9. DBA CA20250026 Dated 28 Mar25.pdf

PDF 9 MB Posted

Attached to
Line Fire BAER and Suppression Repair. San Bernardino National Forest. Federal contract opportunity
Solicitation number
127EAW25R0031
Issued by
Department of Agriculture Forest Service

About this file

This document is a Davis-Bacon wage determination for construction work in California, specifically San Bernardino County, dated March 28, 2025. The wage determination covers multiple construction classifications including building, heavy, highway, and dredging projects, with detailed hourly rates and fringe benefits for various job roles such as asbestos workers, boilermakers, bricklayers, carpenters, cement masons, communications system workers, divers, drywall installers, electricians, elevator mechanics, and many other specialized trades.

The document provides comprehensive wage rates effective for contracts entered into or renewed between January 2022 and 2025, with specific guidelines under Executive Orders 14026 and 13658. Rates vary by job classification and range from approximately $36 to $70 per hour, with additional fringe benefits. The wage determination includes provisions for different geographic zones within California, premium pay for specific locations and hazardous work conditions, and notes about paid vacation and holiday requirements for workers. The document is designed to ensure fair compensation for workers on federal construction contracts in the specified region.

View the file

Other files for this federal contract opportunity

Other files attached to Line Fire BAER and Suppression Repair. San Bernardino National Forest., newest first.
File Type Posted
12. Line Fire Guardrail.pdf PDF
Amendment 2 - 127EAW25R0031 - Line Fire Road Treatment and Suppression Repair.pdf PDF
AMENDMENT 1 127EAW25R0031 Line Fire Road Treatment and Suppression Repair.pdf PDF
11. SAM.gov Q&A.xlsx XLSX spreadsheet
4. Line Fire Suppression Repair Map 36x48.pdf PDF
7. Fire Plan Line Fire.pdf PDF
8. R5 Road Maintenance Specs.pdf PDF
1. RFP 127EAW25R0031 Lake Fire Road Treatment Suppression Repair, BDF.pdf PDF
2. Statement of Work Line BAER.pdf PDF
5. 840-2 Install.pdf PDF
6. 840-2a 18 Inch Detail.pdf PDF
3. BDF PAL Area Map.pdf PDF
10. Past Performance Questionnaire.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .