9. ARS-372.pdf
PDF 31 KB Posted
- Attached to
- Building 154, Air Compressor Replacement, Ames, IA Federal contract opportunity
- Solicitation number
- 12505B22R0025
About this file
This solicitation is for a building air compressor replacement project located in Ames, Iowa. The United States Department of Agriculture Agricultural Research Service is seeking proposals for project number 12505B22R0025, which has a 100% small business set-aside with a NAICS code of 238220 and size standard of $16.5 million. The magnitude of construction is estimated between $500,000 and $1 million. Interested vendors must register in SAM and monitor the website for amendments. Site visits are scheduled for August 17th and 18th, with registration required by August 16th. Questions are due by August 25th with responses posted as amendments. Proposals are due 365 days after notice to proceed. Biobased products must be used where reasonably available and priced.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign in sheet for 154 air compressor project_9_13_2022.pdf | ||
| 12505B22R0025 - Amendment 0001.pdf | ||
| 12505B22R0025_Questions and Answers.pdf | ||
| 12505B22R0025 - Amendment 02.pdf | ||
| Sign in sheet Site visit_22R0025.pdf | ||
| 10. Drawings - Building 154 Air Compressor Replacement Project_FINAL_2022.pdf | ||
| 4. Building Automation Systems_2022_ONEAC-Bldg 154, Air Compressor Replacement.pdf | ||
| 7. Past Performance Questionnaire.pdf | ||
| 5. 2022_Short Circuit Study-Results for 200A disconnects.pdf | ||
| 1. 12505B22R0025 - Bldg 154, Air Compressor Replacement.pdf | ||
| 2. Statement of Work-Bldg 154, Air Compressor Replacement_7.22.22.pdf | ||
| 6. Wage Determination_IA20220074.pdf | ||
| 8. ARS-371.pdf | ||
| 3. Specifications-Bldg 154, Air Compressor Replacement.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR'S REQUEST FOR PAYMENT TRANSMITTAL
CONTRACT NO.
PROJECT
LOCATION
PARTIAL PAYMENT NO.
REQUISITION NO.
FOR PERIOD BEGINNING ENDING
FINAL PAYMENT
ITEM AMOUNT
1. Amount of original contract
2. Change orders and/or amendments
3. Total adjusted contract prices
4. Value of work completed to end of period
5. Value of material stored at the site (Itemize below)
6. Total value of work completed and stored material (Line 4 plus Line 5).
8. Total due contractor thru end of this period
9. Less previous requests
10. Net amount due contractor this payment
7. Less
MATERIAL STORED AT THE SITE (See Item 5 above) Description Value
CONTRACTOR'S PROGRESS PAYMENT CERTIFICATION
SIGNATURE OF CONTRACTOR'S AUTHORIZED REPRESENTATIVE
RECOMMENDED FOR PAYMENT (Signature of EPM, COR, CM or A-E as appropriate)
CONCUR (Signature of EPM or COR as appropriate)
DATE SIGNED
DATE SIGNED
DATE SIGNED
Form ARS-372 (06/2011) USDA-ARS This form was electronically produced by USDA/ARS/OCIO/EASB.
% retainage
The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;(1)
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor's performance.(4)
I hereby certify, to the best of my knowledge and belief, that -
Previous edition is not usable.
c:\\docume~1\\admini~1.for\\mydocu~1\\accounts\\usda2\\origin~1\\set3~1\\ars372.wpf Administrator D:20050417122932- 04'00' D:20050426102902- 04'00'
CONTRACTOR'S REQUEST FOR PAYMENT TRANSMITTAL
CONTRACT NO.
PROJECT
LOCATION
PARTIAL PAYMENT NO.
REQUISITION NO.
FOR PERIOD BEGINNING
ENDING
FINAL PAYMENT
ITEM
AMOUNT
1. Amount of original contract
2. Change orders and/or amendments
3. Total adjusted contract prices
4. Value of work completed to end of period
5. Value of material stored at the site (Itemize below)
6. Total value of work completed and stored material (Line 4 plus Line 5).
8. Total due contractor thru end of this period
9. Less previous requests
10. Net amount due contractor this payment
7. Less MATERIAL STORED AT THE SITE (See Item 5 above) Description Value
CONTRACTOR'S PROGRESS PAYMENT CERTIFICATION
SIGNATURE OF CONTRACTOR'S AUTHORIZED REPRESENTATIVE
RECOMMENDED FOR PAYMENT (Signature of EPM, COR, CM or A-E as appropriate) CONCUR (Signature of EPM or COR as appropriate)
DATE SIGNED
DATE SIGNED
DATE SIGNED
Form ARS-372 (06/2011)
USDA-ARS
This form was electronically produced by USDA/ARS/OCIO/EASB.
% retainage The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(1) (2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor's performance.
(4) I hereby certify, to the best of my knowledge and belief, that - Previous edition is not usable.
| Check if Final payment.: 0 |
| Enter date for period beginning using format MM/DD/YYYY.: |
| Enter date for period ending using format MM/DD/YYYY.: |
| Item. 1. Amount of original contract.: |
| Item 2. Change orders and / or amendments.: |
| Item 3. Total adjusted contract prices.: |
| Item 4. Value of work completed to end of period.: |
| Item 5. Value of material stored at the site (Itemize below).: |
| Item 6. Total value of work completed and stored material (Line 4 plus Line 5). Value of material stored at the site (Itemize below).: |
| Item 7. Enter Percent retainage.: |
| Item 7. Less indicated percentage retainage.: |
| Item 8. Total due contractor thru end of this period.: |
| Item 9. Less previous requests.: |
| Item 10. Net amount due contractor this payment.: |
| Value. Line 1.: |
| Value. Line 2.: |
| Value. Line 3.: |
| Value. Line 4.: |
| Value. Line 5.: |
| Value. Line 6.: |
| Value. Line 7.: |
| Value. Line 8.: |
| Value. Line 9.: |
| Contractor's request for payment transmittal. Enter contract number.: |
| Partial payment number.: |
| Project.: |
| Requisition number.: |
| Location.: |
| Description. Line 1.: |
| Description. Line 2.: |
| Description. Line 3.: |
| Description. Line 4.: |
| Description. Line 5.: |
| Description. Line 6.: |
| Description. Line 7.: |
| Description. Line 8.: |
| Description. Line 9.: |
| Value. Line 10.: |
| Value. Line 11.: |
| Value. Line 12.: |
| Value. Line 13.: |
| Value. Line 14.: |
| Value. Line 15.: |
| Value. Line 16.: |
| Value. Line 17.: |
| Description. Line 10.: |
| Description. Line 11.: |
| Description. Line 12.: |
| Description. Line 13.: |
| Description. Line 14.: |
| Description. Line 15.: |
| Description. Line 16.: |
| Description. Line 17.: |
| Enter date in this format MM/DD/YYYY: |
| Enter date in this format MM/DD/YYYY: |
| Enter date in this format MM/DD/YYYY: |
File details come from the government source that posted it. Updated .