9_SwitchGear Drawings Bid 20250220.pdf
PDF 18 MB Posted
- Solicitation number
- 36C24625B0026
About this file
These are architectural and engineering design drawings for replacing the switchgear building 18 at the Durham VA Medical Center located at 508 Fulton Street in Durham, North Carolina. The comprehensive set of drawings includes detailed plans for architectural, mechanical, electrical, fire protection, and plumbing systems, with the project number 558-20-156. The drawings are dated April 14, 2022, and represent 100% construction documents for a fully sprinklered facility. Key design elements include a new switchgear room, modifications to existing building systems, electrical distribution upgrades involving 15kV switch assemblies and transformers, mechanical system replacements like exhaust fans and split system units, and comprehensive infection control and safety planning for the renovation work.
The project involves replacing the existing switchgear in Building 18, with drawings showing detailed plans for demolition, new construction, electrical riser diagrams, equipment conductor schedules, and system integration. The design incorporates specific requirements for VA medical facility construction, including infection control risk assessment (ICRA) protocols, life safety considerations, and compliance with VA design standards. The electrical scope includes installing new 15kV switch assemblies, rerouting existing electrical feeders, and upgrading the building's electrical distribution infrastructure while maintaining continuity of services for the medical center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24625B0026 0006.pdf | ||
| 36C24625B0026 0005.docx | DOCX document | |
| 36C24625B0026 0004.docx | DOCX document | |
| 36C24625B0026 0003.docx | DOCX document | |
| 36C24625B0026 0002.docx | DOCX document | |
| 36C24625B0026 0001.docx | DOCX document | |
| Pre-Bid site Visit Replace Switchgear.pdf | ||
| 9_Asbestos 2018 9-13-18 bldg 1 drawings.pdf | ||
| S02 36C24625B0026_1 Solicitation 06162025.pdf | ||
| 9_Bid Specs 20250220.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
D
C
B
E
F
MRI
I.C.U.
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
0 4 8 16
VA FORM 08-6231
P
M
Replace Switchgear
Bldg. 18
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
VA PROJECT #: 558-20-156
A
M
G-001
AC, DGCKC
COVER SHEET
FULLY SPRINKLERED
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# APRIL 12, 2022
1, 18
REPLACE SWITCHGEAR
BUILDING 18 AT DURHAM
VAMC
558-20-156
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM , NC 27705
20-108
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
DURHAM VA MEDICAL CENTER
508 FULTON STREET
BUILDING 1
CAMPUS MAP
BUILDING 18
AREA OF WORK
OVERLAPS A PORTION OF
BUILDING 1 AND 18
GENERAL SYMBOL LEGENDCAMPUS MAP
VICINITY MAP
APRIL 14, 2022
DocuSign Envelope ID: CD37F213-B22B-4E65-8B75-B5E7C1B1E6C8
4/14/2022
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
REPLACE SWITCHGEAR BUILDING 18
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
I G
H T
HEPA NEGATIVE
AIR UNIT
EXISTING
WALL
EXISITNG
CEILING
FLEX DUCT
3 5/8" WALL FRAMING WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD; TYPE X - BOTH
SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
I L I N
G
H
E I G
H T
V
A R
I E
S
F
I E
L D
E R
I F
Y
W A
L L
H
E I G
H
R
I E
S
F
I E
R
I F
Y
A
SEAL
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# APRIL 12, 2022
1, 18
REPLACE SWITCHGEAR
BUILDING 18 AT DURHAM
VAMC
558-20-156
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM , NC 27705
20-108
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
A
M
G-002
AC, DGCKC
INFECTION CONTROL RISK
ASSESSMENT (ICRA)
FULLY SPRINKLERED
ILSM SIGNAGE
SCALE: 3" = 1'-0"
ILSM TEMPORARY BARRIER TAG
SCALE: 12" = 1'-0"
ICRA WALL TYPE (2 HR RATED) UL-U419
SCALE: 3/4" = 1'-0"
MOBILE CONTAINMENT CART
SCALE: 1/4" = 1'-0"
APRIL 14, 2022
BG008
REPRODUCTION AREA
BG008B
CANTEEN
STORAGE
BG002
ELECTRONIC SHOP
BG004
OFFICE
BG006
OFFICE
OFFICE
EG002
EG004
CORRIDOR
BG001
SSSSSSSSSSS
SSSSSSSS SSSS S S S S S S
S S
S S
S S
S S
S S
S S
S SSS
S S
S S
S S S
S S
S
S S
S
S
S
EXPANDED SWITCHGEAR RM
CURRENT SWITCHGEAR RM (BLDG 18)
MACHINE ROOM
BUILDING 18
BG007
BG005
PROCESSING
ROOM
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
BG003
(BLDG 1)
BUILDING 1
BG000
(BLDG 1)
BG000A
B G
BG000B
BG000C
IT
(BLDG 1)
BG018
B G
D
M I N
V I F
CORRIDOR
BG009
(BLDG 1)
BG009A
(BLDG 1)
S5
S4
CONSTRUCTION PICKUP /
DROP OFF POINT
M I N
EXIST PR
DOOR
EXIST PR
DOOR
1A
1A
1 1A
M
N
P
Q
R
R.1
S
6 7 8 9 10 11 12 13 14 15
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS
CONFIRMED THE DESIGNATION FOR THIS PROJECT IS
LEVEL III FOR THE CLASS OF PRECAUTIONS OR LEVEL OF
INFECTION CONTROL ACTIVITIES. HARD SURFACE
BARRIERS SHALL BE USED EXCEPT IN THE AREA
INDICATED ON THE PHASING PLAN WITH PLASTIC
BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-
WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS
INTACT AND ACTIVE.
1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR
CLOTHING CHANGES (PROVIDE AND LOCATE A STAGING
AREA FOR TYVEK SUITS NEAR THE PLASTIC BARRIER
ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO CONSTRUCTION
AREA AND LEAVING THE CONSTRUCTION AREA) AND
TOOL STORAGE TIGHT SEALS SHALL BE MAINTAINED AT
THE FULL PERIMETER OF WALLS AND WALL
PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY
CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION
BARRIER. UPON COMPLETION OF THE CONSTRUCTION
PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY
TO MINIMIZE SPREADING OF DUST AND THE
CONTRACTOR SHALL HAVE TEMPORARY DUST
PROTECTION IN PLACE BEFORE REMOVAL OF A
PERMANENT BARRIER.
A DWYER GAUGE SHALL BE USED AT ALL
CONSTRUCTION ENTRY TO VALIDATE NEGATIVE AIR
FLOWS.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE
6A.
2. PROVIDE STICKY MATS AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND
CHANGE DAILY OR MORE OFTEN AS NEEDED TO
PREVENT THE SPREAD OF DUST AND DEBRIS INTO
ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES
DUST AND DEBRIS CONTROL
3. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT
PROCEDURES SHALL BE DEFINED. EGRESS PATHS SHALL
BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE
USED DURING SCHEDULED TIMES; AND ONLY
AUTHORIZED PERSONNEL SHALL BE ALLOWED TO
ENTER THE CONSTRUCTION ZONE. SIGNAGE SHALL
DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE
CONSTRUCTION AREA AND MATERIALS.
4. CONTRACTOR SHALL USE ISOLATION CARTS TO
TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF
THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-
SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN
ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.
