9-CPN 106796 2027 Asphalt Resurfacing Contract 5 - Addendum No. 1.pdf

PDF 537 KB Posted

Attached to
PW 2027 Asphalt Resurfacing Contract 5 City Project No. 106796
Solicitation number
26-0287
Issued by
Tarrant County, Texas

About this file

This is Addendum No. 1 to the City of Fort Worth Transportation and Public Works Department's 2027 Asphalt Resurfacing Contract 5 (City Project No. 106796), issued on September 3, 2026, with bids opening on September 10, 2026. The project involves asphalt resurfacing work including approximately 49,000 square yards of surface milling, 49,000 square yards of asphalt pavement placement (2.5" Type B and 1.5" Superpave SP-D), 15,500 square yards of 11" pavement pulverization with 3" asphalt replacement, concrete curb and gutter work totaling 5,300 linear feet, sidewalk and driveway repairs, barrier-free ramp construction, and various traffic control and pavement marking items. The engineer's estimate for the project is approximately $4,300,000. The addendum clarifies that Railroad Flagmen are required as a separate bid item from Railroad Coordination, and contractors must obtain a Street Use Permit. Asphalt base repair will range from 6" to 8" in depth, and work will exclude the intersection at Sycamore School Road. The proposal form has been revised and the bid table updated in the Bonfire system to reflect these changes, with failure to acknowledge receipt of the addendum potentially resulting in bidder disqualification.

The revised specifications detail comprehensive requirements for asphalt paving operations, including mix design procedures, equipment specifications, material quality standards, production tolerances, placement operations, and compaction requirements. Contractors are required to submit asphalt mix designs for City review and approval prior to production, utilizing either Superpave or dense-graded mixtures with specified binder grades (PG 70-22 for surface courses and PG 64-22 for base courses). Payment is structured as a unit price bid for various line items including remobilization, railroad coordination, concrete removal and replacement, asphalt placement at multiple thicknesses, and miscellaneous items such as traffic control and pavement markings. The contract includes allowances of $30,000 for irrigation adjustment and landscape repair and $150,000 for paving construction contingencies. In-place density testing is conducted every 200 linear feet with penalties or removal and replacement required for sections not meeting specified compaction standards of 92.5% to 96.3%, and pavement thickness deficiencies incur proportional payment reductions based on the extent of non-compliance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF FORT WORTH

STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS

Revised September 2, 2026

2027 Asphalt Resurfacing Contract 5 City Project No. 106796

Addendum No 1

CITY OF FORT WORTH

Transportation and Public Works Department

2027 Asphalt Resurfacing Contract 5 City Project No. 106796

ADDENDUM NO. 1

Addendum No. 1: Issued Wednesday, September 3, 2026

Bid Open Date: Thursday, September 10, 2026

This Addendum forms part of the Specifications & Contract Documents for the above-referenced Project and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this addendum in the space provided below and in the proposal (SECTION 00 41 00). Failure to acknowledge receipt of this addendum could subject the bidder to disqualification.

The Plans and specification documents for 2027 Asphalt Resurfacing Contract 5, City Project No.

106796, are hereby revised by Addendum No. 1 as follows:

SPECIFICATIONS & CONTRACT DOCUMENTS:

a. SECTION 00 42 43 – Replace the PROPOSAL FORM in its entirety with the attached revised

PROPOSAL FORM.

b. SECTION 32 12 16 – Add the attached modified ASPHALT PAVING specification.

c. BIDTABLE (BT-28RX) – The bid table has been revised in Bonfire to reflect the changes made to the proposal form.

d. SUBMISSION INSTRUCTIONS – 26-0287 – The submission instructions have been updated to include Addendum No. 1 under the Requested Information section.

The attendees asked the following questions during the pre-bid conference and on Bonfire. The City of Fort Worth’s responses are below.

Question 1: What is the engineer’s estimate for the project?

Response 1: $4,300,000 is the approximate construction cost based on the engineer’s estimate.

Question 2: What is the average depth of asphalt pavement base repair?

Response 2: Asphalt Base Repair will range from 6” to 8” in depth

Question 3: Will work take place within the intersection at Sycamore School Road?

Response 3: No, the work will skip the intersection at Sycamore School Road and continue within the remaining project limits.

Question 4: Will Railroad Flagmen be required as part of the Railroad Coordination?

Response 4: Yes. Railroad Flagmen will be required for this project. The Proposal Form has been revised to include Railroad Flagmen as a separate bid item from Railroad Coordination. The Contractor will be responsible for all costs associated with obtaining and executing the Railroad Maintenance Consent Letter, staff certification, and insurance requirements under the Railroad Coordination item.

CITY OF FORT WORTH

STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS

Revised September 2, 2026

2027 Asphalt Resurfacing Contract 5 City Project No. 106796

Addendum No 1

Question 5: Is the contractor required to obtain Street Use Permit?

Response 5: Yes. The contractor is required to obtain the Street Use Permit

This Addendum No. 1 forms part of the Specifications and Contract Documents for the above-referenced project and modifies the original Project Manual and Contract Documents of the same.

Acknowledge your receipt of Addendum No. 1 by completing the requested information in the space provided in Section 00 41 00, Bid Form, Page 3 of 3

A signed copy of Addendum No. 1 should be included in the submitted sealed bid at the time of bid submittal. Failure to acknowledge the receipt of Addendum No. 1 could cause the subject bidder to be considered “NONRESPONSIVE,” resulting in disqualification.

Addendum No. 1

RECEIPT ACKNOWLEDGEMENT: Lauren Prieur, P.E.

Director, Transportation and Public Works

By: By:

Zelalem Arega, P.E.

Company:

Address:

City: State:

Engineering Manager, TPW

00 42 43

BID PROPOSAL

1 0170.0101 Specified Remobilization 01 70 00 EA 1 2 0135.0101 Railroad Coordination 01 35 13 LS 1 3 0135.0102 Railroad Flagmen 01 35 13 WD 15 4 0241.1000 Remove Conc Pvmt 02 41 15 SY 1,000 5 0241.1300 Remove Conc Curb & Gutter 02 41 15 LF 5,300 6 3216.0102 7" Concrete Curb & Gutter 32 16 13 LF 5,000 7 3213.0322 Conc Curb at Back of Sidewalk 32 13 20 LF 300 8 0241.0401 Remove Concrete Drive 02 41 13 SF 4,000 9 3213.0401 6" Concrete Driveway 32 13 20 SF 2,800

