36C24625B0026 0002.docx

DOCX document 26 KB Posted

Attached to
Z2DZ--Replace Switchgear Bldg 18 Construction (VA-26-00001395) 558-20-156|
Solicitation number
36C24625B0026
Issued by

About this file

This document is a Request for Information (RFI) and Federal Contract Opportunity for a switchgear replacement project at the Durham VA Health Care Center. The project is a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside under NAICS code 236220, with an estimated construction magnitude between $2,000,000 and $5,000,000. The primary objective is to upgrade the distribution system for Building 18's normal power switchgear and transformers to improve power redundancy, involving comprehensive electrical infrastructure modifications.

Key project requirements include providing new switchgear and transformers in Building 1 BG-000, replacing existing substations and distribution switchgear, installing new transformers T-6 and T-7, and relocating distribution circuits to a new switchgear room. The project demands compliance with state and federal codes, NFPA, and ANSI standards, with work to be performed at the VA Medical Center in Durham, VA. The project has a 238-calendar day performance period from Notice to Proceed, will occur around an occupied 24-hour healthcare facility, and requires appropriate personal protective equipment and infection control measures. The bid is due on 08/07/2025 at 2:00 PM EDT, with a site walk that already occurred on 7/23/25.

View the file

Other files

File Type Posted
36C24625B0026 0006.pdf PDF
36C24625B0026 0005.docx DOCX document
36C24625B0026 0004.docx DOCX document
36C24625B0026 0003.docx DOCX document
36C24625B0026 0001.docx DOCX document
Pre-Bid site Visit Replace Switchgear.pdf PDF
9_Asbestos 2018 9-13-18 bldg 1 drawings.pdf PDF
9_Bid Specs 20250220.docx DOCX document
9_SwitchGear Drawings Bid 20250220.pdf PDF
S02 36C24625B0026_1 Solicitation 06162025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-05-2025 558-20-156 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton

VA

23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton

VA

23667 To all Offerors/Bidders

36C24625B0026

X X X x The purpose of this RFI is to answer questions received.

Bidders must sign and return a copy of all amendments with their bids.