4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED
TO MINIMIZE INFILTRATION FROM ANY ADJACENT
EXCAVATION DEBRIS.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: THE COR SHALL VERIFY AND
NOTIFY CONTRACTOR WHETHER THE CONSTRUCTION
AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR;
FILTERS SHALL BE ADDED OR RETURN VENTS COVERED
AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR
MUST FLOW FROM CLEAN TO DIRTY AREAS.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE WITH
RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE
OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE
ENCLOSURE TO REMOVE DUST SHALL PASS AIR
THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA
FILTER CAPABLE OF FILTRATION RATES OF 300-800 CUBIC
FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY
TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST
INTO A ROOM, A PRE-FILTER AND HEPA FILTER SHALL BE
USED BEFORE EXHAUST TO PREVENT CONTAMINATION
OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE VERIFIED
DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY
AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR
CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING
RE-CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE AIR
PRESSURE TESTING THROUGHOUT THE PROJECT IN THE
FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES,
EQUIPMENT AND RELATED AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL
CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS
BEFORE LEAVING THE CONSTRUCTION AREA. IF
PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS,
FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM
SHALL BE USED TO REMOVE DUST FROM CLOTHING
BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL
CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING
CLOTHING AND STORING EQUIPMENT (DESIGNATED
AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND
MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS
SHALL BE MADE FREE FROM DUST AND MOISTURE BY
VACUUMING AND WET WIPING BEFORE THEIR REMOVAL
FROM THE CONSTRUCTION ZONE OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS
AND KEEP ALL HVAC ISOLATION UNTIL CONTRACTOR HAS
CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS
DONE A TERMINAL CLEANING, AND VA INFECTIOUS
DISEASE CONTROL HAS INSPECTED AND APPROVED THE
CLEANING.
6B. AIR BALANCING AND AHU STARTUP ARE NOT
PERMISSABLE PRIOR TO REVIEW AND APPROVAL OF
EXTENSIVE "CONSTRUCTION CLEAN" BY THE
CONTRACTOR.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED
IN CARTS WITH TIGHTLY FITTED COVERS, DESIGNATED
TRAFFIC ROUTES SHALL BE MADE TO MINIMIZE USE OF
ELEVATORS WITH AN EMPHASIS ON TRANSPORT
DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS
SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY
THE VAMC. WHEN HIGH EFFICIENCY PARTICULATE AIR
(HEPA) FILTERED NEGATIVE AIR MACHINES ARE USED,
ANY OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED BEFORE
BEING TRANSPORTED OUT OF THE CONSTRUCTION
AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE COR.
2018 NFPA 101 SAFETY SAFETY CODE
2018 VA BARRIER FREE DESIGN STANDARD, PG 18-13
2013 VAPHS MEMORANDUM EC-051: SAFETY &
HEALTH DURING CONSTRUCTION ACTIVITITES
2018 INTERNATIONAL CODE (ICC)
2018 INTERNATIONAL BUILDING CODE (IBC)
2010 AMERICAN WITH DISABILITIES ACT (ADA)
STANDARDS
8 9 10 11 12 13 14 15
M
N
P
Q
R
R.1
S
BG008
REPRODUCTION AREA
BG008B
CANTEEN
STORAGE
BG002
ELECTRONIC SHOP
BG004
OFFICE
BG006
OFFICE
OFFICE
EG002
EG004
CORRIDOR
BG001
SSSSSSSSS
SSSSSS SSSS S S S S S S
S S
S S
S S
S S
S S
S S
S SSS
S S
S S
S S S
S S
S
S S
S
S
S
EXPANDED SWITCHGEAR RM
CURRENT SWITCHGEAR RM (BLDG 18)
MACHINE ROOM
BUILDING 18
BG007
BG005
PROCESSING
ROOM
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
BG003
(BLDG 1)
BUILDING 1
BG000
(BLDG 1)
BG000A
B G
BG000B
BG000C
IT
(BLDG 1)
BG018
B G
D
CORRIDOR
BG009
(BLDG 1)
BG009A
(BLDG 1)
S5
S4
TRAVEL DISTANCE = 58'-4"
T R
A V
I S
T A
N C
FEC
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
SEE SHEETS GI002 & A-001 FOR SYMBOLS AND
ABBREVIATIONS.
SEE CIVIL DRAWINGS FOR INFORMATION
INCLUDING CONCRETE SIDEWALKS, CONCRETE
PADS, AND PARKING CONFIGURATIONS. CIVIL
BACKGROUND DRAWING INFORMATION IS FOR
REFERENCE ONLY.
SEE STRUCTURAL DRAWINGS FOR FRAMING
INFORMATION & FRAMING DIMENSIONS. ALL
DIMENSIONS ARE FOR REFERENCE ONLY- VERIFY
ALL FRAMING WITH STRUCTURAL DRAWINGS.
REFER TO PLUMBING DRAWINGS FOR
INFORMATION CONCERNING PLUMBING FIXTURES
AND PIPING SYSTEM(S).
REFER TO MECHANICAL DRAWINGS FOR
INFORMATION CONCERNING HVAC SYSTEM(S).
REFER TO ELECTRICAL DRAWINGS FOR
INFORMATION CONCERNING POWER, LIGHTING
AND COMMUNICATION SYSTEM(S).
REFER TO ELECTRICAL DRAWING FOR FIRE
ALARM NOTIFICATION AND EMERGENCY EGRESS
LIGHTING LOCATIONS.
REFER TO PARTITION TYPES FOR FURTHER FIRE
SEPARATION REQUIREMENTS.
CONTRACTOR TO PROVIDE ALL ADDITIONAL
FRAMING NECESSARY FOR ALL OPENINGS AND
SUPPLEMENTAL FRAMING ABOVE PARTITIONS.
ALL FIRE RATED ASSEMBLIES SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH
TESTED ASSEMBLIES INDICATED.
EXTEND FIRE RATED PARTITIONS, BARRIERS, AND
OTHER SEPARATIONS TO BOTTOM OF
ROOF/FLOOR DECK ABOVE (OR AS DIRECTED BY
UL ASSEMBLY) AND TO EXTERIOR WALL. SEAL
JOINT BETWEEN EDGES OF PARTITION WITH FIRE
RATED SEALANT AND/OR INTUMESCENT
ASSEMBLY.
EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON
PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
EMERGENCY RESPONSE
REFERENCE
CONTROLLED ACCESS -
ALWAYS UNLOCKED IN
DIRECTION OF EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
CA
DE
KB
XXX
XXX
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
EXTERIOR
EXIT
CLR
CAPACITY
L.
M.
N.
O.
P.
ALL PENETRATIONS OF FIRE-RATED ASSEMBLIES
SHALL BE FIRE-SEALED IN ACCORDANCE WITH
APPROVED MANUFACTURER'S DETAIL FOR
LOCATION, TYPE OF CONSTRUCTION,
PENETRATING ITEM AND RATING REQUIRED.
ALL DUCTWORK, DIFFUSERS AND GRILLES
PENETRATING FIRE-RATED WALLS, CEILINGS AND
FLOORS SHALL HAVE THE APPROPRIATE TYPE OF
FIRE/SMOKE DAMPER IN ACCORDANCE WITH THE
TYPE OF CONSTRUCTION BEING PENETRATED
AND THE FIRE/SMOKE RATING REQUIRED.
ALL LIGHT FIXTURES AND ELECTRICAL DEVICES
PENETRATING FIRE-RATED ASSEMBLIES SHALL BE
UL-LISTED FOR INSTALLATION IN THE ASSEMBLY
OR SHALL BE INSTALLED SUCH THAT THE FIRE-
RATING IS NOT COMPROMISED.
SMOKE RESISTANT CONSTRUCTION SHALL MEET
THE REQUIREMENTS OF ALL APPLICABLE CODES.
AREA SHALL BE SEPARATED FROM THE
REMAINDER OF THE BUILDING BY CONSTRUCTION
CAPABLE OF RESISTING THE PASSAGE OF
SMOKE.
STORAGE OF ANY FLAMMABLE OR COMBUSTIBLE
LIQUIDS IS UNDERSTOOD TO NOT BE WITHIN THE
BUILDING. STORAGE OF ANY MATERIAL IS TO BE
IN COMPLIANCE WITH ALL APPLICABLE CODES
AND AUTHORITIES HAVING JURISDICTION.
GROUND FLOOR ICRA PLAN
SCALE: 1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# APRIL 12, 2022
1, 18
REPLACE SWITCHGEAR
BUILDING 18 AT DURHAM
VAMC
558-20-156
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM , NC 27705
20-108
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
BOOTH
A
D
C
B
E
F
MRI
I.C.U.