10 3213.0403 8" Concrete Driveway 32 13 20 SF 1,200 11 0241.0100 Remove Sidewalk 02 41 13 SF 3,000 12 3213.0301 4" Concrete Sidewalk 32 13 20 SF 1,800 13 3213.0311 4" Conc Sidewalk, Adjacent to Curb 32 13 20 SF 1,200 14 0241.1400 Remove Conc Valley Gutter 02 41 15 SY 100 15 3216.0301 7" Conc Valley Gutter, Residential 32 16 13 SY 100 16 3212.0900 Asphalt Crack Sealant 32 12 73 GA 50 17 3212.0600 HMAC Pavement Level-Up 32 16 16 TN 50 18 3212.0401 HMAC Transition 32 12 16 TN 20 19 9999.0001 Asphalt Pvmt Type B (DG-B) (Base Repair) 32 12 16 CY 1,900 20 3211.0601 CEMLIME™ @ 32lbs/SY 32 11 33 TN 250 21 0241.1506 4" Surface Milling 02 41 15 SY 49,000 22 9999.0002 2.5" Asphalt Pvmt Type B (DG-B) 32 12 16 SY 49,000 23 9999.0003 1.5" Asphalt Pvmt Superpave SP-D 32 12 16 SY 49,000 24 0241.1700 11" Pavement Pulverization 02 41 15 SY 15,500 25 3212.0305 3" Asphalt Pvmt Superpave SP-D 32 12 16 SY 15,500 26 3213.0102 7" Conc Pvmt 32 13 13 SY 500 27 3213.0104 9" Conc Pvmt 32 13 13 SY 500 28 0241.0300 Remove ADA Ramp 02 41 13 EA 53 29 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 29 30 3213.0502 Barrier Free Ramp, Type U-1 32 13 20 EA 1 31 3213.0504 Barrier Free Ramp, Type M-2 32 13 20 EA 2 32 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 21 33 3123.0102 Unclassified Excavation 31 23 23 CY 300 34 3292.0100 Block Sod Replacement 32 92 13 SY 1,000 35 3291.0100 Topsoil 32 91 19 CY 200 36 3217.0101 6" SLD Pvmt Marking HAS (W) 32 17 23 LF 16,000 37 3217.0102 6" SLD Pvmt Marking HAS (Y) 32 17 23 LF 16,000 38 3217.0501 24" SLD Pvmt Marking HAE (W) 32 17 23 LF 250 39 3217.0201 8" SLD Pvmt Marking HAS (W) 32 17 23 LF 3,800 40 3217.0504 Preformed Thermoplastic Contrast Marking - 24" Stop Bars 32 17 23 LF 250 41 3217.0502 Preformed Thermoplastic Contrast Markings - 24” Crosswalk 32 17 23 LF 850 42 3217.1002 Lane Legend Arrow 32 17 23 EA 70 43 3217.1004 Lane Legend Only 32 17 23 EA 40 44 3217.5001 Curb Address Painting 32 17 25 EA 10 45 3217.2103 REFL Raised Maeker TY II-A-A 32 17 23 EA 15 46 3217.2104 REFL Raised Marker TY II-C-R 32 17 23 EA 550 47 3305.0107 Manhole Adjustment, Minor 33 05 14 EA 5 48 3305.0112 Concrete Collar for Manhole 33 05 17 EA 25 49 3305.0117 Concrete Collar for Valve 33 05 17 EA 20 50 3110.0111 Site Clearing 31 10 00 SY 1,000 51 3471.0001 Traffic Control 34 71 13 MO 7 52 3471.0002 Portable Message Sign 34 71 13 WK 16 53 9999.0002 Mosaic Tile Street Name 99 99 00 EA 7 54 9999.0003 Irrigation Adjustment & Landscape Repair Allowance 99 99 00 LS 1 $30,000.00 $30,000.00 55 9999.0004 Paving Construction Allowance 99 99 00 LS 1 $150,000.00 $150,000.00

$180,000.00

END OF SECTION

Unit of Measure

Bidlist Item No.

Total Bid

Bid Quantity Unit Price Bid Value

SECTION 00 42 43

PROPOSAL FORM

Description

Project Item Information Bidder's Proposal

UNIT PRICE BID Bidder's Application

Specification Section No.

CITY OF FORT WORTH

STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS

Revised 9/19/2025

2027 Asphalt Resurfacing Contract 5 City Project No. 106796 - Addendum No. 1

32 12 16 - 1

ASPHALT PAVING

CITY OF FORT WORTH 2027 Asphalt Resurfacing Contract 5 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 106796 – Addendum No. 1 Revised September 2, 2026

SECTION 32 12 16 1

ASPHALT PAVING 2

PART 1 - GENERAL 3

1.1 SUMMARY 4

A. Section Includes: 5

1. Constructing a hot-mix asphalt (HMA) pavement layer composed of a compacted, 6 dense-graded, or Superpave mixture of aggregate and asphalt binder for surface or 7 base courses 8

B. Deviations from this City of Fort Worth Standard Specification 9

1. H.M.A.C. BASE REPAIR 10

a. MEASUREMENT 11

1) MEAUREMENT FOR THIS ITEM SHALL BE BY THE CUBIC YARD 12

OF COMPLETED AND ACCEPTED H.M.A.C. BASE REPAIR IN ITS 13

FINAL POSITION FOR THE VARIOUS THICKNESSES AND ASPHALT 14

MIX TYPES. 15

b. PAYMENT 16

1) THE WORK PERFORMED AND MATERIALS FURNISHED IN 17

ACCORDANCE WITH THIS ITEM AND MEASURED AS PROVIDED 18

UNDER “MEASUREMENT” WILL BE PAID FOR AT THE UNIT PRICE 19

BID PER CUBIC YARD OF ASPHALT BASE REPAIR. 20

c. THE PRICE BID SHALL INCLUDE: 21

1) EXCAVATING, SHAPING, AND FINE GRADING THE REPAIR AREA 22

2) FURNISHING, LOADING, UNLOADING, STORING, HAULING AND 23

HANDLING ALL MATERIALS INCLUDING FRIGHT AND ROYALITY. 24

3) MATERIALS AND WORK NEEDED FOR CORRECTIVE ACTION 25

4) REMOVAL AND/OR SWEEPING EXCESS MATERIALS 26

C. Related Specification Sections include, but are not necessarily limited to: 27

1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 28

2. Division 1 - General Requirements 29

3. Section 32 01 17 - Permanent Asphalt Paving Repair 30

1.2 PRICE AND PAYMENT PROCEDURES 31

A. Measurement and Payment 32

1. Asphalt Pavement 33

a. Measurement 34

1) Measurement for this Item shall be by the square yard of completed and 35 accepted asphalt pavement in its final position for various: 36

a) Thicknesses 37

b) Types 38

b. Payment 39

1) The work performed and materials furnished in accordance with this Item 40 and measured as provided under “Measurement” will be paid for at the unit 41 price bid per 42

32 12 16 - 2

Revised September 2, 2026

c. The price bid shall include: 1

1) Shaping and fine-grading the placement area 2

2) Furnishing, loading, unloading, storing, hauling, and handling all materials 3 including freight and royalty 4

3) Traffic control for all testing during construction activities. 5

4) Asphalt, aggregate, and additive 6

5) Materials and work needed for corrective action 7

6) Trial batches 8

7) Tack coat 9

8) Removal and/or sweeping excess material 10

2. H.M.A.C. Transition 11

a. Measurement 12

1) Measurement for this Item shall be by the ton of composite Hot Mix 13 Asphalt required for H.M.A.C. Transition. 14

b. Payment 15

1) The work performed and materials furnished in accordance with this Item 16 and measured as provided under “Measurement” will be paid for at the unit 17 price bid per ton of Hot Mix Asphalt. 18

c. The price bid shall include: 19

1) Shaping and fine-grading the roadbed 20

2) Furnishing, loading, unloading, storing, hauling, and handling all materials 21 including freight and royalty 22

3) Traffic control for all testing during construction activities. 23

4) Asphalt, aggregate, and additive 24

5) Materials and work needed for corrective action 25

6) Trial batches 26

7) Tack coat 27

8) Removal and/or sweeping excess material 28

3. Asphalt Base Course 29

a. Measurement 30

1) Measurement for this Item shall be by the square yard of Asphalt Base 31 Course completed and accepted in its final position for: 32

a) Various thicknesses 33

b) Various types 34

b. Payment 35

1) The work performed and materials furnished in accordance with this Item 36 and measured as provided under “Measurement” will be paid for at the unit 37 price bid per square yard of Asphalt Base Course. 38

c. The price bid shall include: 39

1) Shaping and fine-grading the roadbed 40

2) Furnishing, loading, unloading, storing, hauling, and handling all materials 41 including freight and royalty 42

3) Traffic control for all testing during construction activities. 43

4) Asphalt, aggregate, and additive 44

5) Materials and work needed for corrective action 45

6) Trial batches 46

7) Tack coat 47

8) Removal and/or sweeping excess material 48

4. H.M.A.C. Pavement Level Up 49

32 12 16 - 3

Revised September 2, 2026

a. Measurement 1

1) Measurement for this Item shall be by the ton of H.M.A.C. completed and 2 accepted in its final position. 3

b. Payment 4

1) The work performed and materials furnished in accordance with this Item 5 and measured as provided under “Measurement” will be paid for at the unit 6 price bid per ton of H.M.A.C. 7

c. The price bid shall include: 8

1) Shaping and fine-grading the roadbed 9

2) Furnishing, loading, unloading, storing, hauling, and handling all materials 10 including freight and royalty 11

3) Traffic control for all testing during construction activities. 12

4) Asphalt, aggregate, and additive 13

5) Materials and work needed for corrective action 14

6) Trial batches 15

7) Tack coat 16

8) Removal and/or sweeping excess material 17

5. H.M.A.C. Speed Cushion 18

a. Measurement 19

1) Measurement for this Item shall be per each H.M.A.C. Speed Cushion 20 installed. 21

b. Payment 22

1) The work performed and materials furnished in accordance with this Item 23 and measured as provided under “Measurement” will be paid for at the unit 24 price bid per each H.M.A.C. Speed Cushion installed and accepted in its final 25 position. 26

c. The price bid shall include: 27

1) Shaping and fine-grading the roadbed 28

2) Furnishing, loading, unloading, storing, hauling, and handling all materials 29 including freight and royalty 30

3) Traffic control for all testing during construction activities. 31

4) Asphalt, aggregate, and additive 32

5) Materials and work needed for corrective action 33

6) Trial batches 34

7) Tack coat 35

8) Removal and/or sweeping excess material 36

1.3 REFERENCES 37

A. Abbreviations and Acronyms 38

1. RAP (reclaimed asphalt pavement) 39

2. SAC (surface aggregate classification) 40

3. BRSQC (Bituminous Rated Source Quality Catalog) 41

4. AQMP (Aggregate Quality Monitoring Program) 42

5. H.M.A.C. (Hot Mix Asphalt Concrete) 43

6. WMA (Warm Mix Asphalt) 44

B. Reference Standards 45

32 12 16 - 4

Revised September 2, 2026

1. Reference standards cited in this specification refer to the current reference standard 1 published at the time of the latest revision date logged at the end of this 2 specification unless a date is specifically cited. 3

2. National Institute of Standards and Technology (NIST) 4

a. Handbook 44 - 2007 Edition: Specifications, Tolerances, and Other Technical 5

Requirements for Weighing and Measuring Devices 6

3. ASTM International (ASTM): 7

a. ASTM D6084 - 06 Standard Test Method for Elastic Recovery of Bituminous 8 Materials by Ductilometer 9

4. American Association of State Highway and Transportation Officials 10

a. MP2 Standard Specification for Superpave Volumetric Mix Design 11

b. PP28 Standard Practice for Superpave Volumetric Design for Hot Mix Asphalt 12

(HMA) 13

c. T 201, Kinematic Viscosity of Asphalts (Bitumens) 14

d. T 202 Standard Method of Test for Viscosity of Asphalts by Vacuum Capillary 15

Viscometer 16

e. T 316 Standard Method of Test for Viscosity Determination of Asphalt Binder 17

Using Rotational Viscometer 18

f. TP 1-93 Test Method for Determining the Flexural Creep Stiffness of Asphalt 19

Binder Using the Bending Beam Rheometer (BBR) 20

5. Texas Department of Transportation 21

a. Bituminous Rated Source Quality Catalog (BRSQC) 22

b. TEX 100-E, Surveying and Sampling Soils for Highways 23

c. Tex 106-E, Calculating the Plasticity Index of Soils 24

d. Tex 107-E, Determining the Bar Linear Shrinkage of Soils 25

e. Tex 200-F, Sieve Analysis of Fine and Coarse Aggregates 26

f. Tex 203-F, Sand Equivalent Test 27

g. Tex-204-F, Design of Bituminous Mixtures 28

h. Tex-207-F, Determining Density of Compacted Bituminous Mixtures 29

i. Tex 217-F, Determining Deleterious Material and Decantation Test for Coarse 30

Aggregates 31

j. Tex-226-F, Indirect Tensile Strength Test 32

k. Tex-227-F, Theoretical Maximum Specific Gravity of Bituminous Mixtures 33

l. Tex-243-F, Tack Coat Adhesion 34

m. Tex-244-F, Thermal profile of Hot Mix Asphalt 35

n. Tex 280-F, Determination of Flat and Elongated Particles 36

o. Tex 406-A, Material Finer Than 75 μm (No. 200) Sieve in Mineral Aggregates 37

(Decantation Test for Concrete Aggregates) 38

p. Tex 408-A, Organic Impurities in Fine Aggregate for Concrete 39

q. Tex 410-A, Abrasion of Coarse Aggregate using the Los Angeles Machine 40

r. Tex 411-A, Soundness of Aggregate by Using Sodium Sulfate or Magnesium 41

s. Tex 460-A, Determining Crushed Face Particle Count 42

t. Tex 461-A, Degradation of Coarse Aggregate by Micro-Deval Abrasion 43

u. Sulfate 44

v. Tex-530-C, Effect of Water on Bituminous Paving Mixtures 45

w. Tex-540-C, Measurement of Polymer Separation on Heating in Modified 46

Asphalt Systems 47

x. Tex-541-C, Rolling Thin Film Oven Test for Asphalt Binders 48

y. Tex-920-K, Verifying the Accuracy of Drum Mix Plant Belt Scales 49

32 12 16 - 5

Revised September 2, 2026

z. Tex-921-K, Verifying the Accuracy of Hot Mix Plant Asphalt Meters 1

aa. Tex 923-K, Verifying the Accuracy of Liquid Additive Metering Systems 2

1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 3

1.5 ACTION SUBMITTALS [NOT USED] 4

1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 5

A. Asphalt Paving Mix Design: The City will review and approve all mix designs before 6 the contractor can begin production of the mix. When submitting mix designs to the City 7 for review, include the following items in the report. 8