RFI
Response
1. In regards to drawing HA-01 the Project title on the drawing is Building 1 Halls and Walls. I do see it has in red on the top left for Reference Only.
This is for reference but as this project includes demolition of Vending room, the walls right outside that would be lead containing if it is a yellow glazed block.
2. On Drawing G-003 Under Life Safety General Notes, Note A indicates referencing drawing GI002 which is not included with the contract documents.
This is assuming GI002 is a typo and that it was suppose to be G-002 in which G-002 does speak on ICRA and life safety.
3. Drawing A-101 please clarify the building numbers on the drawings. Some Reference Bldg 1 some reference Bldg 18. Drawing FX101 References the switchgear Rm as Building One.
Building 1 is the hospital itself. Building 18 is the switchgear room. These two rooms are connected but separated by a wall. For this project, we will be taking down that wall and incorporate the vending room (in Building 1) as part of the switchgear room (building 18).
4. Is Building One and Building 18 the same building?
See question # 3 for explanation.
Drawing MH101, Could you provide the approximate physical distance from the Cooling units in the Switchgear Room to the condensing units on the roof.
Bidders should make reasonable assumptions based on the documents provided and include sufficient allowance in their bid to accommodate typical conditions.
Is there a video surveillance/access control component to this project
No video surveillance in the project.
Are you accepting approved equals on this project
No equipment is being sole sourced. Approved equals are acceptable.
1. Will all the work for this project take place during normal work hours? All work should take place during normal work hours.
Work that may need be outside of working hours will need to be coordinated with the COR. This is usually not an issue unless the GC wants to complete this project all at night. Outages will be done outside of working hours but coordination will still need to be completed. Section 01000 subsection 1.25 and Section 010000 subsection 1.6.2
2. Does the Superintendent have to be an employee of GC?
No, but all qualification must be met as seen in the specs. This superintendent will still be viewed as an extension of the GC by default an employee of the GC. This superintendent will be dedicated only to this project and no others. 010000 sub 1.30.B / 014500.10 sub1.5.1.2 / 014500.10 sub 1.6.1
3. Can Superintendent or SSHO have more than one duty?
Superintendent and SSHO are two different individuals with two different roles. We will usually allow QCM/superintendent to the the same person given qualifications are met for both. Section 013526 subsection 1.7/ Section 014500.10 subsection 1.5.1.2
1) Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?
See Specification section 013526 sub 1.7
2) If no to the question above, will the SSHO need to be full-time for this project?
See Specification section 013526 sub 1.7
3) Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC?
See Specification section 014500.10 sub 1.5.1
4) If no to the question above, will the QA/QC need to be full time for this project?
See Specification section 014500.10 sub 1.5.1
5) Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC?
See Specification section 013526 sub 1.7 and See Specification section 014500.10 sub 1.5.1
6) Please confirm if tax should be included in our proposal?
Proposals should cover your cost to perform the terms and conditions given in the solicitation
7) Please provide the latest wage determination for this project’s county.
Wage determination is included in the posting.
8) Page 51 of 68 Section 4.15 Please check off the appropriate box for VAAR clause 852.219-75.
The contractor may check "general construction" and include with their bid submission.
1. Staging Area: Could you please confirm the designated location for the contractor’s staging area?
VA to confirm.
2. Construction Area: What is the defined boundary of the construction area for this project?
See drawing Sheets A-101, MH101, PP101, ED101 and EP101.
3. Switchgear Room Configuration: Will the new switchgear room be a single consolidated space incorporating the existing vending room and the current switchgear room?
Refer to drawing Sheet A-101. There is a new pair-door in the existing wall between the current switchgear room (Bldg 18) and the new expanded switchgear room (BG000, Bldg 1).
4. Equipment Placement: Will the new switchgear be installed in the vending room, or will the transformers be placed there while the switchgear remains in the existing switchgear room?
Refer to drawing Sheets E-001 to E-603.
5. Space Allocation: Alternatively, will all new equipment (transformers and switchgear) be installed within the existing switchgear room, with modifications made to ensure adequate ventilation and spacing?
Refer to the construction documents.
. Will VAMC Facility Electrical Engineering provide a similar or compatible functional Specification against Siemens-Allie?
It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings.
2. Does the SDVOSB Prime have to be a General Contractor?
This is a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside under NAICS code 236220. Contractor qualification determination will be made in accordance with Federal Acquisition Regulations
3. Does the General Construction phase on pages 50-68 apply to the General Contractor designation as the Prime contractor on this project?
All pages of the contract would apply to the awarded party (Prime).
4. Is Siemens SENTRON or GEAFOL OEM being upgraded? Is equipment being bid on this project as a Vendor/Subcontractor?
It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings.
Do the VAMC Switchgear and Transformer Upgrades have similar OEM (Siemens) specifications in the Bid, or can another vendor's OEM equipment be bid?
It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings.
2. Is the Electrical contractor to replace the existing substation B18-SWGR-Main A/B and transformers B18-XF-T6 and B18-XF only?
Refer to Sheet E-601 for the extent of the demolition. In addition to other work, all distribution equipment including the medium voltage compartments B18-MVS-S6 and S7 and downstream items are to be replaced.
3. Is it the intention to have the awarded firm provide the newer version of the existing products now under the SENTRON or GEAFOL product lines? If so, why weren't the specifications and model numbers of the newer Siemens Equipment included in the bid?
The equipment is not sole sourced. Approved equivalents are allowed to be used.
4. What are the NAIC codes for Electrical Distribution Equipment Upgrade of the Siemens infrastructure?
It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings.
. Do we have to provide new switchgear replacing B18-SWGR-Main A/B and related transformers T6 and T7 in Building 1 BG-000?
Refer to Sheet E-602 and other electrical sheets for the full extent of gear being replaced.
2. Are we to provide new Substations and distribution switchgear? Has Siemens SENTRON or GEAFOL provided VAMC Engineering with new SWGR-Main Product numbers and warranty services with commissioning?
It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings. Refer to Sheet E-602 and other electrical sheets for the full extent of gear being replaced.
3. Are we to provide a new tie breaker that can properly transfer power without manual load transfer? Has the Siemens Account Representative provided a make and Siemens Product and item number?
Tie breaker is to be kirk-keyed with the main breakers of the transformer secondaries, and manually controlled.
4. Are we to relocate the distribution circuits to the new switchgear or the former canteen/break room?
Distribution circuits are to be relocated from the existing switchgear to the new switchgear upon energizing, phased in a sequence which is coordinated with the VA so as to be least disruptive and minimize downtime.
5. Provide a concrete foundation to house the new switchgear in the canteen/break room?
Refer to Drawing 3 GROUND FLOOR NEW WORK PLAN and New Keynote 3 on Sheet A-101 and Detail 7 CONCRETE EQUIPMENT BASE on Sheet A-601.
6. Is modifying the existing OIT and HAC closet a General Contractor's responsibility?
General contractor should be working with their subcontractors.
7. Modify the existing location to house the new equipment correctly.
Refer to the construction documents.
8. Is it assumed that just some of the Siemens SWGR-Main A/B is being replaced with new Transformers for T6 and T7?
Refer to Sheet E-602 and other electrical sheets for the full extent of gear being replaced.
9. Are the new SWGR-Main A/B to be replaced with a warranty under the FAR?
Yes, warranty will be required.