F
U
L
T
O
N
S
R
E
E
T
E
R
W
R
A
D
KEY PLAN:
AREA OF WORK
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE TIGHTS S S S
A
M
G-003
AC, DGCKC
GROUND FLOOR ICRA AND SAFETY
PLAN
FULLY SPRINKLERED
EXISTING WALL TO REMAIN
TEMPRORAY WALL
NEW WALL
WALL LEGEND
N
O
R
T
H
0 4 8 16
KEY NOTES
ICRA NOTES
ICRA REFERENCE CODES
PROVIDE TEMPORARY 1-HOUR RATED
SLAB-TO-SLAB BARRIERS CONSIST OF 3-5/8" METAL
STUD FRAMING WITH 5/8" GYPSUM BOARD ON BOTH
SIDES. BARRIERS SHALL BE INSPECTED BY VA LIFE
SAFETY AND ICRA STAFF PRIOR TO START OF
CONSTRUCTION IN SPACE. MAINTAIN NEGATIVE
PRESSURE VENITLATION IN CONSTRUCTION SPACE.
CONTRACTOR TO VERIFY WALL TO DECK AS IT WILL
SERVE AS 1-HR RATED WALL DURING
CONSTRUCTION.
PROVIDED OUTER DOOR TO THE CONSTRUCTION
AREA ANTEROOM SHALL BE 45 MIN. RATED HARD
DOOR IN A RATED FRAME WITH CLOSER.
CONSTRUCTION ACCESS ROUTE.
PROVIDE TWO STICKY MATS AT EACH
CONSTRUCTION ACCESS POINT IN ALL PHASES.
PERFORM WORK REQUIRED BY VA INFECTION
CONTROL PERSONNEL REGARDING ICRA FORM.
SEE ICRA FORM FOR REQUIREMENTS. ALL ICRA
AND ILSM WORK ITEMS MUST BE COMPLETED
PRIOR TO BEGINNING ANY NEW CONSTRUCTION
WORK OR DEMOLITON.
VA REQUIRES THAT ALL APPLICABLE PERMITS BE
COMPLETED AND APPROVED PRIOR TO BEGINNING
ANY WORK ON STATION.
PERMITS INCLUDING: ICRA, ILSM, ABOVE CEIING,
FIRE / SMOKE WALL, UTILITY, FIRE SPRINKLER, FIRE
ALARM SYSTEM, MEDICAL GASES AND CONFINED
SPACE.
ALL CONSTRUCTION DROP OFF AND DELIVERY
WILL BE THROUGH GROUND FLOOR TO LOAD DOCK
AREA.
1A
GROUND FLOOR LIFE SAFETY PLAN
SCALE: 1/8" = 1'-0"
N
O
R
T
H
0 4 8 16
LIFE SAFETY GENERAL NOTES
LIFE SAFETY LEGEND
PROPOSED USE:
OWNED BY: PRIVATE
LOCAL GOVERNMENT
CITY/COUNTY
STATE
FEDERAL
CODE ENFORCEMENT JURISDICTION:
CITY
COUNTY
FEDERAL
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RECONSTRUCTION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
Renovation/Healthcare
N/A
REPLACE SWITCHGEAR BLDG 18
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705
DEPARTMENT OF VETERANS
AFFAIRS
CODE SHEET NOTES
ONE LEAF OF DOUBLE DOOR NEED TO BE INACTIVE
DURING CONSTRUCTION HOURS.
APRIL 14, 2022
F
TO CRAWL
SPACE
UPDN
UP
DN
UP
TO CRAWL
SPACE
TO CRAWL SPACE
RAMP
RAMP
F
F
S SS
S
SS
A-102
D WING CORRIDORS
PHASE 1 (A & B)
C WING CORRIDORS
PHASE 2 (A, B, C, D, E, F, & G)B WING CORRIDORS
PHASE 3
A WING CORRIDORS
PHASE 4 (A & B)
E WING
CORRIDORS
PHASE 5
F WING CORRIDORS
(EAST SIDE)
PHASE 6
PREP
AREA
DG017
COOLER
DG021
FREEZER
DG015
STAIR-4
DG018
ELECTRICA
L CLOSET
DG016
FIRE
PROTECTION
FREEZER
DG014
COOK-CHILL UNITS
DG013
STORAGE
DG008
STORAGE
DG001
CORRIDOR D
STAIR - 5
WOMENS
DG002
MENS SHOWER
DG004
STORAGE
DG006
MECH
CG015
AIR HANDLING UNIT - 6
KITCHEN
CG020
COOLER
CG018
COOLER
CG016
OFFICE
CG014
OFFICE
CG014
C O
R R
ID
O
R C
G
OFFICE
CG010
STORAGE KITCHEN
CG013
F.H.C.
CG009F OFFICE
CG009B
NUTRITION
FOOD
CG009A OFFICE
CG009C
D
CG009B
OFFICE
CG009
OFFICE
CG009
MENS TOILET
CG007
GREEN
ELEVATOR
P5
GREEN
ELEVATOR
P6
GREEN
ELEVATOR
P7
LINEN
CHUTE
TRASH RM
CG003
FEMALE
TOILET
AG001P3
P2
P1
S4
S5
DUMB WAITER
CPR EQUIP
CG008
DUMB WAITER
DUMB WAITER
HOUSE
KEEPING
BG003
STAIR 1
MORGUE
ELEVATOR
CORRIDOR
BG001
SHAFT
MECH RM
BG001A
HOUSE
KEEPING
EG001
VENDING RM
BG000
CANTEEN
STORAGE
BG002
CORRIDORCORRIDOR
ELECTRONIC
SHOP
BG004
STORAGE
BIO-MED
BG005BIO-MED
ADMIN OFFICE
BG007
GAS
GAS
STORAGE
BIO-MED CLINICAL EQUIP UNIT
BG009
CORRIDORSTORAGE
BG009A
OFFICE
BG015
STORAGE
BG010
BG012
WAREHOUSE
BG013
STORAGE
BG017
STAIR 3
FREEZER
BG016
STORAGE
BG014
STORAGE
OFFICE
BG006
MAIL PROCESSING AREA
BG008
CONFERENCE
RM
BG008A
REPRODUCTION
AREA
BG008B
CORRIDOR
CAFETERIA
AG002A
CAFETERIA
AG002
CORRIDOR
CORRIDOR
CANTEEN STORAGE
AG005
FREEZER
FREEZERCANTEEN
STORAGE
AG009
OFFICE
AG008
CANTEEN
OFFICE
AG011
CANTEEN
OFFICE
AG012
MECH
AG012
AG009A
RETAIL STORE
AG015
CANTEEN STORAGE
AG007
STORAGE
AG005A
RETAIL STORE
AG015A
TELEPHONE
AG017
ISO OFFICE
FG154
IRM OFFICE
FG155
IRM OFFICE
FG156A
FG156
ELECTRICAL
CLOSET
FG157
TOILET
FG160A
FG159
RECORDS RM
FG160
WORK RM IRM
FG163
COMP AND PEN
FG163A
KITCHEN
AG010
STORAGE
CANTEEN
FG151
OFFICE
FG149
CANTEEN DINING
AG000A
ISO OFFICE
FG148
OFFICE
FG147A
DECEDENT
AFFAIRS
FG147
AFGE
FG146
AFGE
FG146A
OFFICE,
PRIVACY
FG145
CANTEEN DINING
CANTEEN DINING
CANTEEN DINING
OFFICE
EG002
EG003A EG003B
OFFICE
EG003
OFFICE
EG005A
OFFICE
EG005
ELECTRICAL
CLOSET
EG007A
OFFICE
EG004
OFFICE
EG006 CORRIDOR OFFICE
EG007
OFFICE
EG009
OFFICE
EG008
ELECTRICAL
CLOSET
EG010
OFFICE
EG011
STORAGE
EG013
LAB
EG012
EG012A
ELEVATOR
EG015
STORAGE
EG018A
STORAGE
EG018
LAB
EGO17A
RESEARCH
EG017
CORRIDOR
EG014
ELECTRICAL RM
FG1000
WAITING
FG234
FG1001
STAIR - 12
NEW EXIT
PASSAGEWAY
FG400B
BIO-MED
FG137
STAIR-10
CORRIDOR
GENERAL
STORAGE
FG144A
OFFICE,
NURSING UNION
FG143
ISO OFFICE
FG142
OFFICE
FG137A
CORRIDOR
TELECOM
FG158
SERVER RM
FG104
STORAGE
FG141
TELECOM
FG104A
PC LAB
FG140
COMPUTER RM
FG106
OFFICE
FG139 OFFICE
FG108
STORAGE
FG138
HOUSE
KEEPING
FG15
ELEVATOR
LOBBY
FG12
BROWN
ELEVATOR
P10
BROWN
ELEVATOR
P11
MENS
LOCKER
FG14
MENS
TOILET
FG14A
CORRIDOR
OFFICE
IRMS
FG15A
FG16A
WOMENS
TOILET
FG16
OFFICE
FG103
OFFICE
FG105
IRM OFFICE
FG105D
IRM OFFICE
FG105C
IRM
OFFICE
FG105BIRM OFFICE
FG105A
MENTAL
HEALTH
OFFICE
FG122
OFFICE
FG123
GROUP MEETING
FG124
RELEASE OF INFO
FG107C
COPY RM
FG107B
RELEASE OF
INFO
FG107A
OFFICE OF
RELEASE OF INFO
FG107
HOUSE
KEEPING
FG109
COPY
RM
FG111
OFFICE
FG113
OFFICE
FG114
UTILITY
RM
FG116
TOILET
GF119
TOILET
FG118
CORRIDOR
FG133B
OFFICE
FG125
OFFICE
FG125B
OFFICE
FG125C
FIRE PROTECTION
CONFERENCE RM
FG126
OFFICE
DIRECTOR
MHC
FG130
OFFICE
FG130
OFFICE
FG132
OFFICE
FG134
OFFICE
SOCIAL
WORKER
FG135
OFFICE
FG136
WAITING RM
FG133B
RECEPTION
FG133A
OFFICE
FG112
OFFICE
FG115
OFFICE
FG117
RESIDENT
PSYCH.
OFFICE
FG120
WOMENS
HEALTH
CLINIC
FG121
RECEPTION
FG133
OFFICE
FG131
EXAM RM-2
FG129
EXAM RM-1
FG127
CONFERENCE
RM
FG235
OFFICE
FG236
OFFICE
FG239
OFFICE
FG241
OFFICE
FG243
OFFICE
FG245
CIRC.
FG500C
STORAGE
FG236
GROUP
THERAPY
FG237
OFFICE
FG240
OFFICE
FG242
OFFICE
FG236
CORRIDOR
FG400D
WAITING
FG344
RECEPTION
FG343
LOCKER ROOM
FG343A
EXAMS
FG342
PROCEDURE 7
FG302PROCEDURE 6
FG304
PROCEDURE 5
FG306
PROCEDURE 4
FG308
SUPPLIES
FG310
NOURISH
FG331
PROCEDURE 3
FG313
PROCEDURE 2
FG315
PROCEDURE 1
FG320
SCOPES SOIL
FG319
SCOPES CLEAN
FG318
SOIL
FG317
CLEAN
FG316 TOILET
FG314
STORAGE
FG312
ASSIST
FG311
CLERICAL
FG309
CHIEF
FG307
PHYSICIAN
FG305
CIRC
FG300B
ELEC CLOSET
FG300CL
PHYSICIAN
FG303
P.A.
FG301
CIRC.
FG300A
NEW EXIT PASSAGEWAY
FG400C
GAS
FG189
OFFICE
FG172
STAFF
LOCKERS
FG403
HSK
FG219
EXAM
FG217
WAITING
FG164
RECEPTION
FG171
DRSG RM
FG174
DRSG RM
FG173
CORRIDOR
FG175
TOILET
FG169
TOILET
FG167
SEDATION
FG168
STORAGE
FG170
CONTROL
FG184
MRI EXAM
FG184A
MRI EXAM
FG184B
EQUIP
FG184C
HOUSE
KEEPING
FG178
WORK
RM
FG179
SOILED
UTL
FG180
STORAGE
FG181
DRSG
FG182C DRSG
FG182D
CORRIDOR
FG184
STORAGE
FG182
ELEC.
CLOSET
FG183
BREAK
FG182A
STORAGE
FG182B
CORRIDOR
FG176
TELECOM
FG187
WAITING
FG185
TOILET
FG185A
EQUIP
G185C
CONTROL
RM
G185B
DRSG RM
G186A
DRSG
RM
FG186
EXAM RM
G185A ELEC. RM
FG405
DATA RM
FG404
OFFICE
FG212
CONFERENCE
FG211
WAITING
FG166
PRESCREEN
FG165
OFFICE
FG210
EXAM
FG209
EXAM
FG207
EXAM
FG205
EXAM
FG203
PHOTO
FG202
RECEPTION
FG201
CIRCULATION
FG200A
PROCEDURES
FG214
WAITING
FG216
C
IR
C U
L A
T
IO
N F G
B
LASER
FG213
LASER
FG215
CLEAN
UTL
FG21B
SOILED
UTL
FG218A
STAFF
TOILET
FG220
CLEAN
SUPPLIES
FG221
WAITING
FG222A
WAITING
FG222B
CIRCULATION
FG200C
EXAM
FG224
EXAM
FG226
EXAM
FG228
C
IR
C U
L A
T
IO
N F G
D
EXAM
FG208
EXAM
FG206
EXAM
FG204
EXAM
FG230
EXAM
FG223
EXAM
FG225
EXAM
FG227
EXAM
FG229
OFFICE
FG231
FIELD
FG232
PRETEST/FIT
FG233
PUBLIC TOILETS (W)
FG401
PUBLIC TOILETS (M)
FG402
EXPANSION JOINT
COVER PLATE
EJ COVER
EXPANSION JOINT
COVER PLATE
STORAGE
DG011
HEM/ONC
DG009
OFFICE
DG007 DG005B
OFFICE
ESCORT
DG005
OFFICE
ESCORT
DG005A
EXPANSION JOINT
COVER PLATE
EXPANSION JOINT
COVER PLATE
MECHANICAL
FG345
HSK
FG321
EQUIP
FG322
TOILET
FG323
RECOVERY
FG324
RECOVERY
FG325
RECOVERY
FG326
RECOVERY
FG327
RECOVERY
FG328
RECOVERY
FG329
RECOVERY
FG330
NURSE STATION
FG332
TOILET
FG333
HOLDING
FG334
HOLDING
FG335
HOLDING
FG336
HOLDING
FG337
HOLDING
FG338
TOILET
FG339
RESIDENTS
FG340
EXAMS
FG341
OFFICE
FG246
OFFICE
FG248
OFFICE
FG250
OFFICE
FG247
OFFICE
FG249
A-102
A-101
A-101
A-102
A-103
A-111
A-111
A-112
A-113
A-112
A-112
ADD HANDRAIL
AND BUMPER TO
MATCH EXISTING
PHASE 1A
PHASE 1B
PHASE 2A
PHASE 2B
A-102
1 2 3
2B
2A
1 2
2 1
11 32
PHASE 6
PHASE 6
PHASE 6
PHASE 2C
PHASE 2F
PHASE 2G
PHASE 2E
2 1
3 1
PHASE 5
PHASE 3 1 2 3
PHASE 4B
2 PHASE 4A1 2 3
PHASE 4A
2B
PHASE 2D
S
S
S
S
S S
S
S S
S
S
S S S
S
S
S S
S
S S
S S
S
S S
S SS
S
S S S S
S S
S S
S
S
S
S
S
S
S
S
S
S
SS
S
S
S S
S S
S
S
S
SS
S
S S
S
S S
S
S
SS
S
S
S
S
S
SSS
SS
S
S
S S
S
S
S S S
S
S SS
S
S S S S
S
S S
S S
S
S
S S S
SS S
S
S S S S S S S
S
S
S
S
S
S S
S
S S
S
S S
S S
S S S S
S S
S
S
S
A WING CORRIDORS
B WING CORRIDORS
C WING CORRIDORS
D WING CORRIDORS
E WING CORRIDORS
F WING CORRIDORS
Engineers Architects
Revisions: Date
Drawing Title:
Approved:
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1 /2
:4
:2
P M
HA-01
GROUND FLOOR COMPOSITE PHASING
AND ICRA PLANS
RH AS 1 1
RENOVATE GROUND FLOOR
BUILDING 1 HALLS AND WALLS
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM, NC 27705 JANUARY 26, 2021
BID DOCUMENTS
558-18-26018-305
AREA HATCH LEGEND
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A B C D E F
0 4 8 16
NORTH
Note: The following items are lead-containing com-ponents: Yellow glazed block walls (located throughout hallways) and white plaster walls (Wings A and B).