1. The combined aggregate gradation, source, specific gravity, and percent of each 9 material used; 10

2. Asphalt binder content and grade 11

3. Asphalt binder content and aggregate gradation of RAP stockpiles; 12

4. the Ndesign level used; 13

5. Results of all applicable tests; 14

6. The mixing and molding temperatures; 15

7. The signature of the person or persons that performed the design; 16

8. The date the mixture design was performed; and 17

9. A unique identification number for the mixture design. 18

1.7 CLOSEOUT SUBMITTALS [NOT USED] 19

1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 20

1.9 QUALITY ASSURANCE [NOT USED] 21

1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 22

1.11 FIELD CONDITIONS 23

A. Weather Conditions 24

1. Place mixture when the roadway surface temperature is equal to or higher than the 25 temperatures listed in Table 1. 26 Table 1 27

Minimum Pavement Surface Temperatures 28 Minimum Pavement Surface Temperatures in

Degrees Fahrenheit Originally Specified High

Temperature Binder Grade Subsurface Layers or

Night Paving Operations Surface Layers Placed in Daylight Operations

PG64 45 50

PG 70 551 601

PG 76 601 601

32 12 16 - 6

Revised September 2, 2026

1.Contractors may pave at temperatures 10°F lower than the values shown in Table 1 1 when utilizing a paving process including WMA or equipment that eliminates 2 thermal segregation. In such cases, the contractor must use either a hand-held 3 thermal camera or a hand-held infrared thermometer operated in accordance with 4 Tex-244-F to demonstrate to the satisfaction of the City that the uncompacted mat 5 has no more than 10° F of thermal segregation. 6

2. Unless otherwise shown on the Drawings, place mixtures only when weather 7 conditions and moisture conditions of the roadway surface are suitable in the 8 opinion of the City. 9

1.12 WARRANTY [NOT USED] 11

PART 2 - PRODUCTS 12

2.1 OWNER-FURNISHED PRODUCTS [NOT USED] 13

2.2 MATERIALS 14

A. General 15

1. Furnish uncontaminated materials of uniform quality that meet the requirements of 16 the plans and specifications. 17

2. Notify the City of all material sources. 18

3. Notify the City before changing any material source or formulation. 19

4. When the Contractor makes a source or formulation change, the City will verify 20 that the requirements of this specification are met and may require a new laboratory 21 mixture design, trial batch, or both. 22

5. The City may sample and test project materials at any time during the project to 23 verify compliance. 24

6. The depth of the compacted lift should be at least 2 times the nominal maximum 25 aggregate size. 26

B. Aggregate 27

1. General 28

a. Furnish aggregates from sources that conform to the requirements shown in 29 Table 2, and as specified in this Section, unless otherwise shown on the 30 Drawings. 31

b. Provide aggregate stockpiles that meet the definition in this Section for either 32 coarse aggregate or fine aggregate. 33

c. When reclaimed asphalt pavement (RAP) is allowed by Drawing note, provide 34 RAP stockpiles in accordance with this Section. 35

d. Aggregate from RAP is not required to meet Table 2 requirements unless 36 otherwise shown on the Drawings. 37

e. Supply mechanically crushed gravel or stone aggregates that meet the 38 definitions in Tex 100 E. 39

f. Samples must be from materials produced for the project. 40

g. The City will establish the surface aggregate classification (SAC) and perform 41

Los Angeles abrasion, magnesium sulfate soundness, and Micro-Deval tests. 42

h. Perform all other aggregate quality tests listed in Table 2. 43

32 12 16 - 7

Revised September 2, 2026

i. Document all test results on the mixture design report. 1

j. The City may perform tests on independent or split samples to verify 2

Contractor test results. 3

k. Determine aggregate gradations for mixture design and production testing 4 based on the washed sieve analysis given in Tex 200 F, Part II. 5

Table 2 Aggregate Quality Requirements

Property Test Method Requirement Coarse Aggregate

SAC Tex-499-A(AQMP) As shown on Drawings Deleterious material, %, max Tex-217-F, Part I 1.0 Decantation, %, max Tex-217-F, Part II 1.5 Micro-Deval abrasion, %, max Tex-461-A Note 1 Los Angeles abrasion, %, max Tex-410-A 35 Magnesium sulfate soundness, 5 cycles, %, max Tex-411-A 25 Crushed face count, %, Min Tex 460-A, Part I 852 Flat and elongated particles @ 5:1, %, max Tex-280-F 10

Fine Aggregate Linear shrinkage, %, max Tex-107-E 3

Combined Aggregate3

Sand equivalent, %, min Tex-203-F 45

1. Used to estimate the magnesium sulfate soundness loss

2. Only applies to crushed gravel.

3. Aggregates, without mineral filler, RAP, RAS, or additives, combined as used in the job-mix formula (JMF).

l. Coarse Aggregate 7

1) Coarse aggregate stockpiles must have no more than 20 percent material 8 passing the No. 8 sieve. 9

2) Maximum aggregate size should not be over half of the proposed lift depth 10 to prevent particle on particle contact issues. 11

3) Provide aggregates from sources listed in the BRSQC. 12

4) Provide aggregate from unlisted sources only when tested by the City 13 and/or approved before use. 14

5) Allow 30 calendar days for the City to sample, test, and report results for 15 unlisted sources. 16

6) Class B aggregate meeting all other requirements in Table 2 may be 17 blended with a Class A aggregate in order to meet requirements for Class A 18 materials. 19

7) When blending Class A and B aggregates to meet a Class A requirement, 20 ensure that at least 50 percent by weight of the material retained on the No. 4 21 sieve comes from the Class A aggregate source. 22

8) Blend by volume if the bulk specific gravities of the Class A and B 23 aggregates differ by more than 0.300. 24

9) When blending, do not use Class C or D aggregates. 25

10) For blending purposes, coarse aggregate from RAP will be considered as 26

Class B aggregate. 27

11) Provide coarse aggregate with at least the minimum SAC shown on the 28

Drawings. 29

32 12 16 - 8

Revised September 2, 2026

12) SAC requirements apply only to aggregates used on the surface of travel 1 lanes, unless otherwise shown on the Drawings. 2

m. RAP is salvaged, milled, pulverized, broken, or crushed asphalt pavement. 3

1) No RAP permitted for TxDOT TYPE D H.M.A.C. 4

2) Use no more than 15% Fractionated RAP on Superpave surface course 5 mixes and 20% Fractionated RAP for base course mixes unless otherwise 6 shown on the Drawings. Also, the recycled binder to total binder ratio must 7 not exceed 15% for surface courses and 20% for base courses. 8

