9084 - Questions and Answers (1).pdf
PDF 11 KB Posted
- Solicitation number
- ITB-13195
- Issued by
- Leon County, Florida
About this file
This document is a Questions and Answers (Q&A) addendum for Bid No. DOT-ITB-25-9084-JM issued by the Florida Department of Transportation (FDOT) Procurement Office for a solicitation titled "Pavement Markings: Raised, Reflectorized, and Related Materials". The bid is scheduled to open on Wednesday, July 16, 2025, at 3:00 PM EST, and addresses six specific clarification questions from potential bidders regarding line items in the original bid document. The questions cover topics such as primer specifications, measurement units for various items (inches versus feet), and confirmation of specific pavement marking symbols and drawing references.
The Q&A document provides precise technical clarifications, including specifying that Item #7 is for Permanent Tape Primer and Item #8 is for Preformed Thermoplastic Primer, correcting measurement units from 8 inches to 8 feet for multiple line items, and confirming that Item #37 is specifically for a Bicycle Lane, Helmeted Bicyclist Symbol. For items #29 and #39, the document directs bidders to specific Standard Plans (FY 2025-26 Index 711-00 and 711-002 respectively) and provides links for accessing pavement marking and bicycle drawings. While no specific pricing details are included in this document, it serves as a critical clarification tool for potential bidders to ensure accurate and consistent bidding.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLORIDA DEPARTMENT OF TRANSPORTATION
Procurement Office
605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450
Phone: (850) 414-4381
QUESTIONS AND ANSWERS DATE: 7/10/2025
BID No.: DOT-ITB-25-9084-JM
BID Title: Pavement Markings: Raised, Reflectorized, and Related Materials
OPENING DATE: Wednesday, July 16, 2025 @ 3:00 PM EST
QUESTIONS AND ANSWERS PROVIDED BELOW
Question 1 What is the difference between Item 7 and Item 8? Is one supposed to be pricing for a one gallon can and the other supposed to be pricing for a five gallon container?
Answer 1 Item #7 specifies Permanent Tape Primer and #8 specifies Preformed Thermoplastic Primer.
Question 2 Item 22 says 8 inch. Should it be 8 foot?
Answer 2 Item #22 Should be 8 feet (8’).
Question 3 Item 26 says 8 inch. Should it be 8 foot?
Answer 3 Item #26 Should be 8 feet (8’).
Question 4 Item 27 says 8 inch. Should it be 8 foot?
Answer 4 Item #27 Should be 8 feet (8’).
Question 5 Line Item 37 for bicycle lane symbol: Is this a bicycle or a helmeted bike rider?
Answer 5 Item #37 is for Bicycle Lane, Helmeted Bicyclist Symbol
Question 6 Please confirm if there are drawings available for the line items 29 and 39 for ITB- 13195.
Answer 6 Item #29 see Standard Plans FY 2025-26 Index 711-00. For pavement marking drawings, please follow this link. Item #39 see Standard Plans FY 2025-26 Index 711-002. For the bicycle drawings, please follow this link.
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/711-001.pdf?sfvrsn=8484d2a2_2 https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/711-002.pdf?sfvrsn=3b3cfe76_1
| QUESTIONS AND ANSWERS DATE: 7/10/2025 |
| BID No.: DOT-ITB-25-9084-JM |
| BID Title: Pavement Markings: Raised, Reflectorized, and Related Materials |
File details come from the government source that posted it. Updated .