8-Blind Canyon Guzzler Project NAIP 02112026.pdf

PDF 1 MB Posted

Attached to
NC26-59 Central Region Guzzler Lift FY26
Solicitation number
NC26-59
Issued by
Utah

About this file

This is a project description file related to an Invitation for Bid (IFB) issued by the State of Utah Division of Purchasing, conducted by the Wildlife agency, for helicopter guzzler transportation services in the Central Region. The project involves transporting guzzlers (water catchment systems) to five locations near Green Fountain, Utah. The contract is a project-based engagement with no mandatory site visit required. The work window is flexible, with completion required between June 1 and June 25, 2026. The procurement is anticipated to result in a single contract award to the lowest cost responsive and responsible vendor, with the vendor required to guarantee pricing for the entire project completion.

The file references NAIP (National Agriculture Imagery Program) designation and includes technical project specifications related to the guzzler lift operations. Pricing must remain fixed throughout the project duration with no price adjustment provisions. No specific set-asides, incumbent information, or detailed funding source documentation is provided in this file. The contract structure prioritizes cost competitiveness as the primary evaluation criterion, with vendors required to submit firm pricing that covers all aspects of the helicopter transportation and placement operations at the designated locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Utah Division of Wildlife Resources makes no warranty with respect to the accuracy, completeness or usefulness of the data. Utah Division of Wildlife Resources assumes no liability for direct, indirect, special, or consequential damages resulting from the use or misuse of this data or

$8

$8

ÑÜ

Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community

Legend ÑÜStaging Area $8Lake Fork WMA Guzzlers WMA roads WMA_unclassified_roads DWR_WMAs_2017 ElectricalLines

0 0.3 0.6 0.90.15 Miles

Blind Canyon Guzzler Project 2026

File details come from the government source that posted it. Updated .