9-San Pitch Guzzler Locations Spring 2026.pdf
PDF 1001 KB Posted
- Attached to
- NC26-59 Central Region Guzzler Lift FY26
- Solicitation number
- NC26-59
- Issued by
- Utah
About this file
This is a location reference document prepared by the State of Utah Division of Wildlife for a competitive procurement to provide helicopter guzzler transportation services. The project involves transporting guzzlers (water distribution systems) to five designated locations near Green Fountain, Utah. The service window runs from June 1 through June 25, 2026, with flexible scheduling allowing the vendor to complete work any day within this period. No mandatory site visit is required for interested bidders. The procurement is structured as an Invitation for Bid (IFB) anticipated to result in a single contract award to the lowest cost responsive and responsible vendor. The document serves as supporting technical material identifying the specific guzzler locations that will require transportation during the FY26 project period.
The vendor selected for this contract must provide guaranteed pricing for the entire project completion, ensuring cost certainty for the State of Utah regardless of when services are delivered within the June 1–25 window. This fixed-price requirement protects the procurement unit from price escalation and ensures budget predictability. As a location reference document, this file does not contain pricing terms, bidding deadlines, or award schedules; however, it provides the technical foundation necessary for vendors to prepare accurate cost proposals based on the specific transportation requirements to the five Green Fountain area locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-Helicopter Landing Zones Spring 2026.zip | ZIP file | |
| 4-Boss Tank Guzzlers and Helicopter Landing Zones Spring 2026.zip | ZIP file | |
| 8-Blind Canyon Guzzler Project NAIP 02112026.pdf | ||
| 6-Boss Tank Guzzlers Spring 2026.zip | ZIP file | |
| 1-Vendor Prerequisites - IFB Agency.pdf | ||
| 7-Attachment B Scope of Work.doc | DOC document | |
| 3-Blind Canyon Guzzler Project Basemap 02112026.pdf | ||
| 2-Att.-A-PO-Terms-and-Conditions (1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
San Pitch Guzzler Locations
^ Helicopter Landing Zones Spring 2026
^ Boss Tank Guzzlers Spring 2026
0 0.9 1.80.45 Miles
The Utah Division of Wildlife Resources makes no warranty with respect to the accuracy, completeness or usefulness of the data. Utah Division of Wildlife Resources assumes no liability for direct, indirect, special, or consequential damages resulting from the use or misuse of this data or any of the information
File details come from the government source that posted it. Updated .