9-Mechanical Record Drawings.pdf

PDF 14 MB Posted

Attached to
Mount Pleasant Elementary Boiler Replacement
Solicitation number
27-001
Issued by
Summit County, Utah

About this file

Mechanical Record Drawings for Mount Pleasant Elementary School Boiler Replacement

This document constitutes the mechanical record drawings for a boiler replacement project at Mount Pleasant Elementary School, a facility operated by the North Sanpete School District in Mount Pleasant, Utah. The drawings provide comprehensive specifications for the complete replacement of the hydronic heating system, including detailed mechanical plans, piping layouts, control system designs, equipment schedules, and installation details. The project encompasses installation of two Hamilton Engineering EVO HW 1999 condensing boilers rated at 1,900 MBTU output (sea level) operating at 208V single-phase, along with associated equipment including expansion tanks, air separators, circulation pumps, chiller units, multiple air handling units (AHU-1 through AHU-4), and numerous variable air volume (VAV) boxes serving classroom zones throughout the facility. The mechanical system design includes four air handlers with capacities ranging from 14,000 to 28,000 CFM, 47 VAV boxes for zone temperature control, heating and cooling coil packages, glycol feed systems utilizing 40% propylene glycol, relief fans, make-up air units, and hydronic radiant floor heating boxes. Controls are specified to be provided by Schneider Electric TAC and installed by Utah-YMAS Controls, with direct digital control (DDC) coordination for building pressure management and demand control ventilation incorporating CO2 sensors in each zone.

The project specifications mandate strict adherence to all applicable building codes and industry standards including SMACNA ductwork standards, NEBB air balancing certification, and seismic anchoring per specification 230548. All ductwork is required to conform to maximum 4-foot flexible duct lengths and be insulated with 1.5-inch fiberglass at R-5.2 density, with all transverse joints sealed. The mechanical contractor must provide three bound maintenance manuals with tabs per specification section 01700, coordinate all penetrations with architectural and structural drawings, and implement fire sealing at all rated wall and floor penetrations. Equipment placement requires 3.5-inch concrete utility pads for floor-mounted equipment and 10-foot minimum distances from roof edges for roof-mounted units. A fixed-cost allowance of $26,036.98 is specified for slot diffusers (Types X, Y, and Z) from approved manufacturers, with contact information provided for procurement. The heating system operates at 140°F supply temperature with a return water temperature of 120°F at design conditions, while the chilled water system maintains 44°F supply and 58°F return temperatures. All mechanical work is to be performed at the facility elevation of 5,830 feet, with design cooling loads calculated at 95°F dry bulb ambient and 75°F dry bulb/61°F wet bulb interior design conditions.

View the file

Other files

File Type Posted
2-MPE BOILERS (pump connections) IMG .jpg JPG image
5-MPE Exst Intk IMG .jpg JPG image
4-MPE Exhaust intake Terminations IMG .jpg JPG image
6-MPE Boiler Serial Number .jpeg JPEG file
3-MPE BOILERS IMG .jpg JPG image
7-MPE MECH RM IMG .jpg JPG image
1-RFP 27-001 - Mount Pleasant Elementary Boiler Replacement.pdf PDF
8-MPE Piping Connections IMG .jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

THE ARCHITECTURAL, STRUCTURAL, PLUMBING AND

ELECTRICAL DRAWINGS AND OTHER RELATED DOCUMENTS

SHALL BE CONSIDERED A PART OF THE MECHANICAL

CONTRACT, AS FAR AS THEY APPLY TO THE MECHANICAL

SYSTEMS, AS IF REFERRED TO IN FULL.

ALL FIELD CONDITIONS AND JOB SITE DIMENSIONS ARE TO BE

VERIFIED PRIOR TO COMMENCEMENT OF WORK.

ALL CONSTRUCTION WORK SHALL BE PERFORMED IN STRICT

ACCORDANCE WITH ALL APPLICABLE BUILDING CODES.

ALL DUCTWORK SHALL CONFORM TO SMACNA STANDARDS.

MAXIMUM FLEX DUCT IS 4 FEET.

ALL SUPPLY AND RETURN AIR DUCTWORK TO BE INSULATED

WITH .75 LBS/FT 1-1/2" THICK 5.2 R-VALUE DENSITY

FIBERGLASS (MANVILLE MICROLITE). SUPPLY AND RETURN

DUCTWORK SHALL BE LINED.

COORDINATE ALL SUPPLY AIR DIFFUSERS, EXHAUST GRILLES,

AND RETURN AIR GRILLES WITH ARCHITECTURAL

REFLECTED CEILING PLAN AND WITH ELECTRICAL LIGHT

FIXTURES.

ALL TRANSVERSE JOINTS SHALL BE SEALED WITH TAPE OR

MASTIC.

ALL SUPPLY AND RETURN AIR DUCTWORK SHALL BE

INSULATED PER THE SPECIFICATIONS AND IMC. (ROUND

DUCT WRAPPED AND RECTANGULAR LINED).

ALL DIMENSIONS ARE NET INTERNAL.9

MANUAL VOLUME DAMPERS ARE TO BE PROVIDED IN ALL

SUPPLY, RETURN AND EXHAUST BRANCH DUCTS. DAMPERS

SHALL HAVE LOCKING QUADRANTS, TYPICAL OF DURODYNE

MODEL SPEC SEAL/QUAD SEAL.

THE LOCATION OF ALL PENETRATIONS SHALL BE

COORDINATED WITH ARCHITECTURAL AND STRUCTURAL

DRAWINGS.

MECHANICAL CONTRACTOR SHALL PROVIDE LEVELING

PLATFORM AND CURBS FOR ALL NECESSARY ROOF

EQUIPMENT. COORDINATE WITH ROOF EQUIPMENT

SUPPLIER.

REFER TO ELECTRICAL PLANS FOR LOCATIONS AND

MOUNTING HEIGHT OF THERMOSTATS FOR EQUIPMENT.

PLUMBING CONTRACTOR TO PROVIDE CONDENSATE

DRAINS TO CODE APPROVED RECEPTACLES.

ALL FIELD CONDITIONS AND DIMENSIONS SHOWN ON THE

DRAWINGS SHALL BE VERIFIED PRIOR TO SUBMITTING BIDS.

NO ALLOWANCE WILL BE MADE FOR NOT COMPLYING WITH

THIS REQUIREMENT.

RIGID CONTACT BETWEEN CONDUIT, PIPES, CEILING WIRES,

AND DUCTWORK WILL NOT BE ALLOWED.

THERMOSTATS AND SENSORS SHALL BE SUPPLIED WITH

MECHANICAL EQUIPMENT. INSTALLED BY MECHANICAL

CONTRACTOR AND FINAL CONNECTIONS BY MECHANICAL

CONTRACTOR.

ALL MECHANICAL EQUIPMENT SHALL BE FURNISHED WITH

MAINTENANCE MANUALS, SCHEDULES, TAGS AND LETTER OF

GUARANTEE IN A BINDER (THREE) WITH TABS, AS PER

SPECIFICATION BOOK SECTION 01700.

PROVIDE AIR BALANCE REPORT. BALANCER SHALL BE NEBB

CERTIFIED. SEE AIR BALANCE SCHEDULE.

ALL ROOF EQUIPMENT SHALL BE NO CLOSER THEN 10 FEET

TO THE ROOF EDGE.

FIRE SEAL ALL PIPE AND DUCT PENETRATIONS THROUGH

RATED WALLS AND FLOORS.

SEISMIC ANCHOR ALL EQUIPMENT, DUCTWORK AND PIPES

PER SPECIFICATION 230548.

SET ALL FLOOR MOUNTED MECHANICAL EQUIPMENT ON A 3-1/2"

THICK CONCRETE PAD. (AIR HANDLERS, BOILERS, CHILLER,

PUMPS, EXPANSION TANK & GLYCOL FEED TANK.)

NOTES: APPROVED MFG; COOK, ACME.1.

PROVIDE SPEED CONTROL2.

ACCESSORIES: CURB1.

DISC2.

MOTORIZED DAMPER3.

V-BELT4.

D-DR5.

SPEED CONTROL6.

NOTES: APPROVED MFG; COOK, ACME.1. ACCESSORIES: WITH ROOF VENT.1.

MECHANICAL CONTRACTOR SHALL PROVIDE A FIXED COST ALLOWANCE OF

SYMBOL QUANTITY DESCRIPTION

$26,036.98

THIS SHALL BE INCLUDED IN THE MECHANICAL BID FOR THIS PROJECT. CONTACT BART PETTERSON @ 1-208-322-3403.

FOR PURCHASING THE SLOT DIFFUSERS X, Y & Z.

PLENUMS TO BE R-5-1-1/2" DUCTBOARD AND 16" HIGH, CONTRACTOR TO FIELD CUT INLETS FOR COLLARS. COLLARS TO SHIP LOOSE W/PLENUMS.

X 10 24 X 6 HC LAY-IN-8" NOTE: VERIFY 15/16" T-BAR OR 9/16" FINE LINE T-BAR.

Y 110 48 X 6 HC LAY-IN-10" NOTE: VERIFY 15/16" T-BAR OR 9/16" FINE LINE T-BAR.

Z 2 48 X 6 HC LAY-IN-12" NOTE: VERIFY 15/16" T-BAR OR 9/16" FINE LINE T-BAR.

NOTES: APPROVED MFG; COOK, PENNBARRY.1.

2.

ACCESSORIES: CURB1.

DISC2.

MOTORIZED DAMPER3.

V-BELT4.

D-DR5.

SPEED CONTROL6.

NOTES: COOLING LOADS ARE SIZED @ 95 deg. F DB AMBIENT 75 deg. F DB/61 deg. F WB.1.

APPROVED MFG'S: CARRIER, BRYANT, TRANE & LENNOX.2.

PROVIDE CYCLE PROTECTOR, LOW-AMBIENT CONTROLLER, CRANKCASE HEATER, LOW PRESSURE SWITCH, HIGH PRESSURE

SWITCH AND STARTER ASSISTANCE.

3.

NOTES: MAXIMUM DISCHARGE NC AT BOX DIFFERENTIAL PRESSURE BASED ON ARI STANDARD880-89.1.

MINIMUM CFM IS LOWEST CONTROLLABLE CFM SETTING. (BASED ON 400 FPM INLET VELOCITY).2.

MAXIMUM STATIC PRESSURE DROP PERMISSABLE ACCROSS BOX AT MAXIMUM COOLING CFM.3.

BOX COOLING MAXIMUM IS THE SUM OF DIFFUSERS CFM VALUES AS SHOWN IN THE DRAWINGS. BOX MINIMUM VENTILATION CFM TO BE SET AT THE FRESH AIR MINIMUM VENTILATION Ra X Az CFM. TYPICAL UNLESS OTHERWISE NOTED.

4.

PRESSURE INDEPENDENT SINGLE DUCT CONTROLLER.5.

PROVIDE THREE DUCT DIAMETERS STRAIGHT SECTION BEFORE CONNECTING TO VAV BOX.6.

PIPE 3/4" TO EACH VAV BOX. PROVIDE EVCO STAINLESS BRAIDED FLEX WITH OXYGEN BARRIER TO EACH BOX. 40% GLYCOL.7.

ACCESSSORIES: CURB1.

DAMPER2.

BIRD SCREEN3.

NOTES: APPROVED MFG; COOK,

PENN BARRY

1.

WITH ROOF CURB2.

ACCESSORIES: CURB1.

DISC2.

MOTORIZED DAMPER3.

V-BELT4.