3) Crush or break RAP so that 100 percent of the particles pass the 2-inch 9 sieve. 10

4) RAP from either Contractor or City, including RAP generated during the 11 project, is permitted only when shown on the Drawings. 12

5) City-owned RAP, if allowed for use, will be available at the location 13 shown on the Drawings. 14

6) When RAP is used, determine asphalt content and gradation for mixture 15 design purposes. 16

7) Perform other tests on RAP when shown on the Drawings. 17

8) When RAP is allowed by plan note, use no more than 30 percent RAP in 18

Type A or B mixtures unless otherwise shown on the Drawings. 19

9) Do not use RAP contaminated with dirt or other objectionable materials. 20

10) Do not use the RAP if the decantation value exceeds 5 percent and the 21 plasticity index is greater than 8. 22

11) Test the stockpiled RAP for decantation in accordance with the laboratory 23 method given in Tex-406-A, Part I. 24

12) Determine the plasticity index using Tex-106-E if the decantation value 25 exceeds 5 percent. 26

13) The decantation and plasticity index requirements do not apply to RAP 27 samples with asphalt removed by extraction. 28

14) Do not intermingle Contractor-owned RAP stockpiles with City-owned 29

RAP stockpiles. 30

15) Remove unused Contractor-owned RAP material from the project site upon 31 completion of the project. 32

16) Return unused City-owned RAP to the designated stockpile location. 33

n. Fine Aggregate 34

1) Fine aggregates consist of manufactured sands, screenings, and field sands. 35

2) Fine aggregate stockpiles must meet the gradation requirements in Table 3. 36

3) Supply fine aggregates that are free from organic impurities. 37

4) The City may test the fine aggregate in accordance with Tex-408-A to 38 verify the material is free from organic impurities. 39

5) At most 15 percent of the total aggregate may be field sand or other 40 uncrushed fine aggregate. 41

6) With the exception of field sand, use fine aggregate from coarse aggregate 42 sources that meet the requirements shown in Table 2, unless otherwise 43 approved. 44

7) If 10 percent or more of the stockpile is retained on the No. 4 sieve, test the 45 stockpile and verify that it meets the requirements in Table 2 for coarse 46 aggregate angularity (Tex-460-A) and flat and elongated particles 47 (Tex-280-F). 48

32 12 16 - 9

Revised September 2, 2026

Table 3

Gradation Requirements for Fine Aggregate Sieve Size % Passing by Weight or Volume

3/8" 100 #8 70–100

#200 0–30

2. Mineral Filler 2

a. Mineral filler consists of finely divided mineral matter such as agricultural 3 lime, crusher fines, hydrated lime, cement, or fly ash. 4

b. Mineral filler is allowed unless otherwise shown on the Drawings. 5

c. Do not use more than 2 percent hydrated lime or cement, unless otherwise 6 shown on the Drawings. The Drawings may require or disallow specific 7 mineral fillers. When used, provide mineral filler that: 8

1) Is sufficiently dry, free-flowing, and free from clumps and foreign matter; 9

2) Does not exceed 3 percent linear shrinkage when tested in accordance with 10

Tex-107-E; and meets the gradation requirements in Table 4. 11

Table 4 12 Gradation Requirements for Mineral Filler 13

Sieve Size % Passing by Weight or Volume #8 100

#200 55–100

3. Baghouse Fines 15

a. Fines collected by the baghouse or other dust-collecting equipment may be 16 reintroduced into the mixing drum 17

4. Asphalt Binder and Mix Types 18

a) Surface Course: Use TxDOT dense-graded DG-D with virgin PG 70-22 19

(no recycled materials such as recycled asphalt shingles or reclaimed 20 asphalt pavement) or Superpave SP-D with PG 70-22 as summarized in 21 Table 5. 22

b) Base Course: use PG 64-22 SP-B or TxDOT DG-B mixes for base 23 courses. 24

c) Hand Paving: When hand paving is allowed, PG64-22 can be used for 25 surface courses. 26

Table 5 28

Asphalt Binder and Mixture Requirements 29 Pavement Layer Mixture Requirement

Surface Course PG 70-22 Superpave SP-D

Virgin PG 70-22 TxDOT DG-D (No recycled material)

Binder Course PG 64-22 TxDOT DG-B PG 64-22 Superpave SP-B

32 12 16 - 10

Revised September 2, 2026

b. Separation testing is not required if: 1

1) A modifier is introduced separately at the mix plant either by injection in 2 the asphalt line or mixer, 3

2) The binder is blended on site in continuously agitated tanks, or binder 4 acceptance is based on field samples taken from an in-line sampling port at 5 the hot mix plant after the addition of modifiers. 6

5. Tack Coat 7

a. Unless otherwise shown on the Drawings or approved, furnish CSS-1H, SS-1H, 8 or a PG binder with a minimum high-temperature grade of PG 58 for tack coat 9 binder in accordance with Section 2.2.A.5. 10

6. Additives 11

a. General 12

1) When shown on the Drawings, use the type and rate of additive specified. 13

2) Other additives that facilitate mixing or improve the quality of the mixture 14 may be allowed when approved. 15

b. Liquid Antistripping Agent 16

1) Furnish and incorporate all required asphalt antistripping agents in asphalt 17 concrete paving mixtures and asphalt-stabilized base mixtures to meet 18 moisture resistance testing requirements. 19

2) Provide a liquid antistripping agent that is uniform and shows no evidence 20 of crystallization, settling, or separation. 21

3) Ensure that all liquid antistripping agents arrive in: 22

a) Properly labeled and unopened containers, as shipped from the 23 manufacturer, or 24

b) Sealed tank trucks with an invoice to show contents and quantities 25

c) Provide product information to the City including: 26

(1) Material safety data sheet 27

(2) Specific gravity of the agent at the manufacturer’s recommended 28 addition temperature, 29

(3) Manufacturer’s recommended dosage range, and 30

(4) Handling and storage instructions 31

4) Addition of lime or a liquid antistripping agent at the Mix Plant, 32 incorporate into the binder as follows: 33

a) Handle in accordance with the manufacturer’s recommendations. 34

b) Add at the manufacturer’s recommended addition temperature. 35

c) Add into the asphalt line by means of an in-line-metering device. 36

c. Liquid Asphalt Additive Meters 37

1) Provide a means to check the accuracy of meter output for asphalt primer, 38 fluxing material, and liquid additives. 39