ASBESTOS ABATEMENT NOTES
1. ASBESTOS-CONTAINING MATERIALS
(ACMS) SHALL BE REMOVED AND
DISPOSED OF PROPERLY BY AN
ASBESTOS ABATEMENT CONTRACTOR
UTILIZING SUPERVISORS AND
WORKERS ACCREDITED BY THE
HEALTH HAZARDS CONTROL UNIT OF
THE NORTH CAROLINA DEPARTMENT
OF HEALTH AND HUMAN SERVICES.
THESE DRAWINGS ARE ACCOMPANIED
BY TECHNICAL SPECIFICATIONS FOR
THE REMOVAL AND DISPOSAL OF
ACMS. REFER TO SPECIFICATION
SECTION 028211 FOR ASBESTOS
ABATEMENT SCOPE OF WORK.
2. FLOOR PLANS ARE NOT TO SCALE.
3. FOR APPROXIMATE QUANTITIES OF
ACMS, PLEASE REFER TO
SPECIFICATION SECTION 028211.
4. ABATEMENT CONTRACTOR SHALL
VERIFY QUANTITIES AND LOCATIONS
OF ACM PRIOR TO START OF
ABATEMENT.
LEGEND
Asbestos-containing floor tile and/or mastic
Russell Harrings, CIH Certificate No. 11853 CP Signed 1-27-2021
FOR REFERENCE ONLY
CEILING
STEEL STUDS (3 5/8")
UNDERSIDE OF STRUCTURE
GYP WALL BD (5/8")
SEALANT
FLOOR SLAB
SEALANT
*SEAL ALL
PENETRATIONS WITH
SEALANT
TYPE G3.0
SCALE: 1-1/2"=1'-0"
STC-49 SA870717
G2.0 SIMILAR
WITH 2 1/2" STUDS
G4.0 SIMILAR
WITH 4" STUDS
G1.0 SIMILAR
WITH 1 5/8" STUDS
G6.0 SIMILAR
WITH 6" STUDS
SOUND ATTENUATION
INSULATION
BASE AS SCHEDULED
FLOOR SLAB
FIRE SEALANT
STEEL STUDS (3 5/8")
@ 16" ON CENTER
FIRE RATED GYP
WALL
BD (5/8") - TYPE X
CEILING
UNDERSIDE OF STRUCTURE
*FIRESTOP ALL
PENETRATIONS
TYPE G3.2, (2-HR)
SCALE: 1-1/2"=1'-0"
STC-49 SA870717
UL-U419 2 HOUR
G4.2 SIMILAR
WITH 4" STUDS
G6.2 SIMILAR
WITH 6" STUDS
GLASS FIBER OR MINERAL
WOOL INSULATION
M A
X
FIRE SEALANT
M
I N
M A
X
FIRE RATED GYP
WALL
BD (5/8") - TYPE X
BASE AS SCHEDULED
*FIRESTOP ALL
PENETRATIONS
WALL PRIORITY PLAN & LEGEND
SCALE: 1-1/2"=1'-0"
H
R
R
A T
W
L L
NON-RATED
WALL
RATED WALL
N O
N R
A T
E D
W A
L L
1-HR RATED
WALL
2-HR RATED
WALL
1-HR RATED
WALL
ONE (2)
LAYER OF
GYP. BD. AT
1-HR RATED
WALL
HOLLOW METAL FRAME
JAMB STUDS AS
REQUIRED
HIGHER PRIORITY WALL
METAL STUDS AS
PRESCRIBED IN WALL
SCHEDULE
TWO HOUR FIRE & SMOKE WALL
TWO HOUR FIRE WALL
TWO HOUR SHAFT WALL
ONE HOUR FIRE & SMOKE WALL
ONE HOUR FIRE WALL
NON-RATED WALL
PRIORITY 1 (HIGHEST)
PRIORITY 2
PRIORITY 2
PRIORITY 3
PRIORITY 4
PRIORITY 5 (LOWEST)
WALL PRIORITY LEGEND
M
A X
2"MAX.
GAUGE
SHAPE/TYPE
C-SHAPE
WIDTH
INTERIOR
ALL MECHANICAL SHAFTS SHOULD BE FIRE RATED CONSTRUCTION. AS SHOWN ON PLAN
2-1/2 inch
2-1/2 inch
C-H-SHAPE
C-SHAPE
C-SHAPE
C-SHAPE
1-5/8 inch
3-5/8 inch
4 inch
REFER TO FLOOR PLANS SHEET FOR FIRE RATED AND SMOKE PARTITION LOCATIONS. ALL FIRE & SMOKE
PARTITIONS SHALL EXTEND FROM FLOOR SLAB TO THE UNDERSIDE OF STRUCTURE - DECK ABOVE. ALL
PENETRATIONS SHALL BE SEALED AND PROTECTED WITH FIRE RATED SEALANT TO MAINTAIN THE INTEGRITY OF
THE PARTITION.
PARTITION INSTALLATION SHALL CONFORM TO ALL CODE REQUIREMENTS.
WHERE PARTITIONS OF DIFFERENT FIRE RATING INTERSECT, PARTITION WITH THE HIGHEST PRIORITY SHALL BE
CONTINUOUS PER FOLLOWING PRIORITY LIST:
PRIORITY 1 - TWO HOUR FIRE AND SMOKE WALL
PRIORITY 2 - TWO HOUR FIRE OR SHAFT WALL
PRIORITY 3 - ONE HOUR FIRE AND SMOKE WALL
PRIORITY 4 - ONE HOUR FIRE WALL
PROVIDE IDENTIFICATION OF ALL FIRE RATED AND/OR SMOKE
PARTITIONS AT NOT MORE THAN 10'-0" ON CENTER ABOVE
CEILINGS WITH 3" HIGH STENCILED BLOCK LETTERING AS
FOLLOWS: "1 HOUR FIRE", "1 HOUR FIRE/SMOKE", "2 HOUR
FIRE", "2 HOUR FIRE/SMOKE", "2 HOUR SHAFT", ETC.
EXTEND FIRE RATED WALL CONSTRUCTION BEHIND RECESSED OR BUILD-IN EQUIPMENT SUCH AS FIRE
EXTINGUISHER CABINETS (FEC), ELECTRICAL WATER COOLERS (EWC), ELECTRIC PANELS, ETC.
STAGGER GYPSUM BOARD JOINTS VERTICALLY AND HORIZONTALLY A MINIMUM OF 16" EACH SIDE OF PARTITION
AT ALL PARTITIONS.
PROVIDE TYPE 'X' WATER RESISTANT GYPSUM WALL BOARD, ON ALL SURFACES, IN ALL TOILETS, JANITOR
CLOSETS AND SHOWERS. PROVIDE TYPE 'X' TILE BACKERBOARD ON ANY PARTITION SCHEDULED TO BE
FINISHED WITH CERAMIC TILE.
PROVIDE AND INSTALL ANY STIFFENERS, BRACING, BACK-UP PLATES AND SUPPORTING BRACKETS REQUIRED
FOR THE INSTALLATION OF ALL FLOOR MOUNTED OR SUSPENDED MECHANICAL, OR ELECTRICAL.
ALL VERTICAL PIPING AND COLUMNS EXPOSED IN ROOMS SHALL BE FURRED WITH METAL STUDS AND GWB AND
FINISHED TO MATCH ADJACENT WALLS, U.N.O. EXCEPTIONS: ELEC. CLOSETS, TEL. CLOSETS & MECH. CLOSETS.