D-DR5.

SPEED CONTROL6.

WITH VFD DRIVE (SEE SPEC.)7.

NOTES: MAXIMUM DISCHARGE NC AT BOX DIFFERENTIAL PRESSURE BASED ON ARI STANDARD 880-89.1.

COIL HEATING CAPACITY BASED ON HEATING MAXIMUM AIR FLOW. (60% OF MAXIMUM COOLING CFM)2.

MAXIMUM CFM IS LOWEST CONTROLLABLE CFM SETTING. (BASED ON 400 FPM INLET VELOCITY)3.

MAXIMUM STATIC PRESSURE DROP PERMISSABLE ACROSS BOX AND COIL AT MAXIMUM COOLING CFM.4.

BOX COOLING MAXIMUM IS THE SUM OF DIFFUSERS CFM VALUES AS SHOWN IN THE DRAWINGS. BOX MINIMUM CFM TO BE SET AT 30% OF THIS MAXIMUM. BOX HEATING CFM TO BE SET

AT 60% OF THIS SAME MAXIMUM. TYPICAL UNLESS OTHERWISE NOTED.

5.

PRESSURE INDEPENDENT SINGLE DUCT CONTROLLER.6.

PIPE 3/4" TO EACH VAV BOX. PROVIDE EVCO STAINLESS BRAIDED FLEX WITH OXYGEN BARRIER TO EACH BOX.7.

ACCESSORIES: MERV 8 2" FILTER1.

DOUBLE WALL CONSTRUCTION,

1.5 INSULATION DENSITY

2.

ELECTRICAL DISCONNECT3.

STAINLESS STEEL DRAIN PAN4.

DX COOLING COIL, HOT WATER HEATING COIL. 40% GLYCOL.5.

MOUNTING BRACKETS FOR VERTICAL SUPPORT6.

ACCESSORIES: REFRIGERANT R410 A.1.

AT DESIGN CONDITIONS AND 95 DEGREES F & -0 DEGREES F ENT. AIR TEMP TO CONDENSER.2.

SEE SPECIFICATIONS FOR APPROVED MANUFACTURERS.3.

WALL MOUNTED UNIT. PROVIDE MOUNTING BRACKET AND CONDENSATE PUMP. WIRED CONTROLLER.4.

WITH HEAT PUMP CURB/ANTI-CYCLE/WIRED WALL CONTROL/CASE HEATER.5.

1A

MASONRY/STUD RETURN AIR OPENINGS

1B

1C

1D

1J

1F

1H

1K

TYPE

1'-4"

1'-4"

2'-0"

2'-0"

4'-0"

2'-8"

4'-0"

2'-6"

WIDTH

0'-8"

1'-4"

0'-8"

1'-4"

1'-4"

1'-4"

2'-0"

5'-0"

HEIGHT REMARKS

PROVIDE BLOCK-OUT IN MASONRY/STUD WALL ABOVE

CEILING FOR COORIDOR CEILING PLENUM RETURN.

PROVIDE BLOCK-OUT IN MASONRY/STUD WALL ABOVE

CEILING FOR COORIDOR CEILING PLENUM RETURN.

PROVIDE BLOCK-OUT IN MASONRY/STUD WALL ABOVE

CEILING FOR COORIDOR CEILING PLENUM RETURN.

PROVIDE BLOCK-OUT IN MASONRY/STUD WALL ABOVE

CEILING FOR COORIDOR CEILING PLENUM RETURN.

PROVIDE BLOCK-OUT IN MASONRY/STUD WALL ABOVE

CEILING FOR COORIDOR CEILING PLENUM RETURN.

PROVIDE BLOCK-OUT IN MASONRY/STUD WALL ABOVE

CEILING FOR COORIDOR CEILING PLENUM RETURN.

PROVIDE BLOCK-OUT IN MASONRY/STUD WALL ABOVE

CEILING FOR COORIDOR CEILING PLENUM RETURN.

PROVIDE BLOCK-OUT IN MASONRY/STUD WALL ABOVE

CEILING FOR COORIDOR CEILING PLENUM RETURN.

BUILDING CONTROLS

MECHANICAL CONTRACTOR SHALL INCLUDE IN HIS BASE BID,

CONTROLS BY SCHNEIDER ELECTRIC TAC, INSTALLED BY UTAH-YMAS

CONTROLS. ALTERNATE CONTROL BID SHALL BE IDENTIFIED ON THE

BID FORUM AS AN ADD OR DEDUCT PRICE. SEE SPEC. SECTION 230923.

WATER NOTE

THE GLYCOL MIX WILL BE 40% PROPYLENE GLYCOL.

No.8297

NIELSON

GORDON A.

R E

E

NI

G N

E

D E

L

R E

T

SI

G E

R hatUfoetat

S

ANOISSEFORP

A R C H I T E C T U R E, P. C.

sandstrom associates

845 South 220 East Orem, UT 84058

801.229-0088 801.229-0089 fax www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE ISSUE/REVISION

MECHANICAL, ELECTRICAL, PLUMBING ENGINEER

Consulting Engineers

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of NIELSON ENGINEERING, INC. and is not to be used, in whole or in part,for any other project without the written authorization of an authorized representative of NIELSON ENGINEERING, INC. Unauthorized use will be prosecuted to the fullest extent of the Law.

Copyright c 2012 by:

NIELSON

ENGINEERING, INC.

Nielson Engineering, Inc.

OWNERSHIP OF DOCUMENTS

Pocatello, Idaho 83201

PHONE (208) 232-2577

156 North Twelfth Avenue

FAX (208) 234-0918

RECORD DRAWINGS 7-7-14

/7 /2 :2 :5 P M

C U s e rs \j e ff \D o c u m e n ts \M t P le a s a n t N E I C E N T F

IL

E je ff .r vt

N E W M T P L E A S A N T E L E M E N T A R Y S C H O O L

N O R T H S A N P E T E S C H O O L D

IS

T R

IC

T

E A S T S O U T H

M O U N T P L E A S A N T ,U T A H

9-24-12

SVB

GAN

M1.00

MECHANICAL NOTES AND SCHEDULES

AIR DEVICE SCHEDULE

MARK QUANTITY

NECK

SIZE TYPE PATTERN DUTY

SQ. TO ROUND

TRANS. MANUFACTURER MODEL

A 4 6 X 6 LAY-IN SUPPLY TITUS 272 FL

B 1 6 X 6 LAY-IN SUPPLY TITUS TDCA

C 26 9 X 9 LAY-IN SUPPLY TITUS TDCA

D 9 12 X 12 LAY-IN SUPPLY TITUS TDCA

E 12 18 X 6 WALL SUPPLY TITUS 272 FL

F 10 22 X 10 WALL SUPPLY TITUS 272 RS

G 10 6 X 6 HARD SUPPLY TITUS 272 RS

H 1 8 X 8 HARD SUPPLY TITUS 272 RS

J 6 10 X 10 HARD SUPPLY TITUS 272 RS

K 27 8 X 8 HARD EXHAUST TITUS 50 F

L 2 12 X 12 HARD EXHAUST TITUS 350 RL

M 2 48 X 36 WALL RETURN TITUS 33 RL

N 3 8 X 8 HARD RETURN TITUS 350 RL

P 1 10 X 10 HARD RETURN TITUS 350 RL

Q 1 6 X 6 HARD RETURN TITUS 350 RL

R 1 8 X 8 LAY-IN RETURN TITUS 350 RL

S 1 10 X 10 LAY-IN RETURN TITUS 350 RL

T 3 32 X 8 WALL RETURN TITUS 350 RL

U 8 12 X 12 LAY-IN RETURN TITUS 350 RL

V 2 16 X 16 LAY-IN RETURN TITUS 350 RL

W 40 24 X 24 LAY-IN RETURN TITUS 350 RL

VAV BOX SCHEDULE

TYPE NO. MANUF.

MODEL

NO.

INLET

SIZE

(in.)

MAXIMUM

AIR (CFM.)

HEATING

MAXIMUM

AIR (CFM)

MINIMUM

AIR (CFM) EAT/db LAT/db

S.P. LOSS AT

MAX. CFM

(IN H20)

NC AT

1" H20

(S.P.) GPM

EWT

(HTG)

FEET

OF

HEAD

ROWS

(HTG) NOTES

VAV 2 TITUS ESV-3 16 2800 3660 580 60 °F 100 °F 0.7 26 3.5 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 4 TITUS ESV-3 10 1200 1100 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 6 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 7 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 8 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 9 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 10 TITUS ESV-3 10 1200 1500 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 11 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 12 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 13 TITUS ESV-3 12 1600 1500 325 60 °F 100 °F 0.65 26 2.5 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 16 TITUS ESV-3 14 2200 2320 450 60 °F 100 °F 0.65 26 3 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 19 TITUS ESV-3 12 1600 2085 325 60 °F 100 °F 0.65 26 2.5 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 22 TITUS ESV-3 12 1600 2020 325 60 °F 100 °F 0.65 26 2.5 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 25 TITUS ESV-3 14 2200 2320 450 60 °F 100 °F 0.65 26 3 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 37 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 38 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 39 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 40 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 41 TITUS ESV-3 14 2200 2320 450 60 °F 100 °F 0.65 26 3 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 44 TITUS ESV-3 10 1200 660 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 45 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 46 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 47 TITUS ESV-3 10 1200 1500 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 48 TITUS ESV-3 10 1200 660 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 49 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 50 TITUS ESV-3 12 1600 1500 325 60 °F 100 °F 0.65 26 2.5 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 53 TITUS ESV-3 12 1600 1500 325 60 °F 100 °F 0.65 26 2.5 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 54 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 55 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 56 TITUS ESV-3 10 1200 1500 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 66 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 67 TITUS ESV-3 6 360 300 60 60 °F 100 °F 0.5 26 1 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 68 TITUS ESV-3 6 360 300 60 60 °F 100 °F 0.5 26 1 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 69 TITUS ESV-3 6 400 420 80 60 °F 100 °F 0.5 28 1 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 70 TITUS ESV-3 14 2200 2100 450 60 °F 100 °F 0.65 26 3 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 70A TITUS ESV-3 16 2800 2750 580 60 °F 100 °F 0.7 26 3.5 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 71 TITUS ESV-3 6 400 400 80 60 °F 100 °F 0.5 28 1 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 72 TITUS ESV-3 8 700 900 145 60 °F 100 °F 0.65 28 1.5 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 73 TITUS ESV-3 6 360 265 60 60 °F 100 °F 0.5 26 1 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 106 TITUS ESV-3 10 1200 1200 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 107 TITUS ESV-3 10 1200 660 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 110 TITUS ESV-3 7 700 650 120 60 °F 100 °F 0.5 26 1 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 113 TITUS ESV-3 10 1200 660 230 60 °F 100 °F 0.65 26 2 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 115 TITUS ESV-3 7 700 650 120 60 °F 100 °F 0.5 26 1 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 117 TITUS ESV-3 12 1600 1720 325 60 °F 100 °F 0.65 26 2.5 140 °F 1 2 1,2,3,4,5,6 & 7

VAV 118 TITUS ESV-3 7 700 770 120 60 °F 100 °F 0.5 26 1 140 °F 1 2 1,2,3,4,5,6 & 7

SLOT DIFFUSER SCHEDULE

MARK MANUFACTURER MODEL LENGTH INLET SIZE

CFM

RANGE TYPE COUNT REMARKS

X INNOVATIVE AIR VSD-24-HC 2' - 0" 8" ROUND 0-300 LAY-IN 10 PROVIDE TRANSITION IF NEEDED FROM DUCT TO SLOT DIFFUSER INLET.