Questions Regarding Transformer Specifications

Common Types:

- Dry-type transformers: Often used indoors for hospitals due to safety and ventilation.
The design intent is liquid filled.
- Liquid-filled transformers: Suitable for outdoor installations.
The design intent is liquid filled.
- Medium-voltage (MV) transformers: Typically 2.4kV to 35kV.
See E-602
- Pad-mounted or Substation Transformers: Depending on layout.
The design intent is substation transformer, in line with the gear.

Popular Siemens Models:

- Type 550-EE 5974: Likely a legacy or custom spec – Siemens Allis was a predecessor brand, now Siemens Energy.
It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings.
- New equivalent would fall under Siemens SENTRON or GEAFOL product lines.
It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings.

Specifications to Know:

- kVA rating (size/load)
See E-602
- Primary/secondary voltage
See E-602
- Impedance
not less than 4-1/2 percent
- Tap settings
Provide four, 2-1/2 percent full capacity taps in the primary windings, with two taps above rated voltage and two taps below rated voltage.
- NEMA or ANSI requirements
NEMA 1

Questions Regarding Switchgear

Medium-Voltage Switchgear:

- Air-insulated (AIS) or Gas-insulated (GIS)
Deadfront air break, three-pole gang-operated, interrupter type
- Arc-resistant options available
Not required by plans
- Siemens SIPROTEC, NXAIR, or GM-SG lines
It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings.

Low-Voltage Switchgear:

- Up to 600V
The distribution section is 208V
- Siemens WL Series, Sentron, or PowerMod
It is not required to be siemens equipment but rather any equipment that is equal to equipment within the spec and drawings.

Hospital/VAMC Special Requirements:

- Redundancy and N+1 reliability
Question is unclear
- Remote monitoring (SCADA or BMS integration)
BMS metering integration was not the design intent however each unit substation is to have an integral digital metering package included.
- Seismic compliance and fault tolerance
Question is unclear
Drawing EP101 Note 4 says “integral vacuum fault interrupter at transformer”. There is no mention of a vacuum fault interrupter in the Unit Sub specs 261116.
System is to have Vacuum fault interrupters to protect downstream equipment from damage
The One-Line on E-602 also does not show a vacuum fault interrupter. Please clarify what is required.
System is to have Vacuum fault interrupters to protect downstream equipment from damage
Specification 261219 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS – I don’t see any pad mounted transformers for this project. Please clarify the intent of this spec.
The transformer(s) is part of the lineup of the new switchgear, between the medium voltage section and the distribution section, but is not technically pad mounted.
Specification 26 23 00 LOW-VOLTAGE SWITCHGEAR – paragraph 2.6 specifies a Battery System. I don’t see a battery system on the drawings anywhere. Please confirm a battery system is required and where IT would be located.
No Battery system required.
Drawing E602 Note 2 says provide 60A breaker at Panel EED. However, the One-Line indicates adding a 200A breaker. Please clarify.
Note 2 should say 200A/3 pole breaker to serve Panel B1-PNL using 3-3/0 AWG, 1-6 AWG EG in 2" Conduit.
Are any of the feeders currently under the slab that need to be extended?
Incoming medium voltage feeders to the primary compartment of the existing switchgear are underground. The existing medium voltage feeders must terminate on the new primary compartments.
Will the CO agree to modify page 8 (b) Submission of bids of the Soliciation document SF1442 to accept electronically transmitted bid submissions via email and digitally signed documents where originals can be provided at the COs request?
Bids must be received in accordance with the posted solicitation. This is not being amended at this time.
The bid is due 08/7/2025 at 2:00 PM EDT.
Bids are due in accordance with the posted solicitation on sam.gov. There has not been a modification to the bid due date information.
There are no addendums to the most recent bid documents.
All addenda/amendments are posted on sam.gov
Is there a site walk on 07/29/25 at 2:00 PM.
The site walk took place on 7/23/25 and the sign in sheet is posted with this amendment.
Is the site walk mandatory.
REF 52.236-27, included with the solicitation.
Is there anything else we should know about bidding on this project before moving forward?
Available information is publically accessible to all potential bidders on sam.gov