2) Furnish a meter that reads in increments of 0.1 gal. or less. 40

3) Verify accuracy of the meter in accordance with Tex-923-K. 41

4) Ensure the accuracy of the meter within 5.0 percent. 42

7. Mixes 43

a. Design Requirements 44

1) Superpave mixes: Use the Superpave design procedure provided in Tex-45 204-F to design the mixture meeting the requirements listed in Tables 2, 3, 4, 46 5, 6, 7, and 8. 47

32 12 16 - 11

Revised September 2, 2026

a) Design the mixture at 50 gyrations (Ndesign). Use a target laboratory-1 molded density of 96.0% to design the mixture; however, adjustments 2 can be made to the Ndesign value as noted in Table 8. The Ndesign 3 level may be reduced to at least 35 gyrations at the Contractor’s 4 discretion. 5

b) Provide Hamburg Wheel and indirect tensile strength tests and provide 6 results with the mixture design meeting the requirements in Table 7 and 7

8. 8

Table 6 10 Superpave Mix Master Gradation Limits (% Passing by Weight or Volume) 11 and VMA Requirements for Superpave mixes 12 Sieve Size SP-B

Intermediate

SP-C

Surface

SP-D

Fine Mixture 2″ – – –

1-1/2″ 100.01 – – 1″ 98.0–100.0 100.01 –

3/4″ 90.0–100.0 98.0–100.0 100.01 1/2″ Note2 90.0–100.0 98.0–100.0 3/8″ — Note2 90.0–100.0 #4 23.0–90.0 28.0–90.0 32.0–90.0 #8 23.0–34.6 28.0–37.0 32.0–40.0

#16 2.0–28.3 2.0–31.6 2.0–37.6 #30 2.0–20.7 2.0–23.1 2.0–27.5 #50 2.0–13.7 2.0–15.5 2.0–18.7

#200 2.0–8.0 2.0–10.0 2.0–10.0 Design VMA, % Minimum

14.0 15.0 16.0 Production (Plant-Produced) VMA, % Minimum

13.5 14.5 15.5

1. Defined as Ma sieve size. No tolerance allowed. 13

2. Must retain at least 10% cumulative. 14

Table 7 17 Hamburg Wheel Test Requirements 18

High-Temperature Binder Grade Test Method Minimum # of Passes @ 12.5 mm Rut Depth, Tested @ 50°C

PG 64

Tex-242-F 10,000

PG 70 15,000

PG 76 20,000

Table 8 20

Laboratory Mixture Design Properties 21 Mixture Property Test Method Requirement

Target laboratory-molded density, % Tex-207-F 96.0 Design gyrations (Ndesign) Tex-241-F 501 Indirect tensile strength (dry), psi Tex-226-F 85–2002 Dust/asphalt binder ratio – 0.6–1.43 Boil test4 Tex-530-C – http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit242.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit207.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit241.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit226.pdf http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph530.pdf

32 12 16 - 12

Revised September 2, 2026

1. Adjust within a range of 35–100 gyrations when shown on the plans or specification or 1 mutually agreed between the Engineer and Contractor. 2

2. The City may allow the IDT strength to exceed 200 psi if the corresponding Hamburg Wheel 3 rut depth is greater than 3.0 mm and less than 12.5 mm. 4

3. Defined as % passing #200 sieve divided by asphalt binder content (only for Superpave 5 mixes). 6

4. Used to establish baseline for comparison to production results. May be waived when 7 approved. 8

2) Dense-Graded Mixes: Us a Superpave Gyratory Compactor to design a 10 dense-graded mixture using the procedure provided in Tex-204-F that 11 meets the requirements listed in Tables 2, 3, 4, 5, 7, 8, and 9. 12

a) Design the mixture at 50 gyrations (Ndesign). Use a target laboratory-13 molded density of 96.0% to design the mixture; however, adjustments 14 can be made to the Ndesign value as noted in Table 8. The Ndesign 15 level may be reduced to at least 35 gyrations at the Contractor’s 16 discretion. The target density may be increased to 97% or 97.5% when 17 shown on the plans or specification. 18

b) A Texas Gyratory Compactor (TGC) may be used when shown on the 19 plans. 20

c) Provide Hamburg Wheel and indirect tensile strength tests and provide 21 results with the mixture design meeting the requirements in Table 7 and 22

8. 23

Table 9 Dense-Graded Mix Master Gradation Limits ( % Passing by Weight or

Volume) and VMA Requirements for dense graded mixes Sieve Size

DG-B

Fine Base

DG-C

Coarse Surface

DG-D

Fine Surface

2" – – – 1-1/2" 100 – –

1" 98.0–100.0 100 – 3/4" 84.0–98.0 95.0–100.0 100 1/2" – – 98.0–100.0 3/8" 60.0–80.0 70.0–85.0 85.0–100.0 #4 40.0–60.0 43.0–63.0 50.0–70.0 #8 29.0–43.0 32.0–44.0 35.0–46.0

#30 13.0–28.0 14.0–28.0 15.0–29.0 #50 6.0–20.0 7.0–21.0 7.0–20.0 #200 2.0–7.0 2.0–7.0 2.0–7.0

Design VMA1, % Minimum

– 13.0 14.0 15.0

Production (Plant-Produced) VMA, % Minimum

– 12.5 13.5 14.5

8. Warm Mix Asphalt (WMA) 26

a. WMA is defined as additives or processes that allow a reduction in the 27 temperature at which asphalt mixtures are produced and placed. 28

b. WMA is allowed for use at the Contractor’s option unless otherwise shown on 29 the Drawings. 30

c. Produce an asphalt mixture within the temperature range of 215 degrees F and 31

275 degrees F. 32

32 12 16 - 13

Revised September 2, 2026

d. When WMA is not required by Drawings, produce an asphalt mixture within 1 the temperature range of 215 degrees F and 275 degrees F. 2

2.3 ACCESSORIES [NOT USED] 4

2.4 SOURCE QUALITY CONTROL [NOT USED] 5

PART 3 - EXECUTION 6

3.1 INSTALLERS [NOT USED] 7

3.2 EXAMINATION [NOT USED] 8

3.3 PREPARATION 9

A. Hauling Operations 10

1. Before use, clean all truck beds to ensure mixture is not contaminated. 11

2. When a release agent is necessary to coat truck beds, use a release agent approved 12 by the City. 13

3. Petroleum based products, such as diesel fuel, should not be used. 14

4. If wind, rain, temperature or haul distance impacts cooling, insulate truck beds or 15 cover the truck bed with tarpaulin. 16

5. If haul time in project is to be greater than 30 minutes, insulate truck beds or cover 17 the truck bed with tarpaulin. 18

3.4 INSTALLATION 19

A. Equipment 20

1. General 21

a. Provide required or necessary equipment to produce, haul, place, compact, and 22 core asphalt concrete pavement. 23

b. Ensure weighing and measuring equipment complies with specification. 24

c. Synchronize equipment to produce a mixture meeting the required proportions. 25

2. Production Equipment 26

a. Provide: 27

1) Drum-mix type, weigh-batch, or modified weigh-batch mixing plants that 28 ensure a uniform, continuous production 29