Y INNOVATIVE AIR VSD-48-HC 4' - 0" 10" ROUND 0-600 LAY-IN 110 PROVIDE TRANSITION IF NEEDED FROM DUCT TO SLOT DIFFUSER INLET.

Z INNOVATIVE AIR VSD-48-HC 4' - 0" 12" ROUND 0-600 LAY-IN 2 PROVIDE TRANSITION IF NEEDED FROM DUCT TO SLOT DIFFUSER INLET.

KITCHEN EXHAUST FAN SCHEDULE

TYPE NUMBER CFM S.P. H.P. VOLTAGE PHASE MANUFACTURER Model

OPERATING

WT. (LBS.) ACCESSORIES NOTES

KEF 1 2400 1.5 1.0 208 V 3 GREENHECK CUBE-180HP 126 1,2,& 4 1

KEF 2 2400 1.5 1.0 208 V 3 GREENHECK CUBE-180HP 126 1,2,& 4 1

LOUVER SCHEDULE

MARK QUANTITY

OPENING

SIZE MANUFACTURER MODEL NOTES

L1 4 84 X 48 RUSKIN ELF375

EXHAUST FAN SCHEDULE

TYPE NO. MANUFACTURER Model CFM S.P. H.P. VOLTAGE PHASE

WEIGHT

(LBS.) ACCESSORIES NOTES

EF 1 GREENHECK CUE-060 70 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 2 GREENHECK CUE-060 70 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 3 GREENHECK CUE-060 70 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 4 GREENHECK CUE-060 70 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 5 GREENHECK CUE-065 150 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 6 GREENHECK CUE-060 70 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 7 GREENHECK CUE-080 350 0.25 1/20 120 V 1 34 1,2,3 & 5 1

EF 8 GREENHECK CUE-080 350 0.25 1/20 120 V 1 34 1,2,3 & 5 1

EF 9 GREENHECK CUE-060 100 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 10 GREENHECK CUE-060 75 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 11 GREENHECK CUE-080 350 0.25 1/20 120 V 1 34 1,2,3 & 5 1

EF 12 GREENHECK CUE-080 350 0.25 1/20 120 V 1 34 1,2,3 & 5 1

EF 13 GREENHECK CUE-060 75 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 14 GREENHECK CUE-060 70 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 15 GREENHECK CUE-060 100 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 16 GREENHECK CUE-060 100 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 17 GREENHECK CUE-085 420 0.25 1/20 120 V 1 34 1,2,3 & 5 1

EF 18 GREENHECK CUE-085 420 0.25 1/20 120 V 1 34 1,2,3 & 5 1

EF 19 GREENHECK CUE-131 2000 0.25 3/4 120 V 1 66 1,2,3 & 5 1

EF 20 GREENHECK CUE-085 400 0.25 1/20 120 V 1 34 1,2,3 & 5 1

EF 21 GREENHECK CUE-060 70 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 22 GREENHECK CUE-070 200 0.25 1/25 120 V 1 25 1,2,3 & 5 1

EF 23 GREENHECK CUBE-060 125 0.25 1/25 120 V 1 25 1,2,3 & 5 1

CEILING FAN SCHEDULE

TYPE NO. MANUFACTURER Model CFM AMPS VOLTAGE PHASE

WEIGHT

(LBS.) ACCESSORIES NOTES

CF 1 GREENHECK SP-A110-QA 70 0.58 120 V 1 17

FRESH AIR & EXHAUST HOOD SCHEDULE

TYPE NUMBER CFM S.P. NECK SIZE DUTY MANUFACTURER Model ACCESSORIES NOTES

FAH 1 15375 0.09 30X90 FRESH AIR GREENHECK FABRA HOOD 1 & 3

FAH 2 2000 0.09 12X24 FRESH AIR GREENHECK FABRA HOOD 1, 2 & 3

FAH 3 15375 0.09 30X90 FRESH AIR GREENHECK FABRA HOOD 1 & 3

FAH 4 15375 0.09 30X90 FRESH AIR GREENHECK FABRA HOOD 1, 2 & 3

CONDENSING UNIT SCHEDULE

TYPE NO. MANUFACTURER Model

TONS

CAPACITY

(NOM.) VOLTS PHASE MCA

TOTAL

COOLING SEER

WEIGHT

(LBS.) NOTES

C 1 CARRIER 24APA5036 3 208 1 19 36,000 13 152 1,2 &3

RELIEF FAN SCHEDULE

TYPE NO. MANUFACTURER Model CFM S.P. H.P. VOLTAGE PHASE

WEIGHT

(LBS.) ACCESSORIES NOTES

RF 1 GREENHECK GB 540 13000 0.125 1 208 V 3 755 1, 2, 3, 5 & 7 1

RF 2 GREENHECK GB 540 13000 0.125 1 208 V 3 755 1, 2, 3, 5 & 7 1

RF 3 GREENHECK GB 540 14000 0.125 1 208 V 3 755 1, 2, 3, 5 & 7 1

RF 4 GREENHECK GB 540 14000 0.125 1 208 V 3 755 1, 2, 3, 5 & 7 1

RF 5 GREENHECK GB 420 9000 0.125 3/4 208 V 3 500 1, 2, 3, 5 & 7 1

RF 6 GREENHECK GB 420 9000 0.125 3/4 208 V 3 500 1, 2, 3, 5 & 7 1

FAN POWERED BOX SCHEDULE

TYPE NO. MANUFACTURER Model INLET SIZE MAX CFM MIN CFM

DESIGN

CFM VOLTS PHASE H.P. FLA GPM HEAD

HEATING

MBTU NOTES

FPB 1 TITUS DTQP C10 800 300 600 120 1 1/6 2.3 4 1.90 in-wg 22.0 Btu/h 1,2,3,4,5,6 & 7

FPB 2 TITUS DTQP C10 800 300 600 120 1 1/6 2.3 4 1.90 in-wg 22.0 Btu/h 1,2,3,4,5,6 & 7

FPB 3 TITUS DTQP C10 800 300 600 120 1 1/6 2.3 4 1.90 in-wg 22.0 Btu/h 1,2,3,4,5,6 & 7

FPB 4 TITUS DTQP C10 800 300 600 120 1 1/6 2.3 4 1.90 in-wg 22.0 Btu/h 1,2,3,4,5,6 & 7

FPB 5 TITUS DTQP C10 800 300 600 120 1 1/6 2.3 4 1.90 in-wg 22.0 Btu/h 1,2,3,4,5,6 & 7

FPB 6 TITUS DTQP C10 3490 300 600 120 1 1/6 2.3 4 1.90 in-wg 22.0 Btu/h 1,2,3,4,5,6 & 7

SHEET INDEX

NUMBER NAME

M1.00 MECHANICAL NOTES AND SCHEDULES

M1.01 MECHANICAL SCHEDULES

M2.01 AREA "A" MECHANICAL PLAN

M2.02 AREA "B" MECHANICAL PLAN

M2.03 AREA "C" MECHANICAL PLAN

M2.04 AREA "D" MECHANICAL PLAN

M2.05 ENLARGED KITCHEN & MECH. RM. PLANS

M3.01 AREA 'A' TEMPERATURE CONTROLS PLAN

M3.02 AREA 'B' TEMPERATURE CONTROLS PLAN

M3.03 AREA 'C' TEMPERATURE CONTROLS PLAN

M3.04 AREA 'D' TEMPERATURE CONTROLS PLAN

M4.01 AREA "A" MECHANICAL PIPING PLAN

M4.02 AREA "B" MECHANICAL PIPING PLAN

M4.03 AREA 'C' MECHANICAL PIPING PLAN

M4.04 AREA 'D' MECHANICAL PIPING PLAN

M5.01 MECHANICAL SECTIONS

M5.02 MECHANICAL SECTIONS

M-1A M-1A

MD.01 MECHANICAL DETAILS

MD.02 MECHANICAL DETAILS

MD.03 MECHANICAL DETAILS

MS1.0 HTR. COIL SED. TRAP

FAN COIL SCHEDULE

TYPE NO. MANUFACTURER Model

NOM.

TONS CFM HP VOLTS PHASE MCA EWT

WATER COIL

(HTG) MBTU

DX CLG

MBTU (SEN.)

OPERATING

WGHT. ACCESSORIES

FC 1 GREENHECK LFC-25-FC-15 3 1200 1.0 208 1 13.8 140 F 42000 36000 355 1,2,3,4,5 & 6

SPLIT SYSTEM SCHEDULE

TYPE NO. MANUFACTURER Model

NOM.

TONS CFM VOLTS PHASE MCA FUEL

COOLING

MBTU (SEN)

OPERATING

WT. (LBS.) ACCESSORIES

SS 1 MITSUBISHI MSZ-A17NA 1.5 381 208 1 1 ELEC. 16200 23 1,2,3,4 & 5

SS 1 MITSUBISHI MUZ-A17NA 1.5 208 1 14 88 1,2,3,4 & 5

SS 2 MITSUBISHI MSZ-A17NA 1.5 381 208 1 1 ELEC. 16200 23 1,2,3,4 & 5

SS 2 MITSUBISHI MUZ-A17NA 1.5 208 1 14 88 1,2,3,4 & 5

SS 3 MITSUBISHI MSZ-D36NA 3 848 208 1 1 ELEC. 33200 40 1,2,3,4 & 5

SS 3 MITSUBISHI MUZ-D36NA 3 208 1 21 141 1,2,3,4 & 5

SS 4 MITSUBISHI MUZ-A17NA 1.5 208 1 14 88 1,2,3,4 & 5

SS 4 MITSUBISHI MSZ-A17NA 1.5 381 208 1 1 ELEC. 16200 23 1,2,3,4 & 5

NOTES: PROVIDE WITH PUMP, 75 PSI P & T VALVE, PRE PIPED GAS, HWS & HWR MANIFOLD PACKAGE, STAINLESS STEEL VENT & COMBUSTION AIR VENTING SYSTEM, LOW WATER CUT-OFF, BACNET OR LON TALK COMMUNICATION MODULE, NEUTRALIZER, ELEC. PANEL.

1.

BOILER APPROVAL: BOILER MANUFACTURER SHALL PROVIDE DOCUMENTATION FROM THIRD PARTY TESTING AGENCY THAT THE BOILER MEETS OR EXCEEDS THE FOLLOWING BOILER EFFICIENIES. SUBMIT INFORMATION 14 DAYS PRIOR TO BIDD DATE. RETURN WATER TEMP: 120 DEG. FAHRENHEIT. BOILER EFFICIENEY: 95% / RETURN WATER TEMP: 145 DEG. FAHRENHEIT. BOILER EFFICIENEY 93.5%.

2.

NOTES: BASE MOUNTED.1. 40% GLYCOL2. 8.6 INCH IMPELLER.3. PROVIDE VFD WITH EACH PUMP.4.

ACCESSORIES: CURB1.

DISCONNECT2.

TWO POSITION DAMPER3.

INTAKE HOOD4.

STAINLESS STEEL BURNER5.

MODULATING GAS VALVE6.

CHEMICAL POT FEEDER: J.L. WINGERT CO. MODEL DB-5HD-EK1.

WITH STAND, 5 GALLON TANK CAPACITY, 21-5/8" HIGH X 10" DIA.,

WEIGHT 38 LBS. 3/4" FNPT INLET & OUTLET. PROVIDE BALL

VALVES ON INLET & OUTLET, PIPE AS SHOWN ON DETAILS,

SECURE TO WALL, PROVIDE ASME RATED.

