9-Pricing Section BT-67JP 1793808316.660213.pdf

PDF 228 KB Posted

Attached to
Wabank Road Municipal Campus project
Solicitation number
US.257506
Issued by
Lancaster County, Pennsylvania

About this file

This pricing section document pertains to the Wabank Road Municipal Campus project bid submitted to Lancaster Township in Pennsylvania via the PennBid Program. The project encompasses seven primary bid items and multiple options, including mobilization and demobilization, survey and layout, topsoil stripping and earthwork, stormwater infiltration testing, amended soils preparation and placement, installation of township-provided storm pipes and structures, placement of millings, erosion control supply and installation, and swale installation and stabilization. Bids were due electronically by 11:00 AM on Wednesday, November 4, with a mandatory pre-bid meeting held on Monday, October 26 at 10:00 AM. Questions submitted after 11:00 AM on Thursday, October 29 were not acknowledged. All bidders were required to review the proposed project with the municipality's representative prior to bidding. Lancaster Township Board of Supervisors reserved the right to accept or reject any or all bids.

The pricing document presents comparative bids from three contractors: DH Funk & Sons LLC, H & H General Excavating, and Miller Soil Solutions LLC. Base bid pricing totals $835,911.75, with Option A at $119,605.00, Option B at $64,416.55, Option C at $80,534.76, and Options D, E, and F at $0. The highest total bid across all options reaches $1,296,115.38, while the lowest combined bid totals $677,700.00. Individual line items range from $2,394.99 for swale installation to $603,386.39 for topsoil stripping and earthwork. All items are priced on a lump-sum basis with a quantity of one unit each.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total Cost

Selected #

Selected ($)

# Locked Items Selected Lowest Unit of MeasureQuantity RequiredUnit Price Total Cost Unit Price Total Cost Unit Price Total Cost

#1-1 FALSE Mobilization and demobilization.$ 0 $ 11,756.0 LS 1 $ 31,739.8 $ 31,739.8 $ 11,756.0 $ 11,756.0 $ 35,350.0 $ 35,350.0

#1-2 FALSE Survey and layout.$ 0 $ 5,119.0 LS 1 $ 14,409.73$ 14,409.73 $ 5,119.0 $ 5,119.0 $ 27,850.0 $ 27,850.0

#1-3 FALSE Strip topsoil, earthwork (stockpiling unused material), and replace topsoil.$ 0 $ 338,955.0LS 1 $ 603,386.39$ 603,386.39$ 338,955.0$ 338,955.0 $ 835,911.75$ 835,911.75

#1-4 FALSE Stormwater infiltration testing and provision of results to Township.$ 0 $ 3,500.0 LS 1 $ 16,500.0 $ 16,500.0 $ 11,804.0 $ 11,804.0 $ 3,500.0 $ 3,500.0

#1-5 FALSE Test and use material on-site for mixing of Amended Soils with Township-provided sand and organics. Place Amended Soils.$ 0 $ 48,809.25LS 1 $ 48,809.25$ 48,809.25 $ 125,482.0$ 125,482.0 $ 51,882.0 $ 51,882.0

#2-1 FALSE Installation of Township-provided storm pipes and structures:- EW-C1 and riprap apron- EW-D1 and riprap apron- EW-E1 and riprap apron- HW-1- EW-B1 – MH-B2 – OS-B3 and underdrain$ 0 $ 28,194.24LS 1 $ 28,194.24$ 28,194.24 $ 37,254.0 $ 37,254.0 $ 52,397.0 $ 52,397.0

#3-1 FALSE Installation of Township-provided storm pipes and structures for the remainder of Phase I. (Will only be selected if Option A is also selected)$ 0 $ 43,183.0 LS 1 $ 51,624.53$ 51,624.53 $ 43,183.0 $ 43,183.0 $ 119,605.0$ 119,605.0

#4-1 FALSE Placement of Millings$ 0 $ 25,463.0 LS 1 $ 58,934.3 $ 58,934.3 $ 25,463.0 $ 25,463.0 $ 64,416.55$ 64,416.55

#5-1 FALSE Supply, installation, and maintenance of erosion controls$ 0 $ 44,000.0 LS 1 $ 60,386.06$ 60,386.06 $ 44,000.0 $ 44,000.0 $ 80,534.76$ 80,534.76

#6-1 FALSE Installation and stabilization of Swale 1$ 0 $ 2,394.99 LS 1 $ 2,394.99 $ 2,394.99 $ 7,764.0 $ 7,764.0 $ 5,250.5 $ 5,250.5

#7-1 FALSE Installation and stabilization of Swales 2-5$ 0 $ 14,539.5 LS 1 $ 14,539.5 $ 14,539.5 $ 26,920.0 $ 26,920.0 $ 19,417.82$ 19,417.82

Option D (1)

Option E (1)

Option F (1)

Base Bid Pricing (5)

Option A (1)

Option B (1)

Option C (1)

0 0 0

$ 0 $ 0 $ 0

DH Funk & Sons LLC H & H General ExcavatingMiller Soil Solutions, LLC.

$ 930,918.79 $ 677,700.0 $ 1,296,115.38

$ 835,911.75

$ 119,605.0

$ 64,416.55

$ 80,534.76

$ 19,417.82

File details come from the government source that posted it. Updated .