic bidding is contained in the Notice to Bidders. It is the responsibility of the
Bidders to ensure that bids are delivered in a timely fashion. Late bids, regardless of reason, will not be considered, and will be returned to bidder.
33. Paper bids shall be placed in a sealed envelope, marked plainly and prominently as indicated in the Notice to Bidders, and these Instructions, and addressed:
St. Tammany Parish Government
Department of Procurement
21454 Koop Drive, Suite 2-F
Mandeville, LA 70471
34. See Notice to Bidders for availability of Drawings, Specifications and Contract Documents via electronic methods.
35. Omitted
36. The award of the Contract, if it is awarded, will be to the lowest responsible Bidder, in accordance with State Law. No award will be made until the Owner has concluded such investigations as it deems necessary to establish the responsibility and qualifications of the
Bidder to do the Work in accordance with the Contract Documents to the satisfaction of the Owner within the time prescribed as established by the Department based upon the amount of work to be performed and the conditions of same. The written contract and bond shall be issued in conformance with LSA-R.S. 38:2216. If the Contract is awarded, the
Owner shall give the successful Bidder written notice of the award within forty-five (45) calendar days after the opening of the Bids in conformance with LSA-R.S. 38:2215(A), or any extension as authorized thereunder.
37. At least three days prior to the execution of the Contract, the Contractor shall deliver to the
Owner the required Bonds.
38. Failure of the successful Bidder to execute the Contract and deliver the required Bonds within ten (10) days of the Notice of the Award shall be just cause for the Owner to annul the award and declare the Bid and any guarantee thereof forfeited. Award may then be made to the next lowest responsible bidder.
39. In order to ensure the faithful performance of each and every condition, stipulation and requirement of the Contract and to indemnify and hold harmless the Owner from any and all damages, either directly or indirectly arising out of any failure to perform same, the successful Bidder to whom the Contract is awarded shall furnish a Performance and
Payment Bond in an amount of at least equal to one hundred percent (100%) of the Contract
Price. The Contract shall not be in force or binding upon the Owner until such satisfactory
Bond has been provided to and approved by the Parish. The cost of the Bond shall be paid for by the Contractor unless otherwise stipulated in the Special Provisions.
40. No surety Company will be accepted as a bondsman which has no permanent agent or representative in the State upon whom notices referred to in the General Conditions of these Specifications may be served. Service of said notice on said agent or representative in the State shall be equal to service of notice on the President of the Surety Company, or such other officer as may be concerned.
41. In conformance with LSA-R.S. 38:2219(A)(1)(a), (b), and (c):
Any surety bond written for a public works project shall be written by a surety or insurance company currently on the U.S. Department of the Treasury Financial
Management Service list of approved bonding companies which is published annually in the Federal Register, or by a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A.M. Best's Key Rating Guide, to write individual bonds up to ten percent of policyholders' surplus as shown in the
A.M. Best's Key Rating Guide or by an insurance company that is either domiciled in Louisiana or owned by Louisiana residents and is licensed to write surety bonds.
For any public works project, no surety or insurance company shall write a bond which is in excess of the amount indicated as approved by the U.S. Department of the Treasury Financial Management Service list or by a Louisiana domiciled insurance company with an A- rating by A.M. Best up to a limit of ten percent of policyholders' surplus as shown by A.M. Best; companies authorized by this
Paragraph who are not on the treasury list shall not write a bond when the penalty exceeds fifteen percent of its capital and surplus, such capital and surplus being the amount by which the company's assets exceed its liabilities as reflected by the most recent financial statements filed by the company with the Department of Insurance.
In addition, any surety bond written for a public works project shall be written by a surety or insurance company that is currently licensed to do business in the state of Louisiana. All contractors must comply with any other applicable provisions of
LSA-R.S. 38:2219.
42. Should the Contractor's Surety, even though approved and accepted by the Owner, subsequently remove its agency or representative from the State or become insolvent, bankrupt, or otherwise fail, the Contractor shall immediately furnish a new Bond in another company approved by the Owner, at no cost to the Owner. The new Bond shall be executed under the same terms and conditions as the original Bond. The new bond shall be submitted within thirty (30) days of such time as the Owner notifies Contractor or from the time
Contractor learns or has reason to know that the original surety is no longer financially viable or acceptable to the Parish, whichever occurs first. In the event that Contractor fails or refuses to timely secure additional surety, then the Owner may secure such surety and thereafter deduct such cost or expense from any sum due, or to become due to Contractor.