CP

CHEMICAL POT FEEDER SCHEDULE

J.L. WINGERT CO. GL. 50-E GLYCOL FEED PACKAGE (1 FOR ALL THE SYSTEMS)

50 GALLON POLYETHYLENE TANK, CONTROL PANEL, LOW LEVEL SWITCH,

GEAR PUMP & PRESSURE SWITCH. PIPE TO ALL (2) SYSTEMS IN BUILDING,

THE HEATING SYSTEM AND CHILLED WATER SYSTEM-EVAP. LOOP, DIM. 58-3/8"

HIGH X 26" WIDE X 26" DEEP, 1/2 H.P., 120V, 1 PHASE, PROVIDE ELECTRICAL

CORD WITH PLUG.

GF

GLYCOL FEED SYSTEM

NOTES: AIR HANDLER CONTROLLED BY VFD. SEE SPEC. FOR APPROVED MANUFACTURER.1.

PROVIDE 1-120V/1 PHASE 15 MCA, 15A MOP FOR UNIT OUTLET AND LIGHTS.2.

PROVIDE UNIT WITH INTERNAL SPRING ISOLATOR.3.

SMOKE DETECTOR BY CONTROL CONTRACTOR.4.

PROVIDE 208V/3 PHASE UNIT CONNECTION AND DISCONNECT.5.

6. PROVIDE WINDOW IN ACCESS DOORS AND LIGHTS IN EACH SECTION.

7. PROVIDE FRESH AIR DAMPER AND CONTROLER TO DOCUMENT DEMAND CONTROL VENTILATION 'DCV' (BOTH CFM AND CO2 QUANTITIES).

NOTES: PROVIDE RADIANT HEAT FLOOR BOX WITH COMMERCIAL GRADE GRILLE EQUAL TO TITUS CT-481 (TYPE 5).1.

PIPE RADIANT HEAT FLOOR BOX 1ST IN LAST OUT FOR SELF BALANCING.2.

INSTALL HWS & HWR RETURN PIPES IN PVC SLEEVE FROM INLET OPENING TO THE FIRST BOX & BETWEEN EACH BOX.3.

PIPING SHALL BE EQUAL TO UPONOR HE PEX AND BRASS FITTINGS WITH COMPRESSION-SLEEVE FITTING.4.

No.8297

NIELSON

GORDON A.

R E

E

NI

G N

E

D E

L

R E

T

SI

G E

R hatUfoetat

S

ANOISSEFORP

A R C H I T E C T U R E, P. C.

sandstrom associates

845 South 220 East Orem, UT 84058

801.229-0088 801.229-0089 fax www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE ISSUE/REVISION

MECHANICAL, ELECTRICAL, PLUMBING ENGINEER

Consulting Engineers

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of NIELSON ENGINEERING, INC. and is not to be used, in whole or in part,for any other project without the written authorization of an authorized representative of NIELSON ENGINEERING, INC. Unauthorized use will be prosecuted to the fullest extent of the Law.

Copyright c 2012 by:

NIELSON

ENGINEERING, INC.

Nielson Engineering, Inc.

OWNERSHIP OF DOCUMENTS

Pocatello, Idaho 83201

PHONE (208) 232-2577

156 North Twelfth Avenue

FAX (208) 234-0918

RECORD DRAWINGS 7-7-14

/7 /2 :2 :1 P M

C U s e rs \j e ff \D o c u m e n ts \M t P le a s a n t N E I C E N T F

IL

E je ff .r vt

N E W M T P L E A S A N T E L E M E N T A R Y S C H O O L

N O R T H S A N P E T E S C H O O L D

IS

T R

IC

T

E A S T S O U T H

M O U N T P L E A S A N T ,U T A H

9-24-12

SVB

GAN

M1.01

MECHANICAL SCHEDULES

BOILER SCHEDULE

TYPE NO. MANUFACTURER Model VOLTAGE PHASE MCA

MBTU

OUTPUT

(5380 FT.)

MBTU

OUTPUT

(SEA

LEVEL)

MBTU

INPUT

(SEA

LEVEL)

ASME

PRESS.

RATING LWT (HTG)

FLUE

TYPE

COMB. AIR

INLET FLUE SIZE GPM (HTG) WPD (HD)

WEIGHT

(LBS.) LENGTH WIDTH HEIGHT NOTES

B 3 HAMILTON ENGINEERING EVO HW 1999 208 V 1 26.3 1900 1900 1999 125 140 F POSITIVE

PRESSURE

7" 7" 82.2 8.6 902 29 44 66 1 & 2

B 4 HAMILTON ENGINEERING EVO HW 1999 208 V 1 26.3 1900 1900 1999 125 140 F POSITIVE

PRESSURE

7" 7" 82.2 8.6 902 29 44 66 1 & 2

PUMP SCHEDULE

TYPE NO. MANUFACTURER Model

AREA

SERVED

(GPM)

FLOW

RATE

WORKING

FLUID

HEAD

LOSS (FT)

EFFICIENC

Y

PUMP

TYPE

HORSE

POWER

MOTOR

BHP

MOTOR

SPEED VOLTAGE PHASE NOTES

P 1 TACO FI4009 MECH. RM. 361 40% PGLY 30 76 BASE MOUNT 5.0 3.58 1150 208 3 1,2 & 4

P 2 TACO FI4009 MECH. RM. 361 40% PGLY 30 76 BASE MOUNT 5.0 3.58 1150 208 3 1,2 & 4

P 3 TACO FI4013 MECH. RM. 318 40% PGLY 55 75 BASE MOUNT 7.5 6.2 1150 208 3 1,2 & 4

P 4 TACO FI4013 MECH. RM. 318 40% PGLY 55 75 BASE MOUNT 7.5 6.2 1150 208 3 1,2 & 4

AIR SEPERATOR SCHEDULE

TYPE NO. MANUFACTURER Model

SYSTEM

SERVED

CONNECTI

ON SIZE GPM (HTG) GPM (CLG)

PRESS.

DROP (FT

HD) DIAMETER HEIGHT

FLANGE

TO

FLANGE

DRY

WEIGHT

(LBS)

AS 1 SPIROTHERM VDN-600 HEATING 0' - 6" 361 GPM 0 GPM 2 1' - 6" 3' - 5 23/32" 2' - 3 23/32" 355

AS 2 SPIROTHERM VDN-600 CHILLED 0' - 6" 0 GPM 318 GPM 2 1' - 6" 3' - 5 23/32" 2' - 3 23/32" 355

EXPANSION TANK SCHEDULE

TYPE NO. MANUFACTURER Model

SYSTEM

SERVED EWT (HTG) EWT (CLG) GLYCOL %

TANK

VOLUME

(GAL)

ACCEPT

VOLUME

(GAL)

PRE

CHARGE

(PSI) DIAMETER HEIGHT

OPERATIN

G WT.

(LBS.) REMARKS

ET 1 TACO CA 800 HEATING 150 °F 0 °F 40 211 211 20.00 psi 2' - 6" 7' - 5" 2348

ET 2 TACO CA 90 CHILLED 0 °F 55 °F 40 23 23 20.00 psi 1' - 8" 2' - 8" 312

MAKE-UP AIR UNIT SCHEDULE

TYPE NO. MANUFACTURER Model CFM S.P. H.P. VOLTAGE PHASE FLA FUEL

HEATING

INPUT

HEATING

OUTPUT

WEIGHT.

(LBS.) ACCESSORIES NOTES

MAU 1 TRANE GRCA40GF 1920 0.5 1 208 V 3 4.8 NG 250,000 200,000 1900 1,2,3,4,5 & 6

MAU 2 TRANE GRCA40GF 1920 0.5 1 208 V 3 4.8 NG 250,000 200,000 1900 1,2,3,4,5 & 6

WALL HEATER SCHEDULE

TYPE NO. MANUFACTURER Model

HEATING

INPUT FUEL VOLTAGE PHASE MCA

WEIGHT

(LBS.) REMARKS

WH 1 QMARK AWH 4404 2.0 KW ELEC. 208 V 1 8.3 25 W/WALL STAT

WH 2 QMARK AWH 4404 2.0 KW ELEC. 208 V 1 8.3 25 W/WALL STAT

CABINET HEATER SCHEDULE

Mark NUMBER Manufacturer Model CFM

HEATING

MBTU GPM WPD-HTG EWT (HTG) LWT (HTG) EAT VOLTS H.P. PHASE REMARKS

CH 1 MODINE CW-4 ARRANGEMENT 98 450 24015.0 Btu/h 4.7 1.80 PSI 180 °F 150 °F 50 F 120 1/20 1 HORIZONTAL DOWN DISCHARGE

CH 2 MODINE CW-3 ARRANGEMENT 98 330 17515.0 Btu/h 3.6 1.50 PSI 180 °F 150 °F 50 F 120 1/30 1 HORIZONTAL DOWN DISCHARGE

CHILLER SCHEDULE

MARK NO. MODEL

ELECTRICAL ELECTRICAL ELECTRICAL

MCA

MOCP

(AMPS)

ELECTRICAL EVAPORATOR EVAPORATOR EVAPORATOR EVAPORATOR EVAPORATOR EVAPORATOR

LENGTH- WIDTH- HEIGHT-

# OF

CONDENS

ER FANS

OPER.

WEIGHT NOTESFREQ. VOLT. PHASE EER

FULL LOAD

CAP. IPLV EWT LWT PD FLOW RATE

CHR 1 RTAC250 60 Hz 208 V 3 1129 1200 8.7 2607600.0 Btu/h 13.7 58 °F 44 °F 6.60 psi 320 GPM 268 89 93 14 14.90 kip 40% GLYCOL

EER=9.7

AIR HANDLER UNIT SCHEDULE (ELEV. 5830 FT.)

MARK NO. MODEL

ACTUAL

SUPPLY

AIR FLOW

FAN1

H.P. (SA) MCA PHASE

FAN1 FAN1 FAN1 FAN1

HEATING

COIL1

HEATING

COIL1

HEATING

COIL1

HEATING

COIL1 HEATING COIL1

HEATING

COIL1

HEATING

COIL1

HEATING

COIL1

COOLING

COIL2

COOLING

COIL2

COOLING

COIL2

COOLING

COIL2

COOLING

COIL2

COOLING

COIL2

COOLING

COIL2

COOLING

COIL2

COOLING

COIL2

COOLING

COIL2

UNIT

LENGTH

UNIT

WIDTH

UNIT

HEIGHT

OPERATING

WEIGHT NOTESAIRFLOW

EXTERNAL

STATIC

PRESSURE

TOTAL

STATIC

PRESSURE SIZE AND TYPE

MOTOR

VOLTAGE

FACE

AREA

FACE

VELOCITY

ENTERING

DRY BULB

TEMP.

LEAVING

DRY BULB

TEMP.

FLUID TYPE

PROPYLENE

GLCOL %

TOTAL

CAPACITY

ENTERING

FLUID

TEMP.

LEAVING

FLUID

TEMP.

FACE

AREA

FACE

VELOCITY

ENTERING

DRY BULB

TEMP.

ENTERING

WET BULB

TEMP.

LEAVING

DRY BULB

TEMP.

LEAVING

WET BULB

TEMP.

FLUID TYPE

PROPYLENE

GLYCOL %

TOTAL

CAPACITY

ENTERING

FLUID

TEMP.

LEAVING

FLUID

TEMP.

