This document is a Questions and Answers (Q&A) file issued by the Florida Department of Transportation (FDOT) Procurement Office for Bid No. DOT-ITB-25-9084-JM, titled "Pavement Markings: Raised, Reflectorized, and Related Materials". The bid is scheduled to open on Wednesday, July 16, 2025, at 3:00 PM EST. The Q&A document addresses six specific questions from potential bidders regarding various line items in the bid, including clarifications on primer types, measurement units for certain items (changing from inches to feet), and confirmation of specific pavement marking symbols and available drawings.

The document provides technical clarifications for bidders, such as specifying that Item #7 is for Permanent Tape Primer and Item #8 is for Preformed Thermoplastic Primer, and confirming that several items referencing "8 inch" should actually be "8 feet". The Q&A also directs bidders to specific standard plan indexes for pavement marking and bicycle lane drawings, and confirms that Item #37 is for a Bicycle Lane, Helmeted Bicyclist Symbol. While the document does not detail pricing or contract value, it is part of a procurement process for pavement marking materials that will likely require vendors to be registered in the State of Florida's MyFloridaMarketplace system and comply with various state procurement regulations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLORIDA DEPARTMENT OF TRANSPORTATION

Procurement Office

605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450

Phone: (850) 414-4381

QUESTIONS AND ANSWERS DATE: 7/10/2025

BID No.: DOT-ITB-25-9084-JM

BID Title: Pavement Markings: Raised, Reflectorized, and Related Materials

OPENING DATE: Wednesday, July 16, 2025 @ 3:00 PM EST

QUESTIONS AND ANSWERS PROVIDED BELOW

Question 1 What is the difference between Item 7 and Item 8? Is one supposed to be pricing for a one gallon can and the other supposed to be pricing for a five gallon container?

Answer 1 Item #7 specifies Permanent Tape Primer and #8 specifies Preformed Thermoplastic Primer.

Question 2 Item 22 says 8 inch. Should it be 8 foot?

Answer 2 Item #22 Should be 8 feet (8’).

Question 3 Item 26 says 8 inch. Should it be 8 foot?

Answer 3 Item #26 Should be 8 feet (8’).

Question 4 Item 27 says 8 inch. Should it be 8 foot?

Answer 4 Item #27 Should be 8 feet (8’).

Question 5 Line Item 37 for bicycle lane symbol: Is this a bicycle or a helmeted bike rider?

Answer 5 Item #37 is for Bicycle Lane, Helmeted Bicyclist Symbol

Question 6 Please confirm if there are drawings available for the line items 29 and 39 for ITB- 13195.

Answer 6 Item #29 see Standard Plans FY 2025-26 Index 711-00. For pavement marking drawings, please follow this link. Item #39 see Standard Plans FY 2025-26 Index 711-002. For the bicycle drawings, please follow this link.

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/711-001.pdf?sfvrsn=8484d2a2_2 https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/711-002.pdf?sfvrsn=3b3cfe76_1

QUESTIONS AND ANSWERS DATE: 7/10/2025
BID No.: DOT-ITB-25-9084-JM
BID Title: Pavement Markings: Raised, Reflectorized, and Related Materials