43. The Contractor's bondsman shall obligate itself to all the terms and covenants of these
Specifications and of contracts covering the Work executed hereunder. The Owner reserves the right to do Extra Work or make changes by altering, adding to deducting from the Work under the conditions and in the manner herein before described without notice to the
Contractor's surety and without in any manner affecting the liability of bondsman or releasing it from any of its obligations hereunder.
44. The Bond shall also secure for the Owner the faithful performance of the Contract in strict accordance with plans, specifications, and other Contract Documents. It shall protect the
Owner against all lien laws of the State and shall provide for payment of reasonable attorney's fees for enforcement of Contract and institution or concursus proceedings, if such proceedings become necessary. Likewise, it shall provide for all additional expenses of the Owner occurring through failure of the Contractor to perform.
45. The surety of the Contractor shall be and does hereby declare and acknowledge itself by acceptance to be bound to the Owner as a guarantor, jointly and in solido, with the
Contractor, for fulfillment of terms of the Contract.
46. The performance Bond and Labor and Material Bond forming part of this Contract shall be continued by Contractor and its Surety for a period of one (1) year from date of acceptance of the Work/Project by Owner to assure prompt removal and replacement of all defective material, equipment, components thereof, workmanship, etc., and to assure payment of any damage to property of Owner or others as a result of such defective materials, equipment, workmanship, etc.
47. Contractor agrees to execute an excerpt or extract of this agreement for recordation purposes. If Contractor fails to execute such an excerpt, then the Parish shall file and record the entire Contract and all attachments at the expense of Contractor and Parish is hereby authorized to deduct all related costs from any proceeds due to the Contractor.
48. Contractor shall secure and maintain at its expense such insurance that will protect it and the Parish from claims for injuries to persons or damages to property which may arise from or in connection with the performance of Services or Work hereunder by the Contractor, his agents, representatives, employees, and/or subcontractors. The cost of such insurance shall be included in Contractor’s bid.
49. The Contractor shall not commence work until it has obtained all insurance as required for the Parish Project. If the Contractor fails to furnish the Parish with the insurance protection required and begins work without first furnishing Parish with a currently dated certificate of insurance, the Parish has the right to obtain the insurance protection required and deduct the cost of insurance from the first payment due the Contractor. Further deductions are permitted from future payments as are needed to protect the interests of the Parish including, but not limited to, renewals of all policies.
50. Payment of Premiums: The insurance companies issuing the policy or policies shall have no recourse against the Parish of St. Tammany for payment of any premiums or for assessments under any form of policy.
51. Deductibles: Any and all deductibles in the described insurance policies shall be assumed by and be at the sole risk of the Contractor.
52. Authorization of Insurance Company(ies) and Rating: All insurance companies must be authorized to do business in the State of Louisiana and shall have an A.M. Best rating of no less than A-, Category VII.
53. Policy coverages and limits must be evidenced by Certificates of Insurance issued by
Contractor’s carrier to the Parish and shall reflect:
Date of Issue: Certificate must have current date.
Named Insured: The legal name of Contractor under contract with the Parish and its principal place of business shall be shown as the named insured on all
Certificates of Liability Insurance.
Name of Certificate Holder: St. Tammany Parish Government, Office of Risk
Management, P. O. Box 628, Covington, LA 70434
Project Description: A brief project description, including Project Name, Project
Number and/or Contract Number, and Location.
Endorsements and Certificate Reference: All policies must be endorsed to provide, and certificates of insurance must evidence the following:
Waiver of Subrogation: The Contractor’s insurers will have no right of recovery or subrogation against the Parish of St. Tammany, it being the intention of the parties that all insurance policy(ies) so affected shall protect both parties and be the primary coverage for any and all losses covered by the below described insurance. Policy endorsements required for all coverages.
Additional Insured: The Parish of St. Tammany shall be named as additional named insured with respect to general liability, marine liability, pollution/environmental liability, automobile liability and excess liability coverages. Policy endorsements required.
Hold Harmless: Contractor’s liability insurers shall evidence their cognizance of the Hold Harmless and Indemnification in favor of St.
Tammany Parish Government by referencing same on the face of the
Certificate(s) of Insurance.
Cancellation Notice: Producer shall provide thirty (30) days prior written notice to the Parish of policy cancellation or substantive policy change.
54. The types of insurance coverage the Contractor is required to obtain and maintain throughout the duration of the Contract shall be designated by a separate document issued by the Office of Risk Management.