AHU 1 CSIA050 26000 26000 25.0 98.3 3 1.50 in-wg 3.73 in-wg 32" diameter AF 208 V 47 SF 552 FPM 40 °F 65 °F 40% 599830.0 Btu/h 140 °F 110 °F 49 SF 530 FPM 80 °F 62 °F 55 °F 54 °F 40% 593200.0 Btu/h 44 °F 58 °F 192.9 125.5 75.8 6.59 kip 1,2,3,4,5,6 & 7

AHU 2 CSIA057 28000 28000 30.0 115.5 3 1.50 in-wg 3.63 in-wg 32" diameter AF 208 V 57 SF 496 FPM 40 °F 65 °F 40% 645970.0 Btu/h 140 °F 110 °F 57 SF 492 FPM 80 °F 62 °F 55 °F 54 °F 40% 642330.0 Btu/h 44 °F 58 °F 192.9 125.5 85.5 6.95 kip 1,2,3,4,5,6 & 7

AHU 3 CSIA040 20000 20000 20.0 77.6 3 1.50 in-wg 3.21 in-wg 25" diameter AF 208 V 38 SF 533 FPM 40 °F 65 °F 40% 461410.0 Btu/h 140 °F 110 °F 40 SF 501 FPM 80 °F 62 °F 54 °F 53 °F 40% 484560.0 Btu/h 44 °F 58 °F 110.1 112.5 67.3 4.90 kip 1,2,3,4,5,6 & 7

AHU 4 CSIA030 14000 14000 15.0 60.9 3 1.50 in-wg 3.11 in-wg 22" diameter AF 208 V 29 SF 488 FPM 40 °F 65 °F 40% 322990.0 Btu/h 140 °F 110 °F 30 SF 468 FPM 80 °F 62 °F 54 °F 53 °F 40% 335700.0 Btu/h 44 °F 58 °F 130.6 93.5 61.5 3.21 kip 1,2,3,4,5,6 & 7

CEILING HEATER SCHEDULE

TYPE NO. MANUFACTURER Model HTG INPUT GPM HD VOLTAGE PHASE AMPS

WEIGHT

(LBS)- NOTES

CUH 1 RITTLING RH-18 13000 1.3 .49 120V 1 .70 25 HORIZONTAL DOWNFLOW 180 DEG. F ENTERING WATER

HYDRONIC RADIANT FLOOR BOX SCHEDULE

TYPE NO. MANUFACTURER Model BTU/FT TEMP. G.P.M. DIMENSIONS NOTES

HRB 1 SLANT/FIN HYDRONIC

FLOOR BOX

1570 140 F 1 62-9/16"L X 6-3/16"W X 8-9/16"H 1, 2, 3 & 4

HRB 2 SLANT/FIN HYDRONIC

FLOOR BOX

1570 140 F 1 62-9/16"L X 6-3/16"W X 8-9/16"H 1, 2, 3 & 4

HRB 3 SLANT/FIN HYDRONIC

FLOOR BOX

1570 140 F 1 62-9/16"L X 6-3/16"W X 8-9/16"H 1, 2, 3 & 4

HRB 4 SLANT/FIN HYDRONIC

FLOOR BOX

1570 140 F 1 62-9/16"L X 6-3/16"W X 8-9/16"H 1, 2, 3 & 4

HRB 5 SLANT/FIN HYDRONIC

FLOOR BOX

1570 140 F 1 62-9/16"L X 6-3/16"W X 8-9/16"H 1, 2, 3 & 4

HRB 6 SLANT/FIN HYDRONIC

FLOOR BOX

1570 140 F 1 62-9/16"L X 6-3/16"W X 8-9/16"H 1, 2, 3 & 4

KINDERGARTEN

T.

KINDERGARTEN

VEST.

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

STOR.

NET.

CUST.

T.

GIRLS

CHASE

BOYS

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDOR

SMALL GROUP

CLASSROOM

CLASSROOM

KINDERGARTEN

T.

T.

A B E

M2.01

M2.01

Y

Y

Y

Y

Y

Y

14"x12" 14"x12"

16"x14"

16"x14"

10"ø

10"ø 10"ø

VAV

10"ø

VAV

10"ø 10"ø

22"x12"

22"x12"

W

W

10"ø16"ø

22"x12"22"x12"

16"x14"

10"ø

10"ø

10"ø

10"ø

16"ø

10"ø

16"x14"

14"x12" Y

Y

Y

Y

Y

Y

16"ø20"ø

10"ø 16"x14"

10"ø

10"ø

14"x12"

10"ø

VAV

VAV

VAV

VAV

VAV

22"ø24"ø

16"x14"16"x14"

14"x12" 14"x12"

10"ø

10"ø

10"ø

10"ø 10"ø

Y

Y

Y

Y

Y

Y

10"ø

16"x16"

16"x14"

VAV

10"ø

14"x12" 14"x12"

10"ø

10"ø

10"ø

C

CLASSROOM

Y

Y

Y

Y

Y

14"x12" 14"x12"

16"x14"

16"x14"

10"ø

10"ø 10"ø

VAV

10"ø

10"ø 10"ø22"x16"

16"x14"

12"x12" 8"ø

A

10"ø 10"ø

10"ø

Y

Y

Y

Y

Y

16"x14"

12"x12" 8"ø

A

10"ø 10"ø

10"ø

Y

Y

Y

Y

Y

22"x16"

10"ø 10"ø

VAV

VAV

22"x12"

W 202022"x12"

W

KINDERGARTEN

14"ø 10"ø

24"ø 18"ø16"ø

20"ø 16"ø

24"ø

25"ø

22"ø

14"ø

12"ø

30"x28"

30"x30"

10"ø

C

16"x14"

12"x12" 8"ø

A

10"ø 10"ø

10"ø

Y

Y

Y

Y

Y

16"x14"

12"x12" 8"ø

A

10"ø 10"ø

10"ø

Y

Y

Y

Y

Y

22"x12" W

20"x16" 22"x16"

10"ø 10"ø

10"ø

C

VAV

VAV

22"x16"

16"x14"

14"x12"

10"ø

10"ø

10"ø

10"x12"

VAV

14"ø

VAV

10"ø C

10"ø

10"ø

14"x12"

Y

Y

Y

10"ø

VAV

12"ø

12"ø

10"ø

C F

D

Y

Y

Y

Y

10"ø

W

22"x12"

Y

Y

FPB

112"x12"8"ø

10"ø8"ø

Y

X

W

W

22"x12" 22"x12"

14"ø

10"ø

W

W

W

W

12"ø

20"ø

22"x12" 22"x12"W

W

M5.01

K

8"ø

EF

1EXHAUST

FAN

EF

8"ø

K

EF

EF

8"ø

K

EXHAUST

FAN

EXHAUST

FAN

EXHAUST

FAN

RESOURCE

EF

EF

K

K

K

K

8"ø

10"x10"10"x10"

8"ø

EF

EF

Y

Y

C

14"x12"

SKYLIGHT SKYLIGHT

1B

1B

1B

1B

1D

1D

1A

10"ø

1D

1D

1D

1D

1D

1D

1F

MASONRY

RETURN AIR

OPENINGS

MASONRY

RETURN AIR

OPENINGS

(TYP.)

1A

1F

MASONRY

RETURN AIR

OPENINGS

1F

1F

MASONRY

RETURN AIR

OPENINGS SEE

SHEET M1.00

FOR SIZESW

22"x12"

22"x12"

22"x12"

12"x8"

L

C

12"x8"

L

C

SS

SS

FAN COIL

CONDENSER

K

K

8"ø 8"ø

T

MASONRY

RETURN AIR

OPENINGS

(TYP.)

RF

RF

RELIEF

FAN

RELIEF

FAN

1AU

12"x12"

10"ø 10"ø

10"ø

Y

(TYP.)

1 2

(TYP.)

1 2

(TYP.)

10"ø

10"ø

10"ø 10"ø

(TYP.)

28"ø

22"x12"W

K

8"ø

10"ø10"ø10"ø 10"ø

W

22"x12"

VAV

16"x14"

10"ø

10"ø

10"ø

22"ø

M5.01

M5.01

G

6"ø

SOUND

TRANSFER DUCT

SEE DETAIL

14/MD.03

SOUND TRANSFER

DUCT SEE DETAIL

14/MD.03 (TYP.)

ROTATE CEILING SLOT DIFFUSERS 180

DEGREES & BLOW AIR AT OPPOSITE WALL.

(TYP. OF 4 KINDERGARTEN CLASSROOMS)

S

AHU

AIR HANDLER

C D

L1 12660

L1 12660

60"x48"

84"x48"

84"x48"

90"x48"

C D23

EF

EF

EF

EF

5SS

MECHANICAL CONTRACTOR

SHALL MAKE THIS SERVICE

ACCESS AS WIDE AS POSSIBLE.

14 15 13 16

AHU

13 16

28"x30" 80"x30" 30"x30"

10"x10"

AIR

HANDLER

K

EF

EXHAUST

FAN

14 15 13 16

DD

AHU

1AIR HANDLER

56"x28"

30"x30" 8"x8" 8"x8"

K

K

K

K

27"x106" 30"x80"

D23

48"x60"

48"x90"

8"ø8"ø

SS

No.8297

NIELSON

GORDON A.

R E

E

NI

G N

E

D E

L

R E

T

SI

G E

R hatUfoetat

S

ANOISSEFORP

A R C H I T E C T U R E, P. C.

sandstrom associates

845 South 220 East Orem, UT 84058

801.229-0088 801.229-0089 fax www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE ISSUE/REVISION

MECHANICAL, ELECTRICAL, PLUMBING ENGINEER

Consulting Engineers

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of NIELSON ENGINEERING, INC. and is not to be used, in whole or in part,for any other project without the written authorization of an authorized representative of NIELSON ENGINEERING, INC. Unauthorized use will be prosecuted to the fullest extent of the Law.

Copyright c 2012 by:

NIELSON

ENGINEERING, INC.

Nielson Engineering, Inc.

OWNERSHIP OF DOCUMENTS

Pocatello, Idaho 83201

PHONE (208) 232-2577

156 North Twelfth Avenue

FAX (208) 234-0918

RECORD DRAWINGS 7-7-14

/7 /2 :2 :3 P M

C U s e rs \j e ff \D o c u m e n ts \M t P le a s a n t N E I C E N T F

IL

E je ff .r vt

12-4-12 1 PEER REVIEW

N E W M T P L E A S A N T E L E M E N T A R Y S C H O O L

N O R T H S A N P E T E S C H O O L D

IS

T R

IC

T

E A S T S O U T H

M O U N T P L E A S A N T ,U T A H

9-24-12

SVB

GAN

M2.01

AREA "A" MECHANICAL PLAN

1/8" = 1'-0"

AREA "A" MECHANICAL PLAN 1 KEY PLAN

NOT TO SCALE

AREA A

north

1/8" = 1'-0"

AREA "A" MEZZ MECHANICAL PLAN 2 1/8" = 1'-0"

Section 1A 3 1/8" = 1'-0"

Section 2A 4

M2.01 KEY NOTES

1 ALL COORIDOR CEILINGS AND SOME OF THE CLASSROOMS CEILINGS

ARE RETURN AIR PLENUMS. DUCT ALL ALL ROOM RETURN AIR GRILLES

TO COORIDOR CEILING RETURN PLENUMS. INSTALL MASONRY RETURN

AIR OPENING IN WALLS AS SHOWN ABOVE CEILING.

2 COORDINATE DUCTWORK WITH BUILDING STRUCTURE, PIPES, FIRE

SPRINKLING, ELECTRICAL, ETC.

3 INSTALL AIR HANDLER ON 4" THICK CONCRETE UTILITY PAD.

4 THE OMISSION OF THE INSULATED TRANSFER DUCTS SHOWN IN SOME

WALLS AND NOT OTHER WALLS IS A REVIT SYMBOL ERROR. AT THIS

POINT, DELETE ALL THE INSULATED SOUND TRANSFER DUCTS.

PROVIDE JUST THE MASONRY OPENING SPECIFIED. PROVIDE A CREDIT

FOR THE DUCT AND LABOR.

CLASSROOM

RESOURCE

CORRIDOR

VEST.

MEDIA CENTER

STOR.

OFFICE

KIVA

MEDIA CENTER

READING

PSYCH

SPEECH

A/V STOR.

CLASSROOM

U

Q R

J

K

N

H19

T4

M2.02

P S

M

L

GF

O

Y

Y

Y

14"x12"

16"x14"

16"x16"

10"ø

10"ø

10"ø

W

M5.02

C

10"ø

8"ø

8"ø

16"ø

VAV

12"ø

Y

Y

Y

14"x12"

16"x14"

16"x16"

10"ø

10"ø

10"ø

C

10"ø 22"x12"

22"x12"

W

W

22"x12"

12"ø

14"ø

18"ø

VAV

20"ø

10"ø

10"ø

16"x14"

16"x14"

14"x12"

14"x12"

Y

Y

Y

Y

Y

Y

10"ø

10"ø

10"ø

10"ø

10"ø

10"øVAV

VAV

22"x12"

W

W

22"x12"

10"ø

10"ø

10"ø

14"x12"

16"x14"

VAV

Y

Y

Y

10"ø

30"ø

28"ø

VAV

W

22"x12"

W

VAV

14"x12"

16"x14"

10"ø

10"ø

10"ø

Y

Y

Y

X

10"ø

5"ø

VAV

CLASSROOM

CLASSROOM

CLASSROOM

VAV

10"ø

6"ø

Y

X

8"ø

5"ø

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

STOR

NET.

CUST.

T.

BOYS

GIRLS

VEST.

CORRIDOR

CORRIDOR

22"x12"

VAV

Y

Y

Y

Y

Y

Y

10"ø10"ø

14"x12"

16"x14"

16"x14"

14"x12"

10"ø

10"ø

10"ø

10"ø

VAV

VAV

14"x12"

10"ø

10"ø10"ø

Y

Y

Y

12"x12"

16"ø

18"ø

22"ø

30"x32"

27"ø

25"ø

10"ø

25"ø

14"x12"

Y

Y

Y

Y

Y

Y

14"x12" 16"x14"

10"ø

10"ø

10"ø

10"ø

10"ø

23"ø

21"ø

10"ø

10"ø

30"x32"

26"ø

28"ø

VAV

25"ø

22"ø

14"ø

21"ø

W

W

22"x12"

22"x12"

18"x14"

16"x14"

C

10"ø

VAV

10"ø

C

22"x12"

W

X

Y

8"ø

12"x12"

10"ø

FPB

M2.02

Y

VAV

10"ø

6"ø

U

U

U

SEE SH

EET M

2.03

FO

R D

U

CT

C O

NTIN

U

ATIO

N

16"ø

16"ø

14"ø

SKYLIGHT

12"x14"

12"ø

16"x14"

20"x14"

20"x20"

16"x14"

12"ø

12"ø

D

D

D

D

D

12"ø

VAV

FPB

8"ø10"ø

Y

12"x12"

8"ø

C

VAV

5"ø

Z 45012"ø

12"ø

14"x14" Z

8"ø

VAV

10"ø

RISE DUCT

UP INTO KIVA

VAV

14"ø

18"x16" 10"x12"

20"x18"

14"x14" 10"x12"

10"ø C

VAV

K

K 1008"ø

8"ø

8"ø

10"x10"

EF

EF

8"ø

10"x10"

K

K

K

K

RETURN

AIR

CHASE

RETURN AIR

CHASE

16"x14"

14"x12"

Y

Y

10"ø

10"ø

10"ø

1B

T

1J

1J

1D

1D

1C

1C

SKYLIGHT

1F

T

T

1D

1A

U

12"x12"

22"x12"

W 1115 22"x12"

W

22"x12"

W

1A

1J

1J

1J

1J

1J

1J

22"x12"

W

22"x12"

W

1A

1J

1J

U

12"x12" 12"x12"

U

1C

1C

1C

1C

12"x12"

12"x12"

1A

RF

RF

MASONARY

RETURN AIR

OPENINGS

(TYP.)

MASONARY RETURN

AIR OPENINGS

SEE SHEET M1.00

FOR SIZES. (TYP.)

RELIEF

FAN

FAN

COIL

SS

RELIEF FAN

SS

CONDENSER

MASONARY

RETURN AIR

OPENINGS

(TYP.)

T 1

(TYP.)

EF

EF

B

A

16"ø

10"ø

(TYP.)

(TYP.)

10"x8"

14"x14"

HRB

HYDRONIC RADIANT

FLOOR BOX

HRB

HRB

HRB

HRB

HRB

E

E

E

E

E

E

10"ø

X

SOUND TRANSFER

DUCT SEE DETAIL

14/MD.03 (TYP.)

10"ø

10"ø

M

L

AHU

60"x48"

90"x48"

84"x48"

84"x48"

L1 13480

L1 13475

EF

11EXHAUST FAN

AIR HANDLER

RF

EF

EF

SS

EXHAUST FAN

EXHAUST FAN

MECHANICAL CONTRACTOR

SHALL MAKE THE SERVICE

ACCESS AS WIDE AS POSSIBLE.

54 54

AHU

AIR HANDLER

EF

32"x30" 32"x30"

10"x10"

84"x32"

(TYP.)

10"x10"

8"ø

K

K

MM

AHU

30"x32"

K

K

8"ø8"ø

32"x106"

56"x28"K

K

8"ø 8"ø

48"x90"48"x60"

AIR HANDLER

32"x84"

SS

FAN

COIL

No.8297

NIELSON

GORDON A.

R E

E

NI

G N

E

D E

L

R E

T

SI

G E

R hatUfoetat

S

ANOISSEFORP

A R C H I T E C T U R E, P. C.

sandstrom associates

845 South 220 East Orem, UT 84058

801.229-0088 801.229-0089 fax www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE ISSUE/REVISION

MECHANICAL, ELECTRICAL, PLUMBING ENGINEER

Consulting Engineers

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of NIELSON ENGINEERING, INC. and is not to be used, in whole or in part,for any other project without the written authorization of an authorized representative of NIELSON ENGINEERING, INC. Unauthorized use will be prosecuted to the fullest extent of the Law.

Copyright c 2012 by:

NIELSON

ENGINEERING, INC.

Nielson Engineering, Inc.

OWNERSHIP OF DOCUMENTS

Pocatello, Idaho 83201

PHONE (208) 232-2577

156 North Twelfth Avenue

FAX (208) 234-0918

RECORD DRAWINGS 7-7-14

/7 /2 :2 :4 P M

C U s e rs \j e ff \D o c u m e n ts \M t P le a s a n t N E I C E N T F

IL

E je ff .r vt

N E W M T P L E A S A N T E L E M E N T A R Y S C H O O L

N O R T H S A N P E T E S C H O O L D

IS

T R

IC

T

E A S T S O U T H

M O U N T P L E A S A N T ,U T A H

9-24-12

SVB

GAN

M2.02

AREA "B" MECHANICAL PLAN

1/8" = 1'-0"

AREA "B" MECHANICAL PLAN 1 KEY PLAN

NOT TO SCALE

AREA B

north

1/8" = 1'-0"

AREA "B" MEZZ MECHANICAL PLAN 2

M2.02 KEY NOTES

1 ALL COORIDOR CEILINGS AND SOME OF THE CLASSROOMS ARE

RETURN AIR PLENUMS. DUCT ALL ROOM RETURN GRILLES TO

COORIDOR CEILING RETURN PLENUMS. INSTALL MASONRY RETURN

AIR OPENING IN WALLS AS SHOWN ABOVE CEILING'S.

2 COORDINATE DUCTWORK WITH BUILDING STRUCTURE, PIPES, FIRE

SPRINKLING, ELECTRICAL, ETC.

3 SET AIR HANDLER ON 4" THICK CONCRETE UTILITY PAD.

1/8" = 1'-0"

Section 1B 3 1/8" = 1'-0"

Section 2B 4

NET.

STOR.

STAIR

LOUNGE

VEST.

112W

M

STOR.

PRINCIPAL

COPY

NURSE

T.

STOR.

RECEPTION

VEST.

ENTRY

T.

RESOURCE

CORRIDOR

COMPUTER

NET.

RESOURCE

OFFICE

VEST.

CORRIDOR

076MEDIA CENTER

MEDIA CENTER

M2.04

Y

UQ R

W

X

H

T

Z

VP S

G

M5.02

M5.02

CORRIDOR

8"ø

12"x12"

10"ø

FPB

X

Y

Y

Y

10"ø

10"ø

12"x12"

18"x14"

Y

Y

10"ø

10"ø

7"ø

10"ø

VAV

W

22"x12"

VAV

EF

EF

EF

16"x14"

10"ø

10"ø

12"x12"

C

C

C

C

10"ø

10"ø

16"ø

8"ø

24"ø

23"ø

K

K

FC

V

FAN COIL

EF

K

16"x14" 10"ø C

14"x12" 10"ø

10"ø

14"x12"

V

Y

Y

8"ø

CONF.

VAV

16"ø

VAV

10"ø

30"x16"

C

8"x8"

H

8"x8"

14"x10"

20"x12"

18"x12"

12"x10"

20"x16"

M2.04

20"x14"

10"ø

10"ø

C

C

16"x12"

C

10"ø

10"x12"

10"ø

Y

M2.04

8"ø

X

VAV

12"ø

X

X

G

12"x12"

8"ø

8"ø

6"x6"

Q

CH

CABINET

HEATER 8"x8"

R

S

C

G

C

12"x12"

8"x10"

6"ø

8"ø

W

22"x12"

16"x14"

14"ø

21"ø

MASONRY

RETURN AIR

OPENINGS

1C

1C

1C 1C

1A

1A

W

VAV

Y 45010"ø

8"ø

12"x10"

U

G

12"x12"

C

10"ø 10"ø

10"ø

10"ø

Y

Y

Y

22"x12"

W

J

10"ø

EF

8"x8"

8"x8"

K

K

8"x8" 8"x8"

EF

K

14"x12"

VAV

10"ø

40"x22"

30"ø

28"ø

VAV

10"ø

C

16"x14"

16"x12"

14"x12"

K

RF

F/D

F/D

MASONRY

RETURN AIR

OPENINGS (TYP.)

C

CONDENSER

SS

SS

FAN COIL

CONDENSER

T

CONDENSER SS

VAV

SEE SHEET M2.04

FOR DUCT LAYOUT.

SEE SHEET M2.02

FOR DUCT LAYOUT.

SEE SHEET M2.01

FOR DUCT LAYOUT.

N

G

G

10"x8"

8"x8"

6"ø

6"ø

(TYP.)

1C

22"x12"

8"x8"

8"x8"

(TYP.)

7"ø

10"x8"

EF

8"x8"

SEE SHEET M2.02

FOR DUCT LAYOUT.

E

16"x14"

W

22"x12"

COORDINATE

WITH CEILING

& LIGHTS

7"ø

18"ø

18"ø

32"x16"

No.8297

NIELSON

GORDON A.

R E

E

NI

G N

E

D E

L

R E

T

SI

G E

R hatUfoetat

S

ANOISSEFORP

A R C H I T E C T U R E, P. C.

sandstrom associates

845 South 220 East Orem, UT 84058

801.229-0088 801.229-0089 fax www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE ISSUE/REVISION

MECHANICAL, ELECTRICAL, PLUMBING ENGINEER

Consulting Engineers

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of NIELSON ENGINEERING, INC. and is not to be used, in whole or in part,for any other project without the written authorization of an authorized representative of NIELSON ENGINEERING, INC. Unauthorized use will be prosecuted to the fullest extent of the Law.

Copyright c 2012 by:

NIELSON

ENGINEERING, INC.

Nielson Engineering, Inc.

OWNERSHIP OF DOCUMENTS

Pocatello, Idaho 83201

PHONE (208) 232-2577

156 North Twelfth Avenue

FAX (208) 234-0918

RECORD DRAWINGS 7-7-14

/7 /2 :2 :5 P M

C U s e rs \j e ff \D o c u m e n ts \M t P le a s a n t N E I C E N T F

IL

E je ff .r vt

N E W M T P L E A S A N T E L E M E N T A R Y S C H O O L

N O R T H S A N P E T E S C H O O L D

IS

T R

IC

T

E A S T S O U T H

M O U N T P L E A S A N T ,U T A H

9-24-12

SVB

GAN

M2.03

AREA "C" MECHANICAL PLAN

1/8" = 1'-0"

AREA "C" MECHANICAL PLAN 1 KEY PLAN

NOT TO SCALE

AREA C

north

M2.03 KEY NOTES

1 ALL COORIDOR CEILINGS AND SOME OF THE CLASSROOMS ARE

RETURN AIR PLENUMS. DUCT ALL ROOM RETURN GRILLES TO

COORIDOR CEILING RETURN PLENUMS. INSTALL MASONRY RETURN

AIR OPENING IN WALLS AS SHOWN ABOVE CEILING'S.

2 COORDINATE DUCTWORK WITH BUILDING STRUCTURE, PIPES, FIRE

SPRINKLING, ELECTRICAL, ETC.

3 SET AIR HANDLER ON 4" THICK CONCRETE UTILITY PAD.

CORRIDOR

MULTI-PURPOSE

STOR.

KITCHEN

OFF.

STOR.

WET

STOR

LOCK

T.

STOR.

VEST.

CHILLER

MECH.

GIRLS

BOYS

STORAGE

M2.04

Y

U

R

W

X

H

T

Z

V

S

M2.04

AHU

AHU

CH

WH

CABINET HEATER

WALL HEATER

MAU

MAU

MAKE-UP AIR UNIT

MAKE-UP AIR UNIT

22"ø

20"ø

30"ø

28"ø

24"ø

18"ø

SEE SHEET M2.03

FOR DUCT

CONTINUATION.

10"ø

16"x14"

16"x12"

14"x12"

10"ø 10"ø

10"ø

Y

Y

Y

COACH

CUST.

108 WORK

CONF.

Y

10"ø

12"x10"

8"ø

G

7"ø

8"ø

W

22"x12"

10"ø

C

12"x12"

U

EF

EXHAUST FAN

8"x8"

8"x8"

K

K

8"x8"

8"x8"

K

K

EF

EXHAUST FAN

C

14"x12"

10"x12"

10"ø

ELEC.

MULTI-PURPOSE

X

Y

8"ø

10"ø

CF

CEILING FAN

40"x22"

C 300 16"x14"

14"x12"

J

G

J

10"ø

8"ø

CHR

B

G 115 8"ø

8"ø

8"x10"

16"x14"

20"x18"

22"x22"

D

12"ø

FAH

EF

EF

FAH

FPB

KEF

KEF

KITCHEN EXHAUST FAN

KITCHEN EXHAUST FAN

EF

8"ø K

10"x12"

12"x12"

10"ø

10"ø

J

J

G

6"ø

8"x8"

D

D

D

12"ø

12"ø

12"ø

STOR.

NET.

PLATFORM

RAMP

STAIR

M2.04

M2.04

EXHAUST FAN

EXHAUST FAN

FRESH AIR

HOOD

FRESH AIR

HOOD

AIR HANDLER UNIT

CHILLER

M5.02

VAV

FPB

VAV

VAV

FPB

28"x44"

AIR HANDLER

8"ø

G

M

Y

22"x12"

10"ø

W

EF

EXHAUST FAN

EXHAUST FAN

EF

EXHAUST FAN

8"x8"

K

N

10"x8"

N

N

P

10"x10"

1J

1J

4" DIA. DRYER VENT

K

48"x24"

RF

RELIEF FAN

FAH

RELIEF AIR HOOD

SS

FAN COIL

T

RETURN

AIR

CHASE

RETURN

AIR

CHASE

FS/D

F/D

SS

CUH

CEILING UNIT HEATER

B

B

AS

P

P

ET

ET

1P

P

(TYP.)

AS

16"x14"

16"x14"

16"x14"

16"x14"

1C

1C

(TYP.)

WH

WALL HEATER

T

(TYP.)

WATER HEATERS

STORAGE TANK

WATER SOFTNER

S/FD

F/D

10"ø

10"ø

J

J

20 X 20

WELDED

DUCT

38"ø

38"ø

F

F

F

F

F

F

F

F

F

F

38"ø

FAH

FRESH AIR

HOOD

38"ø

28"x26"

38"ø M

RETURN

AIR GRILLE

8" A.F.F.

M5.02

10"ø

10"ø

10"ø

W

AHU

FAH

1 FRESH

AIR HOOD

AIR

HANDLER

28"x44"

8"ø

TO SUPPLY IN

STORAGE

RM. 084

WWFAH

1FRESH AIR HOOD

44"x28"

AHU

AIR HANDLER

70"x28"

3-1/2" CONCRETE PAD

46"x28"

G

8"ø

10"ø

26"x28"

J

J

10"ø

38"ø

3-1/2" CONCRETE

PAD (TYP.)

8" A.F.F.

AHU

AIR HANDLER

FAH

FRESH AIR HOOD

28"x70" 28"x46"

R E

T U

R N

A

IR

C H

A S

E

28"x70"

26"x26"

M

EF

18"x18"

FAH

FRESH AIR HOODFAH

2FRESH AIR HOOD

EXHAUST

FAN

AHU

48"x24"

60"x30"

28"x96"

29"x95"

CHR

1CHILLER

AIR HANDLER

P

P

B

4 ET

EF

20EXHAUST

FAN

YW X YW X

FAH

EF

FAH

24"x24"18"x18"

AHU

FRESH AIR

HOOD

FRESH AIR

HOOD

EXHAUST

FAN

AIR HANDLER

UNIT

B

B

3CORRIDOR

MECH.

RF

RELIEF FAN

24"x48"

W

12"x22"

40"x22"

96"x28"

90"x30"

No.8297

NIELSON

GORDON A.

R E

E

NI

G N

E

D E

L

R E

T

SI

G E

R hatUfoetat

S

ANOISSEFORP

A R C H I T E C T U R E, P. C.

sandstrom associates

845 South 220 East Orem, UT 84058

801.229-0088 801.229-0089 fax www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE ISSUE/REVISION

MECHANICAL, ELECTRICAL, PLUMBING ENGINEER

Consulting Engineers

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of NIELSON ENGINEERING, INC. and is not to be used, in whole or in part,for any other project without the written authorization of an authorized representative of NIELSON ENGINEERING, INC. Unauthorized use will be prosecuted to the fullest extent of the Law.

Copyright c 2012 by:

NIELSON

ENGINEERING, INC.

Nielson Engineering, Inc.

OWNERSHIP OF DOCUMENTS

Pocatello, Idaho 83201

PHONE (208) 232-2577

156 North Twelfth Avenue

FAX (208) 234-0918

RECORD DRAWINGS 7-7-14

/7 /2 :2 :1 P M

C U s e rs \j e ff \D o c u m e n ts \M t P le a s a n t N E I C E N T F

IL

E je ff .r vt

N E W M T P L E A S A N T E L E M E N T A R Y S C H O O L

N O R T H S A N P E T E S C H O O L D

IS

T R

IC

T

E A S T S O U T H

M O U N T P L E A S A N T ,U T A H

9-24-12

SVB

GAN

M2.04

AREA "D" MECHANICAL PLAN

1/8" = 1'-0"

AREA "D" MECHANICAL PLAN 1 KEY PLAN

NOT TO SCALE

AREA D

north

M2.04 KEY NOTES

1 ALL COORIDOR CEILINGS AND SOME OF THE CLASSROOMS

ARE RETURN AIR PLENUMS. DUCT ALL ROOM RETURN

GRILLES TO COORIDOR CEILING RETURN PLENUMS.

INSTALL MASONRY RETURN AIR OPENING IN WALLS AS

SHOWN ABOVE CEILINGS.

2 COORDINATE DUCTWORK WITH BUILDING STRUCTURE,

PIPES, FIRE SPRINKLING, ELECTRICAL, ETC.

3 INSTALL BOILER AND WATER HEATER COMBUSTION AND

VENT FLUES. LOCATE VENTS 10 FEET FROM FRESH AIR

INTAKES AND THREE FEET ABOVE ROOF PROVIDE WITH

AIRCRAFT CABLE OR STEEL PIPE ANCHORED TO ROOF

STRUCTURE. SEE DETAILS 6, 7 & 13 ON SHEET MD.03.

4 INSTALL 4" DIAMETER DRYER VENT TO ROOF VENT. SEE

DETAIL 8/MD.03.

5 SET THE AIR COOLED CHILLER ON 4" THICK CONCRETE

UTILITY PAD.

1/8" = 1'-0"

AREA "D" MEZZ MECHANICAL PLAN 2

1/8" = 1'-0"

Section 1D 3

1/8" = 1'-0"

Section 2D 4

1/8" = 1'-0"

Section 3D 5

1/8" = 1'-0"

Section 4D 6

W XV

KEF

KITCHEN EXHAUST FAN

KEF

KITCHEN EXHAUST FAN

MAU

MAKE-UP AIR UNIT

MAU

MAKE-UP AIR UNIT

WH

CH

WALL HEATER

CABINET HEATER

WH

WALL HEATER

B

W

22"x12"N

8"ø

8"ø

8"x10" 16"x14"

12"ø 12"ø

20"x18"

8"ø

12"ø 12"ø

D

D

D

D

22"x22"

12"x12"

EF

21 EXHAUST FAN

J 35010"ø

16"x14"

16"x14"

12"x12"

8"ø

8"x8"

K

1J 1J

EF

EXHAUST FAN

16"ø 20"ø

20"ø

8"ø

X

MASONRY RETURN AIR

OPENINGS SEE

SCHEDULE SHHET M1.00

F/SD

F/D

FPB

6FAN POWERED BOX

K

CF

EXHAUST VENTILATOR

CEILING FAN

G

6"ø

10"ø J

35010"x12"

16"x14"

16"x14"

12"ø

12"ø

10"x8"

10"x8"

N

P

10"x10"

8"x8"

20 X 20

WELDED

DUCT

M5.02

Y

X

CORRIDOR

MECH.

AHU

22"ø 40"x22"

16"x14"

VAV

FPB

10"ø

W

48"x24"

B

B

AS

P

P

ET

ET

P

P

AS

WATER SOFTNER

WATER HEATERS

AIR HANDLER

STORAGE

TANK

BOILERS

1 & 2

FAH

FRESH

AIR

HOOD

EF

19EXHAUST

FAN

CUH

CEILING

HEATER

20"ø

BOILER

BOILER

EXPANSION

TANKS

AIR

SEPERATOR

GLYCOL

TANK

RF

RELIEF FAN

60"x30"

PUMPS

PUMPS

FAH

3FRESH

AIR

HOOD

22"x12"

CHR

CHILLER

(TYP.)

(TYP.)

No.8297

NIELSON

GORDON A.

R E

E

NI

G N

E

D E

L

R E

T

SI

G E

R hatUfoetat

S

ANOISSEFORP

A R C H I T E C T U R E, P. C.

sandstrom associates

845 South 220 East Orem, UT 84058

801.229-0088 801.229-0089 fax www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE ISSUE/REVISION

MECHANICAL, ELECTRICAL, PLUMBING ENGINEER

Consulting Engineers

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of NIELSON ENGINEERING, INC. and is not to be used, in whole or in part,for any other project without the written authorization of an authorized representative of NIELSON ENGINEERING, INC. Unauthorized use will be prosecuted to the fullest extent of the Law.

Copyright c 2012 by:

NIELSON

ENGINEERING, INC.

Nielson Engineering, Inc.

OWNERSHIP OF DOCUMENTS

Pocatello, Idaho 83201

PHONE (208) 232-2577

156 North Twelfth Avenue

FAX (208) 234-0918

RECORD DRAWINGS 7-7-14

/7 /2 :2 :3 P M

C U s e rs \j e ff \D o c u m e n ts \M t P le a s a n t N E I C E N T F

IL

E je ff .r vt

N E W M T P L E A S A N T E L E M E N T A R Y S C H O O L

N O R T H S A N P E T E S C H O O L D

IS

T R

IC

T

E A S T S O U T H

M O U N T P L E A S A N T ,U T A H

9-24-12

SVB

GAN

M2.05

ENLARGED KITCHEN & MECH. RM. PLANS

1/4" = 1'-0"

ENLARGED KITCHEN MECHANICAL PLAN 1

1/4" = 1'-0"

ENLARGED AREA "D" MECH. ROOM PLAN 2

M2.05 KEY NOTES

1 COORDINATE THE MECH EQUIPMENT LOCATIONS WITH

KITCHEN PLANS FOR EXACT PLACEMENT.

M2.05 KEY NOTES (MECH. RM)

1 SET ALL MECHANICAL EQUIPMENT ON 4" HIGH UTILITY

PAD. COORDINATE EXACT DIMENSION WITH GENERAL

CONTRACTOR. (CONCRETE BY OTHERS.)

A B E

KINDERGARTEN

T.

KINDERGARTEN

VEST.

CLASSROOM

CLASSROOM

012 CLASSROOM

CLASSROOM

STOR.

NET.

CUST.

T.

GIRLS

CHASE

BOYS

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CORRIDOR

SMALL GROUP

CLASSROOM

CLASSROOM

KINDERGARTEN

T.

T.

VAV

VAV

VAV

4VAV

VAV

VAV

VAV

VAV

CLASSROOM

VAV

VAV

VAV

KINDERGARTEN

VAV

VAV

VAV

VAV

VAV

C

F

D

S

S

S

S S S

S SS

SS SS S

SSSS

TO AHU-1 IN

MEZZANINE

RF

FPB

RF

VAV

6 6

6 6 6

C D

AHU

1AIR HANDLER

TO VAV'S IN

AREA A

DDC CONTROLS CONTRACTOR TO PROVIDE ALL HOT WATER HEATING

VALVES FOR ALL VAV BOXES.

CONTROL CONTRACTOR NOTES

A.

DDC CONTRACTOR TO PROVIDE ALL INTERLOCKING RELAYS FOR PUMP

CONTROL, PUMP STARTERS ARE PROVIDED BY OTHERS.

B.

DDC CONTRACTOR TO PROVIDE CO2 SENSOR FOR EACH VAV BOX / AHU.C.

ALL CONTROL CONDUIT BY CONTROL CONTRACTOR.D.

WALL TEMPERATURE & CO 2 SENSOR

WALL TEMPERATURE & CO 2 SENSOR (AVERAGING)

RECIRCULATION PUMP FOR RADIANT FLOOR HEAT ON SNOW MELT

RADIANT FLOOR MANIFOLD

SNOW MELT MANIFOLD

LEGEND

SNOW MELT SENSOR (MOUNTED ON CONCRETE)

S

S

SM

A

SM

RF

WALL STATT

HEATING VALVE

CONDENSER (LOCATED ON ROOF)C

VAV BOX WITH ZONE CONTROLLER

AIR HANDLER W/ ZONE CONTROL IN MECH. ROOM

ROOFTOP UNIT (LOCATED ON ROOF)

FAN COIL

AH

RT

FC

CABINET HEATER W/ CONTROL & SENSOR MOUNTED IN RETURN AIR

FANF

S

BUILDING MAIN CONTROL PANEL INTERNET CONNECT & TERMINAL

BOILER EMERGENCY SHUT-DOWN SWITCHBE

No.8297

NIELSON

GORDON A.

R E

E

NI

G N

E

D E

L

R E

T

SI

G E

R hatUfoetat

S

ANOISSEFORP

A R C H I T E C T U R E, P. C.

sandstrom associates

845 South 220 East Orem, UT 84058

801.229-0088 801.229-0089 fax www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE ISSUE/REVISION

MECHANICAL, ELECTRICAL, PLUMBING ENGINEER

Consulting Engineers

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of NIELSON ENGINEERING, INC. and is not to be used, in whole or in part,for any other project without the written authorization of an authorized representative of NIELSON ENGINEERING, INC. Unauthorized use will be prosecuted to the fullest extent of the Law.

Copyright c 2012 by:

NIELSON

ENGINEERING, INC.

Nielson Engineering, Inc.

OWNERSHIP OF DOCUMENTS

Pocatello, Idaho 83201

PHONE (208) 232-2577

156 North Twelfth Avenue

FAX (208) 234-0918

RECORD DRAWINGS 7-7-14

/7 /2 :2 :4 P M

C U s e rs \j e ff \D o c u m e n ts \M t P le a s a n t N E I C E N T F

IL

E je ff .r vt

N E W M T P L E A S A N T E L E M E N T A R Y S C H O O L

N O R T H S A N P E T E S C H O O L D

IS

T R

IC

T

E A S T S O U T H

M O U N T P L E A S A N T ,U T A H

9-24-12

SVB

GAN

M3.01

AREA 'A' TEMPERATURE CONTROLS PLAN

1/8" = 1'-0"

AREA "A" TEMPERATURE CONTROLS PLAN 1

1/8" = 1'-0"

AREA "A" MEZZ TEMPERATURE CONTROLS PLAN 2

KEY PLAN

NOT TO SCALE

AREA A

north

M3.01 KEY NOTES

1 ALL CONDUIT BY CONTROL CONTRACTORS.

2 THIS CONTROL DRAWING IS DIAGRAMMATIC AND CAN BE MODIFIED

FOR CONDUIT ROUTING EFFECTIVELY TO EACH ZONE AND DAISY

CHAINING FROM CONTROL TO CONTROL.

3 CONTROL CONTRACTOR SHALL COMPLY WITH SPECIFICATIONS AND

THESE DRAWINGS TO PROVIDE A COMPLETE FUNCTIONAL ADC

CONTROL SYSTEM.

4 PROVIDE WALL TEMPERATURE & CO2 SENSOR AS ONE OR TWO

DEVICES.

5 RELIEF FANS SHALL BE CONTROLLED WITH ZONE AIR HANDLER

FRESH AIR TO CONTROL BUILDING PRESSURE. EACH RELIEF FAN

SHALL RECEIVE A 0-10 VOLT SIGNAL TO CONTROL THE FAN UFD

SPEED.

6 THE SLOT DIFFUSER SUPPLY AIR SHALL NOT BLOW ON THE WALL

STATS. THE WALL STAT SHALL BE LOCATED ON THE BACK WALL.

LOCATE STAT AS SHOWN ON THE MECNAHICAL PLANS M3.01 & M3.04

OR ON THE FRONT OF THE POCKET WALL IN THE CLASSROOMS.

U

Q R

J

K

N

H

T

V

P S

M

L

GF

CLASSROOM

RESOURCE

CORRIDOR

VEST.

MEDIA CENTER

STOR.

OFFICE

KIVA

MEDIA CENTER

READING

PSYCH

SPEECH

A/V STOR.

CLASSROOM

VAV

VAV

VAV

VAV

VAV

VAV

VAV

VAV

CLASSROOM

CLASSROOM

CLASSROOM

VAV

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

STOR

NET.

CUST.

T.

BOYS

GIRLS

VEST.

CORRIDOR

CORRIDOR

VAV

VAV

VAV

VAV

VAV

FPB

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

TO AHU-2

IN MEZZANINE

S

S

S

S

S

S

VAV

VAV

VAV

VAV

FPB

VAV

VAV

SEE SHEET M3.03

FOR CONTINUATION

RF

CORRIDOR

S

VAV

HYDRONIC RADIANT

FLOOR HEAT

CONTROL VALVE

HRB

HRB

HRB

HRB

HRB

HRB

SEE SHEET M3.03

FOR CONTINUATION

M

L

EAST MEZZANINE

AHU

TO VAV'S

IN AREA B

DDC CONTROLS CONTRACTOR TO PROVIDE ALL HOT WATER HEATING

VALVES FOR ALL VAV BOXES.

CONTROL CONTRACTOR NOTES

A.

DDC CONTRACTOR TO PROVIDE ALL INTERLOCKING RELAYS FOR PUMP

CONTROL, PUMP STARTERS ARE PROVIDED BY OTHERS.

B.

DDC CONTRACTOR TO PROVIDE CO2 SENSOR FOR EACH VAV BOX / AHU.C.

ALL CONTROL CONDUIT BY CONTROL CONTRACTOR.D.

WALL TEMPERATURE & CO 2 SENSOR

WALL TEMPERATURE & CO 2 SENSOR (AVERAGING)

RECIRCULATION PUMP FOR RADIANT FLOOR HEAT ON SNOW MELT

RADIANT FLOOR MANIFOLD

SNOW MELT MANIFOLD

LEGEND

SNOW MELT SENSOR (MOUNTED ON CONCRETE)

S

S

SM

A

SM

RF

WALL STATT

HEATING VALVE

CONDENSER (LOCATED ON ROOF)C

VAV BOX WITH ZONE CONTROLLER

AIR HANDLER W/ ZONE CONTROL IN MECH. ROOM

ROOFTOP UNIT (LOCATED ON ROOF)

FAN COIL

AH

RT

FC

CABINET HEATER W/ CONTROL & SENSOR MOUNTED IN RETURN AIR

FANF

S

BUILDING MAIN CONTROL PANEL INTERNET CONNECT & TERMINAL

BOILER EMERGENCY SHUT-DOWN SWITCHBE

No.8297

NIELSON

GORDON A.

R E

E

NI

G N

E

D E

L

R E

T

SI

G E

R hatUfoetat

S

ANOISSEFORP

A R C H I T E C T U R E, P. C.

sandstrom associates

845 South 220 East Orem, UT 84058

801.229-0088 801.229-0089 fax www.sandstromarchitecture.com

DRAWN BY

CHECKED BY

DATE

PROJECT NO.

SHEET NUMBER

SHEET DESCRIPTION

DATE ISSUE/REVISION

MECHANI…