2) Automatic proportioning and measuring devices with interlock cut-off 30 circuits that stop operations if the control system malfunctions 31

3) Visible readouts indicating the weight or volume of asphalt and aggregate 32 proportions 33

4) Safe and accurate means to take required samples by inspection forces 34

5) Permanent means to check the output of metering devices and to perform 35 calibration and weight checks 36

6) Additive-feed systems to ensure a uniform, continuous material flow in the 37 desired proportion 38

3. Weighing and Measuring Equipment 39

a. General 40

1) Provide weighing and measuring equipment for materials measured or 41 proportioned by weight or volume. 42

32 12 16 - 14

Revised September 2, 2026

2) Provide certified scales, scale installations, and measuring equipment 1 meeting the requirements of NIST Handbook 44, except that the required 2 accuracy must be 0.4 percent of the material being weighed or measured. 3

3) Furnish leak-free weighing containers large enough to hold a complete 4 batch of the material being measured. 5

b. Truck Scales 6

1) Furnish platform truck scales capable of weighing the entire truck or truck–7 trailer combination in a single draft. 8

c. Aggregate Batching Scales 9

1) Equip scales used for weighing aggregate with a quick adjustment at zero 10 that provides for any change in tare. 11

2) Provide a visual means that indicates the required weight for each 12 aggregate. 13

d. Suspended Hopper 14

1) Provide a means for the addition or the removal of small amounts of 15 material to adjust the quantity to the exact weight per batch. 16

2) Ensure the scale equipment is level. 17

e. Belt Scales 18

1) Use belt scales for proportioning aggregate that are accurate to within 1.0 19 percent based on the average of 3 test runs, where no individual test run 20 exceeds 2.0 percent when checked in accordance with Tex-920-K. 21

f. Asphalt Material Meter 22

1) Provide an asphalt material meter with an automatic digital display of the 23 volume or weight of asphalt material. 24

2) Verify the accuracy of the meter in accordance with Tex-921-K. 25

3) When using the asphalt meter for payment purposes, ensure the accuracy of 26 the meter is within 0.4 percent. 27

4) When used to measure component materials only and not for payment, 28 ensure the accuracy of the meter is within 1.0 percent. 29

g. Liquid Asphalt Additive Meters 30

1) Provide a means to check the accuracy of meter output for asphalt primer, 31 fluxing material, and liquid additives. 32

2) Furnish a meter that reads in increments of 0.1 gallon or less. 33

3) Verify accuracy of the meter in accordance with Tex-923-K. 34

4) Ensure the accuracy of the meter within 5.0 percent. 35

4. Drum-Mix Plants. Provide a mixing plant that complies with the requirements 36 below. 37

a. Aggregate Feed System 38

1) Provide: 39

a) A minimum of 1 cold aggregate bin for each stockpile of individual 40 materials used to produce the mix 41

b) Bins designed to prevent overflow of material 42

c) Scalping screens or other approved methods to remove any oversized 43 material, roots, or other objectionable materials 44

d) A feed system to ensure a uniform, continuous material flow in the 45 desired proportion to the dryer 46

e) An integrated means for moisture compensation 47

f) Belt scales, weigh box, or other approved devices to measure the 48 weight of the combined aggregate 49

32 12 16 - 15

Revised September 2, 2026

g) Cold aggregate bin flow indicators that automatically signal interrupted 1 material flow 2

b. Reclaimed Asphalt Pavement (RAP) Feed System 3

1) Provide a separate system to weigh and feed RAP into the hot mix plant. 4

c. Mineral Filler Feed System 5

1) Provide a closed system for mineral filler that maintains a constant supply 6 with minimal loss of material through the exhaust system. 7

2) Interlock the measuring device into the automatic plant controls to 8 automatically adjust the supply of mineral filler to plant production and 9 provide a consistent percentage to the mixture. 10

d. Heating, Drying, and Mixing Systems 11

1) Provide: 12

a) A dryer or mixing system to agitate the aggregate during heating 13

b) A heating system that controls the temperature during production to 14 prevent aggregate and asphalt binder damage 15

c) A heating system that completely burns fuel and leaves no residue 16

d) A recording thermometer that continuously measures and records the 17 mixture discharge temperature 18

e) Dust collection system to collect excess dust escaping from the drum. 19

e. Asphalt Binder Equipment 20

1) Supply equipment to heat binder to the required temperature. 21

2) Equip the heating apparatus with a continuously recording thermometer 22 located at the highest temperature point. 23

3) Produce a 24 hour chart of the recorded temperature. 24

4) Place a device with automatic temperature compensation that accurately 25 meters the binder in the line leading to the mixer. 26

5) Furnish a sampling port on the line between the storage tank and mixer. 27

Supply an additional sampling port between any additive blending device and 28 mixer. 29

f. Mixture Storage and Discharge 30

1) Provide a surge-storage system to minimize interruptions during operations 31 unless otherwise approved. 32

2) Furnish a gob hopper or other device to minimize segregation in the bin. 33

3) Provide an automated system that weighs the mixture upon discharge and 34 produces a ticket showing: 35

a) Date 36

b) Project identification number 37

c) Plant identification 38

d) Mix identification 39

e) Vehicle identification 40

f) Total weight of the load 41

g) Tare weight of the vehicle 42

h) Weight of mixture in each load 43

i) Load number or sequential ticket number for the day 44

g. Truck Scales 45

1) Provide standard platform scales at an approved location. 46

5. Weigh-Batch Plants. Provide a mixing plant that complies with Section 2.2.B.4 47 “Drum-Mix Plants,” except as required below: 48

a. Screening and Proportioning 49

32 12 16 - 16

Revised September 2, 2026

1) Provide enough hot bins to separate the aggregate and to control 1 proportioning of the mixture type specified. 2

a) Supply bins that discard excessive and oversized material through 3 overflow chutes. 4

b) Provide safe access for inspectors to obtain samples from the hot bins. 5

b. Aggregate Weigh Box and Batching Scales 6

1) Provide a weigh box and batching scales to hold and weigh a complete 7 batch of aggregate. 8

2) Provide an automatic proportioning system with low bin indicators that 9 automatically stop when material level in any bin is not sufficient to complete 10 the batch. 11

c. Asphalt Binder Measuring System 12

1) Provide bucket and scales of sufficient capacity to hold and weigh binder 13 for 1 batch. 14

d. Mixer 15

1) Equipment mixers with an adjustable automatic timer that controls the dry 16 and wet mixing period and locks the discharge doors for the required mixing 17 period 18

2) Furnish a pug mill with a mixing chamber large enough to prevent spillage. 19

6. Modified Weigh-Batch Plants. Provide a mixing plant that complies with Section 20

2.2.B.5. “Weigh-Batch Plants,” except as specifically described below. 21

a. Aggregate Feeds 22

1) Aggregate control is required at the cold feeds. Hot bin screens are not 23 required. 24

b. Surge Bins 25

1) Provide 1 or more bins large enough to produce 1 complete batch of 26 mixture. 27

c. Hauling Equipment 28

1) Provide trucks with enclosed sides to prevent asphalt mixture loss. 29

2) Cover each load of mixture with waterproof tarpaulins. 30

3) Before use, clean all truck beds to ensure the mixture is not contaminated. 31