55. It is the intent of these instructions that they are in conformance with State Bid Laws.
Should there be any discrepancy or ambiguity in these provisions, the applicable State Bid
Law shall apply.
56. The letting of any public contract in connection with funds that are granted or advanced by the United States of America shall be subject to the effect, if any, of related laws of said
United States and valid rules and regulations of federal agencies in charge, or governing use and payment of such federal funds.
57. Protests based on alleged solicitation improprieties that are apparent before bid opening, or the time set for receipt of initial proposals must be filed with and received by the
Procurement Department BEFORE two (2) working days of the bid opening. Any other protest shall be filed no later than ten (10) calendar days after: the opening of the bid; the basis of the protest is known; or the basis of the protest should have been known (whichever is earlier).
58. It is the Parish’s policy to provide a method to protest exclusion from a competition or from the award of a contract, or to challenge an alleged solicitation irregularity. It is always better to seek a resolution within the Parish system before resorting to outside agencies and/or litigation to resolve differences. All protests must be made in writing, and shall be concise and logically presented to facilitate review by the Parish. The written protest shall include:
The protester’s name, address, and fax and telephone numbers and the solicitation, bid, or contract number;
A detailed statement of its legal and factual grounds, including a description of the resulting prejudice to the protester;
Copies of relevant documents;
All information establishing that the protester is an interested party and that the protest is timely; and
A request for a ruling by the agency; and a statement of the form of relief requested.
The protest shall be addressed to St. Tammany Parish Government Department of
Procurement, P.O. Box 628, Covington, LA 70434
The protest review shall be conducted by the Parish Legal Department.
Only protests from interested parties will be allowed. Protests based on alleged solicitation improprieties that are apparent before bid opening, or the time set for receipt of initial proposals, must be filed with and received by the Department of Procurement BEFORE those deadlines.
Any other protest shall be filed no later than ten (10) calendar days after the basis of the protest is known, or should have been known (whichever is earlier).
The Parish will use its best efforts to resolve the protest within thirty (30) days of the date that it is received by the Parish. The written response will be sent to the protestor via mail and fax, if a fax number has been provided by the protestor. The protester can request additional methods of notification.
59. The last day to submit questions to Procurement shall be no later than 2:00 pm CST, seven
(7) working days prior to the opening of bids, and verification on comparable products will be no later than 2:00 pm CST, fourteen (14) working days prior to the opening date of the bid/proposal due date. Further, any questions or inquiries must be submitted via fax to 985-
898-5227, or via email to Procurement@stpgov.org. Any questions or inquiries received after the required deadline to submit questions or inquiries will not be answered.
Schedule of Events mailto:Procurement@stpgov.org
Date Time (CT)
Bid Due Date June 23, 2026 2:00 PM
Pre-Bid Meeting June 4, 2026 10:00 AM
Inquiry Deadline June 11, 2026 2:00 PM
Addendum Deadline June 17, 2026 2:00 PM
NOTE: The Parish reserves the right to revise this schedule. Any such revision will be formalized by the issuance of an addendum to the Bid Request.
60. St. Tammany Parish Government contracts to be awarded are dependent on the available funding and/or approval by members designated and/or acknowledged by St. Tammany
Parish Government. At any time, St. Tammany Parish Government reserves the right to cancel the award of a contract if either or both of these factors is deficient.
61. Any action by the Parish to disqualify any Bidder on the grounds that they are not a responsible Bidder shall be conducted in accordance with LSA-R.S. 38:2212(X).
62. Failure to complete or deliver within the time specified or to provide the services as specified in the bid or response will constitute a default and may cause cancellation of the contract. Where the Parish has determined the contractor to be in default. The Parish reserves the right to purchase any or all products or services covered by the contract on the open market and to charge the contractor with the cost in excess of the contract price. Until such assessed charges have been paid, no subsequent bid or response from the defaulting contractor will be considered.
63. If any part of the provisions contained herein and/or in the Specifications and Contract for the Work shall for any reason be held invalid, illegal or unenforceable in any respect, such invalidity, illegality or unenforceability shall not affect any other provisions of this
Agreement or attachment, but it shall be construed as if such invalid, illegal, or unenforceable provision or part of a provision had never been contained herein.
Section 03
Summary of Work
I. Work to Include:
The WORK shall consist of point repairs, rehabilitation, and replacement of water and sewer infrastructure. This WORK shall include scheduled and emergency repairs of water and sewer infrastructure. The WORK may also include limited extensions of new water and/or sewer infrastructure to provide service.
The WORK will include handling and disposing of raw sewage in accordance with all applicable Federal, State, and local regulations. The WORK will also include handling potable water in accordance with all applicable Federal, State, and local regulations.
The WORK performed under an emergency call-out may occur outside of normal working hours, such as weekends, holidays, and overnight. The contractor shall provide the appropriate personnel, equipment, and materials required to complete the emergency repair in a timely manner and for the full duration of the repair.
II. Location of Work:
The WORK will occur within and across St. Tammany Parish, including unincorporated Slidell, Lacombe, Abita Springs, Mandeville, Madisonville, Covington, and Goodbee. The Department of Utilities will make reasonable attempts to geographically coordinate any scheduled WORK to minimize additional mobilization by the contractor.
III. Documents: Bid Documents dated April 20, 2026, and entitled:
UTILITY POINT OF REPAIR
BID NO. 26-32-2
IV. The original term of the contract will be from the date of award through December
31, 2026, with an option to extend for two (2) additional one (1) year terms, by written agreement of both parties. The Parish will allow one (1) escalation for either of the optional renewal terms. The escalation may not exceed the U.S. Bureau of
Labor Statistics National Index for all Urban Consumers, unadjusted 12-month figure. The most recently published figure issued at the time an adjustment is requested will be used. A request must be made in writing by the Contractor, and the escalation will only be applied to purchases made after the request is made and the Contract is amended.
V. OTHER REQUIREMENTS (as applicable)
All materials and equipment used for the construction and repair of water and sewer infrastructure shall adhere to all requirements set forth by Federal, State and local regulatory agencies. Additionally, all materials used in the construction and repair of water and sewer infrastructure shall conform with all applicable industry standards established by ASTM, AWWA and NSF.
When not otherwise specified herein, all work and materials shall conform to the requirements of the Louisiana Department of Transportation and
Development hereafter called LDOTD (2016 Edition of Louisiana Standard
Specifications for Roads and Bridges).
Table 3.1
Liquidated Damages
Original Contract Amount Daily Charge
Dollars Dollars
0 - 250,000 500
250,000 – 1 Million 1,000
> 1 Million – 5 Million 1,500
> 5 Million – 10 Million 2,000
> 10 Million 3,000
• Parish reserves the right to increase the Daily charge rate due to additional provisions required in order to complete the project as described in the specifications
Section 04
LOUISIANA UNIFORM PUBLIC WORK BID FORM
TO: St. Tammany Parish Government
21454 Koop Dr., Suite 2F
Mandeville, La 70471
(Owner to provide name and address of owner)
BID FOR: UTILITY POINT OF REPAIR
BID NO. 26-32-2_______________________
(Owner to provide name of project and other identifying information.)
The undersigned bidder hereby declares and represents that she/he; a) has carefully examined and understands the Bidding
Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by:
St. Tammany Parish Government and dated: April 20, 2026 .
(Owner to provide name of entity preparing bidding documents.)
Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the
Designer has assigned to each of the addenda that the Bidder is acknowledging) _________________________________________ .
TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated
“Base Bid” * but not alternates) the sum of:
Dollars ($ )
ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.
Alternate No. 1 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
NA Dollars ($ NA )
Alternate No. 2 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:
NAME OF BIDDER:
ADDRESS OF BIDDER:
LOUISIANA CONTRACTOR’S LICENSE NUMBER:
NAME OF AUTHORIZED SIGNATORY OF BIDDER:
TITLE OF AUTHORIZED SIGNATORY OF BIDDER:
SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:
DATE: _______________________
THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA
UNIFORM PUBLIC WORK BID FORM:
* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.
** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).
BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA R.S. 38:2218(A) attached to and made a part of this bid.
TO: BID FOR:
St. Tammany Parish Government Utility Point Of Repair
21454 Koop Drive, Suite 2F Bid No. 26-32-2
Mandeville, LA. 70471 (OWNER TO PROVIDE NAME AND ADDRESS OF OWNER) (OWNER TO PROVIDE PROJECT NAME & OTHER IDENTIFYING INFO)
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
001 4 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
002 36 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
003 12 EA
LOUISIANA UNIFORM PUBLIC WORK BID FORM
Wording for "description" is to be provided by the Owner. All Quantities Estimated. The Contractor will be paid based upon actual quantities as verified by the Owner.
UNIT PRICES: This form shall be used for any & all work required by the Bidding Documents & described as unit prices. Amounts shall be stated in figures & only in figures.
Mobilization
Emergency Mobilization
UNIT PRICE FORM
Supplemental Mobilization
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
Version 2017 Q2
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1001 100 SY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1002 400 SY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1003 200 LF
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1004 200 LF
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1005 250 TON
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1006 2500 IN/LF
SAW CUT PAVEMENT
Wording for "description" is to be provided by the Owner. All Quantities Estimated. The Contractor will be paid based upon actual quantities as verified by the Owner.
PCC ROLL-OVER CURB W/ CURB DOWELS
UNIT PRICES: This form shall be used for any & all work required by the Bidding Documents & described as unit prices. Amounts shall be stated in figures & only in figures.
BITUMINOUS HOT MIX ASPHALT
8" THICK PCCP, FIBER REINFORCED (IN PLACE)
8" THICK PCCP, HIGH EARLY FIBER REINFORCED
PCC BARRIER CURB W/ CURB DOWELS
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
UNIT PRICE EXTENSION
(Quantity times unit price)
1007 200 LF
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1008 250 SY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1009 250 SY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1010 2500 SY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1011 175 CY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1012 850 CY
REMOVE AND RESTORE COMBINATION CONCRETE CURB AND GUTTER
PCCP ROADWAY REMOVAL 8” THICK OR LESS
PCCP ROADWAY REMOVAL GREATER THAN 8” THICK
UNIT PRICES: This form shall be used for any & all work required by the Bidding Documents & described as unit prices. Amounts shall be stated in figures & only in figures.
Wording for "description" is to be provided by the Owner. All Quantities Estimated. The Contractor will be paid based upon actual quantities as verified by the Owner.
ASPHALT REMOVAL
FURNISH AND PLACE LIMESTONE BASE COURSE
FURNISH AND PLACE GRANULAR BASE COURSE
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
UNIT PRICE EXTENSION
(Quantity times unit price)
1013 100 SY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1014 50 SY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
1015 50 SY
UNIT PRICES: This form shall be used for any & all work required by the Bidding Documents & described as unit prices. Amounts shall be stated in figures & only in figures.
REMOVAL OF CONCRETE WALKS & DRIVES
FIBER REINFORCED 4" THICK PCC PAVING, IN PLACE FOR SIDEWALK
FIBER REINFORCED 6" THICK PCC PAVING, IN PLACE FOR DRIVEWAYS
Wording for "description" is to be provided by the Owner. All Quantities Estimated. The Contractor will be paid based upon actual quantities as verified by the Owner.
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #BASE BID OR ALT #BASE BID OR ALT #
UNIT PRICE EXTENSION
(Quantity times unit price)
2001 20 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2002 5 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2003 15 DAY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2004 100 SY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2005 500 SY
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2006 40 LB
WELL POINTING (INITIAL SET-UP)
WELL POINT PUMPING
ST. AUGUSTINE GRASS SOD
CENTIPEDE GRASS SOD
EXPLORATORY EXCAVATION
SEED & FERTILIZE (CENTIPEDE)
Wording for "description" is to be provided by the Owner. All Quantities Estimated. The Contractor will be paid based upon actual quantities as verified by the Owner.
UNIT PRICES: This form shall be used for any & all work required by the Bidding Documents & described as unit prices. Amounts shall be stated in figures & only in figures.
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
UNIT PRICE EXTENSION
(Quantity times unit price)
2007 2 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2008 2 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2009 10 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2010 2 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2011 4 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2012 2 EA
FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 6” X ALL SIZES
FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 8” X ALL SIZES
FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – UP TO 4” X ALL SIZES
FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 10” X ALL SIZES
FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 12” X ALL SIZES
FURNISH & INSTALL/ TEST/ TAP SS SLEEVE – 14” X ALL SIZES
UNIT PRICES: This form shall be used for any & all work required by the Bidding Documents & described as unit prices. Amounts shall be stated in figures & only in figures.
Wording for "description" is to be provided by the Owner. All Quantities Estimated. The Contractor will be paid based upon actual quantities as verified by the Owner.
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
BASE BID OR ALT #
UNIT PRICE EXTENSION
(Quantity times unit price)
2013 2 EA
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2014 5000 LB
Description:
REF NO.: QUANTITY UNIT OF MEASURE UNIT PRICE
UNIT PRICE EXTENSION
(Quantity times unit price)
2015 100 CY
FLOWABLE FILL GROUT
DUCTILE FITTINGS AND ACCESSORIES (ALL TYPES, ALL SIZES)
Wording for "description" is to be provided by the Owner. All Quantities Estimated.