WHERE HVAC OR OTHER MECHANICAL, ELECTRICAL AND PLUMBING ITEMS PENETRATE PARTITIONS, STUDS
SHALL BE BRACED AND FRAMED TO STRUCTURE AS REQUIRED TO PROVIDE ADEQUATE SUPPORT. ALL
PENETRATIONS THROUGH RATED WALLS SHALL BE SEALED TO PROVIDE FIRE, SMOKE, AND/OR ACOUSTICAL
ISOLATION OF SPACES WITH APPROPRIATE FIRE STOP MATERIAL.
COORDINATE METAL STUD GAUGE WITH PRE-APPROVED EQUIPMENT ANCHORAGE. WHERE DISCREPANCY
OCCURS, THE MORE STRINGENT REQUIREMENT SHALL GOVERN.
PROVIDE FIRE SAFING INSULATION AS REQUIRED TO MAINTAIN THE INTEGRITY OF FIRE RATED PARTITIONS.
PROVIDE REQUIRED FRAMES AND BRACING AROUND WALL PENETRATIONS.
PROVIDE CONTINUOUS ACOUSTICAL SEALANT AT BOTTOM OF ALL PARTITIONS.
WHERE COLUMN FURRING STUDS EXCEED THE MANUFACTURER'S RECOMMENDED LIMITING HEIGHTS, STUDS
SHALL BE BRACED BACK TO THE STRUCTURE AS REQUIRED.
METAL STUD SCHEDULE:
UNLESS NOTED OTHERWISE, STRUCTURAL PROPERTIES LISTED BELOW ARE BASED ON STEEL STUDS C-
SHAPE STUDS AND SHALL HAVE MINIMUM 1-1/4" FLANGE WITH 1/4" RETURN LIPS EACH SIDE.
ALL PARTITIONS SHALL RECEIVE SOUND ATTENUATION BLANKETS, EXCEPT FOR PARTITIONS WHICH DO
NOT SEPARATE TWO OR MORE ROOMS (WING WALLS).
THERE SHALL BE NO BACK-TO-BACK ELECTRICAL, TELEPHONE, OR OTHER OUTLETS, EXCEPT WHERE
SPECIFICALLY SHOWN.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
PARTITION NOTES
PRIORITY 5 - NON-RATED WALL
20C-SHAPE6 inch
MIN. THICKNESS
0.0195"
0.0147"
0.0195"
0.0195"
0.0209"
0.0209"
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CR CARD READER
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
IDPH ILLINOIS DEPARTMENT OF
PUBLIC HEALTH
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
LVT LUXURY VINYL TILE
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PP PUSH PAD
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SJ SEAL JOINT
SJS SEAL JOINT @ SLOPE EDGE
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
C
L
FEC FIRE EXTINGUISHER CABINET
EXP EXPOSED
DEMOLITION KEYNOTE
WALL TYPE
DOOR NUMBER
TYPICAL KEYNOTE
CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
FIRE EXTINGUISHER
FIRE EXTINGUISHER
CABINET
FE
FEC
WINDOW TYPE
FIRE EXTINGUISHER
CABINET
FEC
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE
DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN
THE COR AND CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS FOR SPECIFIC PRODUCTS. DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE
THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION
DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE
INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCT(S) AND IS RESPONSIBLE FOR ACCOMMODATING AND
COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF
CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A
WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED
AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY
ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY
BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE
COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE
REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES
EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR
DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING
KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.
12. COORDINATE THE WORK OF TRADES PRIOR TO THE START OF CONSTRUCTION.
13. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF WORK FOR EACH PHASE.
14. NOTIFY VA COR OF DISCREPANCIES IN THE DRAWINGS AND SPECS PRIOR TO THE START OF WORK.
15. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED FACE OF EXISTING WALL SURFACE.
16. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
17. INSTALL ALL WORK IN ACCORDANCE WITH CURRENT APPLICABLE CODES AND PUBLISHED STANDARDS.
18. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE
DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN
VA COR AND CONTRACTOR BEFORE THE START OF THE WORK.
19. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR
DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
20. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDTION AND RENOVATION PROJECTS. THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR
REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND
QUALITY.
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT
THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL
CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND CONTRACTOR BEFORE THE START OF
THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS FOR SPECIFIC PRODUCTS. DETAILS FOR SPECIFIC
PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER
MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER
FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE
INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCT(S) AND IS
RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE
NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED
ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR
INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE
SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND
UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE
COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS
OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND
SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM
THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL
SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR
GREATER QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE DRAWINGS AND
SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS
PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE
COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO
ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10.REFER TO PLUMBING, ELECTRICAL, AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
11.PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL
FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS REQUIRED FOR COMPLETION
OF THE WORK.
12.COORDINATE THE WORK OF TRADES PRIOR TO THE START OF CONSTRUCTION.
13.FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF WORK FOR EACH PHASE.
14.NOTIFY VA COR OF DISCREPANCIES IN THE DRAWINGS AND SPECS PRIOR TO THE START OF WORK.
15.DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED FACE OF
EXISTING WALL SURFACE.
16. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
17.INSTALL ALL WORK IN ACCORDANCE WITH CURRENT APPLICABLE CODES AND PUBLISHED STANDARDS.
18.INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT
THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL
CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN VA COR AND CONTRACTOR BEFORE THE START OF
THE WORK.