4) When necessary, coat the inside truck beds with an approved release agent 32 from the City. 33

d. Placement and Compaction Equipment 34

1) Provide equipment that does not damage underlying pavement. 35

2) Comply with laws and regulations concerning overweight vehicles. 36

3) When permitted, other equipment that will consistently produce satisfactory 37 results may be used. 38

7. Asphalt Paver 39

a. General 40

1) Furnish a paver that will produce a finished surface that meets longitudinal 41 and transverse profile, typical section, and placement requirements. 42

2) Ensure the paver does not support the weight of any portion of hauling 43 equipment other than the connection. 44

3) Provide loading equipment that does not transmit vibrations or other 45 motions to the paver that adversely affect the finished pavement quality. 46

4) Equip the paver with an automatic, dual, longitudinal-grade control system 47 and an automatic, transverse-grade control system. 48

b. Tractor Unit 49

32 12 16 - 17

Revised September 2, 2026

1) Supply a tractor unit that can push or propel vehicles, dumping directly into 1 the finishing machine to obtain the desired lines and grades to eliminate any 2 hand finishing. 3

2) Equip the unit with a hitch sufficient to maintain contact between the 4 hauling equipment’s rear wheels and the finishing machine’s pusher rollers 5 while mixture is unloaded. 6

c. Screed 7

1) Provide a heated compacting screed that will produce a finished surface 8 that meets longitudinal and transverse profile, typical section, and placement 9 requirements. 10

2) Screed extensions must provide the same compacting action and heating as 11 the main unit unless otherwise approved. 12

d. Grade Reference 13

1) Provide a grade reference with enough support that the maximum 14 deflection does not exceed 1/16 inch between supports. 15

2) Ensure that the longitudinal controls can operate from any longitudinal 16 grade reference including a string line, ski, mobile string line, or matching 17 shoes. 18

3) Furnish paver skis or mobile string line at least 40 feet long unless 19 otherwise approved. 20

8. Material Transfer Devices 21

a. Provide the specified type of device when shown on the Drawings. 22

b. Ensure the devices provide a continuous, uniform mixture flow to the asphalt 23 paver. 24

c. When used, provide windrow pick-up equipment constructed to pick up 25 substantially all roadway mixture placed in the windrow. 26

9. Remixing Equipment 27

a. When required, provide equipment that includes a pug mill, variable pitch 28 augers, or variable diameter augers operating under a storage unit with a 29 minimum capacity of 8 tons. 30

10. Motor Grader 31

a. When allowed, provide a self-propelled grader with a blade length of at least 12 32 feet and a wheelbase of at least 16 feet. 33

11. Handheld Infrared Thermometer 34

a. Provide a handheld infrared thermometer meeting the requirements of 35 Tex-244-F. 36

12. Rollers 37

a. The Contractor may use any type of roller to meet the production rates and 38 quality requirements of the Contract unless otherwise shown on the Drawings 39 or directed. 40

b. When specific types of equipment are required, use equipment that meets the 41 specified requirements. 42

c. Alternate Equipment 43

1) Instead of the specified equipment, the Contractor may, as approved, 44 operate other compaction equipment that produces equivalent results. 45

2) Discontinue the use of the alternate equipment and furnish the specified 46 equipment if the desired results are not achieved. 47

d. City may require Contractor to substitute equipment if production rate and 48 quality requirements of the Contract are not met. 49

32 12 16 - 18

Revised September 2, 2026

13. Straightedges and Templates. Furnish 10-foot straightedges and other templates as 1 required or approved. 2

14. Distributor vehicles 3

a. Furnish vehicle that can achieve a uniform tack coat placement. 4

b. The nozzle patterns, spray bar height and distribution pressure must work 5 together to produce uniform application. 6

c. The vehicle should be set to provide a “double lap” or “triple lap” coverage. 7

d. Nozzle spray patterns should be identical to one another along the distributor 8 spray bar. 9

e. Spray bar height should remain constant. 10

f. Pressure within the distributor must be capable of forcing the tack coat material 11 out of spray nozzles at a constant rate. 12

15. Coring Equipment 13

a. When coring is required, provide equipment suitable to obtain a pavement 14 specimen meeting the dimensions for testing. 15

B. Construction 16

1. Design, produce, store, transport, place, and compact the specified paving mixture 17 in accordance with the requirements of this Section. 18

2. Unless otherwise shown on the Drawings, provide the mix design. 19

3. The City will perform quality assurance (QA) testing. 20

4. Provide quality control (QC) testing as needed to meet the requirements of this 21

Section. 22

C. Production Operations 23

1. General 24

a. The City may suspend production for noncompliance with this Section. 25

b. Take corrective action and obtain approval to proceed after any production 26 suspension for noncompliance. 27

2. Operational Tolerances 28

a. Stop production if testing indicates tolerances are exceeded on any of the 29 following: 30

1) 3 consecutive tests on any individual sieve 31

2) 4 consecutive tests on any of the sieves 32

3) 2 consecutive tests on asphalt content 33

b. Begin production only when test results or other information indicate, to the 34 satisfaction of the City, that the next mixture produced will be within Table 11 35 tolerances. 36

3. Storage and Heating of Materials 37

a. Do not heat the asphalt binder above the temperatures specified in Section 38

2.2.A. or outside the manufacturer’s recommended values. 39

b. On a daily basis, provide the City with the records of asphalt binder and hot-40 mix asphalt discharge temperatures in accordance with Table 10. 41

c. Unless otherwise approved, do not store mixture for a period long enough to 42 affect the quality of the mixture, nor in any case longer than 12 hours. 43

4. Mixing and Discharge of Materials 44

a. Notify the City of the target discharge temperature and produce the mixture 45 within 25 degrees F of the target. 46

32 12 16 - 19

Revised September 2, 2026

b. Monitor the temperature of the material in the truck before shipping to ensure 1 that it does not exceed the maximum production temperatures listed in Table 2

10. The City will not pay for or allow placement of any mixture produced 3 above the maximum production temperatures listed in Table 10. 4

c. Control the mixing time and temperature so that substantially all moisture is 5 removed from the mixture before discharging from the plant. 6

Table 10 8 Maximum Production Temperature 9

High-Temperature Binder Grade1

Maximum Production Temperature

PG 64 325˚F

PG 70 335˚F

PG 76 345˚F

1. The high-temperature binder grade refers to the 10 high-temperature grade of the virgin asphalt 11 binder used to produce the mixture. 12

D. Placement Operations 14

1. Place the mixture to meet the typical section requirements and produce a smooth, 15 finished surface or base course with a uniform appearance and texture. 16

2. Offset longitudinal joints of…