9-!MP27004-27311640 DFCM Addendum 1.pdf
PDF 244 KB Posted
- Solicitation number
- MP27004
- Issued by
- Utah
About this file
This is an Addendum #1 to a Stage II Invitation to Bid issued by the State of Utah Division of Facilities Construction and Management (DFCM) for a roof replacement project at Utah Tech University's Taylor Health facility. The project involves full roof membrane replacement with added insulation at an estimated construction cost of $600,000.00. Only contractors prequalified under DFCM's Stage I Prequalification for Contractors and currently listed on the respective DFCM Prequalified Contractors list as of the solicitation date are eligible to bid. The addendum, dated September 9, 2026, indicates that solicitation schedule changes have been made, with revisions documented in a separate "Revised Solicitation" document available in the U3P system. The addendum requires bidders to acknowledge receipt of this document upon bid submission, with failure to do so potentially resulting in bid disqualification.
The addendum contains no specific DFCM addendum items or Architect/Engineer addendum items to report. Subcontractor list submission deadlines have been modified and are detailed in the Revised Solicitation document. Bidders must reference the supporting documents in the U3P portal for complete solicitation details, schedule revisions, and submission requirements. The project is identified as DFCM Project #27311640 and U3P Event #MP27004.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM Addendum Cover Page, 9.2.2026
DFCM Addendum #1 Reference: UTU Taylor Health Emergency Roof Replacement DFCM Project #27311640 U3P Event #MP27004
Date: September 9, 2026
To: PreQualified Roofing Contractors
From: The Division of Facilities Construction and Management
Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Bidders are required to acknowledge receipt of this Addendum when their bid is submitted. Failure to do so may subject the Bidder to disqualification.
Addendum Items
Solicitation Schedule Changes: See the ‘Revised Solicitation’ document attached under the ‘Supporting Documents’ in U3P. Changes have been made to the following events:
Subcontractor Lists Deadline
DFCM Addendum Items: NA
Click to enter text Click to enter text Click to enter text
A/E Addendum Items: A/E Addendum # NA Click to enter text
Total Attached Pages: 0
File details come from the government source that posted it. Updated .