19.DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO
ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL GOVERN.
20.AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDTION AND RENOVATION PROJECTS. THE CONSTRUCTION
AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING
CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
4'-0" MAX TO HIGHEST
OPERABLE POINT - IF FIRE
EXTINGUISHER OVER 40 LBS
3'-6" MAX HT.
FINISH FLOOR
FIRE EXTINGUISHER CABINET
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# APRIL 12, 2022
1, 18
REPLACE SWITCHGEAR
BUILDING 18 AT DURHAM
VAMC
558-20-156
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM , NC 27705
20-108
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
A
M
A-001
ACKC
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS, NOTES AND
PARTITION TYPES
FULLY SPRINKLERED
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND
GENERAL NOTES
DEMOLITION NOTES
GENERAL NOTES
DEMOLITION NOTES
MOUNTING HEIGHTS
APRIL 14, 2022
BG008
REPRODUCTION AREA
BG002
ELECTRONIC SHOP
BG004
OFFICE
BG006
OFFICE
OFFICE
EG002
EG004
CORRIDOR
CORRIDOR
BG001
SSSSSSSSS
SSSSSS SSSS S S S S S S
S S
S S
S S
S S
S SSS
S S
S S
S S S
S S
S
SS S S S S S S S S S SS
S
S
S
S
MACHINE ROOM
BUILDING 18
BG007
BG005
PROCESSING
ROOM
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
BG003
(BLDG 1)
BUILDING 1
BG000
8 8
(BLDG 1)
CURRENT SWITCHGEAR RM
(BLDG 18)
VENDING RM
BG000
(BLDG 18)
9 10 11 12 13 14 15
M
N
P
Q
R
R.1
S
9 10 11 12 13 14 15
M
N
P
Q
R
R.1
S
M
N
P
Q
R
R.1
S
9 10 11 12 13 14 15
9 10 11 12 13 14 15
BG008
REPRODUCTION AREA
BG002
ELECTRONIC SHOP
BG004
OFFICE
BG006
OFFICE
OFFICE
EG002
EG004
CORRIDOR
CORRIDOR
BG001
SSSSSSSSS
SSSSSS SSSS S S S S S S
S S
S S
S S
S S
S SSS
S S
S S
S S S
S S
S
S S
S
S
S
MACHINE ROOM
BUILDING 18
BG007
BG005
PROCESSING
ROOM
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
BG003
(BLDG 1)
BUILDING 1
BG000
EXP CLG
(BLDG 1)
EXP CLG
CURRENT SWITCHGEAR RM
(BLDG 18)
EXPANDED
SWITCHGEAR RM
BG000
(BLDG 1)
IT
BG018
(BLDG 1)
EXP CLG
REFLECTED CEILING PLAN
LEGEND
CEILING HEIGHT
DESIGNATION
(WHEN HEIGHT
VARIES FROM
TYPICAL)
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF
EGRESS)
A.F.F.10' - 6"
SPRINKLER HEAD
LINEAR INDUSTRIAL
(LED) CHAIN HUNG
EXP CLG
EXPOSED CEILING
TO STRUCTURE
ABOVE
BG008
REPRODUCTION AREA
BG002
ELECTRONIC SHOP
BG004
OFFICE
BG006
OFFICE
OFFICE
EG002
EG004
CORRIDOR
CORRIDOR
BG001
SSSSSSSSS
SSSSSS SSSS S S S S S S
S S
S S
S S
S S
S SSS
S S
S S
S S S
S S
S
SS S S S S S S S S S SS
S
S
S
S
MACHINE ROOM
BUILDING 18
IT
HAC
BG007
BG005
PROCESSING
ROOM
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
BG003
(BLDG 1)
BUILDING 1
BG000
(BLDG 1)
VENDING RM
BG000
(BLDG 18)
BG008
REPRODUCTION AREA
BG002
ELECTRONIC SHOP
BG004
OFFICE
BG006
OFFICE
OFFICE
EG002
EG004
CORRIDOR
CORRIDOR
BG001
SSSSSSSSS
SSSSSS SSSS S S S S S S
S S
S S
S S
S S
S SSS
S S
S S
S S S
S S
S
S S
S
S
S
EXPANDED
SWITCHGEAR RM
MACHINE ROOM
BUILDING 18
BG007
BG005
PROCESSING
ROOM
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
(BLDG 1)
BG003
(BLDG 1)
BUILDING 1
BG000A
BG000
B G
BG000B
BG000C
IT
(BLDG 1)
BG018
B G
D
6'-0"
3'-9"
VIF
V I F
G3.2
G3.2
G3.2
6'-4"
VIF
3'-9 1/2"
VIF
6'-9"
VIF
V I F
9"
VIF
6'-0 1/2"
ALIGN
ALIGN
1'-0 1/2"
VIF
CJ CJCJ
INSTALL CONTROL JOINTS
EQUAL SPACING ON NEW SLAB
(BLDG 1)
A-601
A-601
A-601
A-601
5'-0 1/2"
1'-1 1/2"
VIF
6'-0"5'-0" 2'-7"
BG000
(BLDG 1)
G3.0
A-601
TYP
THIRD FLOOR
F-WING ROOF
FOURTH FLOOR
E-WING ROOF
STAIR TOWER
M
N
P
Q
R
R.1
S
T
11 12
GROUND FLOOR DEMOLITION REFLECTED CEILING PLAN
SCALE: 1/8" = 1'-0"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# APRIL 12, 2022
1, 18
REPLACE SWITCHGEAR
BUILDING 18 AT DURHAM
VAMC
558-20-156
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM , NC 27705
20-108
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
BOOTH
A
D
C
B
E
F
MRI
I.C.U.
F
U
L
T
S
R
E
E
T
E
R
W
R
A
D
KEY PLAN:
AREA OF WORK
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE TIGHTS S S S
A
M
A-101
AC, DGCKC
GROUND FLOOR AND REFLECTED
CEILING DEMOLITION PLAN, NEW WORK
AND REFLECTED CEILING PLAN
FULLY SPRINKLERED
GROUND FLOOR DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
1. REMOVE EXISTING RECESSED RADIATOR
AND FILL WALL.
2. PARTIAL REMOVAL OF WALL TO CREATE NEW
DOOR OPENING.
3. DEMOLISH EXISTING WALL SYSTEM.
4. REMOVE DOOR AND DOOR FRAME.
5. REMOVE EXISTING FLOOR FINISHES TO
EXISTING CONCRETE SLAB. PATCH FLOOR
AS NEED FOR A LEVEL SURFACE. EXISTING
FLOOR CONTAINS ASBESTOS - SEE SHEET
NOTE F.
6. PREPARE FLOOR TO RECEIVE NEW
CONCRETE RAISED SLAB.
7. REMOVE ACOUSTICAL CEILING ASSEMBLY.
8. REMOVAL OF LIGHT FIXTURES, DIFFUSERS
AND OTHER OVERHEAD ELEMENTS. REFER
TO ENGINEERING SHEETS FOR
COORDINATION.
9. REMOVE EXISTING BUMPER RAIL, SAVAGE
AND STORE.
10. REMOVE EXISTING IN WALL HVAC
EQUIPMENT AND RADIATOR ALONG
EXTERIOR WALL.
11. DEMOLISH PLUMBING FIXTURE. PATCH
FLOOR AS NEED FOR A LEVEL SURFACE.
EXISTING WALL TO REMAIN
DEMOLISH WALL
NEW WALL
WALL LEGEND
N
O
R
T
H
0 4 8 16
GROUND FLOOR REFLECTED CEILING PLAN
SCALE: 1/8" = 1'-0"
GROUND FLOOR NEW WORK PLAN
SCALE: 1/8" = 1'-0"
N
O
R
T
H
0 4 8 16
N
O
R
T
H
0 4 8 16
A.
B.
C.
D.
THE CONTRACTOR SHALL CAREFULLY STUDY
AND COMPARE THE REFLECTED CEILING
PLANS WITH THE ELECTRICAL LIGHTING
PLANS, WITH THE MECHANICAL SUPPLY,
RETURN AND EXHAUST PLANS, AND WITH THE
FIRE PROTECTION PLANS, AND CONTRACTOR
SHALL REPORT TO THE COR ANY
INCONSISTENCY THAT HE MAY DISCOVER
PRIOR TO PROCEEDING.
WHERE FIELD CONDITIONS CAUSE
VARIATIONS IN THE REFLECTED CEILING PLAN,
ANY ADJUSTMENTS TO ITEM LOCATIONS
SHALL BE COORDINATED WITH COR.
FRAME ELECTRICAL FIXTURES AND
MECHANICAL DIFFUSERS. COORDINATE WITH
MECHANICAL & ELECTRICAL
SUBCONTRACTORS.
CENTER EXIT SIGNS OVER DOORS, U.N.O.
X
KEY NOTES: DEMO
E. PATCH AND REPAIR WALL TO LIKE CONDITION
WHERE DOOR OPENING IS CREATED.
N
O
R
T
H
0 4 8 16
1. INSTALL NEW DOOR AND FRAME.
2. NEW INFILL INTERIOR WALL.
3. NEW CONCRETE PAD. SEE DETAIL 7/A-601
4. NEW SURFACE MOUNTED FIRE
EXTINGUISHER CASE.
5. PATCH REMOVED WALL HVAC EQUIP AT
EXIST EXTERIOR WALL - SEE DETAIL 12/A-601.
6. NEW EQUIPMENT CURB SEE DETAIL 14/A-601.
CONTRACTOR TO PROVIDE ADEQUATE
PROTECTION DURING CONSTRUCTION.
7. REINSTALL BUMPER RAIL AND MODIFIED TO
ACCOMMODATE NEW DOOR OPENINGS.
KEY NOTES: NEW
F.
VENDING ROOM BG000 CONTAINS HAZARDOUS
MATERIALS SEE SPECIFICATIONS
SECTION 02 82 13.19 ASBESTOS FLOOR TILE AND
MASTIC ABATEMENT. VETERAN'S ADMINISTRATION
REPORT "ASBESTOS 2018 0-13-18. BLDG 1."
REFER TO HA-01 FOR HAZARDOUS MATERIALS IN
THE CORRIDOR AREA.
G.
BETWEEN BG000 AND BG002 CONTRACTOR TO
REPAIR ABOVE CEILING TO DECK ELEMENTS
(OPENINGS, WALLS, STRUCTURE, ETC.) TO MEET
FIRE/SMOKE SEPARATION REQUIREMENTS.
PARTIAL THIRD FLOOR F-WING ROOF
SCALE: 1/8" = 1'-0"
APRIL 14, 2022
SEE PARTITION
TYPES
(2) METAL STUDS TO
FORM HEADER
CAULK BOTH SIDES OF
DOOR - CONTINUOUS
DOOR AND FRAME
- SEE DOOR SCHEDULE
SEE DOOR
SCHEDULE
S E
E
P
A R
T I T
I O
N
T Y
P E
S
DOOR AND FRAME
- SEE DOOR SCHEDULE
CAULK BOTH SIDES OF
DOOR - CONTINUOUS
(2) 2x METAL STUDS TO
FORM JAMB
6"
6"
NEW CONCRETE BASE
PROVIDE #3 DOWEL BARS 24" O.C
EACH WAY. EPOXY DOWELS INTO
EXISTING SLAB
6X6 - W1.4X W1.4 WWF
WIRE TO #3 DOWELS
EXISTING CONCRETE
SLAB
TYPICAL EQUIPMENT
ANCHORAGE - SEE
EQUIPMENT CUT SHEETS
(NEW) 8" CMU INFILL
SHORE EXISTING FRAMING BEARING ON THIS WALL AND
WALL ABOVE OPENING PRIOR TO REMOVING WALL AND
INSTALLING LINTEL
FIELD VERIFY AND INFILL WITH SALVAGE (WHOLE) BRICKS (MATCH
EXISTING COURSING) PROVIDE NEW FLASHING WITH WEEPS
L5 X 3-1/2 X 5/16 (LLV),
BEAR 6" MINIMUM EACH END. MAX SPAN = 8'-0"
METAL COUNTER FLASHING
OVERLAP NEW WEATHER BARRIER TO
EXISTING W/ FLASHING TAPE
NEW WEATHER BARRIER TO MATCH EXISTING
EXTEND WEATHER BARRIER TO COUNTER FLASHING
FILL HOLES WITH FIRE CAULK TO MATCH RATING AFTER REMOVING
SHORING
HM DOOR FRAME 4" AT HEAD
(NEW) 8" CMU INFILL
HM DOOR FRAME
DOOR AS SCHEDULE
SEALANT ON BOTH SIDES
FIELD VERIFY AND INFILL WITH SALVAGE
(WHOLE) BRICKS (MATCH EXISTING
COURSING)
F.F.
F.F.
F
F.F.
F-P
F.F.
G-P
KICK
PLATE
Q
(2) 5/8" GYP BD -
TYPE X EACH SIDE
OF MTL STUD
3 5/8" MTL STUD
V I F
EXISTING WALL
TO REMAIN
REPAIR EXISTING
CORRIDOR WALL
EXISTING DOOR AND
FRAME TO REMAIN
CORRIDOR
BG001
(BLDG 1)
CANTEEN
STORAGE
BG002
(BLDG 1)
EXPANDED
SWITCHGEAR RM
BG000
(BLDG 1)
R
R.1
(2) 5/8" GYP BD -
TYPE X EACH SIDE
OF MTL STUD
3 5/8" MTL STUD
FIRE CAULK JOINT
EXISTING WALL
TO REMAIN
CANTEEN
STORAGE
BG002
CURRENT SWITCHGEAR RM (BLDG 18)
(BLDG 1)
EXISTING TWO-HR RATED WALL
EXPANDED
SWITCHGEAR RM
BG000
(BLDG 1)
R
EXISTING COLUMN TO
REMAIN
V I F
11 1/2"
VIF
5/8" GYP BD
2 1/2 MTL. STUD
11 1/2"
VIF
EXPANDED SWITCHGEAR RM
CORRIDOR
BG001
(BLDG 1)
(2) 5/8" GYP BD - TYPE
X EACH SIDE OF MTL
STUD
3 5/8" MTL STUD2 1/2" MTL STUD
CORNER BEAD
BG000
(BLDG 1)
CORRIDOR
BG001
(BLDG 1)
NEW DOOR AND
FRAME - SEE DOOR
SCHEDULE
PROVIDE 90 DEGREE
CORNER/END FROM
SALVAGED MATERIAL
FOR HANDRAIL &
WALL GUARD
4"
TYP.
Q
V I F
EXPANDED
SWITCHGEAR RM
BG000
(BLDG 1)
S E
E
P
A R
T I T
I O
N
T Y
P E
S
DOOR AND FRAME
- SEE DOOR SCHEDULE
CAULK BOTH SIDES OF
DOOR - CONTINUOUS
(2) 2x METAL STUDS TO
FORM JAMB
SEE PARTITION
TYPES
(2) METAL STUDS TO
FORM HEADER
CAULK BOTH SIDES OF
DOOR - CONTINUOUS
DOOR AND FRAME
- SEE DOOR SCHEDULE
SEE DOOR
SCHEDULE
CORRIDOR SIDE
ROOM SIDE
END CAP BY WP
MANUFACTURER
EXISTING F.F.
BUMPER RAIL
STANDARD HIGH
WALL PROTECTION
RESILIENT WALL
BASE 6"
REPAIR EXISTING
FLOORING
REPAINT EXISTING WALL
EXISTING CEILING TO
REMAIN
EXISTING
ROOF
SYSTEM TO
REMAIN
EQUIPMENT
SUPPORT
NOTE:
BASIS OF DESIGN FOR EQUIPMENT CURB
- NVENT CADDY PYRAMID EQUIPMENT
3 5/8" MTL STUD
ALIGN
EXISTING FINISH
FLOOR
5/8" GYP BD,
FINISH AND PAINT
TO MATCH EXISTING
ALIGN
EXISTING DEMISING
WALL TO REMAIN
EXISTING METAL
STUD FRAMING
WALL TO REMAIN
INSTALL AND
SECURE NEW
METAL STUD
FRAMING
AROUND THE
WALL OPENING
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date# APRIL 12, 2022
1, 18
REPLACE SWITCHGEAR
BUILDING 18 AT DURHAM
VAMC
558-20-156
DURHAM VA MEDICAL CENTER
508 FULTON STREET
DURHAM , NC 27705
20-108
100% CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
A
M
A-601
AC, DGCKC
DOOR SCHEDULE, DOOR ELEVATIONS,
FRAME ELEVATIONS, DOOR DETAILS
ROOM FINISH SCHEDULE, AND DETAIL
FULLY SPRINKLERED
DOOR SCHEDULE
NO.
DOOR DOOR FRAME
HEAD
DETAIL NO.
JAMB
DETAIL NO.
THRESH
DETAIL NO.
LBL
HDWR
SET
REMARKSWIDTH HEIGHT THICK MAT'L ELEV MAT'L ELEV
GROUND FLOOR
BG000A 7' - 0" HM N/A
3' - 0" 7' - 0" 1 3/4" HM N/A
7' - 0" 1 3/4" HM N/A
7' - 0" 1 3/4" HM N/A
1 3/4" HM N/A
ROOM FINISH SCHEDULE
ROOM NO. NAME FLOOR BASE
WALLS CEILING
REMARKS
EAST NORTH SOUTH WEST
FIN HEIGHTFIN FIN FIN FIN
GROUND FLOOR
SWITCHGEAR RM
3' - 0" PAIR
BG000B
BG000C
BG000D
PNT= PAINT
SCW= SOLID CORE WOOD
STN= STAIN
WD= WOOD
IHM= INSULATED HOLLOW METAL
N/A= NOT APPLICABLE
OHD= OVERHEAD DOOR
PF= PREFINISHED
AL= ALUMINUM
ALCW= ALUMINUM CLAD WOOD
EXIST= EXISTING
FRP= FIBER REINFORCED
PLASTIC
HM=
HOLLOW METAL
REMARKS
BG018
BG000
IT
1 3/4" HM
HM
HM
HM
HM
FRAME ELEVATIONSDOOR ELEVATIONS
3' - 0" PAIR
3' - 0" PAIR
CONC
CONC
OPEN TO STRUCTURE
G-P
F
F-P
F-P
F
1/A-601
3/A-601
2/A-601
1. 180 DEGREE DOOR SWING.
3' - 0"BG018
7' - 0"
EXIST
PNT
90 MIN
90 MIN
90 MIN
PNT PNT PNT
1/A-601 2/A-601
1/A-601 2/A-601
5/A-601 6/A-601
HW-5
HW-6A (Rev1)
HW-10
HW-12 (Rev1)
HW-12 (Rev1)
CONCRETE EQUIPMENT BASE
SCALE: 1" = 1'-0"
HEAD DETAIL @ METAL STUD
SCALE: 1 1/2" = 1'-0"
JAMB DETAIL @ METAL STUD
SCALE: 1 1/2" = 1'-0"
JAMB DETAIL
SCALE: 1 1/2" = 1'-0"
HEAD DETAIL
SCALE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .